CN106194163A - Automatic selection method for interpretation of well testing data of oil-water well - Google Patents

Automatic selection method for interpretation of well testing data of oil-water well Download PDF

Info

Publication number
CN106194163A
CN106194163A CN201610607955.2A CN201610607955A CN106194163A CN 106194163 A CN106194163 A CN 106194163A CN 201610607955 A CN201610607955 A CN 201610607955A CN 106194163 A CN106194163 A CN 106194163A
Authority
CN
China
Prior art keywords
well
time
pressure
curve
interpretation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610607955.2A
Other languages
Chinese (zh)
Other versions
CN106194163B (en
Inventor
李琳琳
韩斌
刘述忍
史原鹏
李拥军
吴刚
程小东
卢昊
冯广业
朱宝峰
杨先辉
李洪俊
徐凤兰
赵刚
方正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Bohai Drilling Engineering Co Ltd
Original Assignee
CNPC Bohai Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Bohai Drilling Engineering Co Ltd filed Critical CNPC Bohai Drilling Engineering Co Ltd
Priority to CN201610607955.2A priority Critical patent/CN106194163B/en
Publication of CN106194163A publication Critical patent/CN106194163A/en
Application granted granted Critical
Publication of CN106194163B publication Critical patent/CN106194163B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The invention discloses an automatic selection method for interpretation of well testing data of an oil-water well, which comprises the following 5 steps: firstly, measuring an actually measured pressure historical curve; secondly, judging whether a plurality of well opening and closing test stages exist, wherein the well opening time is more than 2.5 times of the well closing time, and if so, adopting a deconvolution method; if not, entering a third step; thirdly, performing straight line fitting on the open-hole flow curve, and if the correlation coefficient is greater than 0.95, entering a fourth step; otherwise, selecting a variable yield method; fourthly, drawing a double logarithmic curve, and if radial flow occurs, selecting a conventional method; if no radial flow occurs, step five; fifthly, on a double logarithmic curve without radial flow, if the bifurcation characteristic appears, an early well testing analysis method is adopted; if no bifurcation feature is present, a pressure rate interpretation method is employed. Powerful guarantee is provided for solving the problem of parameter multi-solution and improving the parameter accuracy.

Description

A kind of oil-water well well test data explains automatic selecting method
Technical field
The present invention relates to a kind of oil-water well well test data means of interpretation, especially a kind of oil-water well well test data is explained automatically System of selection.
Background technology
The Well Test Technology of Oil/gas Well is understanding oil-gas reservoir, carries out hydrocarbon reservoir evaluation and production performance observation and assessment completion The important means of effect.Well test analysis by bottom pressure mutation analysis is obtained stratum dynamic and static state parameters, as in-place permeability, Skin factor, bottom-hole storage coefficient, pressure boundary, strata pressure etc., for formulation and the adjustment offer section of Oil and gas field development scheme Learn foundation.
At present, main well test analysis means are the modern well test analysis methods utilizing well test curve match.Use the modern times Well test data is explained by well test analysis method, and for major part test layer, Explanation Accuracy can meet Reservoir Analysis, But the problem that some special test curves then exist parameters precision difference, serious can make us that Oil Reservoir Types is produced mistake Understanding.Conclude and be primarily present problems with: 1, modern well test analysis method build-up analysis method is at radial flow Calculate parameter on the basis of dynamic section, if Radial Flow section does not occur, just cannot calculate reservoir parameter, survey the most just cannot be provided Examination interpretation results.2, pressure restoration methods assumes that a bite well is with constant rate of production q (m3/ d) produce tpH () time, then closing well enters Row pressure buildup test, is calculated by percolation equationk.If real well yield is unstable, then using constant rate of production to calculate will Cause parameter inaccurate.3, build-up analysis method is just for the explanation of a closed-in time section, for driving a well for a long time Pressure information can not effectively explain, therefore explain reservoir be limited in scope, it is impossible to full appreciation reservoir boundaries character.For These problems, apply during Fine structural interpretation early test interpretation method, variable-flow stacking method, numerical solution method, The new methods such as deconvolution means of interpretation.During well test analysis, the i.e. curve plate of current multiplex modern well test interpretation method is intended Conjunction method, other method needs explanation personnel rule of thumb subjective judgment, does not has quantitative choosing standard.
Summary of the invention
The technical problem to be solved is to provide a kind of oil-water well well test data and explains automatic selecting method, solves The most only use the parameter multi-solution of modern well test analysis method existence and the problem that degree of accuracy is low.
In order to solve above-mentioned technical problem, the technical solution used in the present invention is: a kind of oil-water well well test data is explained certainly Dynamic system of selection, including 5 steps: first step be measure oil well opening well and making production a period of time after in closing well recovery time Bottom pressure value, obtains the variation relation of bottom pressure and time, draws observed pressure history curve;Second step is to judge Whether there is the test phase of multiple switching well on observed pressure history curve, and well opening time be 2.5 times of the closed-in time with On, the most then use deconvolution means of interpretation;If it is not, then enter step 3;3rd step is split well stream moving curve profit Carry out fitting a straight line with method of least square, if correlation coefficient is more than 0.95, then enter step 4;Otherwise, varying flow rate is selected to explain Method;4th step is to draw pressure derivative and the double logarithmic curve of time and pressure and the double logarithmic curve of time, if any Radial flow occurs, then select the conventional Well Test Data Analysis Method under average discharge;As not having radial flow to occur, then enter the 5th step Suddenly;5th step is the double-log at the double logarithmic curve of the pressure derivative occurred without radial flow and time and pressure with time On curve, if there is branch feathers, then use early well testing analytical method;Without occurring that branch feathers then uses pressure Speed means of interpretation.
The invention has the beneficial effects as follows: according to the scope of application of every kind of method, comprehensive conventional Well Test Data Analysis Method, in early days examination The principle of the new methods such as well means of interpretation, variable-flow stacking method, pressure rates means of interpretation, deconvolution means of interpretation and spy Point, it is provided that one automatically selects means of interpretation, has provided tried hard to keep to solution parameter many solutions problem and raising parameter degree of accuracy Barrier.
Accompanying drawing explanation
Fig. 1 is the flow chart of the oil-water well well test data explanation automatic selecting method of the present invention;
Fig. 2 is the pressure curves of embodiment 1;
Fig. 3 is Δ p-Δ t and the Δ p'-Δ t log-log graph that embodiment 1 utilizes varying flow rate means of interpretation;
Fig. 4 is the embodiment 1 Δ p-Δ t that utilizes conventional method to explain and Δ p'-Δ t log-log graph;
Fig. 5 is the pressure curves of embodiment 2;
Fig. 6 is Δ p-Δ t and the Δ p'-Δ t log-log graph of embodiment 2.
Detailed description of the invention
With detailed description of the invention, the present invention is described in further detail below in conjunction with the accompanying drawings:
As it is shown in figure 1, the oil-water well well test data of the present invention explains automatic selecting method, including 5 steps: first step Suddenly it is to measure the bottom pressure value in closing well after oil well opening well and making production a period of time recovery time, obtains bottom pressure and time Variation relation, draws observed pressure history curve;Second step is to judge whether exist repeatedly on observed pressure history curve Switch the test phase of well, and well opening time is more than 2.5 times of closed-in time, the most then use deconvolution means of interpretation;If Not, then step 3 is entered;3rd step is that split well stream moving curve utilizes method of least square to carry out fitting a straight line, if relevant Coefficient is more than 0.95, then enter step 4;Otherwise, varying flow rate means of interpretation is selected;4th step be draw pressure derivative with The double logarithmic curve of time and pressure and the double logarithmic curve of time, occur if any radial flow, then select under average discharge is normal Rule Well Test Data Analysis Method;As not having radial flow to occur, then enter the 5th step;5th step is occurring without radial flow Pressure derivative and the double logarithmic curve of time and pressure, with on the double logarithmic curve of time, if there is branch feathers, then use Early well testing analytical method;Without occurring that branch feathers then uses pressure rates means of interpretation.
For making the object, technical solutions and advantages of the present invention clearer, below in conjunction with embodiment and accompanying drawing, to this The embodiment of invention is described in further details.
Embodiment 1
Fort, south 1-3 well perforated interval is 2745.6-2802.6m, and thickness is 38.2m, and well log interpretation is oil-water common-layer.In Within 2005, December uses oil pipe conveying underbalance perforating+formation testing+flowing back by hydraulic pump (seeking product) three to enter as oil testing tech on the 19th Row formation testing, once drive a well 66min, and closing well recovers 1781min, and secondary drives a well discharge opeing 60h.
Step one: measure in oil well opening well and making production a period of time (66min) shut-in pressure recovery time (1781min) afterwards Bottom pressure value, obtains the variation relation of bottom pressure and time, draws observed pressure history curve, sees Fig. 2.
Step 2: judge whether to exist on observed pressure history curve the test phase of multiple switching well, and well opening time It it is more than 2.5 times of the closed-in time.From Fig. 2 and test process, there is not multiple switching well in this well, only one open+one pass+ Two open, and therefore, enter step 3.
Step 3: split well stream moving curve 13.7h to 14.8h section utilizes method of least square to carry out fitting a straight line, is intended Conjunction formula is P=2.3714t-17.091, coefficient R2=0.8674, less than 0.95, therefore select varying flow rate means of interpretation.Close Well double-log derivative curve is linear flow in early days, and the later stage enters the obvious radial flow stage, sees Fig. 3.Matching reservoir parameter is: table Skin coefficient is-2.47, and permeability is 0.04 × 10-3μm2, radius of investigation is 58.9m.And use the Modern test well of average product to divide Analysis method, closing well double-log derivative curve later stage intersection, obvious radial flow does not occurs, sees Fig. 4, therefore fitting parameter precision is the highest, The parameter that matching obtains is: skin factor is-4.41, and permeability is 0.571 × 10-3μm2, radius of investigation is 50.2m.
Automatically select explanation to terminate.
Embodiment 2
Between 12-54x well C2-1 layer test zone 2024.80-2026.80m, thickness is 2m, and well log interpretation is oil-water common-layer. Using MFE to make test technology across penetrating connection every survey on March 9th, 2013 to March 19, test process includes that one open-one close two is opened and takes out Drawing, the most once drive a well 90min, and one time closing well recovers 1497min.
Step one: measure in oil well opening well and making production a period of time (90min) shut-in pressure recovery time (1497min) afterwards Bottom pressure value, obtains the variation relation of bottom pressure and time, draws observed pressure history curve, sees Fig. 5.
Step 2: judge whether to exist on observed pressure history curve the test phase of multiple switching well, and well opening time It it is more than 2.5 times of the closed-in time.From Fig. 5 and test process, although there is multiple switching well in this well, but well opening time Being only 90min, and closing well recovery time is 1497min, well opening time is less than 2.5 times of the closed-in time, therefore, enters step Three.
Step 3: split well stream moving curve 17.5h to 19.24h section utilizes method of least square to carry out fitting a straight line, is intended Conjunction formula is P=0.592t-1.6006, coefficient R 2=0.9787, more than 0.95, therefore enters step 4.
Step 4: draw the double logarithmic curve of pressure derivative and the double logarithmic curve of time and pressure and time, have radially Flow out existing, see Fig. 6, then select the conventional Well Test Data Analysis Method under average discharge.
Step 5: at the double-log of the double logarithmic curve of the pressure derivative occurred without radial flow and time and pressure with time On curve, branch feathers does not occur, sees Fig. 6, then use pressure rates means of interpretation." constant bottom-hole storage+radial direction is multiple in selection Close+infinitely great " reservoir parameter that obtains of models fitting is: effective permeability 1.05 × 10-3μm2, flow coefficient 6.18 × 10-3μ m2.m/mPa.s, skin factor-1.66, compound radius 7.05m.
Automatically select explanation to terminate.
In sum, present disclosure is not limited in the above embodiments, and the knowledgeable people in same area can Can propose other embodiment within technological guidance's thought of the present invention easily, but this embodiment is included in this Within the scope of bright.

Claims (1)

1. an oil-water well well test data explains automatic selecting method, it is characterised in that include five steps:
First step: measure the bottom pressure value in closing well after oil well opening well and making production a period of time recovery time, obtain shaft bottom Pressure and the variation relation of time, draw observed pressure history curve;
Second step: judge whether to exist on observed pressure history curve the test phase of multiple switching well, and well opening time It is more than 2.5 times of the closed-in time, the most then uses deconvolution means of interpretation;If it is not, then enter step 3;
3rd step: split well stream moving curve utilizes method of least square to carry out fitting a straight line, if correlation coefficient is more than 0.95, then Enter step 4;Otherwise, varying flow rate means of interpretation is selected;
4th step: draw the double logarithmic curve of pressure derivative and the double logarithmic curve of time and pressure and time, if any footpath Existing to flowing out, then select the conventional Well Test Data Analysis Method under average discharge;As not having radial flow to occur, then enter the 5th step Suddenly;
5th step: at the double-log of the double logarithmic curve of the pressure derivative occurred without radial flow and time and pressure with time On curve, if there is branch feathers, then use early well testing analytical method;Without occurring that branch feathers then uses pressure Speed means of interpretation.
CN201610607955.2A 2016-07-26 2016-07-26 Automatic selection method for interpretation of well testing data of oil-water well Active CN106194163B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610607955.2A CN106194163B (en) 2016-07-26 2016-07-26 Automatic selection method for interpretation of well testing data of oil-water well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610607955.2A CN106194163B (en) 2016-07-26 2016-07-26 Automatic selection method for interpretation of well testing data of oil-water well

Publications (2)

Publication Number Publication Date
CN106194163A true CN106194163A (en) 2016-12-07
CN106194163B CN106194163B (en) 2019-04-12

Family

ID=57495787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610607955.2A Active CN106194163B (en) 2016-07-26 2016-07-26 Automatic selection method for interpretation of well testing data of oil-water well

Country Status (1)

Country Link
CN (1) CN106194163B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587870A (en) * 2017-09-11 2018-01-16 中国石油大学(北京) Shale gas fracturing work down-hole accident monitors and method for early warning and system
CN108614902A (en) * 2016-12-09 2018-10-02 中国石油化工股份有限公司 A kind of shale gas well creation data analysis method producing system variation
CN110486009A (en) * 2019-09-02 2019-11-22 合肥鼎盛锦业科技有限公司 A kind of automatic reverse method of parameter and system on infinity stratum
CN112211627A (en) * 2020-10-30 2021-01-12 西南石油大学 Selection method of low-permeability gas reservoir interference well testing test well

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1438404A (en) * 2003-02-17 2003-08-27 大庆油田有限责任公司 Well-logging analysis method not depending on radial-flow straightway
US20040251021A1 (en) * 2003-06-13 2004-12-16 Schlumberger Technology Corporation, Incorporated In The State Of Texas Apparatus and methods for canceling the effects of fluid storage in downhole tools
WO2005095756A1 (en) * 2004-03-30 2005-10-13 Halliburton Energy Services, Inc. Methods and an apparatus for detecting fracture with significant residual width from previous treatments
CN101216564A (en) * 2008-01-16 2008-07-09 中国科学技术大学 Early well testing analytical method based on small signal extraction technology
CN103452547A (en) * 2012-08-09 2013-12-18 凌毅立 Method and system for analyzing and processing subsequent flow data in well testing data
WO2014160626A1 (en) * 2013-03-29 2014-10-02 Schlumberger Canada Limited Optimum flow control valve setting system and procedure
CN105760645A (en) * 2014-12-18 2016-07-13 中国石油化工股份有限公司 Well test interpretation method based on pressure recovery well test and production data well test

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1438404A (en) * 2003-02-17 2003-08-27 大庆油田有限责任公司 Well-logging analysis method not depending on radial-flow straightway
US20040251021A1 (en) * 2003-06-13 2004-12-16 Schlumberger Technology Corporation, Incorporated In The State Of Texas Apparatus and methods for canceling the effects of fluid storage in downhole tools
WO2005095756A1 (en) * 2004-03-30 2005-10-13 Halliburton Energy Services, Inc. Methods and an apparatus for detecting fracture with significant residual width from previous treatments
CN101216564A (en) * 2008-01-16 2008-07-09 中国科学技术大学 Early well testing analytical method based on small signal extraction technology
CN103452547A (en) * 2012-08-09 2013-12-18 凌毅立 Method and system for analyzing and processing subsequent flow data in well testing data
WO2014160626A1 (en) * 2013-03-29 2014-10-02 Schlumberger Canada Limited Optimum flow control valve setting system and procedure
CN105760645A (en) * 2014-12-18 2016-07-13 中国石油化工股份有限公司 Well test interpretation method based on pressure recovery well test and production data well test

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
ALAIN C.GRINGARTEN: "From Straight Lines to Deconvolution The Evolution of the State of the Art in Well Test Analysis", 《THE 2006 SPE ANNUAL TECHNICAL CONFERENCE AND EXHIBITION》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108614902A (en) * 2016-12-09 2018-10-02 中国石油化工股份有限公司 A kind of shale gas well creation data analysis method producing system variation
CN108614902B (en) * 2016-12-09 2021-06-22 中国石油化工股份有限公司 Shale gas well production data analysis method with changed production system
CN107587870A (en) * 2017-09-11 2018-01-16 中国石油大学(北京) Shale gas fracturing work down-hole accident monitors and method for early warning and system
CN110486009A (en) * 2019-09-02 2019-11-22 合肥鼎盛锦业科技有限公司 A kind of automatic reverse method of parameter and system on infinity stratum
CN110486009B (en) * 2019-09-02 2023-10-31 合肥鼎盛锦业科技有限公司 Automatic parameter reverse solving method and system for infinite stratum
CN112211627A (en) * 2020-10-30 2021-01-12 西南石油大学 Selection method of low-permeability gas reservoir interference well testing test well
CN112211627B (en) * 2020-10-30 2022-03-11 西南石油大学 Selection method of low-permeability gas reservoir interference well testing test well

Also Published As

Publication number Publication date
CN106194163B (en) 2019-04-12

Similar Documents

Publication Publication Date Title
CN106194163A (en) Automatic selection method for interpretation of well testing data of oil-water well
CN107563027A (en) For analyzing the WELL TEST INTERPRETATION MODEL and method of more fracture-cavity units cascaded structures
CN101183154B (en) Geological logging explanation evaluating method
Laochamroonvorapongse et al. Performance assessment of miscible and immiscible water-alternating gas floods with simple tools
CN112377178B (en) Quantitative diagnosis method for edge water invasion front edge
US7059180B2 (en) Water cut rate of change analytic method
RU2318993C1 (en) Method for watered oil pool development
Yamalov et al. Systematic Approach in Testing Field Data Analysis Techniques with an Example of Multiwell Retrospective Testing
McDowell et al. Production effects from frac-driven interactions in the Southeastern Midland basin, Reagan County, Texas
CN200971780Y (en) Measuring instrument for packer of water injection well
Chen et al. Use of pressure/rate deconvolution to estimate connected reservoir-drainage volume in naturally fractured unconventional-gas reservoirs from canadian rockies foothills
Zubarev et al. Feasibility study and selection process for icd applications in an offshore niger delta field
Shayegi et al. Reservoir characterization begins at first contact with the drill bit
Halleck Advances in understanding perforator penetration and flow performance
CN114737947A (en) Method and device for developing and adjusting horizontal well of carbonate reservoir
Garofoli et al. Maximization of downhole tracer profiling evaluation through the integration of different technologies in challenging environments
Proett et al. Objectively Quantifying Wireline and LWD Pressure Test Quality
Ali et al. Analyzing the factors contributing to water coning in a naturally fractured oil reservoir of Kurdistan Region of Iraq
Al-Qenae et al. Tracking the performance of strategically significant EOR Pilot: Zooming into inter-well connectivity
Fisch et al. Hydraulic testing and reservoir characterization of the Taufkirchen site in the Bavarian Molasse Basin, Germany
Lewis Water shutoff in the Dunbar field, identification of candidates and production gains
Rahman et al. Use of PITA for Estimating Key Reservoir Parameters
Elrafie et al. Field Development Plans Optimization by Modeling Fluids Flow Impact and Assessing Intelligent Wells on Reservoir Performance
Do et al. Modelling and Analysis of Mini-Fracture Tests in Hydraulic Fracturing
Shahrekordi et al. A SENSITIVITY ANALYSIS FOR THE EFFECTIVE PARAMETERS DISPARITY ON PRESSURE AND PRESSURE DERIVATIVE OF WELL-TESTING IN A HORIZONTAL WELL.

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210715

Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC Bohai Drilling Engineering Co.,Ltd.

Address before: 300457 Tianjin Binhai New Area Development Zone Huanghai Road 106, Bohai Drilling Engineering Co., Ltd. science and Technology Development Office

Patentee before: CNPC Bohai Drilling Engineering Co.,Ltd.

TR01 Transfer of patent right