CN106194163B - Automatic selection method for interpretation of well testing data of oil-water well - Google Patents

Automatic selection method for interpretation of well testing data of oil-water well Download PDF

Info

Publication number
CN106194163B
CN106194163B CN201610607955.2A CN201610607955A CN106194163B CN 106194163 B CN106194163 B CN 106194163B CN 201610607955 A CN201610607955 A CN 201610607955A CN 106194163 B CN106194163 B CN 106194163B
Authority
CN
China
Prior art keywords
well
time
pressure
curve
interpretation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610607955.2A
Other languages
Chinese (zh)
Other versions
CN106194163A (en
Inventor
李琳琳
韩斌
刘述忍
史原鹏
李拥军
吴刚
程小东
卢昊
冯广业
朱宝峰
杨先辉
李洪俊
徐凤兰
赵刚
方正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Bohai Drilling Engineering Co Ltd
Original Assignee
CNPC Bohai Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Bohai Drilling Engineering Co Ltd filed Critical CNPC Bohai Drilling Engineering Co Ltd
Priority to CN201610607955.2A priority Critical patent/CN106194163B/en
Publication of CN106194163A publication Critical patent/CN106194163A/en
Application granted granted Critical
Publication of CN106194163B publication Critical patent/CN106194163B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The invention discloses an automatic selection method for interpretation of well testing data of an oil-water well, which comprises the following 5 steps: firstly, measuring an actually measured pressure historical curve; secondly, judging whether a plurality of well opening and closing test stages exist, wherein the well opening time is more than 2.5 times of the well closing time, and if so, adopting a deconvolution method; if not, entering a third step; thirdly, performing straight line fitting on the open-hole flow curve, and if the correlation coefficient is greater than 0.95, entering a fourth step; otherwise, selecting a variable yield method; fourthly, drawing a double logarithmic curve, and if radial flow occurs, selecting a conventional method; if no radial flow occurs, step five; fifthly, on a double logarithmic curve without radial flow, if the bifurcation characteristic appears, an early well testing analysis method is adopted; if no bifurcation feature is present, a pressure rate interpretation method is employed. Powerful guarantee is provided for solving the problem of parameter multi-solution and improving the parameter accuracy.

Description

A kind of oil-water well well test data explanation automatic selecting method
Technical field
The present invention relates to a kind of oil-water well well test data means of interpretation, especially a kind of oil-water well well test data is explained automatic Selection method.
Background technique
The Well Test Technology of oil/gas well is understanding oil-gas reservoir, carries out hydrocarbon reservoir evaluation and production performance observation and assessed well The important means of effect.Well test analysis by obtaining stratum dynamic and static state parameters to bottom pressure mutation analysis, as in-place permeability, Skin factor, bottom-hole storage coefficient, pressure boundary, strata pressure etc. provide section for the formulation and adjustment of Oil and gas field development scheme Learn foundation.
Currently, main well test analysis means are the modern well test analysis methods using well test curve match.Using the modern times Well test analysis method explains well test data, and Explanation Accuracy can satisfy Reservoir Analysis for most of test layer, But then there is a problem of parameters precision difference to some special test curves, it is serious that us can be made to generate mistake to Oil Reservoir Types Understanding.Conclude and be primarily present following problems: 1, modern well test analysis method build-up analysis method is in radial flow Calculating parameter can not just calculate reservoir parameter if Radial Flow section does not occur on the basis of dynamic section, also can not just provide survey Try interpretation results.2, pressure recovery method assumes that a well with constant rate of production q (m3/ d) production tp(h) time, then closing well into Row pressure recovery test, is calculated by percolation equationk.It, will using constant rate of production calculating if practical well production is unstable Cause parameter inaccurate.3, build-up analysis method just for closed-in time section explanation, for driving a well for a long time Pressure information cannot effectively explain, therefore explain reservoir be limited in scope, be unable to full appreciation reservoir boundaries property.For These problems, applied during Fine structural interpretation early test interpretation method, variable-flow stacking method, numerical solution method, The new methods such as deconvolution means of interpretation.During well test analysis, multi-purpose modern well test interpretation method, that is, curve plate is quasi- at present Conjunction method, other methods need the personnel's of explaining rule of thumb subjective judgement, do not have quantitative choosing standard.
Summary of the invention
The technical problem to be solved by the invention is to provide a kind of oil-water well well test datas to explain automatic selecting method, solution The certainly only problem low with parameter multi-solution existing for modern well test analysis method and accuracy.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is that: a kind of oil-water well well test data explain from Dynamic selection method, including 5 steps: first step is in measurement oil well opening well and making production rear closing well recovery time for a period of time Bottom pressure value obtains the variation relation of bottom pressure and time, draws observed pressure history curve;Second step is judgement Whether there is the test phase of multiple switching well on observed pressure history curve, and well opening time be 2.5 times of closed-in time with On, if so, using deconvolution means of interpretation;If it is not, then entering step three;Third step is split well stream moving curve benefit Straight line fitting is carried out with least square method, if related coefficient is greater than 0.95, enters step four;Otherwise, varying flow rate is selected to explain Method;4th step is the double logarithmic curve for drawing pressure derivative and time and the double logarithmic curve of pressure and time, if any Radial flow occurs, then selects the conventional Well Test Data Analysis Method under average flow rate;Such as occur without radial flow, then enters the 5th step Suddenly;5th step is the double logarithmic curve of the pressure derivative and time that occur in no radial flow and the double-log of pressure and time On curve, if there is branch feathers, then early well testing analytical method is used;Pressure is used if there are not branch feathers Rate means of interpretation.
The beneficial effects of the present invention are: comprehensive routine Well Test Data Analysis Method, early stage try according to the scope of application of every kind of method The principle of the new methods such as well means of interpretation, variable-flow stacking method, pressure rates means of interpretation, deconvolution means of interpretation and spy Point provides one kind and automatically selects means of interpretation, tries hard to keep to solving the problems, such as that parameter solves to have provided with raising parameter accuracy more Barrier.
Detailed description of the invention
Fig. 1 is the flow chart that oil-water well well test data of the invention explains automatic selecting method;
Fig. 2 is the pressure curves of embodiment 1;
Fig. 3 is Δ p- Δ t and Δ p'- Δ t log-log graph of the embodiment 1 using varying flow rate means of interpretation;
Fig. 4 is the Δ p- Δ t and Δ p'- Δ t log-log graph that embodiment 1 is explained using conventional method;
Fig. 5 is the pressure curves of embodiment 2;
Fig. 6 is the Δ p- Δ t and Δ p'- Δ t log-log graph of embodiment 2.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and detailed description:
As shown in Figure 1, oil-water well well test data of the invention explains automatic selecting method, including 5 steps: first step Suddenly it is the bottom pressure value after measuring oil well opening well and making production for a period of time in closing well recovery time, obtains bottom pressure and time Variation relation draws observed pressure history curve;Second step is judged on observed pressure history curve with the presence or absence of multiple The test phase of well is switched, and well opening time is 2.5 times of the closed-in time or more, if so, using deconvolution means of interpretation;If It is not then to enter step three;Third step is split well stream moving curve using least square method progress straight line fitting, if related Coefficient is greater than 0.95, then enters step four;Otherwise, varying flow rate means of interpretation is selected;4th step be draw pressure derivative with The double logarithmic curve and pressure of time and the double logarithmic curve of time occur if any radial flow, then select normal under average flow rate Advise Well Test Data Analysis Method;Such as occur without radial flow, then enters the 5th step;5th step is that occur in no radial flow On the double logarithmic curve and pressure and the double logarithmic curve of time of pressure derivative and time, if there is branch feathers, then use Early well testing analytical method;Pressure rates means of interpretation is used if there are not branch feathers.
To make the objectives, technical solutions, and advantages of the present invention clearer, below with reference to embodiment and attached drawing, to this The embodiment of invention is described in further details.
Embodiment 1
Southern fort 1-3 well perforated interval is 2745.6-2802.6m, and with a thickness of 38.2m, well log interpretation is oil-water common-layer.In On December 19th, 2005 using oil pipe conveying underbalance perforating+formation testing+flowing back by hydraulic pump (asking production) three make oil testing tech into Row formation testing, once drive a well 66min, and one time closing well restores 1781min, the secondary drain 60h that drives a well.
Step 1: measurement oil well opening well and making production is for a period of time (66min) afterwards in shut-in pressure recovery time (1781min) Bottom pressure value obtains the variation relation of bottom pressure and time, draws observed pressure history curve, sees Fig. 2.
Step 2: judge the test phase that whether there is multiple switching well on observed pressure history curve, and well opening time It is 2.5 times or more of closed-in time.By Fig. 2 and test process it is found that the well be not present multiple switching well, only one open+one pass+ Two open, and therefore, enter step three.
Step 3: split well stream moving curve 13.7h to 14.8h sections carries out straight line fitting using least square method, is intended Conjunction formula is P=2.3714t-17.091, coefficient R2=0.8674, less than 0.95, therefore select varying flow rate means of interpretation.It closes Well double-log derivative curve early stage is linear flow, and the later period enters the apparent radial flow stage, sees Fig. 3.It is fitted reservoir parameter are as follows: table Skin coefficient is -2.47, and permeability is 0.04 × 10-3μm2, radius of investigation 58.9m.And use the Modern test well point of average product Analysis method, the closing well double-log derivative curve later period intersects, does not occur obvious radial flow, see Fig. 4, therefore fitting parameter precision is not high, It is fitted the parameter obtained are as follows: skin factor is -4.41, and permeability is 0.571 × 10-3μm2, radius of investigation 50.2m.
Automatically selecting explanation terminates.
Embodiment 2
Between C2-1 layers of test zone 2024.80-2026.80m of 12-54x well, with a thickness of 2m, well log interpretation is oil-water common-layer. Test technology is made across penetrating connection every survey using MFE on March 9th, 2013 to March 19, test process includes that one open-one close two opens pumping It draws, wherein the 90min that once drives a well, one time closing well restores 1497min.
Step 1: measurement oil well opening well and making production is for a period of time (90min) afterwards in shut-in pressure recovery time (1497min) Bottom pressure value obtains the variation relation of bottom pressure and time, draws observed pressure history curve, sees Fig. 5.
Step 2: judge the test phase that whether there is multiple switching well on observed pressure history curve, and well opening time It is 2.5 times or more of closed-in time.By Fig. 5 and test process it is found that although the well has a multiple switching well, but well opening time Only 90min, and closing well recovery time is 1497min, well opening time is less than 2.5 times of closed-in time, therefore, enters step Three.
Step 3: split well stream moving curve 17.5h to 19.24h sections carries out straight line fitting using least square method, is intended Conjunction formula is P=0.592t-1.6006, coefficient R 2=0.9787, is greater than 0.95, therefore enters step four.
Step 4: the double logarithmic curve of pressure derivative and time and the double logarithmic curve of pressure and time are drawn, there is radial direction Outflow is existing, sees Fig. 6, then selects the conventional Well Test Data Analysis Method under average flow rate.
The reservoir parameter for selecting " constant bottom-hole storage+radial compound+infinity " models fitting to obtain are as follows: effective permeability 1.05×10-3μm2, flow coefficient 6.18 × 10-3μm2.m/mPa.s, skin factor -1.66, compound radius 7.05m.
Automatically selecting explanation terminates.
In conclusion the contents of the present invention are not limited in the above embodiments, the knowledgeable people in same area can Can propose other embodiments easily within technological guidance's thought of the invention, but this embodiment is included in this hair Within the scope of bright.

Claims (1)

1. a kind of oil-water well well test data explains automatic selecting method, which is characterized in that including five steps:
First step: the bottom pressure value in measurement oil well opening well and making production rear closing well recovery time for a period of time obtains shaft bottom The variation relation of pressure and time draws observed pressure history curve;
Second step: judge the test phase that whether there is multiple switching well on observed pressure history curve, and well opening time It is 2.5 times or more of closed-in time, if so, using deconvolution means of interpretation;If it is not, then entering step three;
Third step: split well stream moving curve carries out straight line fitting using least square method, if related coefficient is greater than 0.95, Enter step four;Otherwise, varying flow rate means of interpretation is selected;
4th step: the double logarithmic curve of pressure derivative and the double logarithmic curve of time and pressure and time is drawn, if any diameter It is existing to outflow, then select the conventional Well Test Data Analysis Method under average flow rate;Such as occur without radial flow, then enters the 5th step Suddenly;
5th step: entire pressure derivative and the double logarithmic curve of time and pressure and the double logarithmic curve of time are in no radial direction Outflow is current, if there is branch feathers, then uses early well testing analytical method;Using pressure if there are not branch feathers Power rate means of interpretation.
CN201610607955.2A 2016-07-26 2016-07-26 Automatic selection method for interpretation of well testing data of oil-water well Active CN106194163B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610607955.2A CN106194163B (en) 2016-07-26 2016-07-26 Automatic selection method for interpretation of well testing data of oil-water well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610607955.2A CN106194163B (en) 2016-07-26 2016-07-26 Automatic selection method for interpretation of well testing data of oil-water well

Publications (2)

Publication Number Publication Date
CN106194163A CN106194163A (en) 2016-12-07
CN106194163B true CN106194163B (en) 2019-04-12

Family

ID=57495787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610607955.2A Active CN106194163B (en) 2016-07-26 2016-07-26 Automatic selection method for interpretation of well testing data of oil-water well

Country Status (1)

Country Link
CN (1) CN106194163B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108614902B (en) * 2016-12-09 2021-06-22 中国石油化工股份有限公司 Shale gas well production data analysis method with changed production system
CN107587870A (en) * 2017-09-11 2018-01-16 中国石油大学(北京) Shale gas fracturing work down-hole accident monitors and method for early warning and system
CN110486009B (en) * 2019-09-02 2023-10-31 合肥鼎盛锦业科技有限公司 Automatic parameter reverse solving method and system for infinite stratum
CN112211627B (en) * 2020-10-30 2022-03-11 西南石油大学 Selection method of low-permeability gas reservoir interference well testing test well

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1438404A (en) * 2003-02-17 2003-08-27 大庆油田有限责任公司 Well-logging analysis method not depending on radial-flow straightway
US20040251021A1 (en) * 2003-06-13 2004-12-16 Schlumberger Technology Corporation, Incorporated In The State Of Texas Apparatus and methods for canceling the effects of fluid storage in downhole tools
CN101216564A (en) * 2008-01-16 2008-07-09 中国科学技术大学 Early well testing analytical method based on small signal extraction technology
CN103452547A (en) * 2012-08-09 2013-12-18 凌毅立 Method and system for analyzing and processing subsequent flow data in well testing data
CN105760645A (en) * 2014-12-18 2016-07-13 中国石油化工股份有限公司 Well test interpretation method based on pressure recovery well test and production data well test

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7774140B2 (en) * 2004-03-30 2010-08-10 Halliburton Energy Services, Inc. Method and an apparatus for detecting fracture with significant residual width from previous treatments
GB2530416B (en) * 2013-03-29 2019-12-25 Schlumberger Holdings Optimum flow control valve setting system and procedure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1438404A (en) * 2003-02-17 2003-08-27 大庆油田有限责任公司 Well-logging analysis method not depending on radial-flow straightway
US20040251021A1 (en) * 2003-06-13 2004-12-16 Schlumberger Technology Corporation, Incorporated In The State Of Texas Apparatus and methods for canceling the effects of fluid storage in downhole tools
CN101216564A (en) * 2008-01-16 2008-07-09 中国科学技术大学 Early well testing analytical method based on small signal extraction technology
CN103452547A (en) * 2012-08-09 2013-12-18 凌毅立 Method and system for analyzing and processing subsequent flow data in well testing data
CN105760645A (en) * 2014-12-18 2016-07-13 中国石油化工股份有限公司 Well test interpretation method based on pressure recovery well test and production data well test

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
From Straight Lines to Deconvolution The Evolution of the State of the Art in Well Test Analysis;Alain C.Gringarten;《the 2006 SPE Annual Technical Conference and Exhibition》;20080228;第41-62页 *

Also Published As

Publication number Publication date
CN106194163A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN106194163B (en) Automatic selection method for interpretation of well testing data of oil-water well
CN106093350B (en) The method for determining heterogeneous carbonate reservoir saturation exponent
CN107563027A (en) For analyzing the WELL TEST INTERPRETATION MODEL and method of more fracture-cavity units cascaded structures
CN105545301A (en) Recognition method of properties of complex reservoir stratum fluid in different mud systems
CN101183154B (en) Geological logging explanation evaluating method
CN106600439A (en) Low-mobility oil reservoir physical constraint well test interpretation method and device
CN109386285A (en) A kind of ultra-low permeability oil layer slurry compounding degree and its evaluation method of influence
RU2318993C1 (en) Method for watered oil pool development
Yamalov et al. Systematic Approach in Testing Field Data Analysis Techniques with an Example of Multiwell Retrospective Testing
CN109577966A (en) Using the method for tracer monitoring individual well residual oil saturation
CN200971780Y (en) Measuring instrument for packer of water injection well
CN112069690A (en) Evaluation method for test productivity of deep water fault block oil reservoir long horizontal well multistage oil nozzle
CN109113690A (en) The separate injection interval of separate water injection well determines method
Chen et al. Use of pressure/rate deconvolution to estimate connected reservoir-drainage volume in naturally fractured unconventional-gas reservoirs from canadian rockies foothills
Rafiei Improved oil production and waterflood performance by water allocation management
CN113719271B (en) Well test design parameter correction method
CN114737947A (en) Method and device for developing and adjusting horizontal well of carbonate reservoir
Shi et al. Evaluation the Geological Uncertainties to Increase the Benefit of Offshore Project
Al-Qenae et al. Tracking the performance of strategically significant EOR Pilot: Zooming into inter-well connectivity
Fisch et al. Hydraulic testing and reservoir characterization of the Taufkirchen site in the Bavarian Molasse Basin, Germany
Elrafie et al. Field Development Plans Optimization by Modeling Fluids Flow Impact and Assessing Intelligent Wells on Reservoir Performance
Lewis Water shutoff in the Dunbar field, identification of candidates and production gains
CN117072145A (en) Method for determining effective thickness of down-the-mine reservoir through well test curve
Lin Pressure Buildup or Falloff Test Analysis for a Well in Commingled Reservoirs with Flow Rate Profile Logging
CN107589458B (en) The method for calculating reservoir permeability based on seismic profile quality factor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210715

Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC Bohai Drilling Engineering Co.,Ltd.

Address before: 300457 Tianjin Binhai New Area Development Zone Huanghai Road 106, Bohai Drilling Engineering Co., Ltd. science and Technology Development Office

Patentee before: CNPC Bohai Drilling Engineering Co.,Ltd.

TR01 Transfer of patent right