CN106201687A - Managed task scheduling and decomposing method - Google Patents

Managed task scheduling and decomposing method Download PDF

Info

Publication number
CN106201687A
CN106201687A CN201610525960.9A CN201610525960A CN106201687A CN 106201687 A CN106201687 A CN 106201687A CN 201610525960 A CN201610525960 A CN 201610525960A CN 106201687 A CN106201687 A CN 106201687A
Authority
CN
China
Prior art keywords
task
interface
result
data
scheduling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610525960.9A
Other languages
Chinese (zh)
Inventor
张银霞
傅铁山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inspur Software Group Co Ltd
Original Assignee
Inspur Software Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inspur Software Group Co Ltd filed Critical Inspur Software Group Co Ltd
Priority to CN201610525960.9A priority Critical patent/CN106201687A/en
Publication of CN106201687A publication Critical patent/CN106201687A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/48Program initiating; Program switching, e.g. by interrupt
    • G06F9/4806Task transfer initiation or dispatching
    • G06F9/4843Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
    • G06F9/4881Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • User Interface Of Digital Computer (AREA)

Abstract

The invention discloses a managed task scheduling and decomposing method, which belongs to the technical field of task scheduling and comprises task management, task state checking, task result detail checking, task parameter configuration, task scheduling and decomposing, and task result checking and alarm reporting, wherein the task result checking and alarm reporting specifically comprises visual interface management, an expandable execution interface and execution result checking; the invention discloses a centralized hosting task type operation method, which provides a configurable interface method for various task execution types, completes dynamic task execution calling through a reflection mechanism and is suitable for scheduling scenes of all O-domain data acquisition task types.

Description

Trustship type task scheduling and decomposition method
Technical field
The present invention relates to task scheduling technique field, specifically trustship type task scheduling and decomposition method.
Background technology
It is more that UNICOM field relates to system, data interaction and share be the problem that ESB platform is to be solved, its Middle data sharing is Core Feature.
ESB platform uses the data dispatch of programming mode property performance period, newly-increased data dispatch demand at present It is required for developing in bus and configuring, and bus uses IIB middleware, use ESQL programming language, develop and safeguard Relatively costly, it is unfavorable for reducing the development and maintenance cost in later stage, is also not easy to be managed collectively the scheduling problem of O numeric field data.
In off-the-shelf item, the configuration of data sharing task is too high to personnel qualifications, causes the construction cycle long, maintenance cost High.
Summary of the invention
The technical assignment of the present invention is for above weak point, it is provided that trustship type task scheduling and decomposition method, concentrates Trustship Task operational approach, performs type for multiple-task and provides configurable interface method, complete to move by reflex mechanism State tasks carrying calls.
The technical solution adopted for the present invention to solve the technical problems is:
Trustship type task scheduling and decomposition method, including task management, task status is checked, task result details are checked, task Parameter configuration, task scheduling and decomposition, task result verification and alarm report, specifically include visualization interface management, expansible Perform interface and perform result inspection;
Task management includes acquisition target, collection period, task status, performs class, performs method, supports that the interface task of checking is held Row time and state, support that task result details are checked at interface, it is achieved task essential information additions and deletions change checks reason;
Task status is checked, checks task scheduling situation by interface, checks tasks carrying number of times, performs the time and performs shape State;
Task result details are checked, after checking task scheduling by interface, the result that data acquisition reports, document form data are tied Really, check file storage address, gather correlation time, file size, file name;
Task parameters configures, and reports formatting requirements by each professional, the acquisition interface of each system of interface configurations and data, is used for Task distribution and result are checked;
Task scheduling and decomposition, configure dynamic dispatching by the cron time and perform class and the method for execution, according to task distribution configuration Acquisition instructions after decomposing is issued to the distinct interface of each system;
Task result is checked, and monitors the collection result that each system interface reports, reported result information is carried out with real data Verification, verification index is with reference to task parameters configuration information;
Alarm report, carries out alarm encapsulation for task result verification abnormal data, and is reported to comprehensive monitoring system, and notice is used Family.
Visualization interface manages, and concentrates classification, is separated by general utility functions, centralized management, it is to avoid repeats open, carries For visualization tasks administration interface, configure data dispatch scope, scheduling time and dispatch interface by interface operation, pass through interface Check execution status of task, check task action result by interface.
Further, the module design of visualization interface management is divided into three layers, and interface presents UI layer, business logic processing layer With data access encapsulated layer.
Expansible execution interface provides interface mode to extend different types of execution class method, it is provided that multiple data dispatch, Including Webservice data call, REST calls, and data base interface calls.
Execution result checks, checks its file association attributes, data length;Ensure the reliability of data transmission, also for number According to shared malfunction elimination as verifying foundation.
Task scheduling performs class and the method for execution by reflex mechanism loading tasks, and the task of monitoring REST interface in real time becomes More information, synchronized update task dispatcher.
Result audits the object information of real-time monitored data provider, contrasts with true result according to information content, Abnormal results's report and alarm, notifies comprehensive monitoring system, has realized document result analysis.
Compared to the prior art the trustship type task scheduling of the present invention and decomposition method, have the advantages that
Using the task scheduling mode of trustship type, by data dispatch trustship to third party's module, this module realizes visualization data Scheduler task configuration and the scheduling distribution mechanisms of expansible execution interface, provide fast for flexible configuration task with realizing data acquisition Victory, general instrument, the method is mainly the interface periodic duty collection of the different OMC/ webmaster/integrated system of centralization solution Problem.Wherein task result analysis also can complete to gather the check and correction of file, such as file, checks its file name, size and number, And generate abnormality alarming and notify user, ensure the reliability of data transmission further;
This method for scheduling task, is suitable for all spectra resource tasks type scene.In software system development, the party be can be used directly Method, is greatly decreased workload, and follow-up continuation extension based on this model performs interface, extend acquisition interface scope.
Detailed description of the invention
Below in conjunction with specific embodiment, the invention will be further described.
Trustship type task scheduling and decomposition method, including task management, task status is checked, task result details are checked, Task parameters configure, task scheduling and decomposition, task result verification and alarm report, specifically include visualization interface management, can Extension performs interface and performs result inspection;
Task management includes acquisition target, collection period, task status, performs class, performs method, supports that the interface task of checking is held Row time and state, support that task result details are checked at interface, it is achieved task essential information additions and deletions change checks reason;
Task status is checked, checks task scheduling situation by interface, checks tasks carrying number of times, performs the time and performs shape State;
Task result details are checked, after checking task scheduling by interface, the result that data acquisition reports, document form data are tied Really, check file storage address, gather correlation time, file size, file name;
Task parameters configures, and reports formatting requirements by each professional, the acquisition interface of each system of interface configurations and data, is used for Task distribution and result are checked;
Task scheduling and decomposition, configure dynamic dispatching by the cron time and perform class and the method for execution, according to task distribution configuration Acquisition instructions after decomposing is issued to the distinct interface of each system;
Task result is checked, and monitors the collection result that each system interface reports, reported result information is carried out with real data Verification, verification index is with reference to task parameters configuration information;
Alarm report, carries out alarm encapsulation for task result verification abnormal data, and is reported to comprehensive monitoring system, and notice is used Family.
Visualization interface manages, and concentrates classification, is separated by general utility functions, centralized management, it is to avoid repeats open, carries For visualization tasks administration interface, configure data dispatch scope, scheduling time and dispatch interface by interface operation, pass through interface Check execution status of task, check task action result by interface.The module design of visualization interface management is divided into three layers, boundary Face presents UI layer, business logic processing layer and data access encapsulated layer.
Expansible execution interface provides interface mode to extend different types of execution class method, it is provided that multiple data dispatch, Including Webservice data call, REST calls, and data base interface calls.
Execution result checks, checks its file association attributes, data length;Ensure the reliability of data transmission, also for number According to shared malfunction elimination as verifying foundation.
Task scheduling performs class and the method for execution by reflex mechanism loading tasks, and the task of monitoring REST interface in real time becomes More information, synchronized update task dispatcher.
Result audits the object information of real-time monitored data provider, contrasts with true result according to information content, Abnormal results's report and alarm, notifies comprehensive monitoring system, has realized document result analysis.
The method of work of trustship type task scheduling and decomposition method includes following operating procedure:
A) interface message of system is performed by interface configurations acquisition tasks target, such as url;Object information: such as file name, literary composition Part promptness etc.;
B) by the data acquisition session of performance objective in interface or configuration a) of REST interface;
C) check that task gathers implementation status by interface;
D) after tasks carrying completes, task action result is checked by interface, such as file name, size, time etc.;
E) if any exception, relevant warning information is checked by interface manner.
By detailed description of the invention above, described those skilled in the art can readily realize the present invention.But should Working as understanding, the present invention is not limited to above-mentioned detailed description of the invention.On the basis of disclosed embodiment, described technical field Technical staff can the different technical characteristic of combination in any, thus realize different technical schemes.
In addition to the technical characteristic described in description, it is the known technology of those skilled in the art.

Claims (7)

1. trustship type task scheduling and decomposition method, it is characterised in that including that task management, task status are checked, task result is detailed Feelings are checked, task parameters configures, task scheduling and decomposition, task result verification and alarm report, specifically include visualization interface Management, expansible execution interface and execution result inspection;
Task management includes acquisition target, collection period, task status, performs class, performs method, supports that the interface task of checking is held Row time and state, support that task result details are checked at interface, it is achieved task essential information additions and deletions change checks reason;
Task status is checked, checks task scheduling situation by interface, checks tasks carrying number of times, performs the time and performs shape State;
Task result details are checked, after checking task scheduling by interface, the result that data acquisition reports, document form data are tied Really, check file storage address, gather correlation time, file size, file name;
Task parameters configures, and reports formatting requirements by each professional, the acquisition interface of each system of interface configurations and data, is used for Task distribution and result are checked;
Task scheduling and decomposition, configure dynamic dispatching by the cron time and perform class and the method for execution, according to task distribution configuration Acquisition instructions after decomposing is issued to the distinct interface of each system;
Task result is checked, and monitors the collection result that each system interface reports, reported result information is carried out with real data Verification, verification index is with reference to task parameters configuration information;
Alarm report, carries out alarm encapsulation for task result verification abnormal data, and is reported to comprehensive monitoring system, and notice is used Family.
Trustship type task scheduling the most according to claim 1 and decomposition method, it is characterised in that visualization interface manages, collection Middle classification, separates general utility functions, centralized management, it is to avoid repeats open, it is provided that visualization tasks administration interface, passes through Interface operation configuration data dispatch scope, scheduling time and dispatch interface, check execution status of task by interface, pass through interface Check task action result.
Trustship type task scheduling the most according to claim 2 and decomposition method, it is characterised in that visualization interface management Module design is divided into three layers, and interface presents UI layer, business logic processing layer and data access encapsulated layer.
Trustship type task scheduling the most according to claim 1 and decomposition method, it is characterised in that expansible execution interface carries Different types of execution class method is extended, it is provided that multiple data dispatch for interface mode, including Webservice data call, REST calls, and data base interface calls.
Trustship type task scheduling the most according to claim 1 and decomposition method, it is characterised in that perform result inspection, check Its file association attributes, data length;Ensure the reliability of data transmission, also depend on as verification for data sharing malfunction elimination According to.
Trustship type task scheduling the most according to claim 1 and decomposition method, it is characterised in that task scheduling is by reflection Mechanism loading tasks performs class and the method for execution, monitors the task modification information of REST interface, synchronized update task scheduling in real time Device.
Trustship type task scheduling the most according to claim 1 and decomposition method, it is characterised in that result examination & verification is monitored in real time The object information of data providing, contrasts with true result according to information content, abnormal results's report and alarm, and notice is comprehensive Monitoring system, has realized document result analysis.
CN201610525960.9A 2016-07-06 2016-07-06 Managed task scheduling and decomposing method Pending CN106201687A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610525960.9A CN106201687A (en) 2016-07-06 2016-07-06 Managed task scheduling and decomposing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610525960.9A CN106201687A (en) 2016-07-06 2016-07-06 Managed task scheduling and decomposing method

Publications (1)

Publication Number Publication Date
CN106201687A true CN106201687A (en) 2016-12-07

Family

ID=57465786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610525960.9A Pending CN106201687A (en) 2016-07-06 2016-07-06 Managed task scheduling and decomposing method

Country Status (1)

Country Link
CN (1) CN106201687A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108804206A (en) * 2017-04-26 2018-11-13 武汉斗鱼网络科技有限公司 The processing method and system of synchronous task
CN108920260A (en) * 2018-05-16 2018-11-30 成都淞幸科技有限责任公司 A kind of exchange method and its device of heterogeneous system
CN109447400A (en) * 2018-09-18 2019-03-08 平安科技(深圳)有限公司 Task data management method, device, computer equipment and storage medium
CN113641566A (en) * 2021-08-30 2021-11-12 平安资产管理有限责任公司 System alarm method, device, computer equipment and medium based on artificial intelligence

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108804206A (en) * 2017-04-26 2018-11-13 武汉斗鱼网络科技有限公司 The processing method and system of synchronous task
CN108920260A (en) * 2018-05-16 2018-11-30 成都淞幸科技有限责任公司 A kind of exchange method and its device of heterogeneous system
CN109447400A (en) * 2018-09-18 2019-03-08 平安科技(深圳)有限公司 Task data management method, device, computer equipment and storage medium
CN113641566A (en) * 2021-08-30 2021-11-12 平安资产管理有限责任公司 System alarm method, device, computer equipment and medium based on artificial intelligence

Similar Documents

Publication Publication Date Title
CN103559118B (en) A kind of method for auditing safely based on AOP and annotating information system
Serhani et al. Self-adapting cloud services orchestration for fulfilling intensive sensory data-driven IoT workflows
CN103366312B (en) A kind of intelligent transformer substation cloud system
CN106201687A (en) Managed task scheduling and decomposing method
US9729615B2 (en) System and method for collaborative designing, development, deployment, execution, monitoring and maintenance of enterprise applications
US20150263522A1 (en) Powergrid operation and supervision system
CN105359143B (en) DBD database diagnostics interface system
CN109214704A (en) A kind of distributed intelligence operation platform, method, apparatus and readable storage medium storing program for executing
CN103888287A (en) Information system integrated operation and maintenance monitoring service early warning platform and realization method thereof
CN113595761B (en) Micro-service component optimization method and medium of power system information communication integrated scheduling platform
US20200117151A1 (en) Outage and switch management for a power grid system
US10142242B2 (en) Network support node traffic reduction for self-organizing networks
CN107807872A (en) A kind of power transmission and transformation system method for monitoring operation states
CN108762966A (en) System exception hold-up interception method, device, computer equipment and storage medium
CN104243185A (en) Experiential service monitoring system and method
CN112804093B (en) Centralized scheduling support method and system based on fault capability center
Aksyonov et al. Development of Real-time Simulation Models
CN107220515A (en) Post-abortion cares about intelligent follow-up management system
Corradi et al. SIRDAM4. 0: A support infrastructure for reliable data acquisition and management in industry 4.0
CN114372105A (en) ETL tool based method for realizing system automatic inspection
CN110048881A (en) Information monitoring system, information monitoring method and device
CN103326880B (en) Genesys calling system high availability cloud computing monitoring system and method
CN107979174B (en) Workflow operation method based on power grid operation management system
CN108596460A (en) Service dispatch monitor supervision platform
CN109525422A (en) A kind of daily record data method for managing and monitoring

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161207