CN106193412B - Hang mounting method under fire-fighting spraying under a kind of mineral wool board ceiling form - Google Patents

Hang mounting method under fire-fighting spraying under a kind of mineral wool board ceiling form Download PDF

Info

Publication number
CN106193412B
CN106193412B CN201610552180.3A CN201610552180A CN106193412B CN 106193412 B CN106193412 B CN 106193412B CN 201610552180 A CN201610552180 A CN 201610552180A CN 106193412 B CN106193412 B CN 106193412B
Authority
CN
China
Prior art keywords
spray
mineral wool
wool board
installation
fire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610552180.3A
Other languages
Chinese (zh)
Other versions
CN106193412A (en
Inventor
张海堂
李盛
靳亚北
代先明
严冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201610552180.3A priority Critical patent/CN106193412B/en
Publication of CN106193412A publication Critical patent/CN106193412A/en
Application granted granted Critical
Publication of CN106193412B publication Critical patent/CN106193412B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/006Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation with means for hanging lighting fixtures or other appliances to the framework of the ceiling
    • AHUMAN NECESSITIES
    • A62LIFE-SAVING; FIRE-FIGHTING
    • A62CFIRE-FIGHTING
    • A62C31/00Delivery of fire-extinguishing material
    • A62C31/02Nozzles specially adapted for fire-extinguishing
    • A62C31/22Nozzles specially adapted for fire-extinguishing specially adapted for piercing walls, heaped materials, or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses hang mounting method under fire-fighting spraying under a kind of mineral wool board ceiling form, after the furred ceiling form that examination & verification design for fire protection drawing and clear and definite owner require, arrangement mineral wool board ceiling segmentation figure is required according to owner, mineral wool board ceiling segmentation figure and spray bit map/bitmap are carried out integrating set figure, to spraying the point position collided to keel, spray does not make corresponding change in the case where meeting fire protection rule requirement in the point position of mineral wool board center.The present invention is solved to hang in installation under the fire-fighting spraying under mineral wool board ceiling form, due to frequent synchronous construction between a specialty such as fire-fighting, installation, decorations, form the problem of cross-operation finished product is destroyed and mutually collided, reduce finished product to destroy and collide, improve construction efficiency quality, substantially increase once into excellent rate, cost has been saved, has improved benefit.

Description

Hang mounting method under fire-fighting spraying under a kind of mineral wool board ceiling form
Technical field
The present invention relates to the electromechanical mounting technique field of building, fire-fighting under a kind of mineral wool board ceiling form is particularly related to The lower hang mounting method of spray.
Background technology
At present, hung under the fire-fighting spraying under mineral wool board ceiling form in installation, due to fire-fighting, installation, decoration dress The frequent synchronous construction between a specialty such as repair, form cross-operation, later process often occurs and destroys preceding working procedure finished product Hung under thing, i.e. fire-fighting spraying in installation process and often destroy ceiling joist.In addition, it is necessary that spray point position is hung under fire-fighting spraying Meet to design, check and accept, the requirement of quality, each side such as use and beauty, and the installation of conventional fire-fighting spraying often with The other equipment finished product such as keel collide or spray head installation after not on one wire, not in mineral wool board center, Wu Faman The requirement of foot design, examination, quality, use and beauty etc..In addition, the construction characteristic of spray head is hung under fire-fighting spraying is: Quantity is more, its positioning accuracy request is very high, directly influences the quality of spray installation and the development of furred ceiling partial intersection operation, It is technical problem to be solved during we construct that location and installation thus how is quickly and accurately carried out to spray head.
The content of the invention
The technical problems to be solved by the invention are, the shortcomings that for the above prior art, propose a kind of mineral wool board ceiling Hang mounting method under fire-fighting spraying under form, solves to hang under fire-fighting spraying in building electromechanical installation and is collided with ceiling joist After conflict and spray head installation not on one wire, not in mineral wool board center, can not meet to design, check and accept, quality, use And beauty etc. the problem of requiring.
In order to solve the above-mentioned technical problem, the technical scheme is that being accomplished by the following way:A kind of ore deposit is provided Hang mounting method under fire-fighting spraying, comprises the following steps under cotton plate furred ceiling form:
(1)Drawing integration is carried out to furred ceiling segmentation figure and spray bit map/bitmap before formal construction, useful data is all fallen In a tangible drawing, Local uniqueness is carried out to the spray head for being unsatisfactory for actual operation requirements and aesthetic;To spray point position CAD measurements are carried out away from contents such as wall distance, spray head spacing;
(2)The standard width of a room in an old-style house size in room is checked using rangefinder and spirit level equipment, avoids drawing size and reality Size causes the deviations of spray head there are deviation;
(3)Altitude datum position in the room, the setting height(from bottom) of spray is determined with laser instrument for marking line, and peace is required in spray It is labeled at the height and position of dress;The distance from the wall for the spray head being identified by stadia surveying by CAD diagram, determines spray The mount point position of head is drenched, and makes respective identification on the ground;
(4)Altitude datum location determination furred ceiling finished surface height in the room, furred ceiling finished surface is measured with measuring instrument The distance between to the spray branch pipe that installation is complete, calculate that spray is lower to hang duct length according to this distance, due to spray The pipe diameter size of branch pipe is different, in the presence of hang the different situations of duct length, therefore will be to each section of lower hanging tube road into line position Put numbering, it is ensured that later stage installation site is errorless;
(5)After lower extension line size is measured, coating steel pipe is cut at scene, the installation of mantle fiber and pipe fitting, And be connected spray head in place with the lower hanging tube road of cutting and mantle fiber, then compare step(4)Lower hanging tube road Position Number carry out The lower hanging tube road of installation;
(6)Hanging tube road and spray head are after installation is complete under spray, in the outside of spray head the hard scraps of paper and polybag Carry out parcel protection;
(7)The lower hanging tube road of spray carries out pressure testing experiment, by supervisor after installation is complete to the spray system for completing region Carry out an acceptance inspection, process delivery receitp is handled with other subsequent construction units after acceptance(check).
The further of the present invention limits technical solution, and installation side is hung under fire-fighting spraying under foregoing mineral wool board ceiling form Method, when the spray branch pipe is installed, distance is 350mm between support of pipelines, hanger and nozzle;Support of pipelines, hanger and spray The distance between branch pipe end sprayer is 500mm;Set on pipeline section on spray branch pipe between adjacent two nozzle of each pipeline section Stent be no less than 1;When the distance between adjacent two nozzle is less than 1.8m, hanger is set on the pipeline section, but adjacent is hung The spacing of frame is not more than 3.6m;Support of pipelines is added at spray branch pipe pipeline turning.
Hang mounting method under fire-fighting spraying under foregoing mineral wool board ceiling form, the support of pipelines include being welded by angle steel The frame body and U-loop formed, the frame body include horizontal part angle steel and vertical component effect angle steel, the horizontal part angle steel and vertical component effect angle Steel junction is connected by welding manner, and horizontal part angle steel length is 20cm, and vertical component effect angle steel length is with pipeline Pass line adjustment.
Hang mounting method under fire-fighting spraying under foregoing mineral wool board ceiling form, the support of pipelines chamfer site use 1/ 3L changes into fillet for R, and wherein L is the angle steel length of side.
Further, hang mounting method under fire-fighting spraying under foregoing mineral wool board ceiling form, the spray head from wall Distance at least selects two face walls to position reference.
Cross-operation of the invention in order to realize between fire-fighting, installation, each specialty of decorations, and avoid ceiling joist Destroy, reach requirement while meet finished product protection, shortened the construction period, in mineral wool board ceiling region, hang under fire-fighting spraying and must also It must be installed before keel installation.This requires, after the furred ceiling form that examination & verification design for fire protection drawing and clear and definite owner require, according to Owner requires arrangement mineral wool board ceiling segmentation figure, mineral wool board ceiling segmentation figure and spray bit map/bitmap is carried out integrating set figure, to spray Drench the point position collided with keel, spray is not made in the point position of mineral wool board center in the case where meeting fire protection rule requirement Corresponding change, it is desirable to which the spray point position after change meets the requirement of each side such as design, examination, quality, use and beauty.
Beneficial effects of the present invention are as follows:
Installation method of the present invention is easy to operate, is applicable in, has prevented material impacts waste, material-saving environmental, solves in mineral wool Hung under fire-fighting spraying under plate furred ceiling form in installation, due to often same between a specialty such as fire-fighting, installation, decorations The problem of step construction, the mutually destruction of formation cross-operation finished product and collision, reduce finished product and destroy and collide, improve effect of constructing Rate quality, substantially increase once into excellent rate, has saved cost, has improved benefit;Improve fire-fighting under mineral wool board ceiling form Spray is lower to be hung the construction quality of installation, improves aesthetic effect.
Brief description of the drawings
Fig. 1 is the installation procedure flow diagram of the present invention.
Embodiment
The present invention is described in further detail below:
Embodiment 1
Hang mounting method under fire-fighting spraying, flow such as Fig. 1 institutes under a kind of mineral wool board ceiling form provided in this embodiment Show, comprise the following steps:
(1)Furred ceiling distribution map is integrated:
Drawing integration is carried out to furred ceiling segmentation figure and spray bit map/bitmap before formal construction, useful data is all implemented In one drawing, Local uniqueness is carried out to the spray head for being unsatisfactory for actual operation requirements and aesthetic;To spray point position away from wall The contents such as distance, spray head spacing carry out CAD measurements.
(2)Spray head calibration is high, set a distance unwrapping wire:
The standard width of a room in an old-style house size in room is checked using instrument and equipments such as rangefinder, spirit levels, prevents drawing size and reality Border size causes the deviations of spray head, influences final installation effect there are deviation.
According to the one-meter line position in room, the setting height(from bottom) of spray is decided with equipment such as laser instrument for marking line, Spray is required at the height and position of installation, is labeled using marking pen.
The distance from the wall for the spray head being identified with stadia surveying by CAD diagram, to meet to be accurately positioned, preferably on four sides Wall measures, and determines the mount point position of spray head, makes respective identification on the ground.
(3)The prefabricated and nozzle installation in the lower hanging tube road of spray:
According to the one-meter line location determination furred ceiling finished surface height in room, furred ceiling finished surface is measured to now with measuring instrument The distance between spray branch pipe that installation is complete, calculates the lower extension duct length of spray, due to spraying branch pipe according to this distance Pipe diameter size it is different, in the presence of hang the difference of duct length, therefore the lower hanging tube road of each section of spray is numbered, after convenient Phase installs.
After the completion of lower extension dimensional measurement, coating steel pipe is cut at scene, the installation of mantle fiber, pipe fitting.Wherein spray The installation of head must use professional tool, forbid to be installed using general tools such as monkey wrenches;Spray head is after installation is complete The technological requirement in design drawing should be reached and be finally completed situation.
(4)The protection of spray:
Hung under spray and spray head is after installation is complete, the secondary pollution that sprays in order to prevent and when carrying out keel operation Spray head is damaged, parcel protection is carried out with the hard scraps of paper and polybag in the outside of spray head.
(5)Check and accept:
Spray is lower to be hung after installation is complete, is carried out pressure testing experiment to the spray system for completing region, is tested by supervisor Receive, process delivery receitp is handled with other subsequent construction units after acceptance(check).
The present embodiment of fixation in to(for) spray piping needs to meet condition:
The installation site of the suspension and support of pipeline should not hinder the water spray effect of nozzle first;Support of pipelines, hanger and nozzle Between distance be 350mm;The distance between end sprayer is 500mm.Spray on branch pipe between adjacent two nozzle of each pipeline section Pipeline section set stent be no less than 1;When the distance between nozzle is less than 1.8m, can compartment hanger is set, it is but adjacent The spacing of two hangers is not more than 3.6m, and stent should be added at spray piping turning.Spray piping branch pipe holder is fixed with top plate Using 8 expansion bolts of Φ, it is desirable to which accurate positioning, with nut edge exposure screw thread length is 3mm after shaping, and is not more than 1/2D, D For the diameter of bolt.Road branch pipe holder is welded using angle steel, and support of pipelines is fixedly connected by U-loop with pipeline, wherein angle Steel is using the equal leg angle of L30 × 3, it is desirable to which smooth vertical and horizontal, horizontal component length is 20CM, and vertical component length is with pipeline absolute altitude tune It is whole, horizontal component and vertical component junction whole full weld, it is desirable to weld seam is full, removes welding slag, overlap during welding immediately, And brush antirust paint after polishing flat, it is desirable to which lacquer painting is uniform, must not leak brush.U-loop uses finished product, and exposed screw thread length is detained for 2, U Shape ring must not pollute antirust paint.Stent chamfer site, is used uniformly 1/3L and changes into fillet for R, L is the angle steel length of side.Finally to branch Frame mopping and touch-up paint:Do antirust paint twice outside stent, when touch-up paint must not pollute it is other with stent contact portion, such as top plate, U-shaped Ring, pipeline and bolt, nut.
Above example is merely illustrative of the invention's technical idea, it is impossible to protection scope of the present invention is limited with this, it is every According to technological thought proposed by the present invention, any change done on the basis of technical solution, each falls within the scope of the present invention Within.

Claims (5)

1. hang mounting method under fire-fighting spraying under a kind of mineral wool board ceiling form, it is characterised in that comprise the following steps:
(1) drawing integration is carried out to furred ceiling segmentation figure and spray bit map/bitmap before formal construction, useful data is all implemented In one drawing, Local uniqueness is carried out to the spray head for being unsatisfactory for actual operation requirements and aesthetic;To spray point position away from wall Distance, spray head spacing content carry out CAD measurements;
(2) standard width of a room in an old-style house size in room is checked using rangefinder and spirit level equipment, avoids drawing size and actual size There are deviation, the deviations of spray head are caused;
(3) altitude datum position in the room, the setting height(from bottom) of spray is determined with laser instrument for marking line, and installation is required in spray It is labeled at height and position;The distance from the wall for the spray head being identified by stadia surveying by CAD diagram, determines spray head Mount point position, and make respective identification on the ground;
(4) altitude datum location determination furred ceiling finished surface height in the room, furred ceiling finished surface is measured to now with measuring instrument The distance between spray branch pipe that installation is complete, calculates the lower extension duct length of spray, due to spraying branch pipe according to this distance Pipe diameter size it is different, in the presence of hang the different situations of duct length, therefore each section of lower hanging tube road is compiled into row position Number, it is ensured that later stage installation site is errorless;
(5) after lower extension line size is measured, coating steel pipe is cut at scene, the installation of mantle fiber and pipe fitting, and will Spray head is connected in place with cutting and the lower hanging tube road of mantle fiber, then is compareed the lower hanging tube road Position Number of step (4) and installed Lower hanging tube road;
(6) hanging tube road and spray head after installation is complete, are carried out in the outside of spray head with the hard scraps of paper and polybag under spray Parcel protection;
(7) after spraying lower hanging tube road installation is complete, pressure testing experiment is carried out to the spray system for completing region, is carried out by supervisor Check and accept, process delivery receitp is handled with other subsequent construction units after acceptance(check).
2. hang mounting method under fire-fighting spraying under mineral wool board ceiling form according to claim 1, it is characterised in that:It is described When spraying branch pipe installation, distance is 350mm between support of pipelines, hanger and nozzle;Support of pipelines, hanger and spray branch pipe end The distance between nozzle is 500mm;The stent set on pipeline section on spray branch pipe between adjacent two nozzle of each pipeline section is equal No less than 1;When the distance between adjacent two nozzle is less than 1.8m, hanger, but the spacing of adjacent hanger are set on the pipeline section No more than 3.6m;Support of pipelines is added at spray branch pipe pipeline turning.
3. hang mounting method under fire-fighting spraying under mineral wool board ceiling form according to claim 2, it is characterised in that:It is described Support of pipelines includes the frame body and U-loop being welded by angle steel, and the frame body includes horizontal part angle steel and vertical component effect angle steel, institute State horizontal part angle steel to connect by welding manner with vertical component effect angle-bar joint, horizontal part angle steel length is 20CM, vertical component effect angle Steel length is with pipeline Pass line adjustment.
4. hang mounting method under fire-fighting spraying under mineral wool board ceiling form according to claim 3, it is characterised in that:It is described Support of pipelines chamfer site uses 1/3L to change into fillet for R, and wherein L is the angle steel length of side.
5. hang mounting method under fire-fighting spraying under mineral wool board ceiling form according to claim 1, it is characterised in that:It is described The distance from the wall of spray head at least selects two face walls to position reference.
CN201610552180.3A 2016-07-14 2016-07-14 Hang mounting method under fire-fighting spraying under a kind of mineral wool board ceiling form Active CN106193412B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610552180.3A CN106193412B (en) 2016-07-14 2016-07-14 Hang mounting method under fire-fighting spraying under a kind of mineral wool board ceiling form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610552180.3A CN106193412B (en) 2016-07-14 2016-07-14 Hang mounting method under fire-fighting spraying under a kind of mineral wool board ceiling form

Publications (2)

Publication Number Publication Date
CN106193412A CN106193412A (en) 2016-12-07
CN106193412B true CN106193412B (en) 2018-05-15

Family

ID=57478010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610552180.3A Active CN106193412B (en) 2016-07-14 2016-07-14 Hang mounting method under fire-fighting spraying under a kind of mineral wool board ceiling form

Country Status (1)

Country Link
CN (1) CN106193412B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107526870A (en) * 2017-07-18 2017-12-29 巧夺天宫(深圳)科技有限公司 The design system and its design method of fire-fighting spraying pipeline
CN113212692B (en) * 2021-04-29 2022-08-05 厦门船舶重工股份有限公司 Method for positioning water mist nozzle in passenger public area of ro-ro passenger ship

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201567746U (en) * 2009-10-28 2010-09-01 江苏华浠新型建材有限公司 T-shaped aggregate suspended ceiling
CN203034721U (en) * 2013-01-31 2013-07-03 浙江友邦集成吊顶股份有限公司 Hang ceiling spray head installing structure
CN103321336A (en) * 2013-06-21 2013-09-25 江苏华顶建设工程股份有限公司 Long-span suspended ceiling framework

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080010907A1 (en) * 2006-05-03 2008-01-17 Moench John P Recessed ceiling fixture enclosure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201567746U (en) * 2009-10-28 2010-09-01 江苏华浠新型建材有限公司 T-shaped aggregate suspended ceiling
CN203034721U (en) * 2013-01-31 2013-07-03 浙江友邦集成吊顶股份有限公司 Hang ceiling spray head installing structure
CN103321336A (en) * 2013-06-21 2013-09-25 江苏华顶建设工程股份有限公司 Long-span suspended ceiling framework

Also Published As

Publication number Publication date
CN106193412A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN103774853A (en) Installation construction method for curtain wall with hyperbolic metal veneer
CN106193412B (en) Hang mounting method under fire-fighting spraying under a kind of mineral wool board ceiling form
CN201292587Y (en) Connecting piece for tall building combined stone curtain wall
CN102277802A (en) Track slab fine adjustment method and track laying method based on same
CN110646159A (en) Construction method for high-precision control and measurement of cast-in-place bare concrete wind tunnel
Bryn et al. Geodetic monitoring of deformation of building surrounding an underground construction
CN109441034A (en) A kind of construction technology of BIM auxiliary hyperboloid Special-Shaped Column set square installation
CN112523356B (en) Columnar hyperbolic mirror surface supporting system and construction method thereof
CN104727564A (en) Method for installation construction of roof free-form surface single-layer latticed shell structure of super high-rise building
CN101797956A (en) Field digitized laser lofting method of ship piping system
CN108253193B (en) Wall pipeline pre-embedding construction method
CN112464424A (en) Air duct system prefabricating method based on BIM
CN104452963A (en) A method for manufacturing and constructing steel truss key component
CN102528563A (en) Machining online measurement method of blades of hydroturbine
US8922758B2 (en) Stud mapping and layout method
CN109883327A (en) A kind of racing track frame system monitoring method
CN106289125A (en) A kind of boats and ships close up greatly the measuring method that step simulations carries
CN103334524B (en) Construction method for spherical glass curtain wall with aluminum alloy hidden frame
CN106545690B (en) The assemble method and system that prefabricated group pair of nuclear power station pipeline
CN111546003B (en) Method for manufacturing arch rib of flexible arch bridge
JP2020037809A (en) Lining reinforcement rebar construction support method and lining reinforcement rebar construction support device
CN108444431A (en) Pipe fitting method for detecting shape based on three installation points
CN105064643B (en) The cladding accurate installation method of building stones hanging part for board of R types
FI127088B (en) Method and system for determining production dimensions of a connecting element
CN114000626A (en) Construction method of hyperbolic aluminum plate curtain wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant