CN106196267A - The alarm method of electric heating equipment, device and system - Google Patents

The alarm method of electric heating equipment, device and system Download PDF

Info

Publication number
CN106196267A
CN106196267A CN201610587118.8A CN201610587118A CN106196267A CN 106196267 A CN106196267 A CN 106196267A CN 201610587118 A CN201610587118 A CN 201610587118A CN 106196267 A CN106196267 A CN 106196267A
Authority
CN
China
Prior art keywords
current time
time
peak
running status
electric heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610587118.8A
Other languages
Chinese (zh)
Other versions
CN106196267B (en
Inventor
孙建
徐向东
王兴越
石逸颖
贺家胜
张铁钢
马振华
赵明杰
王彦楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Beijing Lead Electric Equipment Co Ltd
Beijing Huashang Sanyou New Energy Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Beijing Lead Electric Equipment Co Ltd
Beijing Huashang Sanyou New Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd, Beijing Lead Electric Equipment Co Ltd, Beijing Huashang Sanyou New Energy Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610587118.8A priority Critical patent/CN106196267B/en
Publication of CN106196267A publication Critical patent/CN106196267A/en
Application granted granted Critical
Publication of CN106196267B publication Critical patent/CN106196267B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1096Arrangement or mounting of control or safety devices for electric heating systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2200/00Heat sources or energy sources
    • F24D2200/08Electric heater

Abstract

The invention discloses the alarm method of a kind of electric heating equipment, device and system.Wherein, the method includes: obtain current time and the running status of electric heating equipment, and wherein, running status at least includes any one state following: starting state, halted state, energy storage state and malfunction;Judge whether current time is in the peak of power consumption period, and whether running status is starting state;If current time is in the peak of power consumption period, and running status is starting state, then generate prompt messages, and wherein, prompt messages is used for pointing out current time to be in the peak of power consumption period.The present invention solves electric heating equipment of the prior art when the peak of power consumption period uses, it is impossible to the technical problem of user's alarm.

Description

The alarm method of electric heating equipment, device and system
Technical field
The present invention relates to electric heating equipment control field, in particular to the alarm method of a kind of electric heating equipment, dress Put and system.
Background technology
For reducing the coal heating pollution to air, ensureing health, improve ambient air quality, many areas are closely Within several years, the most progressively set about existing warming mode is improved, carry out the mode of using electricity instead of coal energetically, to reach to reduce combustion Coal pollutes, and improves the purpose of air quality.
Since " coal changes electricity " work is implemented, in terms of improving air quality, serve the most positive effect.Meanwhile, Increasing user accesses electrical network, causes the increase of network load, electric heating load to account for the proportion of total load and be also greatly increased. In order to power-assisted " coal changes electricity " works, and realizing electrical network " peak load shifting ", government has put into effect a series of favourable policy, carries out " peak valley Step price " subsidies measures.Therefore, during for warm season, user would generally access electrical network at " paddy valency electricity ", heats, But, user is likely to be due to a variety of causes, does not exits electrical network in time at " peak valency electricity ", and notifies user the most in time, leads Family of applying needs to pay more electricity charge, reduces user and uses likability.
For electric heating equipment of the prior art when the peak of power consumption period uses, it is impossible to the problem of user's alarm, At present effective solution is not yet proposed.
Summary of the invention
Embodiments provide the alarm method of a kind of electric heating equipment, device and system, existing at least to solve Electric heating equipment in technology is when the peak of power consumption period uses, it is impossible to the technical problem of user's alarm.
An aspect according to embodiments of the present invention, it is provided that the alarm method of a kind of electric heating equipment, including: obtain and work as Front time and the running status of electric heating equipment, wherein, running status at least includes any one state following: starting state, Halted state, energy storage state and malfunction;Judge whether current time is in the peak of power consumption period, and whether running status For starting state;If current time is in the peak of power consumption period, and running status is starting state, then generate alarm letter Breath, wherein, prompt messages is used for pointing out current time to be in the peak of power consumption period.
Another aspect according to embodiments of the present invention, additionally provides the alarm device of a kind of electric heating equipment, including: obtain Module, for obtaining the running status of current time and electric heating equipment, wherein, running status at least include following any one State: starting state, halted state, energy storage state and malfunction;Judge module, is used for judging whether current time is in use Electricity peak period, and whether running status be starting state;Generation module, if when current time is in peak of power consumption Section, and running status is starting state, then generate prompt messages, wherein, prompt messages is used for pointing out current time It is in the peak of power consumption period.
The third aspect according to embodiments of the present invention, additionally provides the warning system of a kind of electric heating equipment, including: monitoring Terminal unit, for obtaining the running status of current time and electric heating equipment, and it is high to judge whether current time is in electricity consumption The peak period, and whether running status be starting state, if current time is in the peak of power consumption period, and running status is for opening Dynamic state, then generate prompt messages, and wherein, running status at least includes any one state following: starting state, stops State, energy storage state and malfunction, prompt messages is used for pointing out current time to be in the peak of power consumption period.
In embodiments of the present invention, the running status of current time and electric heating equipment can be obtained, and judge to get Current time and running status whether meet alert if, if current time and running status meet alert if, then give birth to Become prompt messages.Owing to alert if can be time corresponding to peak of power consumption period and running status, thus realize existing The peak of power consumption period alerts to user when using electric heating equipment, solves electric heating equipment of the prior art in peak of power consumption When period uses, it is impossible to the technical problem of user's alarm.Therefore, the scheme provided by the above embodiment of the present invention is permissible When the peak of power consumption period uses electric heating equipment, alert to user in time, reduce the property loss of user, promote the good of user Sensitivity.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this Bright schematic description and description is used for explaining the present invention, is not intended that inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of the alarm method of a kind of electric heating equipment according to embodiments of the present invention;
Fig. 2 is the schematic diagram of the alarm device of a kind of electric heating equipment according to embodiments of the present invention;And
Fig. 3 is the schematic diagram of the warning system of a kind of electric heating equipment according to embodiments of the present invention.
Detailed description of the invention
In order to make those skilled in the art be more fully understood that the present invention program, below in conjunction with in the embodiment of the present invention Accompanying drawing, is clearly and completely described the technical scheme in the embodiment of the present invention, it is clear that described embodiment is only The embodiment of a present invention part rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained under not making creative work premise, all should belong to the model of present invention protection Enclose.
It should be noted that term " first " in description and claims of this specification and above-mentioned accompanying drawing, " Two " it is etc. for distinguishing similar object, without being used for describing specific order or precedence.Should be appreciated that so use Data can exchange in the appropriate case, in order to embodiments of the invention described herein can with except here diagram or Order beyond those described is implemented.Additionally, term " includes " and " having " and their any deformation, it is intended that cover Cover non-exclusive comprising, such as, contain series of steps or the process of unit, method, system, product or equipment are not necessarily limited to Those steps clearly listed or unit, but can include the most clearly listing or for these processes, method, product Or intrinsic other step of equipment or unit.
Embodiment 1
According to embodiments of the present invention, it is provided that the alarm method embodiment of a kind of electric heating equipment, it should be noted that Step shown in the flow chart of accompanying drawing can perform in the computer system of such as one group of computer executable instructions, and, Although showing logical order in flow charts, but in some cases, can perform shown with the order being different from herein The step gone out or describe.
Fig. 1 is the flow chart of the alarm method of a kind of electric heating equipment according to embodiments of the present invention, as it is shown in figure 1, should Method comprises the steps:
Step S102, obtains current time and the running status of electric heating equipment, and wherein, running status at least includes as follows Any one state: starting state, halted state, energy storage state and malfunction.
Concrete, above-mentioned current time can be the current time of intelligent monitoring terminal.Above-mentioned electric heating equipment can be Electric boiler, electric heater, Electric radiant Heating Film etc., this is not specifically limited by the present invention.
Step S104, it is judged that whether current time is in the peak of power consumption period, and whether running status is starting state.
Concrete, the above-mentioned peak of power consumption period can be that the period that user uses electric heating equipment in a large number, i.e. electricity price are higher Period.
Step S106, if current time is in the peak of power consumption period, and running status is starting state, then generate warning Information, wherein, prompt messages is used for pointing out current time to be in the peak of power consumption period.
In the optional scheme of one, by intelligent monitoring terminal, electric heating equipment remotely can be monitored, intelligence The running status of electric heating equipment can be acquired by the Real time Data Acquisition function module in monitor terminal, and according to collection To the running status of electric heating equipment and current time judge, if it is determined that current time is in the peak of power consumption period, And the running status of electric heating equipment is starting state, then intelligent monitoring terminal can be pointed out by event alarm functional module User's high electricity price is reported to the police, and is provided with warning involution button in intelligent monitoring terminal, and user can report to the police again by clicking on Button is returned to terminate to report to the police.
By the above embodiment of the present invention, the running status of current time and electric heating equipment can be obtained, and judge to obtain Whether the current time got and running status meet alert if, if current time and running status meet alert if, Then generate prompt messages.Owing to alert if can be time corresponding to peak of power consumption period and running status, thus real The peak of power consumption period alerts to user when using electric heating equipment now, solves electric heating equipment of the prior art in electricity consumption When peak period uses, it is impossible to the technical problem of user's alarm.Therefore, the scheme provided by the above embodiment of the present invention, Can alert to user in time, reduce the property loss of user when the peak of power consumption period uses electric heating equipment, promote user Likability.
Optionally, according to the above embodiment of the present invention, step S104, it is judged that whether current time is in the peak of power consumption period Including:
Step S1042, obtains peak valley time synopsis.
Concrete, above-mentioned peak valley time synopsis is preserved the corresponding relation of temporal information and period information.
In the optional scheme of one, intelligent monitoring terminal can obtain peak valley time synopsis from local search, at this In the case of ground does not preserves peak valley time synopsis, can get at heating operation management platform Zhong Tai district intelligent terminal Peak valley time synopsis, and the peak valley time synopsis got is saved in this locality.
Step S1044, determines the period information corresponding with current time from peak valley time synopsis, and wherein, the period believes Breath includes any one information following: peak period information and low-valley interval information.
Step S1046, in the case of the period information that current time is corresponding is information peak period, determines current time It is in the peak of power consumption period.
In the optional scheme of one, after getting current time, can determine from peak valley time synopsis and work as The period information that the front time is corresponding, if current time corresponding for peak period, determine when current time is in peak of power consumption Section.
By above-mentioned steps S1042 to step S1046, peak valley time synopsis can be passed through, whether determine current time It is in the peak of power consumption period, thus when the peak of power consumption period uses electric heating equipment to the purpose of user's alarm.
Optionally, according to the above embodiment of the present invention, in step S102, current time and the operation of electric heating equipment are obtained After state, said method also includes:
Step S112, receiving platform district terminal unit send pair time order.
Concrete, above-mentioned district's terminal unit can be that heating operation manages platform Zhong Tai district intelligent terminal.
Step S114, is sent to platform district terminal unit by current time, and receiving platform district terminal unit return terminal time Clock error.
Step S116, if receiving the first waiting time of terminal clock error less than or equal to the first effective time, then According to terminal clock error transfer factor current time.
Concrete, above-mentioned first waiting time can be to send the very first time to when receiving the wait of terminal clock error Between, above-mentioned first effective time can be 10min, and this is not specifically limited by the present invention.
In the optional scheme of one, intelligent monitoring terminal can possess and function during platform district intelligent terminal couple, permissible When carrying out long-range pair by wireless private network, order during platform district intelligent terminal transmission pair, current time is returned by intelligent monitoring terminal To platform district intelligent terminal, platform district intelligent terminal returns terminal clock error, and intelligent monitoring terminal can pass through time adjustment function module If judging to receive terminal clock error in the first effective time, i.e. from sending current time to receiving terminal clock by mistake The waiting time of difference less than or equal to the first effective time, then orders during execution pair, local clock changes to current time+terminal Clocking error;Command expiration time otherwise pair, and notify platform district intelligent terminal.
Herein it should be noted that due to peak valley time synopsis need at platform district intelligent terminal obtain, in order to ensure The effectiveness of prompt messages and accuracy, need to proofread the time of intelligent monitoring terminal, it is ensured that during intelligent monitoring terminal The time of Jian Yutai district intelligent terminal is identical, and therefore, intelligent monitoring terminal can possess the control unit pair to electric heating equipment Shi Gongneng, intelligent monitoring terminal clock every 24 little time errors of precision of keeping time should be not more than 2 seconds, and at the electricity of intelligent monitoring terminal After the dead electricity of source, clock should be able to keep normally working.
By above-mentioned steps S112 to step S116, can be missed by the terminal clock that receiving platform district terminal unit returns Difference, adjusts current time, it is achieved time adjustment function, promotes effectiveness and the accuracy of prompt messages.
Optionally, according to the above embodiment of the present invention, in step S114, current time is sent to platform district terminal unit it After, said method also includes:
Step S1182, platform district terminal unit obtains local zone time.
Step S1184, if receiving the second waiting time of current time less than or equal to the second effective time, Ze Tai district Terminal unit determines that current time is effective time, and calculates the time difference of current time and local zone time.
Concrete, above-mentioned second waiting time can be to order, during transmission pair, the waiting time receiving the very first time, Above-mentioned second effective time can be 3s, and this is not specifically limited by the present invention.
Step S1186, platform district terminal unit judges that whether time difference is more than or equal to preset value.
Concrete, above-mentioned preset value can be 3s, and this is not specifically limited by the present invention.
Step S1188, in the case of time difference is more than or equal to preset value, when platform district terminal unit waits according to second Between and time difference, obtain terminal clock error.
In the optional scheme of one, order when platform district intelligent terminal can send pair, if receiving intelligent monitoring eventually The waiting time of the current time that end returns, such as, at T1, < 3s received platform district intelligent terminal less than or equal to the second effective time Terminal return information is effectively, and the current time that computational intelligence monitor terminal returns, with the time difference of local zone time, i.e. clock Error delta T, if Δ T >=3s, platform district intelligent terminal using Δ T+T1/2 as terminal clock error to write object command mode in real time It is handed down to intelligent monitoring terminal.
Optionally, according to the above embodiment of the present invention, if receiving the second waiting time of current time more than second Effective time, Ze Tai district terminal unit determines that current time is ineffective time, and order when resending pair.
In the optional scheme of one, if it is invalid, again to intelligent monitoring for receiving terminal return information at T1 >=3s Order during terminal transmission pair, and receive the current time that intelligent monitoring terminal returns.
Optionally, according to the above embodiment of the present invention, when resending pair, the number of times of order exceedes preset times, or Time difference is less than in the case of preset value, and platform district terminal unit stops sending terminal clock error.
Concrete, above-mentioned preset times can be 10 times, and this is not specifically limited by the present invention.
In the optional scheme of one, if continuous 10 times invalid, or Δ T < 3s, Ze Tai district intelligent terminal cancels this When secondary pair, when not carrying out pair.
Pass through such scheme, it is possible to achieve with the time adjustment function of platform district terminal unit, thus ensure the accurate of current time Property, it is ensured that record data and the accuracy of preservation data.
Optionally, according to the above embodiment of the present invention, the running status at electric heating equipment includes the situation of malfunction Under, generate fault alarm information.
In the optional scheme of one, in the case of electric heating equipment breaks down, intelligent monitoring terminal can pass through Real time Data Acquisition function module collects the malfunction of electric heating equipment, generates fault report by event alarm functional module Alarming information, reports to the police to malfunction, and user can terminate to report to the police by clicking on warning involution button.
Herein it should be noted that intelligent monitoring terminal can by communication interface functional module by prompt messages and Fault alarm information reports platform district intelligent terminal.
Embodiment 2
According to embodiments of the present invention, it is provided that the alarm device embodiment of a kind of electric heating equipment, Fig. 2 is according to the present invention A kind of schematic diagram of the alarm device of the electric heating equipment of embodiment, as in figure 2 it is shown, this device includes:
Acquisition module 21, for obtaining the running status of current time and electric heating equipment, wherein, running status is at least wrapped Include any one state following: starting state, halted state, energy storage state and malfunction.
Concrete, above-mentioned current time can be the current time of intelligent monitoring terminal.Above-mentioned electric heating equipment can be Electric boiler, electric heater, Electric radiant Heating Film etc., this is not specifically limited by the present invention.
Judge module 23, is used for judging whether current time is in the peak of power consumption period, and whether running status is for opening Dynamic state.
Concrete, the above-mentioned peak of power consumption period can be that the period that user uses electric heating equipment in a large number, i.e. electricity price are higher Period.
Generation module 25, if being in the peak of power consumption period for current time, and running status is starting state, then give birth to Becoming prompt messages, wherein, prompt messages is used for pointing out current time to be in the peak of power consumption period.
In the optional scheme of one, by intelligent monitoring terminal, electric heating equipment remotely can be monitored, intelligence The running status of electric heating equipment can be acquired by the Real time Data Acquisition function module in monitor terminal, and according to collection To the running status of electric heating equipment and current time judge, if it is determined that current time is in the peak of power consumption period, And the running status of electric heating equipment is starting state, then intelligent monitoring terminal can be pointed out by event alarm functional module User's high electricity price is reported to the police, and is provided with warning involution button in intelligent monitoring terminal, and user can report to the police again by clicking on Button is returned to terminate to report to the police.
By the above embodiment of the present invention, the running status of current time and electric heating equipment can be obtained, and judge to obtain Whether the current time got and running status meet alert if, if current time and running status meet alert if, Then generate prompt messages.Owing to alert if can be time corresponding to peak of power consumption period and running status, thus real The peak of power consumption period alerts to user when using electric heating equipment now, solves electric heating equipment of the prior art in electricity consumption When peak period uses, it is impossible to the technical problem of user's alarm.Therefore, the scheme provided by the above embodiment of the present invention, Can alert to user in time, reduce the property loss of user when the peak of power consumption period uses electric heating equipment, promote user Likability.
Embodiment 3
According to embodiments of the present invention, it is provided that the warning system embodiment of a kind of electric heating equipment, Fig. 3 is according to the present invention A kind of schematic diagram of the warning system of the electric heating equipment of embodiment, as it is shown on figure 3, this system includes:
Monitoring terminal equipment 31, for obtaining current time and the running status of electric heating equipment 33, it is judged that current time Whether it is in the peak of power consumption period, and whether running status is starting state, if current time is in the peak of power consumption period, And running status is starting state, then generating prompt messages, wherein, running status at least includes any one shape following State: starting state, halted state, energy storage state and malfunction, prompt messages is used for pointing out current time to be in electricity consumption Peak period.
Concrete, above-mentioned current time can be the current time of intelligent monitoring terminal.Above-mentioned electric heating equipment can be Electric boiler, electric heater, Electric radiant Heating Film etc., this is not specifically limited by the present invention.The above-mentioned peak of power consumption period can be that user is a large amount of Use the period of electric heating equipment, the period that i.e. electricity price is higher.
In the optional scheme of one, by intelligent monitoring terminal, electric heating equipment remotely can be monitored, intelligence The running status of electric heating equipment can be acquired by the Real time Data Acquisition function module in monitor terminal, and according to collection To the running status of electric heating equipment and current time judge, if it is determined that current time is in the peak of power consumption period, And the running status of electric heating equipment is starting state, then intelligent monitoring terminal can be pointed out by event alarm functional module User's high electricity price is reported to the police, and is provided with warning involution button in intelligent monitoring terminal, and user can report to the police again by clicking on Button is returned to terminate to report to the police.
By the above embodiment of the present invention, the running status of current time and electric heating equipment can be obtained, and judge to obtain Whether the current time got and running status meet alert if, if current time and running status meet alert if, Then generate prompt messages.Owing to alert if can be time corresponding to peak of power consumption period and running status, thus real The peak of power consumption period alerts to user when using electric heating equipment now, solves electric heating equipment of the prior art in electricity consumption When peak period uses, it is impossible to the technical problem of user's alarm.Therefore, the scheme provided by the above embodiment of the present invention, Can alert to user in time, reduce the property loss of user when the peak of power consumption period uses electric heating equipment, promote user Likability.
Optionally, according to the above embodiment of the present invention, said system can also include:
Platform district terminal unit, has correspondence with monitoring terminal equipment, order when transmission pair, receives monitor terminal The current time that equipment returns, end clocking error of concurrently making arrangements for his funeral.
Concrete, above-mentioned district's terminal unit can be that heating operation manages platform Zhong Tai district intelligent terminal.
If monitoring terminal equipment is additionally operable to the first waiting time receiving terminal clock error have less than or equal to first The effect time, then according to terminal clock error transfer factor current time.
Concrete, above-mentioned first effective time can be 10min, and this is not specifically limited by the present invention.
In the optional scheme of one, intelligent monitoring terminal can possess and function during platform district intelligent terminal couple, permissible When carrying out long-range pair by wireless private network, order during platform district intelligent terminal transmission pair, current time is returned by intelligent monitoring terminal To platform district intelligent terminal, platform district intelligent terminal returns terminal clock error, and intelligent monitoring terminal can pass through time adjustment function module If judging to receive terminal clock error in the first effective time, i.e. from sending current time to receiving terminal clock by mistake The waiting time of difference less than or equal to the first effective time, then orders during execution pair, local clock changes to current time+terminal Clocking error;Command expiration time otherwise pair, and notify platform district intelligent terminal.
Herein it should be noted that due to peak valley time synopsis need at platform district intelligent terminal obtain, in order to ensure The effectiveness of prompt messages and accuracy, need to proofread the time of intelligent monitoring terminal, it is ensured that during intelligent monitoring terminal The time of Jian Yutai district intelligent terminal is identical, and therefore, intelligent monitoring terminal can possess the control unit pair to electric heating equipment Shi Gongneng, intelligent monitoring terminal clock every 24 little time errors of precision of keeping time should be not more than 2 seconds, and at the electricity of intelligent monitoring terminal After the dead electricity of source, clock should be able to keep normally working.
By such scheme, the terminal clock error that can be returned by receiving platform district terminal unit, adjust current time, Realize time adjustment function, promote effectiveness and the accuracy of prompt messages.
Optionally, according to the above embodiment of the present invention, platform district terminal unit is additionally operable to obtain local zone time, if received Second waiting time of current time is less than or equal to the second effective time, and Ze Tai district terminal unit determines when current time is effective Between, and calculate the time difference of current time and local zone time, and judge time difference whether more than or equal to preset value, in the time Difference is more than or equal in the case of preset value, and platform district terminal unit is according to the second waiting time and time difference, when obtaining terminal Clock error.
Optionally, according to the above embodiment of the present invention, if platform district terminal unit is additionally operable to receive the of current time Two waiting time were more than the second effective time, it is determined that current time is ineffective time, and order when resending pair.
Optionally, according to the above embodiment of the present invention, platform district terminal unit be additionally operable to when resending pair order time Number exceedes preset times, or time difference is less than in the case of preset value, stops sending terminal clock error.
The invention described above embodiment sequence number, just to describing, does not represent the quality of embodiment.
In the above embodiment of the present invention, the description to each embodiment all emphasizes particularly on different fields, and does not has in certain embodiment The part described in detail, may refer to the associated description of other embodiments.
In several embodiments provided herein, it should be understood that disclosed technology contents, can be passed through other Mode realizes.Wherein, device embodiment described above is only schematically, the division of the most described unit, Ke Yiwei A kind of logic function divides, actual can have when realizing other dividing mode, the most multiple unit or assembly can in conjunction with or Person is desirably integrated into another system, or some features can be ignored, or does not performs.Another point, shown or discussed is mutual Between coupling direct-coupling or communication connection can be the INDIRECT COUPLING by some interfaces, unit or module or communication link Connect, can be being electrical or other form.
The described unit illustrated as separating component can be or may not be physically separate, shows as unit The parts shown can be or may not be physical location, i.e. may be located at a place, or can also be distributed to multiple On unit.Some or all of unit therein can be selected according to the actual needs to realize the purpose of the present embodiment scheme.
It addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, it is also possible to It is that unit is individually physically present, it is also possible to two or more unit are integrated in a unit.Above-mentioned integrated list Unit both can realize to use the form of hardware, it would however also be possible to employ the form of SFU software functional unit realizes.
If described integrated unit realizes and as independent production marketing or use using the form of SFU software functional unit Time, can be stored in a computer read/write memory medium.Based on such understanding, technical scheme is substantially The part that in other words prior art contributed or this technical scheme completely or partially can be with the form of software product Embodying, this computer software product is stored in a storage medium, including some instructions with so that a computer Equipment (can be for personal computer, server or the network equipment etc.) perform the whole of method described in each embodiment of the present invention or Part steps.And aforesaid storage medium includes: USB flash disk, read only memory (ROM, Read-Only Memory), random access memory are deposited Reservoir (RAM, Random Access Memory), portable hard drive, magnetic disc or CD etc. are various can store program code Medium.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For Yuan, under the premise without departing from the principles of the invention, it is also possible to make some improvements and modifications, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (10)

1. the alarm method of an electric heating equipment, it is characterised in that including:
Obtain current time and the running status of electric heating equipment, wherein, described running status at least include following any one State: starting state, halted state, energy storage state and malfunction;
Judge whether described current time is in the peak of power consumption period, and whether described running status is described starting state;
If described current time is in the described peak of power consumption period, and described running status is described starting state, then generate Prompt messages, wherein, described prompt messages is used for pointing out current time to be in the peak of power consumption period.
Method the most according to claim 1, it is characterised in that judge whether described current time is in described peak of power consumption Period includes:
Obtain peak valley time synopsis;
The period information corresponding with described current time, wherein, described period information is determined from described peak valley time synopsis Including any one information following: peak period information and low-valley interval information;
In the case of the period information that described current time is corresponding is information described peak period, determine at described current time In the described peak of power consumption period.
Method the most according to claim 1, it is characterised in that obtaining current time and the running status of electric heating equipment Afterwards, described method also includes:
Receiving platform district terminal unit send pair time order;
Described current time is sent to described district's terminal unit, and receives the terminal clock that described district's terminal unit returns Error;
If the first waiting time receiving described terminal clock error is less than or equal to the first effective time, then according to described end End clocking error adjusts described current time.
Method the most according to claim 3, it is characterised in that set described current time being sent to described district's terminal For afterwards, described method also includes:
Described district's terminal unit obtains local zone time;
If the second waiting time receiving described current time is less than or equal to the second effective time, the most described district's terminal sets For determining that described current time is effective time, and calculate described current time and the time difference of described local zone time;
Described district's terminal unit judges that whether described time difference is more than or equal to preset value;
In the case of described time difference is more than or equal to described preset value, described district's terminal unit waits according to described second Time and described time difference, obtain described terminal clock error.
Method the most according to claim 4, it is characterised in that if receiving the second waiting time of described current time More than described second effective time, the most described district's terminal unit determines that described current time is ineffective time, and resends Order when described pair.
Method the most according to claim 5, it is characterised in that the number of times of order exceedes default when resending described pair Number of times, or described time difference is less than in the case of described preset value, and described district's terminal unit stops sending described terminal Clocking error.
Method the most according to claim 1, it is characterised in that the running status at described electric heating equipment includes described event In the case of barrier state, generate fault alarm information.
8. the alarm device of an electric heating equipment, it is characterised in that including:
Acquisition module, for obtaining the running status of current time and electric heating equipment, wherein, described running status at least includes Any one state following: starting state, halted state, energy storage state and malfunction;
Judge module, is used for judging whether described current time is in the peak of power consumption period, and whether described running status is Described starting state;
Generation module, if being in the described peak of power consumption period for described current time, and described running status be described in open Dynamic state, then generate prompt messages, wherein, when described prompt messages is used for pointing out current time to be in peak of power consumption Section.
9. the warning system of an electric heating equipment, it is characterised in that including:
Monitoring terminal equipment, for obtaining the running status of current time and electric heating equipment, it is judged that whether described current time It is in the peak of power consumption period, and whether described running status is starting state, if described current time is in described electricity consumption Peak period, and described running status is described starting state, then generate prompt messages, wherein, described running status is extremely Include any one state following less: described starting state, halted state, energy storage state and malfunction, described alarm Information is used for pointing out current time to be in the peak of power consumption period.
System the most according to claim 9, it is characterised in that described system also includes:
Platform district terminal unit, has correspondence with described monitoring terminal equipment, order when transmission pair, receives described monitoring The current time that terminal unit returns, end clocking error of concurrently making arrangements for his funeral;
If described monitoring terminal equipment is additionally operable to receive the first waiting time of described terminal clock error less than or equal to the One effective time, then according to current time described in described terminal clock error transfer factor.
CN201610587118.8A 2016-07-22 2016-07-22 The alarm method of electric heating equipment, device and system Active CN106196267B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610587118.8A CN106196267B (en) 2016-07-22 2016-07-22 The alarm method of electric heating equipment, device and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610587118.8A CN106196267B (en) 2016-07-22 2016-07-22 The alarm method of electric heating equipment, device and system

Publications (2)

Publication Number Publication Date
CN106196267A true CN106196267A (en) 2016-12-07
CN106196267B CN106196267B (en) 2019-09-10

Family

ID=57491825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610587118.8A Active CN106196267B (en) 2016-07-22 2016-07-22 The alarm method of electric heating equipment, device and system

Country Status (1)

Country Link
CN (1) CN106196267B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107168446A (en) * 2017-07-05 2017-09-15 国网山东电力公司微山县供电公司 Intelligent power method, unit, equipment and system
CN107606688A (en) * 2017-08-30 2018-01-19 国网北京市电力公司 The control method of heating equipment, apparatus and system
CN108375702A (en) * 2017-12-01 2018-08-07 国网北京市电力公司 The monitoring method and device of electric heating equipment
CN110332602A (en) * 2019-05-09 2019-10-15 辽宁省鑫源温控技术有限公司 The electric heating temperature control method of peak valley ordinary telegram valence operation function
CN115031288A (en) * 2022-06-14 2022-09-09 国网北京市电力公司 Equipment state analysis method and device and computer readable storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29814510U1 (en) * 1998-08-14 1998-11-19 Kasebaum Roman Device for detecting the malfunction of heating, heating burner or boiler systems
JPH11142446A (en) * 1997-11-11 1999-05-28 Toshiba Corp Electronic watt-hour meter
KR20100000691U (en) * 2008-07-14 2010-01-22 전옥님 Electric heat mat comprising of dual safety means
CN201955367U (en) * 2010-12-30 2011-08-31 宁波三星电气股份有限公司 Intelligent electric energy meter
CN104537438A (en) * 2014-12-26 2015-04-22 国家电网公司 Forecast and monitoring method for peak-hour power usage
CN104654449A (en) * 2014-12-17 2015-05-27 东北大学 Distributed electric heat energy storage heating control system and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11142446A (en) * 1997-11-11 1999-05-28 Toshiba Corp Electronic watt-hour meter
DE29814510U1 (en) * 1998-08-14 1998-11-19 Kasebaum Roman Device for detecting the malfunction of heating, heating burner or boiler systems
KR20100000691U (en) * 2008-07-14 2010-01-22 전옥님 Electric heat mat comprising of dual safety means
CN201955367U (en) * 2010-12-30 2011-08-31 宁波三星电气股份有限公司 Intelligent electric energy meter
CN104654449A (en) * 2014-12-17 2015-05-27 东北大学 Distributed electric heat energy storage heating control system and method
CN104537438A (en) * 2014-12-26 2015-04-22 国家电网公司 Forecast and monitoring method for peak-hour power usage

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107168446A (en) * 2017-07-05 2017-09-15 国网山东电力公司微山县供电公司 Intelligent power method, unit, equipment and system
CN107168446B (en) * 2017-07-05 2018-07-06 国网山东电力公司微山县供电公司 Intelligent power method, unit, equipment and system
CN107606688A (en) * 2017-08-30 2018-01-19 国网北京市电力公司 The control method of heating equipment, apparatus and system
CN108375702A (en) * 2017-12-01 2018-08-07 国网北京市电力公司 The monitoring method and device of electric heating equipment
CN110332602A (en) * 2019-05-09 2019-10-15 辽宁省鑫源温控技术有限公司 The electric heating temperature control method of peak valley ordinary telegram valence operation function
CN115031288A (en) * 2022-06-14 2022-09-09 国网北京市电力公司 Equipment state analysis method and device and computer readable storage medium

Also Published As

Publication number Publication date
CN106196267B (en) 2019-09-10

Similar Documents

Publication Publication Date Title
CN106196267A (en) The alarm method of electric heating equipment, device and system
CN104021019B (en) A kind of apply the control method of self-starting, terminal and server
CN104536417B (en) A kind of monitoring method of water heater, server and system
Costes et al. SURF A PROGRAM FOR DEPENDABILITY EVALUATlON OF COMPLEX FAULT-TOLERANT COMPUTING SYSTEMS
CN106196266A (en) The control method of electric heating equipment, device and system
CN104270609A (en) Method, system and device for remote monitoring
CN106091105B (en) Monitor terminal equipment and monitoring system
CN103580283A (en) Power grid protecting device constant value checking system and method based on information protecting system
CN111130925B (en) Resource monitoring method and device, computer equipment and storage medium
Kumar et al. Dimensions of internet of things: Technological taxonomy architecture applications and open challenges—a systematic review
CN104679739A (en) Method for controlling spreading of unreal information
CN109703396B (en) Charging control method, device, equipment and storage medium for wireless charging parking place
CN106289833A (en) The fault detection method of thermal store and device
CN109951469A (en) A kind of method, apparatus, storage medium and server creating domain name black and white lists
Xu et al. Health monitoring and management for manufacturing workers in adverse working conditions
CN108181546A (en) Localization method, positioning device and the terminal device of distribution network failure
CN110400080A (en) Examination data monitoring method, device, computer equipment and storage medium
Al Rabaiei et al. Internet of things: Applications and challenges
CN102196465B (en) The management method of a kind of wireless sensor network and system
CN104932028B (en) A kind of method of locating terminal and terminal
CN106126011A (en) The resource occupation method for information display of a kind of application program and mobile terminal
CN107294905A (en) A kind of method and device for recognizing user
CN105528669A (en) Load prediction system for power system
CN108389106A (en) Method and device is rented in the automatic spelling in whole source of renting a house
CN108151131A (en) The control method and system of electric heating equipment, storage medium, processor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant