CN106194223A - The excavation method of large-scale down stream surge-chamber dome under a kind of complex geological condition - Google Patents

The excavation method of large-scale down stream surge-chamber dome under a kind of complex geological condition Download PDF

Info

Publication number
CN106194223A
CN106194223A CN201610579821.4A CN201610579821A CN106194223A CN 106194223 A CN106194223 A CN 106194223A CN 201610579821 A CN201610579821 A CN 201610579821A CN 106194223 A CN106194223 A CN 106194223A
Authority
CN
China
Prior art keywords
excavation
district
layer
dome
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610579821.4A
Other languages
Chinese (zh)
Inventor
和孙文
曾理
周涛
陈芝焕
张发斌
董罗刚
贺斌
彭正良
方越
王鹏飞
王林涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN201610579821.4A priority Critical patent/CN106194223A/en
Publication of CN106194223A publication Critical patent/CN106194223A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D13/00Large underground chambers; Methods or apparatus for making them
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The present invention discloses the excavation method of large-scale down stream surge-chamber dome under a kind of complex geological condition, down stream surge-chamber dome use hands air drill coordinate bore the layering of quick-fried platform, subregion excavates, and have employed both sides, point fan-shaped stick after first middle drift, region progressively expands excavation, stress discharges by stages, the excavation construction method of dome two-ended cables supporting follow-up;Design profile line position bore angle is controlled according to concentric circular same elevation principle.Use the excavation method of the present invention, it is possible to increase excavation Forming Quality, save construction investment;Once excavate molding maximum span and the subregion of stress by effectively controlling cavern, adjust release by stages, solve the major diameter cavern dome adjoining rock stability problem under complex geological condition.

Description

The excavation method of large-scale down stream surge-chamber dome under a kind of complex geological condition
Technical field
The invention belongs to construction technology in geotechnical engineering field, underground, under specifically a kind of complex geological condition, large-scale tail water is adjusted The excavation method of pressure chamber dome.
Background technology
Conventional underground chamber adit excavates the classification according to country rock, design excavated section size, execution conditions, mode of slagging tap Full face tunneling or layering, the scheme of subregion excavation is typically used etc. factor.The construction of down stream surge-chamber dome generally uses " cross Excavating load ", " reserved core rock pillar method " or " after first middle drift, stick excavating load is divided in both sides " several excavation methods.Such as: three plates Hydropower Station and slubbing Hydropower Station have employed " cross excavating load ", and Jinping hydropower station and crow East Germany power station have employed " reserved core rock pillar method ", subregion carries out the construction of system anchor bolt and gunite concrete immediately after having excavated, finally complete pre- Stress anchor cable construction.
At present reality can run into some hydropower station down stream surge-chamber dome maximum digging diameter 48m, reach the world built and Building the cylinder type down stream surge-chamber of maximum gauge, having that cavern is huge, complex geologic conditions, design structural style are many Change, the engineering characteristic that prescription is high, use conventional excavation method to there is rock mass relaxation modification and cause country rock safety and stability to be asked The problem that topic is prominent and dome sphere curved surface structural excavation build molding difficulty is big.
Summary of the invention
By solving the excavation molding of major diameter dome and the adjoining rock stability problem that Practical Project construction is run into, the present invention carries For the excavation method of large-scale down stream surge-chamber dome under a kind of complex geological condition, use both sides, point fan-shaped bar after first middle drift Block, the excavation method that region progressively expands excavation, stress discharges by stages, dome two-ended cables supporting is followed up.
The present invention is realized by following technical proposal.The excavation of large-scale down stream surge-chamber dome under a kind of complex geological condition Method, through following each step:
(1) according to down stream surge-chamber dome structure feature and construction passage deployment scenarios, down stream surge-chamber dome is divided into two Floor nine district;
Described two-layer nine district refers to that its base plate is the Ith layer with up to position, dome summit, its end with passage of constructing for layering boundary line Plate following dome excavation scope is the IIth layer;
The Ith layer of performance parameter according to practice of construction equipment and structure design build be divided into again I-1Layer and I-2Layer;
Ith-1Floor middle drift excavation scope is the 1. district, both sides scope according to radially carrying out subregion, I-1The protective layer excavation of layer Scope is the 2. district, the Ith-2The middle part excavation scope of floor be the 3., 4. district, the Ith-2The outer shroud of layer reserves protective layer excavation scope It it is the 5. district;IIth descending grade road, floor middle part excavation scope is the 6. district, and other region, the IIth layer of middle part (without descending grade road) is excavated Scope is the 7. district, and it is the 8. district, reserved ramp excavation model of the IIth layer that the outer shroud of the IIth floor reserves protective layer excavation scope Enclosing is the 9. district;
(2) first passing through anchoring observation hole early excise dome before dome excavation to wearing prestress anchorage cable making hole construction, dome is opened Digging excavation and the supporting construction first completing middle drift region, middle drift excavation completes dome center immediately to wearing pre-answering after terminating The lower rope of power anchor cable, stretching construction, then according to " fan-shaped stick method " subregion complete I-1The excavation supporting of layer protective layer, I-1 Layer is after supporting terminates, first carry out I-2The excavation of layer central region, then according to " fan-shaped stick method " subregion complete I-2Outside Ceng Ring reserves the excavation supporting of protective layer;Ⅰ-2After layer supporting completes, use the mode in descending grade road to be excavated to II layer of floor elevation, enter The excavation of II layer of central region of row;Then according to " fan-shaped stick method " subregion completes the excavation supporting construction of II layer of protective layer; After II layer of whole supporting complete, more finally excavate reserved ramp;Specifically:
Ith floor first passes through construction passage and uses pad slag mode to complete the excavation in the range of the Ith Ceng① district and supporting construction, so After complete the 2. excavation in the range of district and supporting construction, the starts the after 2. district's supporting completes, and 3. district, the excavation in the 4. district are executed Work;Finally complete the excavation in the range of the Ith Ceng⑤ district and supporting construction;Ith layer of whole excavation supporting i.e. proceed to after completing II layer of excavation stage;
First IIth layer use descending grade excavation with construction passage usual friendship mouth position according to the slope ratio of 12% from down stream surge-chamber dome Mode completes the excavation in the 6. district, then completes the excavation in 7. district, middle part the, then starts the 8. excavation in district and supporting construction, the II floor excavation supporting finally excavates the reserved ramp in the 9. district after being basically completed.
The dome excavation of described step (2) is to use hands air drill to coordinate the quick-fried platform of brill to excavate.
The of described step (2) 2. district, the 5. district, the 8. district all use fan-shaped point of stick, according to the same elevation of concentric circular Principle in the way of long and short pricker combines, carry out horizontal photoface exploision.
The supporting construction system for use in carrying anchor pole of described step (2) uses three arm rock drilling jumbos to carry out pore-creating, hand fit puts down Chassis completes the filling construction of anchor pole, and gunite concrete uses large-scale wet shot car to construct.
The dome two-ended cables supporting follow-up of described step (2) is during excavation and supporting construction, according to prestressed anchor The exposure scope in site, rope hole, arranges to carry out reeving and stretching construction of prestress anchorage cable in time.Middle drift excavation exceedes dome The distance of central point should meet the requirement of construction prestressed cable.
The present invention uses that " both sides, point fan-shaped stick after first middle drift, region progressively expands excavation, stress discharges by stages, vault Top two-ended cables supporting follow-up " mode excavate, have the advantage that
One is by first excavating middle drift, completing the construction prestressed cable of dome center in time;With routine excavation side Case compares, and by early excise ceiling anchor cable, reduces cavern and once excavates the maximum span of molding, and cross-cut effect is obvious, Effectively control the lax deformation range of rock mass.
Two is that down stream surge-chamber dome uses horizontal slice, the excavation plan of plane subregion, and excavation region progressively expands, real Adjustment by stages and the release of surrouding rock stress are showed;Compared with conventional excavation plan, owing to surrouding rock stress is adjusted several times, Acutely adjust a series of safety problem brought due to stress after avoiding underground cavern excavation off-load.
Three is that 2., 5., 8. district is all according to " the same elevation of concentric circular former for down stream surge-chamber dome design profile line position Reason ", the mode using " long and short pricker " to combine carries out horizontal photoface exploision, solves dome sphere curved surface structural excavation build Problem;Compared with conventional excavation plan, due to the raising of excavation quality, decrease filling spray and resilience of later stage gunite concrete Amount, has saved construction investment.
The excavation method of the present invention, it is possible to increase excavation Forming Quality, has saved construction investment;By effectively controlling cavern Once excavate molding maximum span and the subregion of stress, adjust release by stages, solve the major diameter hole under complex geological condition Room dome adjoining rock stability problem.
Accompanying drawing explanation
Fig. 1 is layering and the subregion schematic diagram of the present invention.
Fig. 2, Fig. 3, Fig. 4 and Fig. 5 are the schematic diagram excavated district by district respectively.
Fig. 6 is according to concentric circular same elevation principle, uses long and short pricker to combine the blast hole knot carrying out the explosion of horizon light face Structure schematic diagram.
In figure: 1.-middle drift, 2.-I-1Layer protective layer, 3.-I-2Excavation scope in the middle part of Ceng, 4.-I-2Open in the middle part of Ceng Dig scope, 5.-I-2Outer shroud reserves protective layer, 6.-II layer of descending grade road excavation scope, excavation area, 7.-II layer of middle part, and 8.-II Layer outer shroud reserves protective layer, 9.-reserved ramp.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing, the present invention will be further described.
Embodiment 1
(1) according to down stream surge-chamber dome structure feature and construction passage deployment scenarios, down stream surge-chamber dome is divided into two Floor nine district;
Described two-layer nine district refers to that its base plate is the Ith layer with up to position, dome summit, its end with passage of constructing for layering boundary line Plate following dome excavation scope is the IIth layer;
The Ith layer of performance parameter according to practice of construction equipment and structure design build be divided into again I-1Layer and I-2Layer;
Ith-1Floor middle drift excavation scope is the 1. district, I-1The protective layer excavation scope of floor is the 2. district, the Ith-2The middle part of layer Excavation scope be 3., 4. district, the Ith-2It is the 5. district that the outer shroud of floor reserves protective layer excavation scope;Descending grade road, IIth layer of middle part Excavation scope is the 6. district, and the IIth other region, floor middle part (without descending grade road) excavation scope is the 7. district, outer shroud of the IIth layer Reserved protective layer excavation scope is the 8. district, and the reserved ramp excavation scope of the IIth floor is the 9. district;
(2) first passing through anchoring observation hole early excise dome before dome excavation to wearing prestress anchorage cable making hole construction, dome is opened Digging excavation and the supporting construction first completing middle drift region, middle drift excavation completes dome center immediately to wearing pre-answering after terminating The lower rope of power anchor cable, stretching construction, then according to " fan-shaped stick method " subregion complete I-1The excavation supporting of layer protective layer, I-1 Layer is after supporting terminates, first carry out I-2The excavation of layer central region, then according to " fan-shaped stick method " subregion complete I-2Outside Ceng Ring reserves the excavation supporting of protective layer;Ⅰ-2After layer supporting completes, use the mode in descending grade road to be excavated to II layer of floor elevation, enter The excavation of II layer of central region of row;Then according to " fan-shaped stick method " subregion completes the excavation supporting construction of II layer of protective layer; After II layer of whole supporting complete, more finally excavate reserved ramp;Specifically:
Ith floor first passes through construction passage and uses pad slag mode to complete the excavation in the range of the Ith Ceng① district and supporting construction, so After complete the 2. excavation in the range of district and supporting construction, the starts the after 2. district's supporting completes, and 3. district, the excavation in the 4. district are executed Work;Finally complete the excavation in the range of the Ith Ceng⑤ district and supporting construction;Ith layer of whole excavation supporting i.e. proceed to after completing II layer of excavation stage;
First IIth layer use descending grade excavation with construction passage usual friendship mouth position according to the slope ratio of 12% from down stream surge-chamber dome Mode completes the excavation in the 6. district, then completes the excavation in 7. district, middle part the, then starts the 8. excavation in district and supporting construction, the II floor excavation supporting finally excavates the reserved ramp in the 9. district after being basically completed;
Wherein, the 2. district, the 5. district, the 8. district all use fan-shaped point of stick, according to the principle of the same elevation of concentric circular with long and short The mode that pricker combines carries out horizontal photoface exploision;
Above-mentioned supporting construction system for use in carrying anchor pole uses three arm rock drilling jumbos to carry out pore-creating, hand fit's platform truck completes anchor pole Filling is constructed, and gunite concrete uses large-scale wet shot car to construct;Dome two-ended cables supporting follow-up is in excavation and supporting Construction period, according to the exposure scope in site, prestress anchorage cable hole, arrange in time to carry out prestress anchorage cable reeve and stretch-draw is executed Work.

Claims (5)

1. the excavation method of large-scale down stream surge-chamber dome under a complex geological condition, it is characterised in that through following each step Rapid:
(1) according to down stream surge-chamber dome structure feature and construction passage deployment scenarios, down stream surge-chamber dome is divided into two Floor nine district;
Described two-layer nine district refers to that its base plate is the Ith layer with up to position, dome summit, its end with passage of constructing for layering boundary line Plate following dome excavation scope is the IIth layer;
The Ith layer of performance parameter according to practice of construction equipment and structure design build be divided into again I-1Layer and I-2Layer;
Ith-1Floor middle drift excavation scope is the 1. district, both sides scope according to radially carrying out subregion, I-1The protective layer excavation model of layer Enclosing is the 2. district, the Ith-2The middle part excavation scope of floor be the 3., 4. district, the Ith-2The outer shroud of layer is reserved protective layer excavation scope and is 5. district;IIth descending grade road, floor middle part excavation scope is the 6. district, and the IIth other region, floor middle part excavation scope is the 7. district, the It is the 8. district that the outer shroud of II floor reserves protective layer excavation scope, and the reserved ramp excavation scope of the IIth floor is the 9. district;
(2) first passing through anchoring observation hole early excise dome before dome excavation to wearing prestress anchorage cable making hole construction, dome is opened Digging excavation and the supporting construction first completing middle drift region, middle drift excavation completes dome center immediately to wearing pre-answering after terminating The lower rope of power anchor cable, stretching construction, then according to " fan-shaped stick method " subregion complete I-1The excavation supporting of layer protective layer, I-1 Layer is after supporting terminates, first carry out I-2The excavation of layer central region, then according to " fan-shaped stick method " subregion complete I-2Outside Ceng Ring reserves the excavation supporting of protective layer;Ⅰ-2After layer supporting completes, use the mode in descending grade road to be excavated to II layer of floor elevation, enter The excavation of II layer of central region of row;Then according to " fan-shaped stick method " subregion completes the excavation supporting construction of II layer of protective layer; After II layer of whole supporting complete, more finally excavate reserved ramp;Specifically:
Ith floor first passes through construction passage and uses pad slag mode to complete the excavation in the range of the Ith Ceng① district and supporting construction, so After complete the 2. excavation in the range of district and supporting construction, the starts the after 2. district's supporting completes, and 3. district, the excavation in the 4. district are executed Work;Finally complete the excavation in the range of the Ith Ceng⑤ district and supporting construction;Ith layer of whole excavation supporting i.e. proceed to after completing II layer of excavation stage;
First IIth layer use descending grade excavation with construction passage usual friendship mouth position according to the slope ratio of 12% from down stream surge-chamber dome Mode completes the excavation in the 6. district, then completes the excavation in 7. district, middle part the, then starts the 8. excavation in district and supporting construction, the II floor excavation supporting finally excavates the reserved ramp in the 9. district after being basically completed.
The excavation method of large-scale down stream surge-chamber dome under complex geological condition the most according to claim 1, its feature exists In: the dome excavation of described step (2) is to use hands air drill to coordinate the quick-fried platform of brill to excavate.
The excavation method of large-scale down stream surge-chamber dome under complex geological condition the most according to claim 1, its feature exists In: described step (2) the 2. district, the 5. district, the 8. district all use fan-shaped point of stick, according to the principle of the same elevation of concentric circular Horizontal photoface exploision is carried out in the way of long and short pricker combines.
The excavation method of large-scale down stream surge-chamber dome under complex geological condition the most according to claim 1, its feature exists Three arm rock drilling jumbos are used to carry out pore-creating, hand fit's platform truck in: the supporting construction system for use in carrying anchor pole of described step (2) complete Becoming the filling construction of anchor pole, gunite concrete uses large-scale wet shot car to construct.
The excavation method of large-scale down stream surge-chamber dome under complex geological condition the most according to claim 1, its feature exists In: the dome two-ended cables supporting follow-up of described step (2) is during excavation and supporting construction, according to position, prestress anchorage cable hole The exposure scope of point, arranges to carry out reeving and stretching construction of prestress anchorage cable in time.
CN201610579821.4A 2016-07-21 2016-07-21 The excavation method of large-scale down stream surge-chamber dome under a kind of complex geological condition Pending CN106194223A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610579821.4A CN106194223A (en) 2016-07-21 2016-07-21 The excavation method of large-scale down stream surge-chamber dome under a kind of complex geological condition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610579821.4A CN106194223A (en) 2016-07-21 2016-07-21 The excavation method of large-scale down stream surge-chamber dome under a kind of complex geological condition

Publications (1)

Publication Number Publication Date
CN106194223A true CN106194223A (en) 2016-12-07

Family

ID=57492219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610579821.4A Pending CN106194223A (en) 2016-07-21 2016-07-21 The excavation method of large-scale down stream surge-chamber dome under a kind of complex geological condition

Country Status (1)

Country Link
CN (1) CN106194223A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288654A (en) * 2017-06-27 2017-10-24 长江勘测规划设计研究有限责任公司 Super-span dome hollow ring in underground nuclear reactor cavern excavates structure and excavation method
CN108755622A (en) * 2018-07-25 2018-11-06 中国水利水电第十四工程局有限公司 A kind of excavation method of large-diameter circular cartridge type down stream surge-chamber
CN111550249A (en) * 2020-05-14 2020-08-18 中国水利水电第五工程局有限公司 Method for excavating hyperbolic inverted suspension dome in vertical shaft
CN112065470A (en) * 2020-09-23 2020-12-11 中铁四局集团有限公司 Cave depot tank body excavation method
CN112065401A (en) * 2020-09-23 2020-12-11 中国水利水电第七工程局有限公司 Large-diameter vertical cavity excavation method
CN112127920A (en) * 2020-09-23 2020-12-25 中铁四局集团有限公司 One-step molding sector excavation method for double-curved-surface cave depot dome
CN112145185A (en) * 2020-09-23 2020-12-29 中铁四局集团有限公司 Hyperboloid cave depot dome excavation method
CN112412502A (en) * 2020-12-16 2021-02-26 中铁四局集团有限公司 Excavation method for one-step blasting forming of cave depot tank body

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2979116B2 (en) * 1995-12-06 1999-11-15 鹿島建設株式会社 Excavation method in underground large cavity construction
CN102704958A (en) * 2012-06-14 2012-10-03 中国水电顾问集团华东勘测设计研究院 Construction method for large section underground cavity excavation supporting
CN102808627A (en) * 2012-09-07 2012-12-05 中国建筑第八工程局有限公司 Underground excavation construction method of steel pipe shed
CN105201532A (en) * 2015-09-11 2015-12-30 中铁九局集团第二工程有限公司 Ring excavation construction method for underground large-span spherical-cap-shaped dome under weak surrounding rock
CN105569693A (en) * 2015-12-28 2016-05-11 金诚信矿业管理股份有限公司 Underground stable rock stratum large-scale chamber construction method applied to medium-length hole blasting

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2979116B2 (en) * 1995-12-06 1999-11-15 鹿島建設株式会社 Excavation method in underground large cavity construction
CN102704958A (en) * 2012-06-14 2012-10-03 中国水电顾问集团华东勘测设计研究院 Construction method for large section underground cavity excavation supporting
CN102808627A (en) * 2012-09-07 2012-12-05 中国建筑第八工程局有限公司 Underground excavation construction method of steel pipe shed
CN105201532A (en) * 2015-09-11 2015-12-30 中铁九局集团第二工程有限公司 Ring excavation construction method for underground large-span spherical-cap-shaped dome under weak surrounding rock
CN105569693A (en) * 2015-12-28 2016-05-11 金诚信矿业管理股份有限公司 Underground stable rock stratum large-scale chamber construction method applied to medium-length hole blasting

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄汝东等: "白鹤滩水电站尾水调压室穹顶开挖支护施工技术", 《水力水电科技》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288654A (en) * 2017-06-27 2017-10-24 长江勘测规划设计研究有限责任公司 Super-span dome hollow ring in underground nuclear reactor cavern excavates structure and excavation method
CN108755622A (en) * 2018-07-25 2018-11-06 中国水利水电第十四工程局有限公司 A kind of excavation method of large-diameter circular cartridge type down stream surge-chamber
CN108755622B (en) * 2018-07-25 2023-05-09 中国水利水电第十四工程局有限公司 Excavation method of large-diameter cylindrical tail water pressure regulating chamber
CN111550249A (en) * 2020-05-14 2020-08-18 中国水利水电第五工程局有限公司 Method for excavating hyperbolic inverted suspension dome in vertical shaft
CN111550249B (en) * 2020-05-14 2021-10-22 中国水利水电第五工程局有限公司 Method for excavating hyperbolic inverted suspension dome in vertical shaft
CN112065470A (en) * 2020-09-23 2020-12-11 中铁四局集团有限公司 Cave depot tank body excavation method
CN112065401A (en) * 2020-09-23 2020-12-11 中国水利水电第七工程局有限公司 Large-diameter vertical cavity excavation method
CN112127920A (en) * 2020-09-23 2020-12-25 中铁四局集团有限公司 One-step molding sector excavation method for double-curved-surface cave depot dome
CN112145185A (en) * 2020-09-23 2020-12-29 中铁四局集团有限公司 Hyperboloid cave depot dome excavation method
CN112412502A (en) * 2020-12-16 2021-02-26 中铁四局集团有限公司 Excavation method for one-step blasting forming of cave depot tank body

Similar Documents

Publication Publication Date Title
CN106194223A (en) The excavation method of large-scale down stream surge-chamber dome under a kind of complex geological condition
CN110173267B (en) Construction method for subway shield zone to pass through existing station
CN104453921B (en) A kind of Soft Rock Tunnel Excavation construction technology
CN105443132B (en) Shallow buried covered excavation cross stull method for tunnel construction
CN103452561B (en) Vertical in-tunnel construction method of multilayer transverse channel of underground excavation station of metro, and construction method on east side and west side
CN102720504A (en) Double-side-wall-pilot-hole subsection bench cut method construction method
CN103277106B (en) Highway tunnel three-step five-procedure excavation construction method
CN103244133B (en) The milling of coal measure strata tunnel is dug and is combined construction with explosion
CN102226399A (en) Soft rock four-line large-span tunnel three-bench cable-bracing excavation construction method
CN104806252B (en) Underground dome excavation construction arrangement and excavation method
CN107288653A (en) A kind of the benching tunnelling method excavation supporting structure of weak surrounding rock large cross-section tunnel double -side approach three and construction method
CN106337686A (en) Rock stratum underground excavation three-story subway station umbrella cover structure and construction method thereof
CN102373930A (en) Rapid construction method of weak surrounding rock large-section multi-arc tunnel
CN106988750B (en) Implementation mode of ultra-short-distance underpass of existing station of large-span interval tunnel
CN204729099U (en) Rock quality layer tunneling three layers of subway station canopy structure
CN201991017U (en) Subway large-span station body structure based on arch cover method construction forming
CN110043269A (en) A kind of excavation construction process of freeway tunnel barrel
CN105201532A (en) Ring excavation construction method for underground large-span spherical-cap-shaped dome under weak surrounding rock
CN107288642A (en) PBA construction technologies
CN102322266A (en) Tunnel excavating and constructing method
CN109113757A (en) Tunnel cross mouth rapid constructing method
CN101539021A (en) Road tunnel excavation method
CN104632227A (en) Subway station excavation technology of single-layer beam arch structure
CN105821817A (en) Method for excavating semicircular dome of giant cylindrical surge chamber
CN109113749A (en) Four line large section railway tunnel construction method of weak surrounding rock

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207