CN106193069A - A kind of equipment integrating for side slope concrete protection - Google Patents

A kind of equipment integrating for side slope concrete protection Download PDF

Info

Publication number
CN106193069A
CN106193069A CN201610789261.5A CN201610789261A CN106193069A CN 106193069 A CN106193069 A CN 106193069A CN 201610789261 A CN201610789261 A CN 201610789261A CN 106193069 A CN106193069 A CN 106193069A
Authority
CN
China
Prior art keywords
template
track
concrete
hopper
side slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610789261.5A
Other languages
Chinese (zh)
Other versions
CN106193069B (en
Inventor
王亚斌
段景朝
曹国义
罗红杰
王金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 5 Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN201610789261.5A priority Critical patent/CN106193069B/en
Publication of CN106193069A publication Critical patent/CN106193069A/en
Application granted granted Critical
Publication of CN106193069B publication Critical patent/CN106193069B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

The invention discloses a kind of equipment integrating for side slope concrete protection, by main framing system, operating room, dynamical system, running gear, excavation system, template system, concrete distributing, vibrate and (flatten, wipe one's face) system, curing system, monitoring system, hydraulic system and automation control system composition, can be by the excavation groove of side slope concrete protection, the installation of template and check, concreting molding (includes cloth, vibrate, press polish, polish) and form removable combine together and carry out, disposably roadbed side slope concrete protection can be poured molding simultaneously, simple structure, safe and reliable to operation, easy construction, improve production efficiency, reduce construction cost, it is effectively accomplished concrete construction quality requirement.

Description

A kind of equipment integrating for side slope concrete protection
Technical field
The present invention relates to roadbed side slope concrete protection technical field of construction, be specially one for side slope concrete protection Equipment integrating.
Background technology
The traditional construction technology of the many employings of roadbed side slope protection works is constructed, and all utilizes and manually carries out excavating groove, Use fritter gang form (or plank sheathing) to carry out termination and the bracing reinforcement of superstructure template and dismounting, take construction to complete One section, the method carrying out next section after dismounting is constructed, and the method working procedure is numerous and diverse, construction more difficulty and hand excavation Groove construction efficiency is low.If roadbed body uses chemical modifying soil to fill, arched framework (or grid) is taked to carry out bank protection Construction, then arch (grid) channel excavation constructional difficulties, the construction period is long, and superstructure dash adds along (or grid) shuttering supporting Gu difficulty, after having constructed, the Concrete Structure Design size and construction quality require to be difficult to be guaranteed, thus cause side slope to be mixed Solidifying soil safeguard structure integral linear weak effect, is difficult to reach the requirement of on-the-spot civilized construction during construction;According to on-the-spot human resources Input situation be analyzed: if roadbed body use chemical modifying soil fill, utilize traditional construction technique to carry out large area arch During the construction of shape skeleton (or grid) side slope concrete protection, owing to construction work amount is big, for ensureing roadbed side slope concrete protection Structure design size, construction safety quality and construction speed, need to put into substantial amounts of human and material resources and equipment carries out construction operation, Considerably increasing construction cost, extend the construction period, in work progress, quality safety process control cannot be protected simultaneously Barrier.
Summary of the invention
The roadbed body that chemical modifying soil (or element soil) fills is present invention aims to for the problems referred to above, it is provided that One can improve construction production efficiency, reduces personnel and puts into, reduces the one for side slope concrete protection of construction cost Equipment, and this simple in equipment, processing and fabricating cost is low, and can be to the sizing punching block of arched framework (grid) side slope protection Plate quality-controlling parameters carries out checking adjustment.Technical scheme is as follows:
A kind of equipment integrating for side slope concrete protection, including slope top line walking apparatus and slope bottom row walking apparatus, and across The main framing of the domatic rectangle being connected between slope top line walking apparatus and slope bottom row walking apparatus;Main framing direction of advance side is provided with Track is run in front side, and front side is run track and is provided with supporting leg, and supporting leg is provided with adjustable hydraulic compressing cylinder, is provided with excavation bottom supporting leg Pick;Being additionally provided with the straight line transport track being parallel to front side operation track on main framing, straight line transports track and is connected to template storage Deposit district;Main framing is arranged right below template track, and template track is arranged at casting space both sides along groove, and passes through active link Track is connected to straight line and transports track, and active link track is connected to main framing by rotary shaft, and template include soil body mould with Superstructure template;Being additionally provided with operation between the template track of casting space both sides and run track, operation sets in running track Plug-in type vibrating rod and pressing, surface finishing device, operation operation track is had to be connected to straight line also by active link track and transport rail Road;Main framing is also arranged above being connected to the hopper of casting space by concrete transport telescoping tube.
Further, also including the water tank being arranged on the top line walking apparatus of slope, water tank is connected to hopper by maintenance pipe.
Further, described main framing is connected respectively at the bottom of slope top line walking apparatus and slope by the hydraulic jack of supertronic degree Running gear.
Further, arranging template and run draw-in groove in described template track, template is provided for dismounting in running draw-in groove The template telecontrol equipment of template.
Further, also include the elevating hopper for accepting concrete in pump truck and the hopper for transfer concrete, Elevating hopper is connected to hopper by charging belt machine, and hopper is connected to hopper by equipment of conveyer.
Further, also include that template support body, template track are connected on main framing by template support body, template support body On be additionally provided with the adjustable hydraulic compressing cylinder of adjusting template, described superstructure template and template track are provided with for detection template The induction apparatus of position.
Further, described superstructure template back surface is provided with for controlling concreting by monitor stress The stress induction device of speed.
Further, described superstructure template back surface is provided with for controlling concreting by monitor stress The stress induction device of speed.
Further, it is provided with for monitoring concrete discharging speed and putting in storage in described hopper and concrete transport telescoping tube The induction apparatus of temperature.
The invention has the beneficial effects as follows:
1) present invention can be by excavation groove, the installation of template and the check of side slope concrete protection, concreting molding (bag Include cloth, vibrate, press polish, polish) and form removable combine together and carry out, can disposably by roadbed side slope concrete protection simultaneously Pour molding;
2) present invention achieves and realize automated machine in roadbed arch (grid) side slope concrete protection engineering large-area construction Operation, when previous structure skeleton assembly, can be changed structural framework, works template border template rail system, available The construction of effect same, the equally valid effect reaching primary concreting molding is carried out in Other Engineering position;
3) present invention not only solves drawback and the shortcoming of traditional construction technique, more achieves work progress information system management, Both it had been effectively accomplished job site and had collected checking of data and work progress experimental test data, be easy to again in the later stage coagulation The inspection of soil property amount and checking and accepting;
4) present invention not only simple structure, safe and reliable to operation, easy construction, greatly reduce operation people in work progress Member, goods and materials and the input of equipment, improve again production efficiency, reduce construction cost, instead of traditional construction technology, simultaneously It is effectively accomplished concrete construction quality requirement, it is ensured that the linear and presentation quality of arch (grid) side slope concrete protection Requirement.
Accompanying drawing explanation
Fig. 1 is the present invention plane structure chart for the equipment integrating of side slope concrete protection.
Fig. 2 is the generalized section in Fig. 1 at A-A.
Fig. 3 be the present invention for the equipment integrating of side slope concrete protection concrete distributing, vibrate (flatten, wipe one's face) rail The installation site in road and running orbit figure.
Fig. 4 is the present invention front view for the equipment integrating of side slope concrete protection.
Fig. 5 is the present invention lateral side view for the equipment integrating of side slope concrete protection.
Fig. 6 is superstructure template of the present invention and template track connection diagram.
Fig. 7 is that plug-in type vibrating of the present invention rod runs track connection diagram with operation.
Fig. 8 is pressing, surface finishing device runs track connection diagram with operation.
In figure: 1-main framing;11-rotary shaft;12-supporting leg;The hydraulic jack of the 13-regulation gradient;2-slope top line walking apparatus; 21-hopper;22-water tank;23-maintenance pipe;24-equipment of conveyer;25-hopper;26-concrete transport telescoping tube;27-elevating hopper; 28-charging belt machine;3-slope bottom row walking apparatus;Track is run on front side of 4-;41-adjustable hydraulic compressing cylinder;42-excavates pick;5- Operation runs track;6-active link track;7-straight line transports track;8-template track;81-superstructure template;82-template Storage area;83-template telecontrol equipment;84-template runs draw-in groove;9-plug-in type vibrating rod;10-flattens, surface finishing device.
Detailed description of the invention
With specific embodiment, the present invention is described in further details below in conjunction with the accompanying drawings.As it is shown in figure 1, it is a kind of for limit The equipment integrating of slope concrete protection, concrete structure includes slope top line walking apparatus 2 and slope bottom row walking apparatus 3, and across domatic The main framing 1 of the rectangle being connected between slope top line walking apparatus 2 and slope bottom row walking apparatus 3;Main framing 1 direction of advance side is provided with Track 4 is run in front side, and front side is run track 4 and is provided with supporting leg 12, and supporting leg 12 is provided with adjustable hydraulic compressing cylinder 41, supporting leg 12 end Portion is provided with excavation pick 42;Being additionally provided with the straight line transport track 7 being parallel to front side operation track 4 on main framing 1, straight line transports rail Road 7 is connected to template storage area 82;Main framing 1 is arranged right below template track 8, and template track 8 is arranged at along groove and pours sky Between both sides, and be connected to straight line by active link track 6 and transport track 7, active link track 6 is connected to by rotary shaft 11 Main framing 1, and template includes soil body mould and superstructure template 81;It is additionally provided with between the template track 8 of casting space both sides Operation operation track 5(is as shown in Figure 2), operation is provided with plug-in type vibrating rod 9 and pressing, surface finishing device 10, behaviour in running track 5 Make to run track 5 and be connected to straight line transport track 7 also by active link track 6;Main framing 1 is also arranged above being transported by concrete Telescoping tube 26 is connected to the hopper 25 of casting space.
To on the whole, this equipment is by main framing system, operating room, dynamical system, running gear, excavation system, template System, concrete distributing, vibrate (flatten, wipe one's face) system, curing system, monitoring system, hydraulic system and Automated condtrol system System composition.
Main framing system is assembled by angle steel and bolt, can be any when assembly according to the length of roadbed side slope Lengthening or shorten, main framing is connected on the running gear at the bottom of Po Ding, slope, uses connecting pin bolt to be attached, at work progress In, available computer automation control system controls hydraulic system and carries out adjusting main framing according to design slope ratio.
Operating room is formed by controlling device, computer control system and display monitoring system;Control device major control Manage running gear and the dynamical system of this automation integrated equipment;Management is controlled by computer control system and display monitoring system Excavation system processed, template system, monitoring device system and hydraulic system.
The dynamical system of this equipment is made up of Diesel engine, total motor and three separated motors, utilizes Diesel engine Thering is provided power for automation integrated equipment, make equipment walk, total motor and separated motor for equipment provide electric energy, by always simultaneously Motor controls separated motor, and guarantee each device of equipment carry out properly functioning three separated motors be respectively provided be arranged on top, slope, In running gear at the bottom of slope and excavation system.
The running gear of this equipment is formed by controlling device, running gear and power set, controls device and is arranged at behaviour Make indoor, utilize operation button can control running gear and power set;Running gear fills according to the walking of excavator, bull-dozer Putting and be configured, this running gear includes rail chain type (or rubber tyre formula), is mounted with on the running gear top at the bottom of slope to drive Room, operating room, diesel-driven generator and motor, arrange total motor, total hydraulic jack and motor on the running gear on top, slope, opening Dig and installation motor is set on the operation track of system;Power set are mainly provided kinetic energy by diesel-driven generator, through a series of Power transmission, finally pass to each position of automation integrated equipment arrange device on, it is ensured that each device is properly functioning.
The excavation system of this equipment is formed by running track, adjustable hydraulic compressing cylinder and excavation worth, runs track even Being connected on main framing direction of advance to be separately provided, excavating device moves up and down also along track, is controlled out by computer Dig the speed that device orbits, utilize adjustable hydraulic compressing cylinder to control excavation worth, it is possible to be controlled by computer Three worth of excavation system upper, middle and lower are the most at the uniform velocity excavated, and;Utilize the excavation worth connected on adjustable hydraulic compressing cylinder Enter the cutting depth of slope soil, it is ensured that groove disposably excavates molding.
Template system: be made up of template rail system, template system and template stocking system, template rail system connects At two side lower parts of main framing, template track 8 is with bolts assembled, can be changed shape according to design requirement (such as arch, square, circular etc.), arranges template in template track 8 and runs draw-in groove 84, and template arranges template in running draw-in groove 84 Telecontrol equipment 83, can be used to assembling and disassembling template, and structure is as shown in Figure 6.Left and right sides template can be by the independent fortune of template track 8 Row installation form, at the rectilinear orbit of both sides, is each provided with active link track, can be carried out to each by active link track Arch dispersion template;Template system is made up of soil body mould and the superstructure template 81 of lower channel, and soil body mould is at roadbed The groove utilizing excavation system to excavate according to design physical dimension in side slope forms, and superstructure template 81 is according to design dash The set shaped steel formwork made along size, can carry out installing, removing by template track;Template stocking system is divided into the left and right sides, The set shaped steel formwork of processing and fabricating can be stored, to be onstructed complete after, template is taken in stocking system.Also include template frame Body, template track 8 is connected on main framing 1 by template support body, template support body is additionally provided with the adjustable hydraulic of adjusting template Oil cylinder, described superstructure template 81 and template track 8 are provided with the induction apparatus for detection template position.
Concrete distributing system is by elevating hopper, charging belt machine, hopper, equipment of conveyer, hopper, concrete delivery tube group Becoming, elevating hopper 27 is used for accepting concrete in pump truck, and hopper 21 is for transfer concrete, and elevating hopper 27 is by charging belt machine 28 are connected to hopper 21, and hopper 21 is connected to hopper 25 by equipment of conveyer 24.It is additionally provided with baffle plate at each hopper, is pouring During concrete, controlling concrete mix well, concrete carries out from bottom to top casting concrete by concrete delivery tube.
The attached vibrator that vibrating system is installed by plug-in type vibrating rod and superstructure template back surface forms, mixed Solidifying soil pours in soil body mold process, when, after the predetermined altitude reaching computer installation, being arranged on the plug-in type on the left of main framing and shake Dynamic rod will run, along operation, the concrete that track 5 carries out vibrating in clay model, as shown in Figure 7;When concreting to top keeps off Water along time, available be arranged on induction apparatus monitoring device in template and carry out the change of detection template stress, and show coagulation at CRT picture The height that soil pours, when casting concrete reaches the predetermined altitude of computer installation, computer automatically turns on superstructure mould The attached vibrator of back carries out vibrated concrete, and the frequency data that vibrate detected by induction monitoring device, if inspection When surveying maximum (or minima) that data are arranged more than (or being less than) computer program, computer shakes automatically adjusting adhesion type The frequency of vibration smash, effective guarantee concrete pouring construction quality;Flatten, the system of wiping one's face is by running track pressing, wiping one's face Device forms, and after concreting completes, opens and is arranged on the pressing on the right side of Tectonic Framework, device of wiping one's face along operation operation Track 5 runs, as shown in Figure 8, and pressing, troweling concrete.Concrete distributing, the installation of (flatten, the wipe one's face) track that vibrates Position and running orbit are as shown in Figure 3.
Curing system is made up of water tank and maintenance pipe, and water tank 22 is arranged on slope top line walking apparatus 2, by maintenance pipe 23 It is connected to hopper 25.In advance water is loaded water tank, by maintenance pipe, hopper is delivered in water transport, entered by concrete transport telescoping tube Row curing concrete, and it is carried out hopper, concrete transport telescoping tube, it is possible to it is carried out template.Concrete structure such as Fig. 4, Fig. 5 Shown in.
Monitoring system is made up of various sensing devices, data communication apparatus, and sensing receives processor and data conveyer It is arranged on operating room, and connects computer;Various sensors are separately mounted to template, feed opening, the concrete conveyance mouth of pipe, water tank The positions such as the maintenance mouth of pipe, skeleton and hydraulic jack, can control the operation of equipment in work progress constantly;Data communication is mainly entered Row collects the data of all kinds of induction installations monitoring, and is delivered in computer, be analyzed by the data collected by computer, Document Solution.As superstructure template 81 back side is provided with the stress of the speed for being controlled concreting by monitor stress Induction apparatus;It is provided with the sensing for monitoring concrete discharging speed and placement temperature in hopper 25 and concrete transport telescoping tube 26 Device.
Hydraulic system is made up of dynamical element, executive component, control element, auxiliary element and hydraulic oil, hydraulic system It is divided into total hydraulic oil pump, variable pump, distributing valve and each adjustable separatory pressure oil pump composition, controls total liquid by computer program Pressure oil pump, variable pump, distributing valve and each adjustable separatory pressure oil pump operate, the adjustable separatory pressure on main framing supporting leg Oil pump can be controlled the height of skeleton according to design slope ratio, and be adjusted, check main framing.The adjustable hydraulic of excavation system Pressure oil pump is adjusted, checks excavation worth, it is ensured that the degree of depth reaching design of excavation groove.Main framing 1 is by the regulation gradient Hydraulic jack 13 be connected respectively to slope top line walking apparatus 2 and slope bottom row walking apparatus 3.
By to construction technology and process production management characteristic analysis, automation control system must is fulfilled for field apparatus The work such as the detection of state, the control of each device and the display of Technical innova-tion, the collection of data, process and data communication Task, for realizing this purpose, automation control system should be made up of four parts, i.e. computer data processing system, display monitoring System, Monitoring Data system and executive control system, the control principle of the most each system is:
Computer data processing system: require according to design drawing, equipment runs and reaches each index etc. in production process, profit Carry out working out computer control system program by the purpose of this automation control system with computer programming professional, in construction During, by In-put design drawing data parameter in computer program (by the way of such as roadbed side slope slope ratio, side slope protection, The channel excavation degree of depth, the speed of service, xoncrete structure size etc.), available computer is to equipment and the operation of each device And the overall process that construction produces controls in real time, it is analyzed the Various types of data of Monitoring Data systematic collection processing, draws Conclusion, can require to carry out managing job site equipment Automatic Control according to design drawing, and will detect in work progress Each data carry out record, and preserve, it is simple to the later stage is to the inspection of concrete quality, examination;
Display monitoring system: automation integrated equipment construction technique uses CRT picture to show, key frame and each subsystem picture energy The ruuning situation of each equipment construction process of Dynamic Announce (such as: run, stop, fault etc.) and each construction technology data, if Put specific character display operation, and the functions such as position and time that the result of operation and display break down can be reflected, important Data (such as the degree of depth, the width of channel excavation, the time of concreting, speed, placement temperature, the frequency that vibrator vibrates, Position that the binding force of template and fault are occurred by concrete and time etc.) special data should be had show, main device fortune The situation of row uses lamplight pointing, and arranges alarm, if occurring being unsatisfactory for In-put design requirement (or equipment in work progress Break down) time, can be pointed out by warning, and small-sized image pickup head, the at any time fortune of facilities for observation are installed on structural framework Market condition, can arbitrarily regulate and control to observe each CRT picture;
Monitoring Data system: the data monitoring system of automation integrated equipment is to utilize that to be arranged on template, feed opening, concrete defeated Send the induction installation on the positions such as the mouth of pipe, tank port, skeleton and hydraulic jack to carry out each construction technology Data Detection to collect, and The data of collection are sent to computer, carry out Data Analysis Services by computer program, it was therefore concluded that, and send corresponding Instruction;
Automation integrated equipment is to run according to side slope concrete protection construction technology, when entering every one procedure, and behaviour Author can pass through input through keyboard start stop command, the monitoring device of each operation and execution device and carry out isolated operation, individually controls, CRT picture shows the position and the data of monitoring that this operation constructs;
Executive control system: before automation integrated equipment construction, technician requires to input construction parameter according to design drawing In computer program, in work progress, automation integrated equipment utilization diesel-driven generator is driven this plant running, passes through The adjustable hydraulic compressing cylinder that main framing supporting leg is connected with running gear carries out the ratio of the design slope according to input and adjusts main framing, and will The data collection of induction installation monitoring is sent to computer, after being analyzed and processed by computer, in the data that CRT picture shows, Operator according to adjusting each separating device of automation integrated equipment, treats main framing and each point according to on-site actual situations After device has adjusted, operator first assigns instruction unlatching excavation system and constructs, and auto-control is integrally set by computer The standby speed run forward and the speed of excavation system excavation, excavation system will be excavated according to the white line of in-site measurement setting-out Construction, it is ensured that groove once excavates molding, after channel excavation molding, person to be operated assigns the instruction of superstructure model sheetinstallat, Template rail system brings into operation, and indicating template is run the position installed by CRT picture, and typified form will be along template track System carries out installation form, and undetermined type template is all run after (arch or grid) put in place along template track, and computer controls Rotary shaft carries out entire lowering template according to design requirement, it is ensured that template decline tentatively puts in place,
After template tentatively declines and puts in place, operator by after keyboard input template accurate adjustment start stop command, utilize structure template and The induction apparatus installed on template track is monitored the position of template, meanwhile, the adjustable hydraulic that available template support body connects Oil cylinder is adjusted the position of template according to the data that computer is collected, track that indicating template is moved by CRT picture and data, Until template adjusts, installs to the range of error of computer program setting, subsequent processing construction can be carried out, thus reach The effect of template secondary accurate adjustment;
After template secondary accurate adjustment completes, when pump truck is by concrete delivery to elevating hopper, the induction apparatus that elevating hopper is installed receives letter After number, can transmit signals to computer, computer assigns charging belt machine and equipment of conveyer operating instruction automatically, under pump truck After material, by baffle plate, concrete is put into elevating hopper, utilize charging belt machine to be transported to hopper through baffle plate by concrete, then Utilize equipment of conveyer that concrete transportation to hopper, CRT picture will be shown the weight of hopper concrete and portion to be poured Position shape of template, operator passes through input through keyboard concreting start stop command, and the control valve opened in hopper pours Concrete, CRT picture measures, by the side of concreting, the position that indicating template pours, and utilization is arranged on hopper and coagulation The speed of the induction apparatus monitoring concrete discharging of soil delivery tube and placement temperature, when bottom soil body mould concreting, utilize The concrete square amount that computer recording pours, after side's amount of concreting reaches predetermined altitude, computer will turn off Hopper, and open on the left of skeleton install internal vibration rod along run operation run track 5 carry out vibrated concrete, shake After smashing, continue casting concrete, until concreting, to superstructure template, treats that concreting is to top structure When making concrete, the stress of template back surface stress induction device monitoring controls the speed of concreting, when superstructure coagulation When soil pours the predetermined altitude reaching computer input, computer would automatically turn on the form vibrator of template back surface and shakes Smashing concrete, meanwhile, computer controls feed opening valve and reduces the speed of concreting, and when mount stress sensing in template During the maximum that the data of device monitoring are arranged more than computer program, it is shinny that monitoring system will send warning, display lamp, and CRT Picture will show the position at this position, and by the shrinking valve of feed opening carrying out shrinking the speed of perfusion of reduction concrete, directly Within the scope of reaching computer installation to the stress of template, casting concrete will be proceeded, after concreting completes, open Open the pressing on the right side of main framing, device of wiping one's face runs track 5 along operation and carries out concrete pressing, wipes one's face.
After concrete surface troweling, operator, by after input through keyboard concrete curing start stop command, opens water tank and supports The valve of pillar, the water in water tank enters hopper by maintenance pipe, utilizes concrete delivery pipe to carry out mixed to poured Solidifying soil maintenance (hopper the most capable of washing, concrete conveying pipe), during concrete setting, utilizes the stress being arranged on template back surface Induction apparatus carries out detecting the concrete stress to template, when the minima that the stress detected is arranged less than computer program, Representing that template reaches the intensity of form removal, CRT picture shows the relativeness of concrete and template equally, and computer will start automatically Adjustable hydraulic compressing cylinder on template support body, adjustable hydraulic compressing cylinder is displaced outwardly making template depart from concrete, template rotary shaft Being lifted up, can complete form removable task, after form removable, computer automatically turns on template rail system, makes template to mould Plate stocking system contract, and utilize maintenance pipe that template is rinsed.
In construction early stage, after roadbed body has filled, advanced row roadbed side slope cuts slope construction, and carries out equipment integrating In the section of the testing construction of side slope concrete protection examination, determined by test section construction and be applicable to one for side slope concrete protection Each operation construction parameter of automation integrated equipment construction, after parameter determination to be onstructed, can use automation integrated equipment Carrying out large-area construction, concrete work progress divides following step to implement:
The first step: check that device automation control system runs program normal, and the construction parameter of each operation determined is inputted In automation integrated equipment computer program, it is ensured that import data errorless.
Second step: after roadbed body (chemical modifying soil or element soil) has filled, begin with plant equipment and cut Slope, after cutting slope and completing, is gone out bridge arch shape (grid) side slope concrete protection channel excavation line by survey crew setting-out.
3rd step: use manually or crane is by the automation integrated equipment steel structure of roadbed side slope concrete protection engineering construction Main framing and each sub-device are transported to job site, are manually started and carry out assembly, after assembly completes, the most tentatively adjust steel structure Skeleton and each system and device.
4th step: manually automation integrated equipment steel llex cornuta frame and each system and device being carried out secondary accurate adjustment, accurate adjustment is complete Cheng Hou, opens and releases the button, and starts diesel-driven generator and generates electricity, and drives dynamic equipment to run, and begins preparing for construction.
5th step: automation integrated equipment runs to the initial construction location of roadbed side slope concrete protection, utilizes main bone The adjustable hydraulic compressing cylinder installed on frame supporting leg carries out adjusting main framing, and the data collection monitored by induction installation according to slope ratio Being sent to computer, after being analyzed and processed by computer, in the data that CRT picture shows, operator is according to on-site actual situations Adjusting each separating device of automation integrated equipment, after main framing and each separating device have adjusted, operator first assigns Instruction is opened excavation system and is constructed, and speed and excavation system that auto-control equipment integrating is run forward by computer are opened The speed dug, the white line according to in-site measurement setting-out is carried out excavation construction by excavation system, it is ensured that groove once excavates molding, treats After channel excavation molding, person to be operated assigns the instruction of superstructure model sheetinstallat, and template rail system brings into operation, CRT picture On by indicating template run install position, typified form will carry out installation form, undetermined type template along template rail system All running after (arch or grid) put in place along template track, computer controls rotary shaft and carries out under entirety according to design requirement Fall template, it is ensured that template decline tentatively puts in place.
6th step: after template tentatively declines and puts in place, operator, by after keyboard input template accurate adjustment start stop command, utilizes The induction apparatus installed in structure template and template track is monitored the position of template, and meanwhile, available template support body connects Adjustable hydraulic compressing cylinder is adjusted the position of template according to the data that computer is collected, and indicating template is moved by CRT picture Track and data, until template adjusts, installs to the range of error of computer program setting, can carry out subsequent processing and execute Work, thus reached the effect of template secondary accurate adjustment.
7th step: after template secondary accurate adjustment completes, when pump truck is by concrete delivery to elevating hopper, the sensing that elevating hopper is installed After device receives signal, can transmit signals to computer, charging belt machine assigned automatically by computer and equipment of conveyer runs Instruction, after pump truck blanking, puts into elevating hopper by baffle plate by concrete, utilizes charging belt machine to be transported through baffle plate by concrete Transporting to hopper, recycling equipment of conveyer is by concrete transportation to hopper, and CRT picture is by the weight of display hopper concrete With position template shape to be poured, operator passes through input through keyboard concreting start stop command, opens the control in hopper Valve carries out casting concrete, and CRT picture measures, by the side of concreting, the position that indicating template pours, and utilization is arranged on down The speed of the induction apparatus monitoring concrete discharging of hopper and concrete transportation pipe and placement temperature, in bottom, soil body mould concrete waters When building, utilizing the concrete square amount that computer recording pours, after side's amount of concreting reaches predetermined altitude, computer will It is automatically switched off hopper, and the internal vibration rod opening installation on the left of skeleton vibrates along running operation operation track 5 Concrete, after vibrating, continues casting concrete, until concreting is to design superstructure template, treats coagulation When soil pours to superstructure concrete, the stress of template back surface stress induction device monitoring controls the speed of concreting, When superstructure concreting reaches the predetermined altitude of computer input, computer would automatically turn on the attachment of template back surface Formula vibrator carries out vibrated concrete, and meanwhile, computer controls feed opening valve and reduces the speed of concreting, and works as template During the maximum that the data of upper mount stress induction apparatus monitoring are arranged more than computer program, monitoring system will send warning, refer to Show that lamp is shinny, and CRT picture will show the position at this position, and reduce concrete by carrying out the shrinking valve of feed opening shrinking Speed of perfusion, until within the scope of the stress of template reaches computer installation, casting concrete will be proceeded, will treat concrete After having poured, open the pressing on the right side of main framing, device of wiping one's face runs track 5 along operation and carries out concrete pressing, wipes one's face.
8th step: after concrete surface troweling, operator is by, after input through keyboard concrete curing start stop command, opening The valve of water tank maintenance pipe, the water in water tank enters hopper by maintenance pipe, utilizes concrete delivery pipe to carry out having poured The concrete curing (hopper the most capable of washing, concrete conveying pipe) become, during concrete setting, utilizes and is arranged on template back surface Stress induction device carry out detect the concrete stress to template, when the stress detected less than computer program arrange minimum During value, representing that template reaches the intensity of form removal, CRT picture shows the relativeness of concrete and template equally, and computer will be from The dynamic adjustable hydraulic compressing cylinder started on template support body, adjustable hydraulic compressing cylinder is displaced outwardly making template depart from concrete, template Rotary shaft is lifted up, and can complete form removable task, and after form removable, computer automatically turns on template rail system, makes mould Plate is to template stocking system contract, and utilizes maintenance pipe to be rinsed template.
9th step: after template has been cleaned, it is mobile that operator utilizes control device to drive automatic sliding form apparatus to carry out operation, During automatic sliding form apparatus moves, maintenance of equipment personnel carry out checking template and each system, set when automation integrated For when moving to the next position, above-mentioned steps is constructed again.

Claims (9)

1. the equipment integrating for side slope concrete protection, it is characterised in that include slope top line walking apparatus (2) and slope bottom row Walking apparatus (3), and the main bone across the domatic rectangle being connected between slope top line walking apparatus (2) and slope bottom row walking apparatus (3) Frame (1);Main framing (1) direction of advance side is provided with front side and runs track (4), and front side is run track (4) and is provided with supporting leg (12), Supporting leg (12) is provided with adjustable hydraulic compressing cylinder (41), and supporting leg (12) bottom is provided with excavation pick (42);Main framing also sets on (1) Being parallel to front side and run straight line transport track (7) of track (4), straight line transports track (7) and is connected to template storage area (82); Main framing (1) is arranged right below template track (8), and template track (8) is arranged at casting space both sides along groove, and by activity Link track (6) is connected to straight line and transports track (7), and active link track (6) is connected to main framing by rotary shaft (11) , and template includes soil body mould and superstructure template (81) (1);It is additionally provided with between the template track (8) of casting space both sides Operating and run track (5), operation is provided with plug-in type vibrating rod (9) and pressing, surface finishing device (10), operation in running track (5) Run track (5) and be connected to straight line transport track (7) also by active link track (6);Main framing (1) is also arranged above passing through Concrete transport telescoping tube (26) is connected to the hopper (25) of casting space.
Equipment integrating for side slope concrete protection the most according to claim 1, it is characterised in that also include being arranged on Water tank (22) on slope top line walking apparatus (2), water tank (22) is connected to hopper (25) by maintenance pipe (23).
Equipment integrating for side slope concrete protection the most according to claim 1, it is characterised in that described main framing (1) it is connected respectively to slope top line walking apparatus (2) and slope bottom row walking apparatus (3) by the hydraulic jack (13) of the regulation gradient.
Equipment integrating for side slope concrete protection the most according to claim 1, it is characterised in that described template track (8) arranging template in and run draw-in groove (84), template is provided for dismounting the template telecontrol equipment of template in running draw-in groove (84) (83).
Equipment integrating for side slope concrete protection the most according to claim 1, it is characterised in that also include for holding Connecing the elevating hopper (27) of concrete in pump truck and be used for the hopper (21) of transfer concrete, elevating hopper (27) passes through charging belt machine (28) being connected to hopper (21), hopper (21) is connected to hopper (25) by equipment of conveyer (24).
Equipment integrating for side slope concrete protection the most according to claim 1, it is characterised in that also include template frame Body, template track (8) is connected on main framing (1) by template support body, template support body is additionally provided with the adjustable of adjusting template Hydraulic jack, described superstructure template (81) and template track (8) are provided with the induction apparatus for detection template position.
Equipment integrating for side slope concrete protection the most according to claim 1, it is characterised in that described superstructure Template (81) back side is provided with the stress induction device of the speed for being controlled concreting by monitor stress.
Equipment integrating for side slope concrete protection the most according to claim 1, it is characterised in that described superstructure Template (81) back side is provided with uses attached vibrator.
Equipment integrating for side slope concrete protection the most according to claim 1, it is characterised in that described hopper (25) and it is provided with the induction apparatus for monitoring concrete discharging speed and placement temperature in concrete transport telescoping tube (26).
CN201610789261.5A 2016-08-31 2016-08-31 A kind of equipment integrating for side slope concrete protection Active CN106193069B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610789261.5A CN106193069B (en) 2016-08-31 2016-08-31 A kind of equipment integrating for side slope concrete protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610789261.5A CN106193069B (en) 2016-08-31 2016-08-31 A kind of equipment integrating for side slope concrete protection

Publications (2)

Publication Number Publication Date
CN106193069A true CN106193069A (en) 2016-12-07
CN106193069B CN106193069B (en) 2018-05-04

Family

ID=58085426

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610789261.5A Active CN106193069B (en) 2016-08-31 2016-08-31 A kind of equipment integrating for side slope concrete protection

Country Status (1)

Country Link
CN (1) CN106193069B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532662A (en) * 2018-05-30 2018-09-14 田振刚 A kind of subgrade protection construction equipment and its application method
CN108673724A (en) * 2018-07-04 2018-10-19 中国水利水电第五工程局有限公司 A kind of integration apparatus for precast concrete construction
CN112343056A (en) * 2020-11-18 2021-02-09 杨玉庆 Concrete pouring device for hydraulic engineering building and use method thereof
CN113668538A (en) * 2021-07-20 2021-11-19 中铁建华南建设有限公司 Fluid material conveying device

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010285748A (en) * 2009-06-09 2010-12-24 Tekken Constr Co Ltd Quality control system for concrete delivered to construction site
KR101292096B1 (en) * 2012-12-04 2013-08-08 김정영 Method for constructing soundproof wall or retaining wall and sliding form
CN204780926U (en) * 2015-07-14 2015-11-18 中国葛洲坝集团股份有限公司 High -steep concrete slipform pulls controlling means
CN204875699U (en) * 2015-06-08 2015-12-16 中国水利水电第十一工程局有限公司 Optical equipment is smeared in domatic lining cutting of channel with precompression acts on with pushing away to put down
CN204959758U (en) * 2015-08-20 2016-01-13 中国水利水电第十工程局有限公司 Construction of panel rock -fill dam concrete panel is automatic machine of smearing of repairing of section panel completely
CN105442609A (en) * 2015-11-20 2016-03-30 山东送变电工程公司 Self-supporting chute device for pouring of foundation concrete
CN205152899U (en) * 2015-11-20 2016-04-13 中国水电建设集团十五工程局有限公司 Concrete face rockfill dam panel construction is with paving, level and wipe one's face integrated device
CN205171462U (en) * 2015-12-12 2016-04-20 新疆北方建设集团有限公司 Half section of channel vibrates and moves synovial membrane concrete lining machine
CN105714743A (en) * 2016-04-06 2016-06-29 山东中博重工机械有限公司 Crawler type multifunctional concrete lining machine
CN206034465U (en) * 2016-08-31 2017-03-22 中国水利水电第五工程局有限公司 A integrative equipment for protection of side slope concrete

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010285748A (en) * 2009-06-09 2010-12-24 Tekken Constr Co Ltd Quality control system for concrete delivered to construction site
KR101292096B1 (en) * 2012-12-04 2013-08-08 김정영 Method for constructing soundproof wall or retaining wall and sliding form
CN204875699U (en) * 2015-06-08 2015-12-16 中国水利水电第十一工程局有限公司 Optical equipment is smeared in domatic lining cutting of channel with precompression acts on with pushing away to put down
CN204780926U (en) * 2015-07-14 2015-11-18 中国葛洲坝集团股份有限公司 High -steep concrete slipform pulls controlling means
CN204959758U (en) * 2015-08-20 2016-01-13 中国水利水电第十工程局有限公司 Construction of panel rock -fill dam concrete panel is automatic machine of smearing of repairing of section panel completely
CN105442609A (en) * 2015-11-20 2016-03-30 山东送变电工程公司 Self-supporting chute device for pouring of foundation concrete
CN205152899U (en) * 2015-11-20 2016-04-13 中国水电建设集团十五工程局有限公司 Concrete face rockfill dam panel construction is with paving, level and wipe one's face integrated device
CN205171462U (en) * 2015-12-12 2016-04-20 新疆北方建设集团有限公司 Half section of channel vibrates and moves synovial membrane concrete lining machine
CN105714743A (en) * 2016-04-06 2016-06-29 山东中博重工机械有限公司 Crawler type multifunctional concrete lining machine
CN206034465U (en) * 2016-08-31 2017-03-22 中国水利水电第五工程局有限公司 A integrative equipment for protection of side slope concrete

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘洪海等: "土工布上行驶的履带摊铺机附着性能", 《长江大学学报(自然科学版)》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532662A (en) * 2018-05-30 2018-09-14 田振刚 A kind of subgrade protection construction equipment and its application method
CN108673724A (en) * 2018-07-04 2018-10-19 中国水利水电第五工程局有限公司 A kind of integration apparatus for precast concrete construction
CN112343056A (en) * 2020-11-18 2021-02-09 杨玉庆 Concrete pouring device for hydraulic engineering building and use method thereof
CN113668538A (en) * 2021-07-20 2021-11-19 中铁建华南建设有限公司 Fluid material conveying device

Also Published As

Publication number Publication date
CN106193069B (en) 2018-05-04

Similar Documents

Publication Publication Date Title
CN106193069B (en) A kind of equipment integrating for side slope concrete protection
CN108104838B (en) A kind of automation control method of lining construction
CN106592426B (en) The construction method of transverse prestress overall with reinforced concrete bridge deck plate prefab-form system
CN101906768B (en) Panel construction method of concrete faced rock-fill dam
Zhong et al. Theoretical research on construction quality real-time monitoring and system integration of core rockfill dam
CN206034465U (en) A integrative equipment for protection of side slope concrete
CN109736354A (en) Tunnel open excavation section main structure construction method
CN108254205A (en) Tunnel danger stone collapses indoor large comprehensive simulation test platform and method
CN106192905B (en) A kind of lining cutting device for drainage groove
CN104234012A (en) Ultralong concrete slip form body of concrete rockfill dam and construction method of slip form body
CN109137976A (en) Municipal administration synthesis pipe gallery hydraulic jumbo and its construction method
CN104452591B (en) A kind of construction of cast-in-situ box-beam technique that is applied to science of bridge building
CN108086106B (en) Road mix method integrated intelligent construction device
CN112663516A (en) Construction method of bridge thin-wall hollow pier column
CN115559168A (en) Rapid rush-repair method for local damaged area of airport pavement
CN105937240B (en) A kind of integration apparatus for concrete topping construction
CN110904969A (en) High steep slope slab corridor structure concrete placement slipform system
CN108301440A (en) With waterproof, the underground pipe gallery construction method of drain function
CN206034378U (en) A lining cutting device for drainage groove
CN205741911U (en) A kind of sliding form apparatus for bridge floor engineering construction
CN201704603U (en) Pavement paver capable of constructing across central dividing strip
CN101886364A (en) Pavement paver capable of spanning central median for construction and construction method thereof
CN104947853B (en) A kind of Inner standpipe formula cast-in-situ reinforced concrete column and construction method
CN204753510U (en) Digital multi -functional canal lining machine
CN110409531A (en) Pipeline water shakes sand backfill operation platform and its method under town road restricted clearance

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant