CN106193619B - Large span ball type network frame dissipates in the air spells protection construction method - Google Patents

Large span ball type network frame dissipates in the air spells protection construction method Download PDF

Info

Publication number
CN106193619B
CN106193619B CN201610593321.6A CN201610593321A CN106193619B CN 106193619 B CN106193619 B CN 106193619B CN 201610593321 A CN201610593321 A CN 201610593321A CN 106193619 B CN106193619 B CN 106193619B
Authority
CN
China
Prior art keywords
steel wire
rack
wire rope
ball type
type network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610593321.6A
Other languages
Chinese (zh)
Other versions
CN106193619A (en
Inventor
荣太龙
王振品
王凤杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201610593321.6A priority Critical patent/CN106193619B/en
Publication of CN106193619A publication Critical patent/CN106193619A/en
Application granted granted Critical
Publication of CN106193619B publication Critical patent/CN106193619B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3261Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • E04G21/3266Safety nets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Emergency Lowering Means (AREA)

Abstract

The present invention relates to a kind of large span ball type network frames to dissipate spelling protection construction method in the air, includes the following steps:Ball type network frame starting frame is installed, in the top both sides of rack, upper layer main rope together along longitudinal direction is respectively set, along rack, twice pair steel wire rope is laterally set, secondary steel wire rope both ends are connected by movable snap ring with upper layer main rope, it is connected with secondary steel wire rope on operator's safety belt, in the lower section of rack activity safety net is laid between adjacent twice lower layer steel wire rope along rack longitudinally every one across one of lower layer's steel wire rope is arranged.Large span ball type network frame of the present invention dissipates in the air spells protection construction method, is not required to be abound with full hall scaffold, saves a large amount of construction material;Reduce fund input;Save the duration;Construction safety risk is reduced, protection network and safety belt play the role of double protection, ensure the life security of construction worker.

Description

Large span ball type network frame dissipates in the air spells protection construction method
Technical field
The present invention relates to a kind of construction techniques, are spelled in particular to a kind of large span ball type network frame dissipates in the air Protection construction method.
Background technology
In recent years, with the fast development of computer science and technology, China's grid structure technology also enter one it is brand-new Epoch, the modeling structure of various novelties also shows like the mushrooms after rain therewith.Grid structure with bolt-sphere joints is because of its work of constructing Phase is short, and span is big, structure novel, reasonable stress, from heavy and light, it is handsome in appearance the advantages that, be widely used in large-scale stadium, The places such as market, terminal, waiting room, gas station, exhibition center, cinema.
Large span space grid structure form is increasingly becoming a kind of trend for meeting people's fantasy.Spherical net rack structure Installation mainly has 3 kinds of methods:Assembly in pieces at height, whole lockup method and aerial sliding methed.The most commonly used is Assembly in pieces at height at present Ball type network frame is installed, but operation risk factor is higher in Assembly in pieces at height installation process, without reliable safety measure, construction operation Personnel can only lie in safety belt in bolt sphere, the careless slightly possibility for being susceptible to high-altitude of falling, hang in installation process.
Full hall scaffold is integrally set up using ball type network frame lower part, is only capable of installing convenient for rack lower boom, winds up installation still Safety belt can only be lain on installation bolt ball, but this scheme scaffold building amount is big, costly, the duration is also longer, causes Unnecessary waste.
Invention content
Deficiency in for the above-mentioned prior art, the present invention provide a kind of safe and reliable, raising construction efficiency, reduction construction The large span ball type network frame of cost dissipates in the air spells protection construction method.
The technical solution used in the present invention is:
A kind of large span ball type network frame is scattered in the air to spell protection construction method, includes the following steps:
Step 1, installation ball type network frame starting frame, according to rack integral arrangement, selecting structure stress most unfavorable combination is set up Two between full hall scaffold, each two adjacent pillars for one across.Scaffold top completely spreads scaffold board, as operation platform And rack temporary supporting platform;
Step 2, when rack starting frame is installed to span centre one third position, in support platform upper edge rack laterally disposed two A jack, to prevent rack downwarp;
Step 3, in the top of rack, civil engineering structure column has been completed as fixed point, in the respectively setting one of rack both sides using both ends The upper layer main rope of road along longitudinal direction;
Step 4, twice pair steel wire rope is laterally set along rack, secondary steel wire rope both ends pass through movable snap ring and upper layer king wire Rope is connected, and secondary steel wire rope is slided by snap ring on the main rope of upper layer back and forth;
Step 5, when worker constructs, it is connected with secondary steel wire rope on operator's safety belt, secondary steel wire rope passes through active card Ring can be moved forward and backward along longitudinal direction, and safety belt hitch point is guaranteed when worker's forward/backward operation;
Step 6, in the lower section of rack, using civil engineering structure column and the rack lower edge ball installed as fixed point, along net Frame longitudinal direction is every one across one of lower layer's steel wire rope of setting;
Step 7, it is laid with activity safety net between adjacent twice lower layer steel wire rope, passes through between safety net and lower layer's steel wire rope Movable snap ring is connected;Safety net is slided by snap ring on lower layer's steel wire rope back and forth.
Ball type network frame starting frame lower part is provided with the jack for being used to support ball type network frame.
The advantageous effect of the present invention compared with the prior art:
Large span ball type network frame of the present invention dissipates in the air spells protection construction method, is not required to be abound with full hall scaffold, saves a large amount of Construction material;Reduce fund input;Save the duration;Construction safety risk is reduced, protection network and safety belt play double protection Effect, ensures the life security of construction worker.
Description of the drawings
Fig. 1 is that large span ball type network frame of the present invention dissipates the safety steel cable vertical view arrangement of winding up for spelling protection construction method in the air Figure;
Fig. 2 is that large span ball type network frame of the present invention dissipates the lower edge safety net for spelling protection construction method in the air, steel wire rope is overlooked Layout drawing;
Fig. 3 is that large span ball type network frame of the present invention dissipates the main structure diagram for spelling protection construction method in the air.
Critical piece symbol description in attached drawing:
In figure:
1, ball type network frame starting frame 2, rack
3, upper layer main rope 4, secondary steel wire rope
5, movable snap ring 6, lower layer's steel wire rope
7, safety net 8, jack.
Specific implementation mode
Referring to the drawings and embodiment the present invention will be described in detail:
Attached drawing 1-3 spells protection construction method it is found that a kind of large span ball type network frame dissipates in the air, includes the following steps:
Step 1, installation ball type network frame starting frame 1, according to 2 integral arrangement of rack, selecting structure stress most unfavorable combination is taken If two across full hall scaffold;
Step 2, it is laterally disposed in support platform upper edge rack when rack starting frame is installed to span centre one third position Two jack 8, to prevent rack downwarp;
Step 3, in the top of rack 2, civil engineering structure column has been completed as fixed point using both ends, has respectively been arranged in 2 both sides of rack Upper layer main rope 3 along longitudinal direction together;
Step 4, twice pair steel wire rope 4 is laterally set along rack, 4 both ends of secondary steel wire rope pass through movable snap ring 5 and upper layer master Steel wire rope 3 is connected, and secondary steel wire rope 4 is slided by snap ring 5 on upper layer main rope 3 back and forth;
Step 5, when worker constructs, it is connected with secondary steel wire rope 4 on operator's safety belt;
Step 6, in the lower section of rack 2, using civil engineering structure column and the rack lower edge ball installed as fixed point, along net 2 longitudinal direction of frame is every one across one of lower layer's steel wire rope 6 of setting;
Step 7, activity safety net 7 is laid between adjacent twice lower layer steel wire rope 6, between safety net 7 and lower layer's steel wire rope 6 It is connected by movable snap ring 5;Safety net 7 is slided by snap ring 5 on lower layer's steel wire rope 6 back and forth.Safety net 7 is with rod member for grid Installation moves forward, and protective action is played to operator.
The above described is only a preferred embodiment of the present invention, not making in any form to the structure of the present invention Limitation.It is every according to the technical essence of the invention to any simple modification, equivalent change and modification made by above example, Belong within the scope of technical scheme of the present invention.

Claims (1)

1. a kind of large span ball type network frame dissipates in the air spells protection construction method, which is characterized in that include the following steps:
Step 1, installation ball type network frame start to walk frame, according to rack integral arrangement, selecting structure stress most unfavorable combination set up two across Full hall scaffold, between each two adjacent pillars for one across;
Scaffold top completely spreads scaffold board, as operation platform and rack temporary supporting platform;
Step 2, when rack starting frame is installed to span centre one third position, laterally disposed two thousand in support platform upper edge rack Jin top, to prevent rack downwarp;
Step 3, in the top of rack, civil engineering structure column has been completed as fixed point using both ends, one of edge is respectively set in rack both sides Longitudinal upper layer main rope;
Step 4, twice pair steel wire rope is laterally set along rack, secondary steel wire rope both ends pass through movable snap ring and upper layer main rope phase Connection, secondary steel wire rope are slided by snap ring on the main rope of upper layer back and forth;
Step 5, when worker constructs, it is connected with secondary steel wire rope on operator's safety belt, secondary steel wire rope can by movable snap ring It is moved forward and backward along longitudinal direction, safety belt hitch point is guaranteed when worker's forward/backward operation;
Step 6, vertical along rack using civil engineering structure column and the rack lower edge ball installed as fixed point in the lower section of rack To every one across be arranged one of lower layer's steel wire rope;
Step 7, it is laid with activity safety net between adjacent twice lower layer steel wire rope, passes through activity between safety net and lower layer's steel wire rope Snap ring is connected;Safety net is slided by snap ring on lower layer's steel wire rope back and forth, and when worker's forward/backward operation slides safety net, plays Lower portion acts on.
CN201610593321.6A 2016-07-26 2016-07-26 Large span ball type network frame dissipates in the air spells protection construction method Active CN106193619B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610593321.6A CN106193619B (en) 2016-07-26 2016-07-26 Large span ball type network frame dissipates in the air spells protection construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610593321.6A CN106193619B (en) 2016-07-26 2016-07-26 Large span ball type network frame dissipates in the air spells protection construction method

Publications (2)

Publication Number Publication Date
CN106193619A CN106193619A (en) 2016-12-07
CN106193619B true CN106193619B (en) 2018-11-06

Family

ID=57495802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610593321.6A Active CN106193619B (en) 2016-07-26 2016-07-26 Large span ball type network frame dissipates in the air spells protection construction method

Country Status (1)

Country Link
CN (1) CN106193619B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110040632A (en) * 2019-04-01 2019-07-23 杭州通达集团有限公司 A kind of segmental hoisting construction method of large span section steel beam

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425260A (en) * 2011-11-25 2012-04-25 安徽鲁班建设投资集团有限公司 Annular single-point installation method for large-span hemispherical roof steel-structured net rack
CN103669566A (en) * 2013-12-09 2014-03-26 中国建筑第二工程局有限公司 Steel-reinforced concrete base of large-span net rack roof and construction method of steel-reinforced concrete base

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425260A (en) * 2011-11-25 2012-04-25 安徽鲁班建设投资集团有限公司 Annular single-point installation method for large-span hemispherical roof steel-structured net rack
CN103669566A (en) * 2013-12-09 2014-03-26 中国建筑第二工程局有限公司 Steel-reinforced concrete base of large-span net rack roof and construction method of steel-reinforced concrete base

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
"大型悬空球壳网架安装技术";汤新泉;《建筑施工》;20141125;第36卷(第11期);第1245-1247页 *
"大跨度钢桁架高空散拼技术";李保平等;《中国建筑金属结构》;20090416(第4期);第31-37页 *
"球型网架安装方法探讨";周皓等;《武汉大学学报(工学版)》;20111020;第44卷;第289-291页 *
"铁路客站高大空间吊顶施工平台技术";武利平等;《铁道建筑技术》;20131120;第29-32页 *

Also Published As

Publication number Publication date
CN106193619A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN103669815B (en) Unsettled rope pipe combined type full hall scaffold operation platform and guard system building method
CN106193619B (en) Large span ball type network frame dissipates in the air spells protection construction method
CN203895813U (en) Power transformer equipment maintenance rack
CN204418629U (en) A kind of integrated form climbing frame
CN105839907A (en) Suspension type steel platform scaffold foundation and method for mounting same
CN205777438U (en) A kind of suspension type steel platform legs hand cradle basis
CN204139567U (en) Aerial work platform
CN204754746U (en) Mobilizable platform handrail rail ladder
CN205259559U (en) Four -wheel removes scaffold combination operation platform
CN103741939B (en) The outside climbing type CONSTRUCTION OPERATIONS platform of building and mounting method
CN211775606U (en) Regularization assembled that can have enough to meet need climbs frame and goes up people's passageway
CN210420875U (en) Safe bridge construction platform
CN204238536U (en) Safety protection operation platform
CN204186134U (en) Aluminium alloys maintenance fence
CN205976403U (en) Removal operation platform that indoor long corridor was used
CN104499771A (en) Aluminum alloy maintenance fence
CN205558305U (en) Steel gallery promotes reinforcing apparatus
CN205370085U (en) Closed overhead view structure of urban area railway area net
CN106906992A (en) A kind of scaffolding structure
CN208310162U (en) A kind of movable operation platform system
CN203412309U (en) Security isolation platform of formed lift shaft
CN210368675U (en) Work platform is assembled to I shaped steel roof beam cantilever
CN109138499B (en) Prefabricated staircase shaping construction protection frame
CN203640251U (en) Climbing type building construction operating platform outside building
CN105568874A (en) Layout method for closed type elevated landscape structure of urban railway zone network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant