CN106194026B CN201610712819.XA CN201610712819A CN106194026B CN 106194026 B CN106194026 B CN 106194026B CN 201610712819 A CN201610712819 A CN 201610712819A CN 106194026 B CN106194026 B CN 106194026B
Authority
CN
China
Prior art keywords
rov
folding arm
arm device
hydraulic
hydraulic folding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610712819.XA
Other languages
Chinese (zh)
Other versions
CN106194026A (en
Inventor
张振波
于欣哲
刘宾
轩义华
薛志刚
龙黎
李东方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Oilfield Services Ltd
China National Offshore Oil Corp CNOOC
CNOOC Deepwater Development Ltd
CNOOC China Ltd Shenzhen Branch
Original Assignee
China Oilfield Services Ltd
China National Offshore Oil Corp CNOOC
CNOOC Deepwater Development Ltd
CNOOC China Ltd Shenzhen Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Oilfield Services Ltd, China National Offshore Oil Corp CNOOC, CNOOC Deepwater Development Ltd, CNOOC China Ltd Shenzhen Branch filed Critical China Oilfield Services Ltd
Priority to CN201610712819.XA priority Critical patent/CN106194026B/en
Publication of CN106194026A publication Critical patent/CN106194026A/en
Application granted granted Critical
Publication of CN106194026B publication Critical patent/CN106194026B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/12Underwater drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/001Survey of boreholes or wells for underwater installation

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to a kind of control methods of well site survey system for marine dynamically-positioned drilling platform, the control method is the following steps are included: S1: after dynamically-positioned drilling platform reaches well location to be measured, hydraulic folding arm device for carrying TSS440 system is installed on the frame of ROV, meanwhile the ROV carries well site survey equipment;S2: the hydraulic folding arm device is adjusted to erected state, operator controls the ROV and enters water, and is moved to seabed predetermined operation position;S3: operator controls the hydraulic folding arm device and is adjusted to balance state, keep the search coil of the TSS440 system parallel with the horizontal median axis of the ROV, it controls the ROV and carries out investigation operation according to default investigation survey line, obtain the survey data of the TSS440 system and the well site survey equipment, and by the survey data real-time Transmission to the platform.The present invention realizes that well site survey system of the preferably control for marine dynamically-positioned drilling platform carries out the investigation work of seabed well site.

Description

A kind of control method of the well site survey system for marine dynamically-positioned drilling platform
Technical field
The present invention relates to offshore petroleum drilling technical fields, bore more specifically to one kind for marine dynamic positioning The control method of the well site survey system of well platform.
Background technique
With the continuous development of China's economic, petroleum-based energy demand is continuously increased.Single land exploitation oil gas Resource has been unable to meet needs, and following more and more exploitations will focus on sea.The master of China's Marine oil and gas resource exploitation at present Continental shelf that will be shallower in coastal waters, however the oil and gas reserves at deep-sea accounts for about the one third of Chinese Petroliferous total resources, with stone The progress of exploration activity production technique marches deep-sea and has become certainty.
Carrier of the marine dynamically-positioned drilling platform as deep water hydrocarbon resource exploitation, the semi-submersible type drilling well relative to shallow sea Platform possesses DP dynamic positioning system, provides good operating condition for deep water hydrocarbon resource drilling.General drilling platforms exists It needs to carry out well site to design well head before spudding in investigate in advance.
Traditional deep water well site investigation method is with dedicated investigation vessel traction tube workpiece, carrying multibeam echosounder, side Sonar is swept, the equipment such as system, magnetometer is shallowly cutd open well site region is investigated.Due to investigation vessel and tube workpiece higher cost, In addition the influence of sea situation and operating water depth is limited in blue water, operating efficiency is low, causes the expense of deep water well site survey non- Chang Gao.Since the depth of water is very big, fact-finding process is difficult by double ship positionnings, data transmission distance is long, at the middle and upper levels flow instability etc. because Element influences, and obtained data error is larger.To reduce drillng operation risk, generally require drill ship far from the pre- location of well, this Exploration success ratio is reduced to a certain extent.
Therefore, it is necessary to preferably control well site survey system to carry out the investigation work of seabed well site.
Summary of the invention
The technical problem to be solved in the present invention is that in view of the above drawbacks of the prior art, providing a kind of for marine dynamic Power positions the control method of the well site survey system of drilling platforms.
The technical solution adopted by the present invention to solve the technical problems is: constructing a kind of flat for marine dynamic positioning drilling well The control method of the well site survey system of platform, comprising the following steps:
S1: after dynamically-positioned drilling platform reaches well location to be measured, installation is for carrying TSS440 system on the frame of ROV Hydraulic folding arm device, meanwhile, the ROV carries well site survey equipment;
S2: the hydraulic folding arm device is adjusted to erected state, operator controls the ROV and enters water, and is moved to Seabed predetermined operation position;
S3: operator controls the hydraulic folding arm device and is adjusted to balance state, keeps the spy of the TSS440 system Test coil is parallel with the horizontal median axis of the ROV, controls the ROV according to default investigation survey line and carries out investigation operation, obtains The survey data of the TSS440 system and the well site survey equipment, and the survey data real-time Transmission is put down to described Platform.
In control method of the present invention, further includes:
S4: after completing investigation operation, operator controls the hydraulic folding arm device by the umbilical cables of the ROV and adjusts For erected state, and the ROV is recycled to the platform;
The hydraulic folding arm device, the TSS440 system and the well site survey equipment under being dismantled from the ROV.
In control method of the present invention, the S4 includes: after completing investigation operation, by the hydraulic folding arm device Be adjusted to erected state, the ROV returns to the platform from seabed to by the moon pool door of the platform, during which described in hydraulic folding Arm assembly keeps erected state.
In control method of the present invention, the S1 includes: the afterframe installation hydraulic folding arm in the ROV Device, installs the TSS440 system on the hydraulic folding arm device, and holded up by controlling the hydraulic folding arm device or Balance the search coil of the TSS440.
In control method of the present invention, the S2 includes: after the hydraulic folding arm device is adjusted to erected state, The ROV enters water by the moon pool door of the platform, before the ROV reaches the predetermined operation position, the hydraulic folding Arm assembly keeps erected state.
In control method of the present invention, the S3 includes: that camera is installed on the ROV, the camera The working condition of the hydraulic folding arm device is acquired in real time, and is transmitted to the platform by the umbilical cables of the ROV;
Operator's hydraulic folding arm device according to the working condition feedback adjustment of the hydraulic folding arm device.
In control method of the present invention, the S3 further include: operator judges the ROV by monitoring device Whether the default investigation survey line is deviateed, if so, controlling the ROV returns to the default investigation survey line.
In control method of the present invention, controls the hydraulic folding arm device and be adjusted to erected state or balance state Include:
Operator issues control signal, and the control signal is transmitted to the liquid of the ROV by the umbilical cables of the ROV Pressure control valve;
The control signal is transmitted to hydraulic motor by the hydraulic control valve, and the hydraulic motor controls the hydraulic folding The folding arm of arm assembly is holded up or is balanced.
In control method of the present invention, the default investigation survey line includes a plurality of investigation survey line, and adjacent described Repetitive rate between survey line is no less than 20%, and the survey line density increases with the reduction apart from the distance of well head.
In control method of the present invention, the well site survey equipment include: multibeam echosounder, side scan sonar, System is shallowly cutd open, the survey data of the well site survey equipment includes: depth information, earth surface reflection strength information, bottom section letter Breath.
The control method for implementing the well site survey system for marine dynamically-positioned drilling platform of the invention, has following The utility model has the advantages that realize in the case where dynamically-positioned drilling platform moon pool insufficient space, at sea dynamically-positioned drilling platform On preferably control ROV and carry the researching tools such as TSS440 system and be lauched, carry out seabed well site survey operation, and investigate efficiency High, precision height.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples, in attached drawing:
Fig. 1 is program circuit of the present invention for the control method of the well site survey system of marine dynamically-positioned drilling platform Figure;
Fig. 2 is the control principle drawing of the well site survey system in the present invention.
Specific embodiment
For a clearer understanding of the technical characteristics, objects and effects of the present invention, now control attached drawing is described in detail A specific embodiment of the invention.
The invention discloses a kind of control methods of well site survey system for marine dynamically-positioned drilling platform, realize Preferably control carries out the investigation work of seabed well site for the well site survey system of marine dynamically-positioned drilling platform.
The well site survey system for marine dynamically-positioned drilling platform includes ROV (Remote Operated Vehicle, unmanned remotely controlled submersible vehicle) and TSS440 system.Drilling platforms includes bottom founded rig, jack-up rigs Platform, floating vessel type drilling platforms (drill ship) and semisubmersible drilling platform are primarily used for the offshore structures of probing well, upper dress There are the equipment such as drilling well, power, communication, navigation.ROV is to can be used for underwater observation, inspection and the underwater robot of construction;TSS440 System is to can be used for the magnetic survey system of pipeline and submarine optical fiber cable detection.Hydraulic folding arm device is installed in ROV afterframe, it is hydraulic TSS440 system is installed, the search coil of TSS440 system can be bundled in hydraulic folding arm device by installing band on folding arm device On two armed levers, and with armed lever keeping parallelism state, ROV real-time control hydraulic folding arm device holds up or balances TSS440 system The search coil of system, at the same ROV carry video camera, multibeam echosounder, side scan sonar, shallowly cut open the well site surveys such as system equipment into Row well site survey.As shown in Fig. 2, transmitting signal to ROV by the umbilical cables of ROV after ROV operator issues control signal Hydraulic control valve on, hydraulic control valve makes corresponding movement to hydraulic motor according to signal, and hydraulic motor passes through hydraulic folding The armed lever swing arm of the steering linkage control hydraulic folding arm device of arm assembly, to control holding up for the search coil of TSS440 system With balance, when the armed lever of hydraulic folding arm device be erected state when, armed lever is vertical with seabed holding, the detection line of TSS440 system Circle is also correspondingly holded up, vertical with seabed holding;When the armed lever of hydraulic folding arm device is to balance state, armed lever and seabed are kept In parallel, the search coil of TSS440 system is also correspondingly balanced, and seabed keeping parallelism and carries out operation.Operator is logical simultaneously Crossing ROV postposition video camera can be observed in real time the state of hydraulic folding arm device.
The heretofore described well site survey system for marine dynamically-positioned drilling platform can control ROV, hydraulic Folding arm device and well site survey operation process realize that ROV is carried in the case where dynamically-positioned drilling platform moon pool insufficient space The researching tools such as TSS440 are lauched, and complete well site survey operation.Namely utilize dynamically-positioned drilling platform and its configuration ROV realizes deep water well site survey operation.And the time of drilling platforms jointed rod is utilized in the well site survey operation, and Originally ROV is in rest and reorganization state, so the operation scheme is without additionally increasing the drilling platforms activity duration during this period.This is System realizes a kind of well site survey mode high-efficient, with high accuracy.
Refering to fig. 1, the control method of the well site survey system for marine dynamically-positioned drilling platform of the invention, including Following steps:
S1: after dynamically-positioned drilling platform reaches well location to be measured, installation is for carrying TSS440 system on the frame of ROV Hydraulic folding arm device, meanwhile, ROV carry well site survey equipment.Well site survey equipment includes: that sound is swept in multibeam echosounder, side , shallowly cut open system, by multibeam echosounder, side scan sonar, shallowly cut open system respectively obtain depth information, earth surface reflection intensity believe The survey datas such as breath, bottom profile information.
Specifically, S1 includes: that dynamically-positioned drilling platform reaches well location to be measured, and after starting dynamic positioning state, then Start jointed rod, hydraulic folding arm device is installed in the afterframe of ROV, TSS440 system is installed on hydraulic folding arm device, and The search coil of TSS440 is holded up or balanced by controlling hydraulic folding arm device.Control hydraulic folding arm device is adjusted to erected state Or it balances state and includes:
Operator issues control signal, and control signal is transmitted to the hydraulic control valve of ROV by the umbilical cables of ROV;
Hydraulic control valve will control signal and be transmitted to hydraulic motor, and the folding arm of hydraulic motor control hydraulic folding arm device is holded up Or it balances.
S2: hydraulic folding arm device is adjusted to erected state, operator controls ROV and enters water, and it is predetermined to be moved to seabed Job position.
Specifically, S2 includes: after hydraulic folding arm device is adjusted to erected state, and operator controls ROV and passes through platform Moon pool door enters water, and before ROV reaches predetermined operation position, hydraulic folding arm device keeps erected state.
S3: operator controls hydraulic folding arm device and is adjusted to balance state, keep the search coil of TSS440 system with The horizontal median axis of ROV is parallel, and control ROV carries out investigation operation according to default investigation survey line, obtains TSS440 system and well The survey data of investigation apparatus, and by survey data real-time Transmission to platform.
Specifically, S3 includes: that camera is installed on ROV, and camera acquires the working condition of hydraulic folding arm device in real time, And platform is transmitted to by the umbilical cables of ROV;
Operator is according to the working condition feedback adjustment hydraulic folding arm device of hydraulic folding arm device.
In control method of the present invention, S3 further include: operator judges whether ROV deviates by monitoring device The default investigation survey line, if so, control ROV returns to default investigation survey line.
In the control method of the invention, further includes:
S4: after completing investigation operation, operator controls the hydraulic folding arm device by the umbilical cables of ROV and is adjusted to perpendicular The state of rising, and ROV is recycled to the platform;
The hydraulic folding arm device, TSS440 system and well site survey equipment under being dismantled from ROV.
Specifically, S4 includes: that after completing investigation operation, hydraulic folding arm device is adjusted to erected state, ROV from seabed to Platform is returned to by the moon pool door of platform, during which hydraulic folding arm device keeps erected state.
In control method of the present invention, presetting investigation survey line includes a plurality of investigation survey line, and between adjacent survey line Repetitive rate be no less than 20%, survey line density increases with the reduction apart from the distance of well head.
It should be understood that above embodiments only express the preferred embodiment of the present invention, description is more specific and detailed Carefully, but it cannot be understood as limitations on the scope of the patent of the present invention;It should be pointed out that for the common skill of this field For art personnel, without departing from the inventive concept of the premise, above-mentioned technical characterstic can be freely combined, can also be done Several modifications and improvements out, these are all within the scope of protection of the present invention;Therefore, all to be done with scope of the invention as claimed Equivalents and modification, should belong to the covering scope of the claims in the present invention.

Claims (10)

1. a kind of control method of the well site survey system for marine dynamically-positioned drilling platform, which is characterized in that including with Lower step:
S1: dynamically-positioned drilling platform reaches well location to be measured, and after starting dynamic positioning state, then starts jointed rod;? Hydraulic folding arm device for carrying TSS440 system is installed on the frame of ROV, meanwhile, the ROV carries well site survey equipment;
S2: during the drilling platforms jointed rod, the hydraulic folding arm device is adjusted to erected state, operator It controls the ROV and enters water, and be moved to seabed predetermined operation position;
S3: operator controls the hydraulic folding arm device and is adjusted to balance state, keeps the detection line of the TSS440 system It encloses parallel with the horizontal median axis of the ROV, controls the ROV according to default investigation survey line and carry out investigation operation, described in acquisition The survey data of TSS440 system and the well site survey equipment, and by the survey data real-time Transmission to the platform.
2. control method according to claim 1, which is characterized in that further include:
S4: after completing investigation operation, operator controls the hydraulic folding arm device by the umbilical cables of the ROV and is adjusted to perpendicular The state of rising, and the ROV is recycled to the platform;
The hydraulic folding arm device, the TSS440 system and the well site survey equipment under being dismantled from the ROV.
3. control method according to claim 2, which is characterized in that the S4 includes: after completing investigation operation, will be described Hydraulic folding arm device is adjusted to erected state, and the ROV returns to the platform, phase from seabed to by the moon pool door of the platform Between the hydraulic folding arm device keep erected state.
4. control method according to claim 1, which is characterized in that the S1 includes: the afterframe installation in the ROV The hydraulic folding arm device installs the TSS440 system on the hydraulic folding arm device, and by controlling the hydraulic folding The search coil of the TSS440 is holded up or balanced to arm assembly.
5. control method according to claim 1, which is characterized in that the S2 includes: the hydraulic folding arm device adjustment After erected state, the ROV enters water by the moon pool door of the platform, the ROV reach the predetermined operation position it Before, the hydraulic folding arm device keeps erected state.
6. control method according to claim 1, which is characterized in that the S3 includes: to install camera shooting on the ROV Head, the camera acquires the working condition of the hydraulic folding arm device in real time, and is transmitted to institute by the umbilical cables of the ROV State platform;
Operator's hydraulic folding arm device according to the working condition feedback adjustment of the hydraulic folding arm device.
7. control method according to claim 1, which is characterized in that the S3 further include: operator is set by monitoring It is standby to judge whether the ROV deviates the default investigation survey line, if so, controlling the ROV returns to the default investigation survey line.
8. control method according to claim 1, which is characterized in that control the hydraulic folding arm device and be adjusted to hold up shape State balances state and includes:
Operator issues control signal, and the control signal is transmitted to the hydraulic control of the ROV by the umbilical cables of the ROV Valve processed;
The control signal is transmitted to hydraulic motor by the hydraulic control valve, and the hydraulic motor controls the hydraulic folding arm dress The folding arm set is holded up or is balanced.
9. control method according to claim 1, which is characterized in that the default investigation survey line includes that a plurality of investigation is surveyed Line, and the repetitive rate between the adjacent survey line is no less than 20%, the survey line density with the distance apart from well head reduction And increase.
10. control method according to claim 1, which is characterized in that the well site survey equipment includes: multibeam echosounding Instrument, shallowly cuts open system at side scan sonar;
The survey data of the well site survey equipment includes: depth information, earth surface reflection strength information, bottom profile information.
CN201610712819.XA 2016-08-23 2016-08-23 A kind of control method of the well site survey system for marine dynamically-positioned drilling platform Active CN106194026B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610712819.XA CN106194026B (en) 2016-08-23 2016-08-23 A kind of control method of the well site survey system for marine dynamically-positioned drilling platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610712819.XA CN106194026B (en) 2016-08-23 2016-08-23 A kind of control method of the well site survey system for marine dynamically-positioned drilling platform

Publications (2)

Publication Number Publication Date
CN106194026A CN106194026A (en) 2016-12-07
CN106194026B true CN106194026B (en) 2019-01-04

Family

ID=57524875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610712819.XA Active CN106194026B (en) 2016-08-23 2016-08-23 A kind of control method of the well site survey system for marine dynamically-positioned drilling platform

Country Status (1)

Country Link
CN (1) CN106194026B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108413926B (en) * 2018-01-31 2020-12-04 上海荟蔚信息科技有限公司 High-precision measurement method for underwater topography elevation of pile foundation of offshore wind farm

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103303449A (en) * 2013-05-30 2013-09-18 河北工业大学 Underwater working robot
CN203786566U (en) * 2014-03-21 2014-08-20 中国海洋石油总公司 Submarine cable maintenance underwater robot system
CN104777845A (en) * 2015-04-15 2015-07-15 上海海事大学 Underwater main body device of underwater robot and autonomous obstacle avoidance method
CN105020538A (en) * 2015-08-04 2015-11-04 浙江水利水电学院 Sewage pipe network diving robot and detection method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103303449A (en) * 2013-05-30 2013-09-18 河北工业大学 Underwater working robot
CN203786566U (en) * 2014-03-21 2014-08-20 中国海洋石油总公司 Submarine cable maintenance underwater robot system
CN104777845A (en) * 2015-04-15 2015-07-15 上海海事大学 Underwater main body device of underwater robot and autonomous obstacle avoidance method
CN105020538A (en) * 2015-08-04 2015-11-04 浙江水利水电学院 Sewage pipe network diving robot and detection method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
TSS440在海管检测中的应用;宋春娜;《中国石油和化工标准与质量》;20140610;第15-17页
水下机器人在渤海海底光缆调查中的应用;陶林等;《石油钻采工艺》;20090415;第31卷(第2期);第118-120页

Also Published As

Publication number Publication date
CN106194026A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
RU2610384C1 (en) System for underwater investigation of underground space and method for underwater investigation of underground space
NO341202B1 (en) Procedure for generating a seismic wave and collecting seismic data from a subsurface formation
CN106351590B (en) A kind of drilling machine people's bracket for deep earth sampling
WO2014130320A1 (en) Floatable subsea platform (fsp)
CN103395479B (en) Multifunctional installation and investigation vessel
US20070187170A1 (en) Method for collection and registration seismic data
CN112253036B (en) Efficient operation equipment and method for running blowout preventer stack without guide rope and moving blowout preventer stack between wells
CN107476798B (en) Wellhead attitude monitoring system and method suitable for whole process of deepwater jet downcomer
WO2014060741A2 (en) Improvements in or relating to marine operations
CN106194026B (en) A kind of control method of the well site survey system for marine dynamically-positioned drilling platform
WO2012110096A1 (en) Marine exploration vehicle
US4260291A (en) Installation of an offshore structure
CN203428001U (en) Multifunctional installation and exploration ship
CN106285480B (en) A kind of well site survey method for marine dynamically-positioned drilling platform
CN113131404B (en) Method for laying cables in submarine underground rock
US20150176346A1 (en) Method and system for wireline intervention in a subsea well from a floating vessel
CN203844977U (en) Offshore platform device used for offshore static sounding
Crook Deep-sea technology
Schmidt et al. Historical development of the offshore industry
JPH10169351A (en) Excavation method of submarine well and installation method of observation instrument in submarine well
Max et al. Leveraging Technology for NGH Development and Production
Legrand et al. NADIA: Wireline re-entry in deep sea boreholes
CN117166923A (en) System-integrated movable submarine shallow drilling equipment and laying method thereof
KR20150000168A (en) BOP Test Apparatus and Method
NO347421B1 (en) A deep-sea underwater drilling system for drilling and core sampling on a seabed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Applicant after: China Offshore Oil Group Co., Ltd.

Applicant after: CNOOC (China) Co., Ltd. Shenzhen Branch

Applicant after: China Oilfield Services Limited

Applicant after: CNOOC Deepwater Development Limited

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Applicant before: China National Offshore Oil Corporation

Applicant before: CNOOC (China) Co., Ltd. Shenzhen Branch

Applicant before: China Oilfield Services Limited

Applicant before: CNOOC Deepwater Development Limited

CB02 Change of applicant information