CN106192669B - Place coiled material face layer - Google Patents

Place coiled material face layer Download PDF

Info

Publication number
CN106192669B
CN106192669B CN201610778409.5A CN201610778409A CN106192669B CN 106192669 B CN106192669 B CN 106192669B CN 201610778409 A CN201610778409 A CN 201610778409A CN 106192669 B CN106192669 B CN 106192669B
Authority
CN
China
Prior art keywords
coiled material
place
layer
coiled
basis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610778409.5A
Other languages
Chinese (zh)
Other versions
CN106192669A (en
Inventor
陆大伟
刘丽欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan U Crown Sports Material Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610778409.5A priority Critical patent/CN106192669B/en
Priority to PCT/CN2016/101675 priority patent/WO2018040229A1/en
Publication of CN106192669A publication Critical patent/CN106192669A/en
Application granted granted Critical
Publication of CN106192669B publication Critical patent/CN106192669B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/04Pavings made of prefabricated single units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/08Surfaces simulating grass ; Grass-grown sports grounds

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention proposes a kind of place coiled material face layer, including the prefabricated coiled material being detachably connected with place basis, the prefabricated coiled material includes multiple the first coiled materials with radian and multiple linear second coiled materials, first coiled material and the sliceable runway/court surface layer for forming closure of second coiled material.According to coiled material face in place provided by the invention layer, it is improved on the basis of existing technology, the coiled material of script strip is designed as first coiled material with radian and linear second coiled material, no matter straight way or bend, change shape without secondary application active force, therefore inner structure tension is unified after coiled material is mated formation, first coiled material, the second coiled material can be spliced into court, runway etc., later stage deformation probability is low when in use, solves scene in the prior art and stretches the problems such as coiled material radian is susceptible to crack, bulge.

Description

Place coiled material face layer
Technical field
The present invention relates to infrastructure technique fields, and in particular to a kind of to apply in runway, football pitch, basketball court, road Deng place coiled material face layer.
Background technology
With the development of productivity level, the raising of living standards of the people, the leisure time of people is also more and more, sport Movement is one of people's spare time favorite activity, and therefore, sports equipment science, hommization are directly related to sporter's Personal safety is widely promoted and applied, but current place coiled material face layer exist in terms of production and construction with Lower defect:
1st, the current running track coiled material processed is strip, and no radian, wide cut is fixed value, when scene is mated formation not It only needs to carry out cutting work, since plastic cement race track has bend, needs manually or mechanically to make straight volume when mating formation Material deformation generates radian, due to unbalance stress inside and outside monolithic coiled material, causes density inconsistent, the mechanics such as frost heave, structural internal force Performance is also inconsistent, and the big elasticity of inner ring density is big, and outer ring density is small small, and the frozen-heave coefficient after cold and hot variation is inconsistent, Corner is caused to be easiest to crack and bulge phenomenon occur, when there is crack, bulge phenomenon in the local later stage, the general side of remedying Formula is:
A. crack:Processing is to be poured into fill and lead up gap with polyurethane glue, and the gap filled up after causing and prefabricated coiled material rush It is inconsistent to hit absorption elastic force;
B. bulge:Present corner is had more, causes Internal and external cycle surface tension inconsistent due to pullling deformation, inner ring is laterally pressed Power is too big, and bulge phenomenon occurs, and the mode of reparation is mostly it to be made to reduce lateral water using the part that it is extra that wedge shape rejects coiled material Concora crush power, thus more produces gap, influences strip quality and beauty, it is easier to cause the damage of movement.
Therefore using scene stretch coiled material radian by the way of be susceptible to crack, bulge the problems such as, not only the later stage reparation take Expenses of labour power and the damage for easily causing sportsman during exercise.
2nd, the current chinampa coiled material processed is strip, with blank base fabric edge (practical base fabric is wider than Practical knitting width), lawn both sides are cut there are the extra blank base fabric for not working out upper careless silk when scene is mated formation Work, manually cuts extra base fabric, and the precision that requirement is trimmed during trimming is very high.Edge base fabric stays mostly, then real It will appear at the two panels lawn docking of border significantly without careless silk gap, influence the beauty in court.If edge base fabric stays few, then weave Careless silk at base fabric edge easily comes off, and influences the quality in court.And the connection mode on two panels lawn is very unreasonable, at present It is using most lawn on-link mode (OLM)s:
The first step mats formation lawn roll on court according to number order when dispatching from the factory.
Second step, worker's wallpaper knife or scissors trim the extra blank base fabric of lawn edge.
Third walks, and the lawn that two panels has been built simultaneously abuts together, turns down lawn edge, makes the base fabric of lawn edge upward.
4th step at the butted line on two panels lawn, spreads a connect band, and connect band is simply be bonded with ground.
5th step is stained with glue roller coating connect band with round brush and has turned down lawn edge base fabric upward.
6th step, lawn close up, and the lawn that edge has been brushed to glue turns back original state, and rolls two panels lawn with external force Seaming position makes two panels lawn pass through connect band and connects into a piece of lawn.
Above-mentioned lawn link step is more there are drawback:
A, the artificial extra base fabric in edge that cuts the grass on a lawn, human error is too big, causes the lawn edge after trimming irregular not Together, the sensorial effects after lawn is mated formation and quality are influenced.
B, due to manually using glue and connecting the lawn of band forms bonding, uncertain factor is too many, and glue smears thin and thick Differ, glue whether smear in place, glue be most preferably bonded timing, close up after lawn roll roll abutting edge whether in place, Etc. factor it is too many, it is difficult to ensure that lawn bonding quality.
C, during onsite application glue, some glue is more or less had and are fallen in the careless silk on lawn, grass fiber is glued Cheng Yituan influences the beauty in court, later stage extremely difficult processing very much.
D, the environmental-protecting performance of glue differs, and can cause the air pollution to scene, covert to influence athletes ' body health.
In view of this, it is special to propose the present invention.
Invention content
The present invention is directed to solve at least some of the technical problems in related technologies.
The present invention provides a kind of place coiled material face layers thus.Its specific technical solution is as follows:
A kind of place coiled material face layer, including the prefabricated coiled material being detachably connected with place basis, the prefabricated coiled material includes Multiple the first coiled materials with radian and multiple linear second coiled materials, first coiled material and second coiled material are sliceable Form the runway/court surface layer being closed.
According to coiled material face in place provided by the invention layer, it is improved on the basis of existing technology, by script strip Coiled material be designed as first coiled material with radian and linear second coiled material, no matter straight way or bend, without secondary Apply active force and change shape, thus coiled material mat formation after inner structure tension it is unified, the first coiled material, the second coiled material can be spliced into Court, runway etc., later stage deformation probability is low when in use, solves scene stretching coiled material radian in the prior art and is susceptible to The problem of crack, bulge;
The bottom surface of an example according to the present invention, first coiled material and second coiled material is provided with protrusion, described Protrusion mutually block with the groove on place basis and or, the bottom surface of first coiled material and second coiled material set it is fluted, it is described Groove and place basis protrusion mutually card and.
An example according to the present invention, the prefabricated coiled material coordinate with place base bond.
An example according to the present invention, the prefabricated coiled material include top coat layer, elastic layer and bottom surface articulamentum, the face Markings are provided on enamelled coating, the bottom surface articulamentum is connected with place basis.
An example according to the present invention, the material of the markings include Noctilucent material, the material packet of the top coat layer Noctilucent material is included, the luminescent color of the Noctilucent material of the top coat layer is different from the luminous face of the Noctilucent material of the markings Color.
An example according to the present invention is provided with fibrous layer in the elastic layer.
An example according to the present invention, the material of the elastic layer include coconut palm palm fibre.
The side of an example according to the present invention, first coiled material and second coiled material sets with teeth, Mei Gejuan The tooth of material can be engaged.
An example according to the present invention, prefabricated coiled material further include sliding part, and the tooth of the coiled material passes through the sliding part shape Into zipper structure.
An example according to the present invention, first coiled material and/or second coiled material further include chinampa coiled material, The chinampa coiled material is made of a plurality of lawn roll, and the side volume setting of each lawn roll is with teeth, and the tooth of each lawn roll is equal Can be engaged, and zipper structure is formed by sliding part.
Some additional aspect and advantage of the present invention will be set forth in part in the description, partly will be from following description In become it is apparent or by the present invention practice recognize.
Description of the drawings
Fig. 1 is the schematic diagram of the place coiled material face layer of the embodiment of the present invention one;
Fig. 2 is the schematic diagram of the first coiled material of the place coiled material face layer of the embodiment of the present invention one;
Fig. 3 is the splicing status diagram of the place coiled material face layer of the embodiment of the present invention;
Fig. 4 is the splicing status diagram of the first coiled material of the place coiled material face layer of the embodiment of the present invention;
Fig. 5 is the place coiled material face layer of the embodiment of the present invention and a kind of connection diagram on place basis;
Fig. 6 is the place coiled material face layer of the embodiment of the present invention and another connection diagram on place basis;
Fig. 7 is the structure diagram of the place coiled material face layer of the embodiment of the present invention;
Fig. 8 is the schematic diagram of the junction between the coiled material and coiled material of the place coiled material face layer of the embodiment of the present invention;
Fig. 9 is the schematic diagram of the lawn roll of the place coiled material face layer of the embodiment of the present invention;
Figure 10 is the connected mode schematic diagram of the lawn roll of the place coiled material face layer of the embodiment of the present invention.
In figure:1st, the first coiled material;2nd, the second coiled material;3rd, it is raised;4th, groove;5th, place basis;51st, first foundation module; 52nd, the second basic module;6th, top coat layer;61st, elastic layer;7th, bottom surface articulamentum;8th, lawn roll;81st, tooth;82nd, artificial lawn filament; 83rd, chinampa base fabric.
Specific embodiment
The embodiment of the present invention is described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached The embodiment of figure description is exemplary, it is intended to for explaining the present invention, and is not considered as limiting the invention.
Embodiment one
With reference to shown in attached drawing 1-4, a kind of place coiled material face layer is present embodiments provided, including detachable with place basis 5 The prefabricated coiled material of connection, prefabricated coiled material include multiple the first coiled materials 1 with radian and multiple linear second coiled materials 2, the The 2 sliceable runway/court surface layer for forming closure of one coiled material 1 and the second coiled material.The present invention's thes improvement is that, script is long The coiled material of strip is designed as first coiled material 1 with radian and linear second coiled material 2, no matter straight way or bend, equal nothing Secondary application active force is needed to change shape, thus coiled material mat formation after inner structure tension it is unified, the first coiled material 1, the second coiled material 2 can To be spliced into court, runway etc., later stage deformation probability is low when in use, solves scene in the prior art and stretches coiled material radian The problem of being susceptible to crack, bulge;As shown in Fig. 2, the banking arrangement of prefabricated coiled material is that coiled material is rolled into different radii up and down Cylindrical form transported or packed.
In addition to above-mentioned improvements, the place coiled material face of the present embodiment layer also has many improvements, for example, coiled material and The combination on basis, as shown in figure 5, the combination on coiled material of the prior art and place basis is to use environment-friendlyadhesive adhesive mostly Water is bonded, therefore applicant devises combination as shown in Figure 6 on the basis of said program, i.e., in the first coiled material 1 and second the bottom surface of coiled material 2 be provided with protrusion 3, protrusion 3 and the 4 phase card of groove on place basis 5 and, alternatively, in the first coiled material 1 Fluted (not shown) is set with the bottom surface of the second coiled material 2, the raised (not shown) on groove and place basis mutually block and, by coiled material And the combination on basis is designed to the form of snap fastener, protrusion 3 and groove 4, and stable structure is secured and is readily disassembled.In the present embodiment In, the shape of protrusion and groove is not limited, such as can be bar shaped, circle etc., and certain those skilled in the art are in the knot The improvement being readily apparent that made on the basis of structure is also in the present invention, such as other Detachable connection structures are also in this hair Within bright protection domain.
Specifically, in the present embodiment, as shown in fig. 7, the prefabricated coiled material of the present invention includes top coat layer 6,61 and of elastic layer Bottom surface articulamentum 7 is provided with markings on top coat layer 6, and bottom surface articulamentum 7 is connected with place basis 5, bottom surface articulamentum 7 with The connection mode on place basis 5 is as described in the preceding paragraph.
Specifically, the place coiled material face layer as the present embodiment is further improved, when setting markings, by marking line Material selection or added with Noctilucent material, the material of top coat layer 6 is also selected or added with Noctilucent material, the noctilucence of top coat layer 6 The luminescent color of material is different from the luminescent color of the Noctilucent material of markings, when people are when moving at night, even if place without Light, but sporter still can clearly distinguish track line, when being unlikely to night without light, run out of motor area and cause to damage, not only have Conducive to night movement, but also can be energy saving.In addition, being additionally provided with fibrous layer in the elastic layer 6 of the present embodiment, setting is fine The purpose for tieing up layer is deformed after preventing coiled material stress, improves structural mechanics restorability and structural stability.
Specifically, the place coiled material face layer as the present embodiment is further improved, most of material of coiled material can be selected Coconut palm palm fibre is made, such as the material selection coconut palm palm fibre by elastic layer 61, and coconut palm palm fibre is the rope extracted from cocoanut husk, is passed through High-temperature sterilization and clean rear compression are bundled, and monofilament is a kind of nuisanceless, environmentally protective all-natural product and disappears by high temperature Poison handles and by state administration for commodity inspection inspection and quarantine, have many advantages, such as it is moisture-proof, ventilative, antibacterial, it is harmless stingless Swash, recoverable, further improve the feature of environmental protection of place coiled material face layer.It should be noted that coconut palm can be selected in elastic layer 61 Palm fibre is not construed as a kind of limitation to the present invention as elastic layer, and other materials can also do elastic layer.
Specifically, the place coiled material face layer as the present embodiment is further improved, it is found by the applicant that current coiled material and volume Connecting method between material is not only constructed cumbersome, but also structural strength can not be protected, service life also than relatively low, because This, applicant is improved in the junction of coiled material and coiled material, as shown in figure 8, the side by the first coiled material 1 and the second coiled material 2 Set with teeth, the form of tooth is similar to being engaged between groove and protrusion, and the tooth of each coiled material can be engaged.Further , it is more convenient in order to splice, sliding part can be installed in the junction of prefabricated coiled material, the tooth of coiled material passes through the sliding part shape Into zipper structure, not only easy for construction but also dismounting and change facilitates.
Specifically, in the present embodiment, as shown in Figures 9 and 10, the court that coiled material face layer is formed also has chinampa volume Material, chinampa coiled material are made of multiple lawn rolls 8, and the connection mode between existing lawn roll is by connect band or glue The realizations such as water connect, and construction worker needs the junction of lawn roll coating glue or installation connect band, and not only cost is higher, and And the tedious process time is long, therefore applicant is also improved in the junction of lawn roll, as shown in fig. 7, in each lawn roll 8 Side volume setting with teeth 81, there is on lawn roll 8 chinampa grass silk 82, lawn roll bottom has chinampa base fabric 83, The structure of tooth 81 is similar with the structure of the tooth of above-mentioned coiled material, and the tooth of each lawn roll 8 can be engaged, and passes through sliding part Zipper structure is formed, it is easy for installation, and being completely embedded between lawn roll.
Embodiment two
In addition to the improvement on prefabricated coiled material, applicant has found during work progress and use, prior art midfield Subgrade construction process is unanimously continued to use in the construction of ground foundation, and not only working procedure is complicated, and the construction period is longer, and can not expire mostly Waterproof, the LP blades function on sufficient runway basis, when impeded drainage or problem of frost heave occur for part basis, the basic product that can occur Phenomena such as water, sedimentation, bubbling, fracture, do not simply fail to be adjusted to original horizontal plane, and when bulge, the crack phenomena such as The paralysis of entire runway facility can be caused when serious, therefore applicant has carried out the improvement of globality on the basis of runway, field By the road structure for needing to construct layer by layer originally is improved to multiple sliceable basic modules, basic module includes more ground foundation A and matched first foundation module of the first coiled material and multiple and matched second basic module of the second coiled material, basic module Internal hollow out, and drainage channel is equipped in inside, not only construction is simple, shortens the construction period, and can well solve draining and ask Topic, and rebound, the mechanical property all same of each basic module, and stable structure.
By taking runway as an example, the wedge-shaped in cross-section shape of first foundation module, it include multiple B1 blocks, C1 blocks and block, second The rectangular shape in cross section of basic module, including multiple A1 blocks and A2 blocks, the splicing of multiple basic modules becomes entirety Runway basis, the certainly specific variables such as shape and quantity do not do excessive restriction, such as first foundation module in the present invention An arc similar with the first web-shaped can be spliced into.
Specifically, in the present embodiment, the embodiment of basic module can also there are many, basic module includes base surface The rubber strip of waterproof action is posted in plate, retaining wall and bearing column, the side of base panel, retaining wall include peripheral retaining wall and Inside retaining wall, it should be noted that " interior ", " outer " here refers to the inward-outward direction of runway entirety, peripheral retaining wall and Inside retaining wall is separately positioned on the both sides of base panel lower part and is connected with base panel, and bearing column is arranged on outer enclosing Between cob wall and inside retaining wall, drainage channel is formed between inside retaining wall and bearing column, base panel is located at draining Position above channel is equipped with multiple discharge outlet, is two in the present embodiment, bearing column forms the inner wall of drainage channel, draining The bottom of the channel is additionally provided with bottom plate, and bottom plate is connected respectively with inside retaining wall and inner wall.
Specifically, in the present embodiment, as a further improvement on the present invention, applicant can for the height of optimized integration To adjust this purpose, support arm is outward extended in the bottom end of bearing column, levelling device, leveling dress are installed on support arm It puts on sleeper.Advantageous, in the present embodiment, the structure of levelling device includes connecting plate, and bearing column, which is mounted on, to be connected On fishplate bar, connecting plate is equipped with mounting hole, and screw rod is equipped on mounting hole, is installed on screw rod there are two leveling nut, two are adjusted Flush nut is located at the both sides up and down of support arm respectively, and one end of screw rod is mounted on sleeper, may pass through the sleeper of lower section, and lead to It crosses fixing nut to fix, the other end is mounted on by leveling nut on connecting plate, when the height for needing adjustment base panel and is inclined During gradient, it can be operated by adjusting vertical position of the leveling nut on screw rod.
Specifically, in the present embodiment, it has been found that most of place bases are harder, in order to improve people's fortune Comfort level when dynamic, as a further improvement on the present invention, applicant is additionally provided with bullet between leveling nut and support arm Property damping device, elastic shock-absorbing device can as one buffering component, greatly improve sporter during the motion relax Suitable degree, specifically in the present embodiment, which is preferably yielding rubber pier, rubber pad other than damping, There are one special roles:The later stage is facilitated to check whether sleeper moves up and down, illustrates sleeper by ground as rubber cushion deformation is excessive It heaves and moves upwards, such as deform too small or gap occur, illustrate that sleeper sinks.Certain elastic shock-absorbing device can also be other Structure, the elastic component of for example, one skeleton structure or the pier stud vibration-damped table of such as bridge structure, subtract as long as can play Shake buffering effect.
The coiled material face layer of the present invention and place basis are further described with reference to above-described embodiment:
1st, the production on place basis:According to place size, place basis and gutter are designed in one, basis is divided into Several fritters for the purpose of being readily transported, internal hollow out, while design on single fritter various functions chaining part and pre- Stay functional hole position.
2nd, the production of place coiled material face layer:According to modular basis specification data produced or pre-manufactured, protect Under the premise of demonstrate,proving convenience in transport, the modularization plastic coat of bulk is made as possible.And it designs and links required work(with basis It can property connector.And with marking all markings and lines.
Place coiled material face layer and the construction technology on place basis:
1st, scene is cut the earth, depth is consistent with the module height of modularization runway, puts down according to initial stage designed size Whole soil layer, rammed earth.
2nd, sleeper is buried with graded broken stone, equipped with standard load-bearing bolt on sleeper, sleeper is according to design size with dedicated Specifications control slide calliper rule determine position and spacing.
3rd, modular basis is assembled, there are one the screw and a reinforcing screw of control leveling on sleeper, in two spiral shells Installation of modular basis on silk, and elastic rubber pier is equipped between connecting plate and adjusting nut, have on modular basis Reserved hole position may pass through the bolt on sleeper, after adjusting height, pulls tight bolt, continues a piece of modular basis under installation, There is reserved hole position at the link of two modular basis, can be fixed with screw, finally make the modularization of entire sports ground Basis is connected to become an entirety.
4th, installation of modular plastic coat.Install modularization face layer successively according to serial number.Initial production plastic coat with Basic quality inspection is bonded using Environment-friendlyglue glue, and after product up-gradation, without glue, modular basis and plastic coat design connection Firmware, such as box and pin, basis are mother, and plastic coat is public affairs, is mutually twisted connection.
5th, clean place, enjoin the points for attention of user, and hand over user how inspection, how leveling.
6th, send someone periodically live inspection, allow through user, enter runway basic internal from inspection socket, check whether there is because The hanging phenomenon that sleeper sinks and generates, if having the basic bulging phenomenon generated due to sleeper bulging.
In conclusion with reference to the description above to the manufacture craft of technical solution and work progress, it is provided in this embodiment Place coiled material face layer and place basis have the advantages that:
1st, coiled material is produced with basis in factory modularization, not allocation of raw materials at the scene, and scene is without construction rubbish, dust Deng reducing environmental pollution.
2nd, shop specification metaplasia is produced, and avoids product quality irregular.
3rd, for coiled material, no matter straight way or bend, change shape, frozen-heave coefficient system without secondary application active force One, later stage deformation probability is low.
4th, basic flatness is good, and the gradient is integrally unified, effective anti-ponding.Seam is few, overall aesthetic degree enhancing.
5th, foundation resilience is unified, avoids that sportsman is caused to damage because of soft or hard uneven.
6th, environmentally friendly coefficient is high, and large-scale production effectively prevent raw material inferior to mix, and effectively quality is controlled to check on.
7th, factory modularization produces, and standardization level is high, and measure of precision is high, and uniform specification, markings are accurate, size essence Really, human error is effectively reduced.
8th, modularization face layer and basis can be bonded with Environment-friendlyglue glue, also can be without glue, using the form of male-female coupling part Assembly and connection while reducing pollution, reduces the influence of human factor in installation process.
9th, the effective anti-freeze expansion of levelling device, effective anti-settling.
10th, the wasting of resources is reduced, reduces manpower and materials waste, without individually designed according to different geologic structures, reduction is set Count cost, effectively save cost.
11st, the expendable material utilization amount such as sandstone and concrete is reduced, the design of basic hollow out reduces weight, transport It is convenient, only semi-finished product is needed to transport after modularization, without individually transporting the various independent auxiliary materials such as sandstone, glue, particle, save transport Cost in a disguised form reduces CO2 emissions, effective protection environment.
12nd, the inspection socket reserved after basic module, people can enter, and check whether runway bottom structure has breakage at any time, Accomplish to prevent in advance and leveling at any time, avoid the generation of hanging and bulging phenomenon.
13., can batch production volume production, also can customization of individual character production.
14th, convenient later maintenance is removed without large area, and either basic module or plastic coat module occur indivedual Region is damaged, after can transferring early time data according to number, produces the product of this number again according to data, is individually replaced this volume Number product.Overall pulling down is avoided to cause the waste of economy and resource.
15th, service life is long, and service life increases several times service life than original sand-stone concrete basis.
16th, recyclable, it is dirty to avoid environment caused by due to dismounting using recyclable material for the material of modular basis Dye.
17th, application field is wide, runway, football pitch, and the various places such as basketball court, road can live group after modularized production Dress.Reduce field ground soil layer construction and caused by environmental pollution.
18th, module bulk produces, and bulk is assembled, and seam is few, overall aesthetic degree enhancing.
19th, convenient for disassembly and assembly, replaceable place re-assemblies.
20th, without lower shoveling layer or shallow cut soil layer, according to modularization runway produced or pre-manufactured and live feelings Condition digs basis, reduces excavation and transportation cost.
21st, short construction period, speed are fast, and without curing period, construction is finished and can be come into operation at once
22nd, can construction in summer, spring, summer, autumn and winter, rainy season do not influence to construct.
23rd, have predictable, user can predict the following place performance and apperance made in advance before mating formation, and keep away Exempting from traditional basis, user can not Accurate Prediction before mating formation with coiled material.
24th, the connection mode of zipper button facilitates worker's joint connection in site coiled material, court lawn caused by reducing artificial cut edge Seam crossing is irregular, provides the structural stability and aesthetics of whole scene layer coiled material.Meanwhile avoid onsite application glue etc. viscous Agent is tied, effectively reduces environment and air pollution, when effectively preventing traditional approach construction lawn, accidentally falls into the glue in lawn It happens careless silk binding agent is coherent.
25th, the connection mode of zipper button, structure is more stable, is not in showing of coming unglued in the traditional lawn glue bonding later stage As occurring.
26th, the on-link mode (OLM) of zipper button, convenient for the repair and replacement on lawn, the serious region of part wears only needs list This lawn is solely replaced, does not need to all remove whole audience replacement, effectively save cost improves cost performance, and it is unnecessary to avoid Waste.
27th, the on-link mode (OLM) of zipper button after can lawn be removed, replaces place and continues to mat formation, can repeated disassembled and assembled profit With.
28th, the on-link mode (OLM) of zipper button, speed of application faster, effectively reduce construction period, without curing period, to worker Level of constructing requirement is lower, no matter blowing and raining, spring, summer, autumn and winter can all mat formation.It is protected from weather influences.
29th, runway and court surface layer material selection Noctilucent material do top coat layer, and night place glimmer is clear-cut, can be into The energy is effectively saved in the simple movement of row, the use for reducing light.The court of illuminating at night or runway further increase city simultaneously Beauty.
30th, plant fiber can be used as elastic material, such as coconut palm palm fibre in runway or the elastic layer in court, can effectively reducing The usage amount of product is learned, it is more green, environmentally friendly.
31st, after adding fibrous layer in runway or court elastic layer, runway or court deformation probability is can effectively avoid, is increased Service life.
It should be noted that in the description of the present invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom " The orientation or position relationship of the instructions such as " interior ", " outer ", " clockwise ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " be based on Orientation shown in the drawings or position relationship are for only for ease of the description present invention and simplify description rather than instruction or imply institute The device or element of finger must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that this hair Bright limitation.
In addition, term " first ", " second " are only used for description purpose, and it is not intended that instruction or hint relative importance Or the implicit quantity for indicating indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more this feature.In the description of the present invention, " multiple " are meant that two or more, unless separately There is clearly specific limit.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc. Term should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or integral;Can be that machinery connects It connects or is electrically connected;It can be directly connected, can also be indirectly connected by intermediary, can be in two elements The connection in portion or the interaction relationship of two elements.It for the ordinary skill in the art, can be according to specific feelings Condition understands the concrete meaning of above-mentioned term in the present invention.
In the present invention unless specifically defined or limited otherwise, fisrt feature can be with "above" or "below" second feature It is that the first and second features are in direct contact or the first and second features pass through intermediary mediate contact.Moreover, fisrt feature exists Second feature " on ", " top " and " above " but fisrt feature right over second feature or oblique upper or be merely representative of Fisrt feature level height is higher than second feature.Fisrt feature second feature " under ", " lower section " and " below " can be One feature is immediately below second feature or obliquely downward or is merely representative of fisrt feature level height less than second feature.
In the description of this specification, reference term " one embodiment ", " example ", " is specifically shown " some embodiments " The description of example " or " some examples " etc. means specific features, structure, material or the spy for combining the embodiment or example description Point is contained at least one embodiment of the present invention or example.Moreover, particular features, structures, materials, or characteristics described It may be combined in any suitable manner in any one or more of the embodiments or examples.In addition, without conflicting with each other, this The technical staff in field can be by the different embodiments or examples described in this specification and the spy of different embodiments or examples Sign is combined.
Although the embodiments of the present invention has been shown and described above, it is to be understood that above-described embodiment is example Property, it is impossible to limitation of the present invention is interpreted as, those of ordinary skill in the art within the scope of the invention can be to above-mentioned Embodiment is changed, changes, replacing and modification.

Claims (8)

1. a kind of place coiled material face layer, which is characterized in that
Including the prefabricated coiled material being detachably connected with place basis, the prefabricated coiled material includes multiple the first coiled materials with radian With multiple linear second coiled materials, first coiled material and the sliceable runway/court surface for forming closure of second coiled material Layer;
The setting of the side of first coiled material and second coiled material is with teeth, and the tooth of each coiled material can be engaged;
Prefabricated coiled material further includes sliding part, and the tooth of the coiled material forms zipper structure by the sliding part.
2. coiled material face in place according to claim 1 layer, which is characterized in that first coiled material and second coiled material Bottom surface is provided with protrusion, and the groove on the protrusion and place basis fastens or, first coiled material and second coiled material Bottom surface setting it is fluted, the groove and the protrusion on place basis fasten.
3. place coiled material face layer according to claim 1, which is characterized in that the prefabricated coiled material is matched with place base bond It closes.
4. place coiled material face layer according to claim 1, which is characterized in that the prefabricated coiled material includes top coat layer, elasticity Layer and bottom surface articulamentum are provided with markings on the top coat layer, and the bottom surface articulamentum is connected with place basis.
5. place coiled material face layer according to claim 4, which is characterized in that the material of the markings includes noctilucence material Material, the material of the top coat layer include Noctilucent material, and the luminescent color of the Noctilucent material of the top coat layer is different from the mark The luminescent color of the Noctilucent material of line.
6. place coiled material face layer according to claim 4, which is characterized in that be provided with fibrous layer in the elastic layer.
7. place coiled material face layer according to claim 4, which is characterized in that the material of the elastic layer includes coconut palm palm fibre.
8. according to claim 1-7 any one of them place coiled material face layer, which is characterized in that first coiled material and/or institute It states the second coiled material and further includes chinampa coiled material, the chinampa coiled material is made of a plurality of lawn roll, the side of each lawn roll Side volume setting is with teeth, and the tooth of each lawn roll can be engaged, and forms zipper structure by sliding part.
CN201610778409.5A 2016-08-29 2016-08-29 Place coiled material face layer Active CN106192669B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610778409.5A CN106192669B (en) 2016-08-29 2016-08-29 Place coiled material face layer
PCT/CN2016/101675 WO2018040229A1 (en) 2016-08-29 2016-10-10 Site coiled material surface layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610778409.5A CN106192669B (en) 2016-08-29 2016-08-29 Place coiled material face layer

Publications (2)

Publication Number Publication Date
CN106192669A CN106192669A (en) 2016-12-07
CN106192669B true CN106192669B (en) 2018-06-26

Family

ID=58086228

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610778409.5A Active CN106192669B (en) 2016-08-29 2016-08-29 Place coiled material face layer

Country Status (2)

Country Link
CN (1) CN106192669B (en)
WO (1) WO2018040229A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018040228A1 (en) * 2016-08-29 2018-03-08 陆大伟 Site foundation and modular rubberized site
CN112458827A (en) * 2020-11-06 2021-03-09 广东亚设体育产业有限公司 Noctilucent plastic sports ground surface layer and laying method thereof
CN116175920B (en) * 2023-01-10 2023-09-19 广州市柏奥体育场地设施工程有限公司 Preparation process of micro-foaming polyurethane runway

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2492588Y (en) * 2001-02-28 2002-05-22 张意丰 Combined health walk
CN202482731U (en) * 2012-03-19 2012-10-10 臧小松 Spliced artificial turf
CN104032646A (en) * 2014-05-09 2014-09-10 大连千森体育设施工程有限公司 Split mounting type miniature track cycling raceway
CN206015464U (en) * 2016-08-29 2017-03-15 陆大伟 Place coiled material surface layer

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0975502A (en) * 1995-07-12 1997-03-25 Tamapatsuku Kk Playing ground
US7591731B2 (en) * 2005-11-29 2009-09-22 Alphadev Llc Proposed running track design for fairer 200 m and 400 m races
CN106192671B (en) * 2016-08-29 2018-07-03 陆大伟 Modularization synthetic court

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2492588Y (en) * 2001-02-28 2002-05-22 张意丰 Combined health walk
CN202482731U (en) * 2012-03-19 2012-10-10 臧小松 Spliced artificial turf
CN104032646A (en) * 2014-05-09 2014-09-10 大连千森体育设施工程有限公司 Split mounting type miniature track cycling raceway
CN206015464U (en) * 2016-08-29 2017-03-15 陆大伟 Place coiled material surface layer

Also Published As

Publication number Publication date
WO2018040229A1 (en) 2018-03-08
CN106192669A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN106192669B (en) Place coiled material face layer
CN101487237A (en) Production method of vertical stone blocking net
CN110145064A (en) One kind is rib-ring-shaped to open up scissors central shoring cable dome structure
CN206157523U (en) Modularization plastic place
CN206015464U (en) Place coiled material surface layer
CN106192671B (en) Modularization synthetic court
CN205775691U (en) A kind of asphalt roads structure
CN209260471U (en) The airfield pavement structure that face Laying Asphalt Surface Course constructs in Deteriorated concrete pavement road
CN208039278U (en) A kind of protective device for side slope
WO2018040228A1 (en) Site foundation and modular rubberized site
CN105369991B (en) A kind of construction method of zero stress seam self-adapting type roofing preset slot waterproof system wide
CN207091926U (en) A kind of science of bridge building protector
CN207583079U (en) A kind of flexible adjusting guardrail baffle system
CN207793797U (en) A kind of football pitch chinampa with plumbing function
CN209011637U (en) A kind of plane view ladder structure
CN207391971U (en) Novel road surface structure and road surface
CN107558323B (en) A kind of construction technology of tramcar and town road usual friendship mouth bullet contracting body road surface
CN206024651U (en) Landscape plant who is applied to slope surface structure hangs suspended net
CN208533367U (en) The prefabricated pave-load layer structure of mountable steel bridge ultra-toughness durability
CN207131028U (en) Multifunctional suspending assembled floor-board
CN206319700U (en) The safe purse seine in a kind of construction site or municipal gardens
CN207031959U (en) A kind of multifunctional ecological permeable terrace of reusable edible
CN207452914U (en) A kind of protective slope structure
CN110093831A (en) A kind of rollable wireless charging pavement structure and preparation method thereof
CN201665914U (en) Multilayer flexible shed tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220915

Address after: 414400 south of sanjiaotang road and west of Xintang Road (Miluo Industrial Park, Changsha Economic Development Zone), Bishi Town, Miluo City, Yueyang City, Hunan Province

Patentee after: HUNAN U-CROWN SPORTS MATERIAL Co.,Ltd.

Address before: No. 2, Tonggang Street, Daowai District, Harbin, Heilongjiang, 150010

Patentee before: Lu Dawei