CN106195440A - Water supply line construction pipe drawing device and tube drawing construction method - Google Patents

Water supply line construction pipe drawing device and tube drawing construction method Download PDF

Info

Publication number
CN106195440A
CN106195440A CN201610725168.8A CN201610725168A CN106195440A CN 106195440 A CN106195440 A CN 106195440A CN 201610725168 A CN201610725168 A CN 201610725168A CN 106195440 A CN106195440 A CN 106195440A
Authority
CN
China
Prior art keywords
cylinder
pipeline
hydraulic cylinders
drawing device
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610725168.8A
Other languages
Chinese (zh)
Other versions
CN106195440B (en
Inventor
陈子传
周连国
唐胜天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Stecol Corp
Original Assignee
Sinohydro Tianjin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Tianjin Engineering Co Ltd filed Critical Sinohydro Tianjin Engineering Co Ltd
Priority to CN201610725168.8A priority Critical patent/CN106195440B/en
Publication of CN106195440A publication Critical patent/CN106195440A/en
Application granted granted Critical
Publication of CN106195440B publication Critical patent/CN106195440B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/02Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same
    • B23P19/022Extracting or inserting relatively long parts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/02Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same
    • B23P19/025For detaching only
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/02Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same
    • B23P19/027Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same using hydraulic or pneumatic means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Emergency Lowering Means (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

Water supply line construction pipe drawing device and tube drawing construction method, pipe drawing device includes holding part and drive mechanism tightly, holds part tightly and uses hooping structure, and it is bolted respectively at two ends by two semicircular bands and constitutes;Drive mechanism includes two hydraulic cylinders, two hydraulic cylinders are set in parallel in the same side of hooping structure, the cylinder rod end of two hydraulic cylinders two ends connecting portion with two semicircle bands respectively is formed connected, two hydraulic cylinders are separately fixed on respective oil cylinder bracket, the inner side of the one end stretched out near hydraulic cylinder cylinder rod on each oil cylinder bracket is provided with and can form, with pipeline major part flange, the hanging platform coordinated, and is separately installed with lanyard part at the two ends of each oil cylinder bracket;Two hydraulic cylinders are connected with the oil supply system of peripheral hardware by pipeline respectively.Tube drawing construction method, step is;S1 pipe drawing device is installed and is put in place;S2 opens oil supply system, it is achieved tube drawing.The present invention is not limited by construction site, improves pipeline construction efficiency.

Description

Water supply line construction pipe drawing device and tube drawing construction method
Technical field
The invention belongs to water supply line technical field of construction, execute particularly to water supply line construction pipe drawing device and tube drawing Work method.
Background technology
Waterline construction links in, be frequently encountered by mounted pipe, short tube, suppress the pipes such as plug join want Again the problem transferred to.Extracting of this large scale ductile iron pipe, it is common that dependence main equipment such as excavator, loader, Crane etc. coordinate extracts, operate and bother very much, from time, cost and work efficiency for be very be unfavorable for scene Construction.It addition, some construction sites cannot be introduced into main equipment, so, the difficulty of tube drawing is further increased.
Summary of the invention
The present invention solves that technical problem present in known technology provides a kind of water supply line construction pipe drawing device And tube drawing construction method, this pipe drawing device simple in construction, do not limited by construction site, flexible and convenient to use, tube drawing can be reduced Construction cost, this tube drawing construction method improves pipeline construction efficiency.
The present invention solves that technical problem is adopted the technical scheme that present in known technology:
A kind of water supply line construction pipe drawing device, it is characterised in that: include with tube fit hold tightly part and with hold tightly The drive mechanism that part connects, described in hold part tightly and use hooping structure, hooping structure is by two semicircular bands at two ends respectively It is bolted composition;Described drive mechanism uses hydraulic drive mechanism, and it includes two hydraulic cylinders, and two hydraulic cylinders are parallel Be arranged on the same side of hooping structure, the cylinder rod end of two hydraulic cylinders respectively with the two ends connecting portion shape of two halves circle band Becoming fixing to connect, two hydraulic cylinders are separately fixed on respective oil cylinder bracket, near hydraulic cylinder on each oil cylinder bracket The inner side of one end that bar stretches out is provided with and can form, with pipeline major part flange, the hanging platform coordinated, at the two ends of each oil cylinder bracket respectively Lanyard part is installed;Two hydraulic cylinders are connected with the oil supply system of peripheral hardware by pipeline respectively.
Preferred: two semicircular bands are by band iron materials processing molding.
Preferred: lanyard part uses hanging ring structure or hook structure.
A kind of tube drawing construction method, it is characterised in that have employed the arbitrary described water supply line construction of claim 1-3 and use Pipe drawing device, the step of tube drawing is:
S1 pipe drawing device is installed and is put in place: first by two semicircular bands under the shape body separated, obvolvent one on the other On pipeline to be extracted;Then artificial or by small-sized pulling apparatus, by two stay cords, the wherein two ends of a stay cord Connecting two cylinder brackets and be positioned at two lanyard parts of front end, the two ends of another root stay cord connect two cylinder brackets and are positioned at two extensions of rear end Two cylinder brackets and two hydraulic cylinder synchronous being arranged on cylinder bracket are transferred to be connected with pipeline to be extracted by rope part The both sides of fixed-piping, and make the hanging platform on two cylinder brackets be affiliated to coordinate with the major part flange position formation of fixed-piping;? After by the end of the cylinder rod of two hydraulic cylinders respectively connecting portion with two semicircle band two ends be fixed by bolt Connecting, the hooping structure simultaneously making two semicircular bands be formed is held tightly on pipeline to be extracted;
S2 pipe drawing device is installed after putting in place, opens oil supply system, two hydraulic cylinder synchronous actions, applies outside to cylinder rod Release power, two cylinder brackets are limited by the major part flange position of fixed-piping, make two cylinder rods be passed by power by hooping structure Move on pipeline to be extracted, make pipeline to be extracted obtain an outside pull out force, when the effect being applied to both sides cylinder rod When power reaches the friction value of tube wall and cushion rubber, pipe is pulled out, and completes tube drawing action.
The present invention has the advantage that with good effect:
This pipe drawing device is mainly made up of anchor ear, two hydraulic cylinders and two cylinder brackets, and overall structure is simple, uses Time, anchor ear is held tightly on pipeline to be extracted, and two oil cylinders and two cylinder brackets are arranged on and pipeline to be extracted respectively The both sides of fixed-piping being connected, except outside the hydraulic system that connects, mainly occupy the space in existing pipeline foundation ditch, the most not Limited by construction site, be there is advantage flexible and convenient to use.This pipe drawing device large-scale sets compared to what existing tube drawing used Standby, its use cost is relatively low, so, so that it may the construction cost of tube drawing is greatly lowered.The tube drawing using this pipe drawing device is constructed Method, owing to the installation of pipe drawing device and the operation of tube drawing are more convenient and time saving and energy saving, so, is also greatly improved pipe The efficiency of line construction.
Accompanying drawing explanation
Fig. 1 is the structural representation that pipe drawing device of the present invention coordinates with water pipeline.
In figure: 1, hold part tightly;1-1, semicircular band;1-2, bolt;2, drive mechanism;2-1, hydraulic cylinder;2-2, oil Bracket cylinder;2-2-1, hanging platform;2-3, lanyard part;1 ', pipeline to be extracted;2 ', fixed-piping;2-1 ', major part flange.
Detailed description of the invention
For the summary of the invention of the present invention, feature and effect can be further appreciated that, hereby enumerate following example, and coordinate accompanying drawing Describe in detail as follows:
Refer to Fig. 1, a kind of water supply line construction pipe drawing device, mainly by with tube fit hold tightly part 1 and with armful Drive mechanism 2 two parts that tight part connects are constituted.
Described part of holding tightly uses hooping structure, and hooping structure is passed through spiral shell respectively by two semicircular band 1-1 at two ends Bolt 1-2 connects and composes, concrete, and two semicircular bands all arrange outward extending flanging, at the flanging at two ends at two ends Being provided with bolt hole in part, two semicircular bands are connected formation hooping structure by the flanging at two ends.
Described drive mechanism uses hydraulic drive mechanism, and it includes that two hydraulic cylinder 2-1, two hydraulic cylinders are set in parallel in The same side of hooping structure, the cylinder rod end of two hydraulic cylinders two ends connecting portion with two halves circle band respectively is formed fixing Connect, concrete, flat structure is made in the cylinder rod end of two hydraulic cylinders, the cylinder rod end of two hydraulic cylinders is clamped in respectively The respective side of two semicircular bands coordinates between flanging, after respective side coordinates flanging to be locked by bolt, also achieves Fixing with cylinder rod end is connected.Two hydraulic cylinders are separately fixed on an oil cylinder bracket 2-2, lean on each oil cylinder bracket The inner side of one end that nearly hydraulic cylinder cylinder rod is stretched out is provided with and can form, with pipeline major part flange, the hanging platform 2-2-1 coordinated, at each oil The two ends of bracket cylinder are separately installed with lanyard part 2-3.Two hydraulic cylinders are connected with the oil supply system of peripheral hardware by pipeline respectively, supply Oil system, with reference to existing hydraulic cylinder oil supply system, mainly includes hydraulic pump, Fuel Tanking Unit, control valve and connecting line, at this In invention, hydraulic pump preferably employs the gasoline engine hydraulic pump structure of rated pressure 12.5MPA, it is possible to provide bigger power output. Above-mentioned oil supply system is the most not shown.
In said structure, two semicircular bands are the most preferably by band iron materials processing molding.Concrete, 80*8 can be used Band iron machine-shaping.
In said structure, lanyard part uses hanging ring structure or hook structure.
A kind of tube drawing construction method, have employed above-mentioned water supply line construction pipe drawing device, and the step of tube drawing is:
S1 pipe drawing device is installed and is put in place: first by two semicircular bands under the shape body separated, obvolvent one on the other On pipeline to be extracted, concrete, make the tuck portion at two semicircular band two ends align one by one, now on flanging Bolt hole is also at positive status;Then artificial or by small-sized pulling apparatus, by two stay cords, a wherein stay cord Two ends connect two cylinder brackets and are positioned at two lanyard parts of front end, and the two ends of another root stay cord connect two cylinder brackets and are positioned at rear end Two cylinder brackets and two hydraulic cylinder synchronous being arranged on cylinder bracket are transferred to and pipeline 1 ' to be extracted by two lanyard parts The both sides of fixed-piping 2 ' being connected, i.e. one cylinder bracket and hydraulic cylinder are arranged on the side of fixed-piping, another Cylinder bracket and another hydraulic cylinder are arranged on the opposite side of fixed-piping, and make the hanging platform on two cylinder brackets and fixed-piping Major part flange position 2-1 ' formed be affiliated to coordinate;Finally by the end of the cylinder rod of two hydraulic cylinders respectively with two halves circle band The connecting portion at two ends is fixedly connected by bolt, concrete, the flat end of two cylinder rods is inserted respectively into two halves circular Band two ends corresponding flanging between, and by connect corresponding two flangings bolt, the flat end of cylinder rod is fixedly clamped, with Time make two semicircular bands be formed hooping structure hold tightly at pipeline to be extracted;
S2 pipe drawing device is installed after putting in place, opens oil supply system, two hydraulic cylinder synchronous actions, applies outside to cylinder rod Release power, two cylinder brackets are limited by the major part flange position of fixed-piping, make two cylinder rods be passed by power by hooping structure Move on pipeline to be extracted, make pipeline to be extracted obtain an outside pull out force, when the effect being applied to both sides cylinder rod When power reaches the friction value of tube wall and cushion rubber, pipe is pulled out, and completes tube drawing action.
Above-mentioned pipe drawing device and tube drawing construction method, in addition to being applicable to pipeline and extracting, are also applied for suppressing the pipes such as plug and join Extracting of part.
Use this pipe drawing device, can be after water pipeline bulge test, in the case of not damaging oversleeve, extract pipe or Person suppresses plug, it is not necessary to main equipment, it is only necessary to simple manual operation, without geographical restrictions, makes construction simplify, and saving sets Standby, save fund, production efficiency is greatly improved.This pipe drawing device is particularly executed some main equipments are unapproachable Building site section, has preferably application.

Claims (4)

1. a water supply line construction pipe drawing device, it is characterised in that: include with tube fit hold tightly part and with hold part tightly Connect drive mechanism, described in hold tightly part use hooping structure, hooping structure is led at two ends respectively by two semicircular bands Cross bolt to connect and compose;Described drive mechanism uses hydraulic drive mechanism, and it includes two hydraulic cylinders, and two hydraulic cylinders are parallel to be set Putting the same side at hooping structure, the cylinder rod end of two hydraulic cylinders two ends connecting portion with two halves circle band respectively is formed Fixing connection, two hydraulic cylinders are separately fixed on respective oil cylinder bracket, near hydraulic cylinder cylinder rod on each oil cylinder bracket The inner side of the one end stretched out is provided with and can form, with pipeline major part flange, the hanging platform coordinated, and pacifies respectively at the two ends of each oil cylinder bracket Equipped with lanyard part;Two hydraulic cylinders are connected with the oil supply system of peripheral hardware by pipeline respectively.
Water supply line construction pipe drawing device the most according to claim 1, it is characterised in that: two semicircular bands are equal By band iron materials processing molding.
Water supply line construction pipe drawing device the most according to claim 1, it is characterised in that: lanyard part uses hanging ring structure Or hook structure.
4. a tube drawing construction method, it is characterised in that have employed the arbitrary described water supply line of claim 1-3 and construct with pulling out Pipe device, the step of tube drawing is:
S1 pipe drawing device is installed and is put in place: first by two semicircular bands under the shape body separated, obvolvent is being treated one on the other On the pipeline extracted;Then artificial or by small-sized pulling apparatus, by two stay cords, wherein the two ends of a stay cord connect Two cylinder brackets are positioned at two lanyard parts of front end, and the two ends of another root stay cord connect two cylinder brackets and are positioned at two lanyards of rear end Two cylinder brackets and two hydraulic cylinder synchronous being arranged on cylinder bracket are transferred to and consolidating that pipeline to be extracted is connected by part The both sides in fixed tube road, and make the hanging platform on two cylinder brackets be affiliated to coordinate with the major part flange position formation of fixed-piping;Finally The end of the cylinder rod of two hydraulic cylinders is fixed even by bolt with the connecting portion at two semicircle band two ends respectively Connecing, the hooping structure simultaneously making two semicircular bands be formed is held tightly on pipeline to be extracted;
S2 pipe drawing device is installed after putting in place, opens oil supply system, two hydraulic cylinder synchronous actions, applies outside release to cylinder rod Power, two cylinder brackets are limited by the major part flange position of fixed-piping, make two cylinder rods power transmission be arrived by hooping structure On pipeline to be extracted, pipeline to be extracted is made to obtain an outside pull out force, when the active force being applied to both sides cylinder rod reaches During to the friction value of tube wall and cushion rubber, pipe is pulled out, and completes tube drawing action.
CN201610725168.8A 2016-08-25 2016-08-25 Water supply line construction pipe drawing device and tube drawing construction method Active CN106195440B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610725168.8A CN106195440B (en) 2016-08-25 2016-08-25 Water supply line construction pipe drawing device and tube drawing construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610725168.8A CN106195440B (en) 2016-08-25 2016-08-25 Water supply line construction pipe drawing device and tube drawing construction method

Publications (2)

Publication Number Publication Date
CN106195440A true CN106195440A (en) 2016-12-07
CN106195440B CN106195440B (en) 2018-08-21

Family

ID=57524277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610725168.8A Active CN106195440B (en) 2016-08-25 2016-08-25 Water supply line construction pipe drawing device and tube drawing construction method

Country Status (1)

Country Link
CN (1) CN106195440B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108223913A (en) * 2018-03-07 2018-06-29 山东顺河路桥工程有限公司 Pipe installing checks auxiliary tool with backfill
CN109895027A (en) * 2019-04-01 2019-06-18 中建新疆建工(集团)有限公司 Novel heavy socket pipe tube drawing device
CN111911711A (en) * 2020-07-15 2020-11-10 谢祥松 Natural gas energy pipeline laying construction method
CN112811350A (en) * 2021-02-04 2021-05-18 大连轩泰重工有限公司 Ascending pipe drawing vehicle
CN113202975A (en) * 2021-05-20 2021-08-03 中铁隧道局集团有限公司 Underground obstacle pipeline processing method for urban restricted area
CN114211451A (en) * 2021-10-28 2022-03-22 上海外高桥造船有限公司 Pipe drawing device for movable jig frame

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2113598B (en) * 1981-12-15 1985-12-11 Omega Software Heat exchanger maintenance
JPS61257723A (en) * 1985-05-04 1986-11-15 Chiyoda Chem Eng & Constr Co Ltd Extracting and extruding device of pipe bundle
JP2010017833A (en) * 2008-07-14 2010-01-28 Kurimoto Ltd Pipe joint dismantling device and dismantling method
CN201419313Y (en) * 2009-06-12 2010-03-10 上海船厂船舶有限公司 Assembly and disassembly device for ship coupling
CN203141057U (en) * 2012-12-18 2013-08-21 云南昆钢重型装备制造集团有限公司 Drawing device
CN103612107A (en) * 2013-11-25 2014-03-05 河北钢铁股份有限公司邯郸分公司 Universal tool capable of quickly disassembling various components
CN205978809U (en) * 2016-08-25 2017-02-22 中国水利水电第十三工程局有限公司 Pipe drawing device is used in water feeding line construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2113598B (en) * 1981-12-15 1985-12-11 Omega Software Heat exchanger maintenance
JPS61257723A (en) * 1985-05-04 1986-11-15 Chiyoda Chem Eng & Constr Co Ltd Extracting and extruding device of pipe bundle
JP2010017833A (en) * 2008-07-14 2010-01-28 Kurimoto Ltd Pipe joint dismantling device and dismantling method
CN201419313Y (en) * 2009-06-12 2010-03-10 上海船厂船舶有限公司 Assembly and disassembly device for ship coupling
CN203141057U (en) * 2012-12-18 2013-08-21 云南昆钢重型装备制造集团有限公司 Drawing device
CN103612107A (en) * 2013-11-25 2014-03-05 河北钢铁股份有限公司邯郸分公司 Universal tool capable of quickly disassembling various components
CN205978809U (en) * 2016-08-25 2017-02-22 中国水利水电第十三工程局有限公司 Pipe drawing device is used in water feeding line construction

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108223913A (en) * 2018-03-07 2018-06-29 山东顺河路桥工程有限公司 Pipe installing checks auxiliary tool with backfill
CN108223913B (en) * 2018-03-07 2023-09-05 山东顺河路桥工程有限公司 Pipeline installation and backfill checking auxiliary tool
CN109895027A (en) * 2019-04-01 2019-06-18 中建新疆建工(集团)有限公司 Novel heavy socket pipe tube drawing device
CN111911711A (en) * 2020-07-15 2020-11-10 谢祥松 Natural gas energy pipeline laying construction method
CN112811350A (en) * 2021-02-04 2021-05-18 大连轩泰重工有限公司 Ascending pipe drawing vehicle
CN113202975A (en) * 2021-05-20 2021-08-03 中铁隧道局集团有限公司 Underground obstacle pipeline processing method for urban restricted area
CN114211451A (en) * 2021-10-28 2022-03-22 上海外高桥造船有限公司 Pipe drawing device for movable jig frame
CN114211451B (en) * 2021-10-28 2023-12-05 上海外高桥造船有限公司 Tube drawing device for adjustable jig frame

Also Published As

Publication number Publication date
CN106195440B (en) 2018-08-21

Similar Documents

Publication Publication Date Title
CN106195440A (en) Water supply line construction pipe drawing device and tube drawing construction method
CN203519351U (en) Loading device for mooring test
CN109057362A (en) A kind of Suo Cheng network rope system traction tensioning integral construction method and equipment
CN103741717A (en) Immersed tunnel flexible joint
CN201588236U (en) Hydraulic grab for construction of underground continuous wall and grab machine
CN205978809U (en) Pipe drawing device is used in water feeding line construction
CN108203992A (en) A kind of assembled underground pipe gallery
CN102561706A (en) Internal threading method for spatial large-span prestressed steel structure steel strand
CN203654287U (en) Pile casing pulling device
CN208534487U (en) Small-bore mire water equilibrium tube equipment slip casting tail sleeve device
CN209339072U (en) A kind of road sweeper imbitition connecter
CN206987816U (en) A kind of integrated form slurry pipe-jacking machine pushing tow system
CN204371413U (en) A kind of highstrenghtpiston's pipe for escaping
CN104455742A (en) Clamp structure for underwater control cable
CN103411027A (en) Underground pipeline construction mould
CN203908755U (en) Flexible joint for immersed tunnel
CN204456112U (en) One scraps well well casing plucking device
CN203472146U (en) Hollow jack type steel-plastic composite pipe internal-expansion flaring tool
CN104213628B (en) Jacking mechanism for underground pipe culvert engineering
CN110145322A (en) Slip casting tail sleeve and small-bore mire water equilibrium tube equipment
CN202914399U (en) Inline pump
CN202203598U (en) Built-in pipeline traction device
CN108083117B (en) A kind of twin-tub rope telescopic system and crane for realizing the synchronous recycling of boom
CN202100840U (en) Three-dimensional steel framed composite pipe
CN101339110A (en) Pipeline pressure testing machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 300384 Tianjin Binhai New Area High-tech Zone Huayuan Industrial Area No. 2, 4-2101

Patentee after: China Construction Municipal Construction Group Co., Ltd.

Address before: 300384 No. 2, Rongyuan Road, Huayuan Industrial Area, Nankai District, Tianjin 4-2101

Patentee before: Sinohydro Tianjin Engineering Co.,Ltd.

CP03 Change of name, title or address