CN106193036A - PHC tube pile of major diameter construction method - Google Patents

PHC tube pile of major diameter construction method Download PDF

Info

Publication number
CN106193036A
CN106193036A CN201510214772.XA CN201510214772A CN106193036A CN 106193036 A CN106193036 A CN 106193036A CN 201510214772 A CN201510214772 A CN 201510214772A CN 106193036 A CN106193036 A CN 106193036A
Authority
CN
China
Prior art keywords
pile
phc
tube
stake
major diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510214772.XA
Other languages
Chinese (zh)
Inventor
唐文生
沈霞
王靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201510214772.XA priority Critical patent/CN106193036A/en
Publication of CN106193036A publication Critical patent/CN106193036A/en
Pending legal-status Critical Current

Links

Abstract

A kind of PHC tube pile of major diameter construction method, PHC pile tube diameter >=0.8m, it is characterised in that comprise the following steps: a puts PHC pipe pile position, uses the position of total powerstation accurate settingout stake point;B feeds PHC pile tube, and crane is sling pile top one end of PHC pile tube, and the little hook block of stake machine plays the other end of PHC pile tube and fed in pile cover;C inserts PHC pile tube, and its pile top is directed at after feeding good PHC pile tube the stake position put well;The perpendicularity of d correction first segment PHC pile tube;The pile extension of ePHC pile tube, pile sinking, to stopping hammering when the 60-80cm of ground, carries out the pile extension of PHC pile tube;FPHC pile tube pile sinking is to designed elevation, and stake top mark height deviation allowable value is within ± 50mm.It is reasonable, workable that the PHC tube pile of major diameter construction method of the present invention has construction procedure design science, and construction quality is safe and reliable;Working specification and the advantage reducing Construction Cost.

Description

PHC tube pile of major diameter construction method
Technical field
The present invention relates to the pile base construction method of a kind of foundation engineering, specifically, be a kind of PHC tube pile of major diameter construction method.
Background technology
PHC pile tube, owing to its manufacturing technology is advanced, produce technology, the economic advantages such as industrialization degree height, steady quality, short construction period and resource consumption are few, is the most comparatively fast developed, it has also become the important pile foundation material of foundation engineering.At present, domestic construction of structures is increasing to PHC pile tube diametric requirements.Economy is the most simply constructed these large-diameter tubular piles, is our technology topic of always inquiring into, and makes PHC tube pile of major diameter be more widely used.But current domestic PHC tube pile of major diameter construction method is still in the stage lack of standardization, there is a lot of not science, irrational place, work progress is numerous and diverse, operating expenses is high.
The most known PHC tube pile of major diameter construction method also exists above-mentioned all inconvenience and problem.
Summary of the invention
The purpose of the present invention, is to propose a kind of working specification, safe and reliable PHC tube pile of major diameter construction method.
The purpose of the present invention, is to propose the PHC tube pile of major diameter construction method of a kind of job instruction.
For achieving the above object, the technical solution of the present invention is:
A kind of PHC tube pile of major diameter construction method, PHC pile tube diameter >=0.8m, it is characterised in that comprise the following steps:
A, putting PHC pipe pile position, use the position of total powerstation accurate settingout stake point, pile position deviation is less than 10mm;
B, feeding PHC pile tube, crane is sling pile top one end of PHC pile tube, and the little hook block of stake machine plays the other end of PHC pile tube and fed in pile cover;
C, slotting PHC pile tube, be directed at the stake position put well by its pile top after feeding good PHC pile tube, it is desirable to pile top is just coincide with white lime circle;
D, the perpendicularity of correction first segment PHC pile tube, two theodolites are that an angle of 90 degrees arranges the perpendicularity being corrected PHC pile tube;First segment PHC pile tube perpendicularity deviation is not more than 0.3%, and second section PHC pile tube is not more than 0.5% to minor details pile verticality deviation;
The pile extension of e, PHC pile tube, pile sinking, to stopping hammering when the 60-80cm of ground, carries out the pile extension of PHC pile tube;
F, PHC pile tube pile sinking is to designed elevation, and stake top mark height deviation allowable value is within ± 50mm.
The PHC tube pile of major diameter construction method of the present invention can also be further achieved by the following technical measures.
Aforesaid method, in wherein said b step, pile cover 2cm bigger than stake diameter.
Aforesaid method, the diameter different choice corresponding stake machine of wherein said PHC pile tube and pile monkey.
Aforesaid method, a diameter of 0.8m of wherein said PHC pile tube, selects SP135 stake machine, and selects >=10 tons of pile monkeys.
Aforesaid method, wherein also needs to the distance≤800mm on pile center and the guide rod limit controlling PHC pile tube.
Aforesaid method, the pile center of wherein said PHC pile tube and the distance on guide rod limit are 710mm.
Aforesaid method, in wherein said step e, the pile extension of the pile extension of PHC pile tube uses CO2Gas shielded arc welding, during welding, each joint is by two welders symmetrical welding both sides while;Welding is no less than 8 minutes cool time;Welding uses multiple tracks circumferential weld transverse weld technique, and welding procedure is characterized by and accurately grasps electric current, voltage, send wire speed and soldering supplying angle.
Aforesaid method, in wherein said pile extension, the centerline deviation < 5mm of upper and lower 2-section pipe stake.
Aforesaid method, wherein said pile cover and hammer, it is provided with corresponding elastic insert between pile cover with stake top.
Aforesaid method, wherein said elastic insert uses the steel cable of Φ 22mm, and the steel cable number of plies is 9 layers.
Aforesaid method, uses cardboard matter liner between wherein said pile cover and stake top, the liner thickness after hammering compression is 100mm-120mm.
Aforesaid method, in wherein said PHC pile tube pile sinking, when injection final section PHC pile tube, pile sinking is to stopping hammering during away from ground 60-80cm, and stake holes point is welded on pile end plate by the circular steel plate using 2mm thickness diameter identical with stake diameter, stake holes is blocked, to prevent security incident.
After using technique scheme, the PHC tube pile of major diameter construction method of the present invention has the advantage that
1, construction procedure design science is reasonable, workable;
2, using the PHC stake of large-scale piling machine construction major diameter, construction quality is safe and reliable;
3, working specification, reduces Construction Cost.
Accompanying drawing explanation
Fig. 1 is the large-scale piling machine structural representation of the embodiment of the present invention;
Fig. 2 is the stake holes plugging plate plane graph of the embodiment of the present invention;
Fig. 3 is the stake holes plugging plate profile of the embodiment of the present invention;
Fig. 4 is the pile cover liners plane figure of the embodiment of the present invention;
Fig. 5 is the pile cover liner profile of the embodiment of the present invention.
In Fig. 1: 1 slide block bolt, 2 slide blocks, pile cover liner on 3,4 parallels, 5 times pile cover liners.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing thereof, the present invention is illustrated further.
Embodiment 1
A kind of PHC tube pile of major diameter construction method of the present invention, a diameter of 0.8m of PHC pile tube, selects SP135 stake machine, and selects 10 tons of pile monkeys, it is characterised in that comprise the following steps:
A, putting PHC pipe pile position, use the position of total powerstation accurate settingout stake point, pile position deviation is less than 10mm;
B, feeding PHC pile tube, crane is sling pile top one end of PHC pile tube, and the little hook block of stake machine plays the other end of PHC pile tube and fed in pile cover, pile cover 2cm bigger than stake diameter;
C, slotting PHC pile tube, be directed at the stake position put well by its pile top after feeding good PHC pile tube, it is desirable to pile top is just coincide with white lime circle;
D, the perpendicularity of correction first segment PHC pile tube, two theodolites are that an angle of 90 degrees arranges the perpendicularity being corrected PHC pile tube;First segment PHC pile tube perpendicularity deviation is not more than 0.3%, and second section PHC pile tube is not more than 0.5% to minor details pile verticality deviation;
The pile extension of e, PHC pile tube, pile sinking, to stopping hammering when the 60-80cm of ground, carries out the pile extension of PHC pile tube;
F, PHC pile tube pile sinking is to designed elevation, and stake top mark height deviation allowable value is within ± 50mm:
Wherein: the pile center of described PHC pile tube and the distance on guide rod limit are 710mm, pile monkey slide block bolt and guide rod back gauge are 370mm;The pile extension of the pile extension of PHC pile tube uses CO2Gas shielded arc welding, during welding, each joint is by two welders symmetrical welding both sides while;Welding is no less than 8 minutes cool time;Welding uses multiple tracks circumferential weld transverse weld technique, and welding procedure is characterized by and accurately grasps electric current, voltage, send wire speed and soldering supplying angle;In described pile extension, the centerline deviation < 5mm of upper and lower 2-section pipe stake;Described pile cover and hammer, be provided with corresponding elastic insert between pile cover with stake top, described elastic insert uses the steel cable of Φ 22mm, and the steel cable number of plies is 9 layers;Using cardboard matter liner between described pile cover and stake top, the liner thickness after hammering compression is 100mm-120mm;In described PHC pile tube pile sinking, when injection final section PHC pile tube, pile sinking is to stopping hammering during away from ground 60-80cm, stake holes point is welded on pile end plate by the circular steel plate using 2mm thickness diameter identical with stake diameter, stake holes is blocked, to prevent security incident.
The present invention has substantive distinguishing features and significant technological progress, and the PHC tube pile of major diameter construction method construction procedure design science of the present invention is reasonable, workable;Using the PHC stake of large-scale piling machine construction major diameter, construction quality is safe and reliable;Working specification, reduces Construction Cost.
Above example is used for illustrative purposes only, rather than limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, it is also possible to make various conversion or change.Therefore, the technical scheme of all equivalents also should belong to scope of the invention, should be limited by each claim.

Claims (12)

1. a PHC tube pile of major diameter construction method, PHC pile tube diameter >=0.8m, it is characterised in that comprise the following steps:
A, putting PHC pipe pile position, use the position of total powerstation accurate settingout stake point, pile position deviation is less than 10mm;
B, feeding PHC pile tube, crane is sling pile top one end of PHC pile tube, and the little hook block of stake machine plays the other end of PHC pile tube and fed in pile cover;
C, slotting PHC pile tube, be directed at the stake position put well by its pile top after feeding good PHC pile tube, it is desirable to pile top is just coincide with white lime circle;
D, the perpendicularity of correction first segment PHC pile tube, two theodolites are that an angle of 90 degrees arranges the perpendicularity being corrected PHC pile tube;First segment PHC pile tube perpendicularity deviation is not more than 0.3%, and second section PHC pile tube is not more than 0.5% to minor details pile verticality deviation;
The pile extension of e, PHC pile tube, pile sinking, to stopping hammering when the 60-80cm of ground, carries out the pile extension of PHC pile tube;
F, PHC pile tube pile sinking is to designed elevation, and stake top mark height deviation allowable value is within ± 50mm.
2. PHC tube pile of major diameter construction method as claimed in claim 1, it is characterised in that in described b step, pile cover 2cm bigger than stake diameter.
3. PHC tube pile of major diameter construction method as claimed in claim 1, it is characterised in that the diameter different choice corresponding stake machine of described PHC pile tube and pile monkey.
4. PHC tube pile of major diameter construction method as claimed in claim 3, it is characterised in that a diameter of 0.8m of described PHC pile tube, selects SP135 stake machine, and selects >=10 tons of pile monkeys.
5. PHC tube pile of major diameter construction method as claimed in claim 1, it is characterised in that also need to the distance≤800mm on pile center and the guide rod limit controlling PHC pile tube.
6. PHC tube pile of major diameter construction method as claimed in claim 5, it is characterised in that the pile center of described PHC pile tube and the distance on guide rod limit are 710mm.
7. PHC tube pile of major diameter construction method as claimed in claim 1, it is characterised in that in described step e, the pile extension of the pile extension of PHC pile tube uses CO2Gas shielded arc welding, during welding, each joint is by two welders symmetrical welding both sides while;Welding is no less than 8 minutes cool time;Welding uses multiple tracks circumferential weld transverse weld technique.
8. the PHC tube pile of major diameter construction method as described in claim 1 or 7, it is characterised in that in described pile extension, the centerline deviation < 5mm of upper and lower 2-section pipe stake.
9. PHC tube pile of major diameter construction method as claimed in claim 1, it is characterised in that described pile cover and hammer, is provided with corresponding elastic insert between pile cover with stake top.
10. PHC tube pile of major diameter construction method as claimed in claim 9, it is characterised in that described elastic insert uses the steel cable of Φ 22mm, and the steel cable number of plies is 9 layers.
11. PHC tube pile of major diameter construction methods as claimed in claim 1, it is characterised in that using cardboard matter liner between described pile cover and stake top, the liner thickness after hammering compression is 100mm-120mm.
12. PHC tube pile of major diameter construction methods as claimed in claim 1, it is characterized in that, in described PHC pile tube pile sinking, when injection final section PHC pile tube, pile sinking is to stopping hammering during away from ground 60-80cm, stake holes point is welded on pile end plate by the circular steel plate using 2mm thickness diameter identical with stake diameter, stake holes is blocked, to prevent security incident.
CN201510214772.XA 2015-04-30 2015-04-30 PHC tube pile of major diameter construction method Pending CN106193036A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510214772.XA CN106193036A (en) 2015-04-30 2015-04-30 PHC tube pile of major diameter construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510214772.XA CN106193036A (en) 2015-04-30 2015-04-30 PHC tube pile of major diameter construction method

Publications (1)

Publication Number Publication Date
CN106193036A true CN106193036A (en) 2016-12-07

Family

ID=57457643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510214772.XA Pending CN106193036A (en) 2015-04-30 2015-04-30 PHC tube pile of major diameter construction method

Country Status (1)

Country Link
CN (1) CN106193036A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083145A (en) * 2017-06-13 2018-12-25 日本车辆制造株式会社 Piling machine
CN109385997A (en) * 2017-08-04 2019-02-26 上海宝冶集团有限公司 The construction method of PHC tubular pole under narrow site condition
CN110130341A (en) * 2019-06-06 2019-08-16 五冶集团上海有限公司 A kind of PHC is fed piling method
CN111456001A (en) * 2020-04-11 2020-07-28 深圳市联胜基础建筑工程有限公司 Tubular pile sinking construction process and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE389146B (en) * 1970-12-29 1976-10-25 Bolt Associates Inc WAY OPERATING A PALE IN THE GROUND AND PALE DRIVING APPLIANCE FOR IMPLEMENTING THE SET
JPS60219323A (en) * 1984-04-13 1985-11-02 Seikichi Yamamoto Pressing-into method of pile
CN101255694A (en) * 2008-04-14 2008-09-03 河南国基建设集团有限公司 High-strength prestressed concrete pipe pile construction method
CN101429768A (en) * 2008-11-28 2009-05-13 湖南省第二工程有限公司 Pre-stress high-strength concrete pipe pile static-pressure construction method
CN101684651A (en) * 2008-09-25 2010-03-31 中冶成工建设有限公司 Ultralong and ultradeep prestressed high strength concrete centrifuge tube pile construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE389146B (en) * 1970-12-29 1976-10-25 Bolt Associates Inc WAY OPERATING A PALE IN THE GROUND AND PALE DRIVING APPLIANCE FOR IMPLEMENTING THE SET
JPS60219323A (en) * 1984-04-13 1985-11-02 Seikichi Yamamoto Pressing-into method of pile
CN101255694A (en) * 2008-04-14 2008-09-03 河南国基建设集团有限公司 High-strength prestressed concrete pipe pile construction method
CN101684651A (en) * 2008-09-25 2010-03-31 中冶成工建设有限公司 Ultralong and ultradeep prestressed high strength concrete centrifuge tube pile construction method
CN101429768A (en) * 2008-11-28 2009-05-13 湖南省第二工程有限公司 Pre-stress high-strength concrete pipe pile static-pressure construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孙福洋: "PHC管桩静压施工工艺及施工质量与安全控制措施", 《施工技术》 *
杜强: "PHC管桩施工工艺", 《山西建筑》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083145A (en) * 2017-06-13 2018-12-25 日本车辆制造株式会社 Piling machine
CN109083145B (en) * 2017-06-13 2021-04-02 日本车辆制造株式会社 Pile driver
CN109385997A (en) * 2017-08-04 2019-02-26 上海宝冶集团有限公司 The construction method of PHC tubular pole under narrow site condition
CN109385997B (en) * 2017-08-04 2021-01-15 上海宝冶集团有限公司 Construction method of PHC tubular pile under narrow field condition
CN110130341A (en) * 2019-06-06 2019-08-16 五冶集团上海有限公司 A kind of PHC is fed piling method
CN111456001A (en) * 2020-04-11 2020-07-28 深圳市联胜基础建筑工程有限公司 Tubular pile sinking construction process and device
CN111456001B (en) * 2020-04-11 2021-11-16 深圳市联胜基础建筑工程有限公司 Tubular pile sinking construction process and device

Similar Documents

Publication Publication Date Title
CN106193036A (en) PHC tube pile of major diameter construction method
CN101429768B (en) Pre-stress high-strength concrete pipe pile static-pressure construction method
CN105479045A (en) External butt joint worktable of large-caliber pipes
CN204266193U (en) Pile foundation steel bar cage locator
CN202500731U (en) Internal prestressed steel-concrete wind power tower
CN103821141A (en) Thread pile construction process
CN204040035U (en) A kind of positioning guiding structure of steel pile casting
CN108797571A (en) A kind of novel stiff composite pile efficient construction method
CN204940889U (en) Novel compositions adjustment means
CN116100182A (en) Welding method for C-shaped marine LNG storage tank anti-moving block
CN103382843B (en) The construction equipment preventing push-bench and tube coupling from rotating with pull bar and construction method
CN104590505A (en) Construction precision control method for cylinder pin hole type leg
CN106284366A (en) External pulling type Larsen steel sheet pile reinforcement means
CN205857182U (en) A kind of end-protecting device for steel-pipe pile construction
CN102615492A (en) Hoisting butt joint method of tower-like containers
CN204852606U (en) Curve push pipe tube coupling bell and spigot connection form
CN208195281U (en) A kind of device orthopedic for high-intensitive penstock tile assembling nozzle
CN109385997B (en) Construction method of PHC tubular pile under narrow field condition
CN202493386U (en) External prestressing steel and concrete wind power tower
CN108723707A (en) The manufacturing method of skirt Basic annular plate
CN207294819U (en) Jackstay type fixator for last furnace shell assembly
CN102900074B (en) Prefabricated tubular pile with end screw thread with X-shaped variable section and construction method thereof
CN108639955A (en) A method of for the lifting positioning of ship large scale equipment
CN108607902A (en) A kind of device and method orthopedic for heavy caliber high-strength steel pipe tile assembling nozzle
CN109332981A (en) Filling pile cage of reinforcement tools and its application method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207