CN106184629A - A kind of cableway vehicle peculiar to vessel - Google Patents

A kind of cableway vehicle peculiar to vessel Download PDF

Info

Publication number
CN106184629A
CN106184629A CN201610520512.XA CN201610520512A CN106184629A CN 106184629 A CN106184629 A CN 106184629A CN 201610520512 A CN201610520512 A CN 201610520512A CN 106184629 A CN106184629 A CN 106184629A
Authority
CN
China
Prior art keywords
cableway
coaster
wheel shaft
roller group
ships
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610520512.XA
Other languages
Chinese (zh)
Other versions
CN106184629B (en
Inventor
向鹏洋
施东兴
覃刚
王洪林
余谱
李艳春
孙立坤
明国军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Marine Machinery Plant Co Ltd
Original Assignee
Wuhan Marine Machinery Plant Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Marine Machinery Plant Co Ltd filed Critical Wuhan Marine Machinery Plant Co Ltd
Priority to CN201610520512.XA priority Critical patent/CN106184629B/en
Publication of CN106184629A publication Critical patent/CN106184629A/en
Application granted granted Critical
Publication of CN106184629B publication Critical patent/CN106184629B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • B63B27/32Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures using cableways

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Handcart (AREA)
  • Rollers For Roller Conveyors For Transfer (AREA)

Abstract

The invention discloses a kind of cableway vehicle peculiar to vessel, belong to marine machinery field.Cableway vehicle includes: the coaster on loading part and the cableway that is slidably mounted between two boats and ships, loading part is fixedly mounted on coaster, coaster includes coaster casing, upper roller group and bottom roller group, upper roller group and bottom roller group are installed in rotation in coaster casing respectively, cableway is installed in upper roller group and bottom roller group slidably through coaster casing, in coaster casing, the length direction interval along cableway is disposed with the first installed part and the second installed part, first installed part is for being connected with the winch pull rope installed on boats and ships in two boats and ships, second installed part is for being connected with the winch pull rope installed on another boats and ships in two boats and ships.The present invention solves the problem that the overall manufacturing cost of cableway vehicle is higher.

Description

A kind of cableway vehicle peculiar to vessel
Technical field
The invention belongs to marine machinery field, particularly to a kind of cableway vehicle peculiar to vessel.
Background technology
Cableway vehicle peculiar to vessel is personnel or the one machine peculiar to vessel of supply of transporting between the boats and ships two navigation Tool equipment, common cableway vehicle generally includes cableway tackle and drive mechanism, and drive mechanism is arranged in cableway tackle, Drive mechanism drives and slidably reciprocates on cableway tackle cableway between two ships, thus realizes transport personnel or supply.
During realizing the present invention, inventor finds that prior art at least there is problems in that owing to needs drive Load and slide on higher cableway tackle cableway between two ships, so drive mechanism is required to meet reciprocating motion, drive Dynamic performance is strong, the high requirement of unfailing performance, thus causes the manufacture difficulty of drive mechanism relatively greatly, and then makes cableway vehicle Overall manufacturing cost higher.
Summary of the invention
The problem higher in order to solve the overall manufacturing cost of cableway vehicle, embodiments provides a kind of ship Use cableway vehicle.Described technical scheme is as follows:
Embodiments providing a kind of cableway vehicle peculiar to vessel, described cableway vehicle includes: loading part and The coaster being slidably mounted on the cableway between two boats and ships, described loading part is fixedly mounted on described coaster, described Coaster includes that coaster casing, upper roller group and bottom roller group, described upper roller group and described bottom roller group are pacified the most rotationally Be contained in described coaster casing, described cableway through described coaster casing be installed in slidably described upper roller group and described under Between roller group, in described coaster casing, the length direction interval along described cableway is disposed with the first installed part and the second installation Part, described first installed part for being connected with the winch pull rope installed on boats and ships in said two boats and ships, described the Two installed parts are for being connected with the winch pull rope installed on another boats and ships in said two boats and ships.
In a kind of implementation of the present invention, described upper roller group includes at least two the first roll wheel assembly, described extremely Few two the first roll wheel assemblies are spaced layout along the length direction of described cableway, and described bottom roller group includes that at least two second is rolled Wheel assembly, described second roll wheel assembly and described first roll wheel assembly one_to_one corresponding, described at least two the second roll wheel assembly edge The orientation interval of described first roll wheel assembly is arranged.
In the another kind of implementation of the present invention, each described first roll wheel assembly all includes the first wheel shaft and with described First wheel shaft the first roller one to one, each described first wheel shaft is fixing respectively to be inserted in described coaster casing, each described First roller is rotatably mounted around on each self-corresponding described first wheel shaft respectively.
In another implementation of the present invention, the periphery wall of described first wheel shaft one end is provided with outward flange, described The other end of the first wheel shaft is coaxially arranged with locating ring, and described first roller is between described outward flange and described locating ring.
In another implementation of the present invention, each described second roll wheel assembly all includes the second wheel shaft and with described Great wheel arbor the second roller one to one, each described second wheel shaft is fixing respectively to be inserted in described coaster casing, and each described the Second wheel is rotatably mounted around on each self-corresponding described second wheel shaft respectively.
In another implementation of the present invention, described cableway vehicle also includes lifting by crane assembly, described lifting group Part includes upending frame and for lifting the hook of described loading part, and one end of described upending frame is fixedly mounted on described coaster case On body, the other end of described upending frame is connected with described hook.
In another implementation of the present invention, described loading part includes suspension ring, seat and at least two suspender belt group, institute Stating suspension ring to be sleeved on described hook, one end of each described suspender belt group is connected with described suspension ring respectively, each described suspender belt group The other end is connected with described seat respectively.
In another implementation of the present invention, described hook is provided with opening, described opening and described suspension ring phase Coupling, described opening part is provided with the snap close for locking described suspension ring.
In another implementation of the present invention, described suspension ring are provided with link, the middle part of described link and institute Stating suspension ring to connect, described suspension ring are connected with described at least two suspender belt group by described link, described at least two suspender belt group It is evenly arranged in the two ends of described link.
In another implementation of the present invention, in described suspender belt group, the position near described seat is provided with life jacket, In described suspender belt group, the position of corresponding described life jacket is provided with bandage, and described bandage is arranged around the surrounding of described seat.
The technical scheme that the embodiment of the present invention provides has the benefit that
When the cableway vehicle work that the embodiment of the present invention is provided, cableway passes coaster casing, and cableway clamps Between upper roller group and bottom roller group, so that coaster is difficult to cableway, it is ensured that the reliability of cableway vehicle; Coaster by the first installed part being arranged on coaster casing and the second installed part, connect respectively the pull rope on boats and ships and Pull rope on another boats and ships, by pullling of two pull ropes, it is achieved that cableway vehicle moves back and forth on cableway; Owing to two pull ropes directly act on coaster casing, so the utilization rate of the active force of pull rope is the highest such that it is able to ensure Cableway vehicle there is stronger driveability.Further, the cableway vehicle provided due to the embodiment of the present invention is used The winch pull rope being arranged on two ships instead of drive mechanism, so simple in construction, manufacture difficulty are low, thus reduces cableway The overall manufacturing cost of vehicle.
Accompanying drawing explanation
For the technical scheme being illustrated more clearly that in the embodiment of the present invention, in embodiment being described below required for make Accompanying drawing be briefly described, it should be apparent that, below describe in accompanying drawing be only some embodiments of the present invention, for From the point of view of those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other according to these accompanying drawings Accompanying drawing.
Fig. 1 is the structural representation of the cableway vehicle that the embodiment of the present invention provides;
Fig. 2 is the elevational perspective view of the coaster that the embodiment of the present invention provides;
Fig. 3 is the side view cutaway drawing of the coaster that the embodiment of the present invention provides;
Fig. 4 be the embodiment of the present invention provide loading part face structural representation;
Fig. 5 is the side-looking structural representation of the loading part that the embodiment of the present invention provides;
In figure, each symbol represents that implication is as follows:
1-coaster, 11-coaster casing, 12-upper roller group, 121-the first roll wheel assembly, 122-the first wheel shaft, 123-first Roller, 124-outward flange, 125-locating ring, 126-bearing, 13-bottom roller group, 131-the second roll wheel assembly, 132-second takes turns Axle, 133-the second roller, 14-the first installed part, 15-the second installed part, 16-clamp, 2-loading part, 21-suspension ring, 22-seat, 221-flap, 23-suspender belt group, 231-suspender belt, 24-link, 241-lightening hole, 25-life jacket, 251-bandage, 3-lifting group Part, 31-upending frame, 32-hook, 33-snap close, 100-cableway, 200-pull rope, 210-clasp.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention clearer, below in conjunction with accompanying drawing to embodiment party of the present invention Formula is described in further detail.
Embodiment
Embodiments provide a kind of cableway vehicle peculiar to vessel, as it is shown in figure 1, this cableway vehicle includes: Coaster 1 on loading part 2 and the cableway 100 that is slidably mounted between two boats and ships, loading part 2 is fixedly mounted on coaster 1 On.Wherein, loading part 2 is used for loading goods or personnel, and coaster 1 is used for driving loading part 2 to reciprocatingly slide on cableway, with reality Thing or the transport of personnel from stock.
Fig. 2 is the elevational perspective view of coaster, and in conjunction with Fig. 2, specifically, coaster 1 includes coaster casing 11, upper roller group 12 and Bottom roller group 13, upper roller group 12 and bottom roller group 13 are installed in rotation in coaster casing 11 respectively, and cableway 100 is through sliding Box body 11 is installed between upper roller group 12 and bottom roller group 13 slidably, along the length of cableway 100 in coaster casing 11 Interval, direction is disposed with the first installed part 14 and the second installed part 15, and the first installed part 14 is used for and a ship in two boats and ships Pull rope 200 on oceangoing ship connects, and the second installed part 15 is for the pull rope 200 on another boats and ships in two boats and ships even Connect.
When the cableway vehicle work that the embodiment of the present invention is provided, cableway 100 is through coaster casing 11, and cableway 100 are installed between upper roller group 12 and bottom roller group 13, so that coaster is difficult to cableway 100, it is ensured that cableway is transported Send the reliability of device;Coaster, by the first installed part 14 and the second installed part 15 being arranged on coaster casing 11, connects respectively Connect the pull rope 200 on boats and ships and the pull rope 200 on another boats and ships, by pullling of two pull ropes 200, it is achieved Cableway vehicle moves back and forth on cableway 100;Owing to two pull ropes 200 directly act on coaster casing 11, so The utilization rate of the active force of pull rope 200 is the highest such that it is able to ensure cableway vehicle has stronger driveability.And And, the cableway vehicle provided due to the embodiment of the present invention instead of with the winch pull rope 200 being arranged on two ships and drives Motivation structure, so simple in construction, manufacture difficulty are low, thus reduces the overall manufacturing cost of cableway vehicle.
In above-mentioned implementation, two boats and ships can be respectively provided with the winch of pulling traction rope 200, pull rope One end of 200 is connected with winch, and the other end of pull rope 200 is connected with coaster, such that it is able to come by controlling the rotating speed of winch Realize the control to cableway vehicle sliding speed.
Preferably, the first installed part 14 and the second installed part 15 can be all the peace perpendicular with the sidewall of coaster casing 11 Dress pin, one end of two pull ropes 200 can be provided with the clasp 210 matched with mounting pin, consequently facilitating the tearing open of pull rope 200 Dress.
With continued reference to Fig. 2, it is preferable that upper roller group 12 includes, two the first roll wheel assemblies 121, two the first roller groups Part 121 is spaced layout, so that coaster 1 can pass through two the first roll wheel assemblies 121 simultaneously along the length direction of cableway 100 It is slidably mounted on cableway 100, further increasing the reliability of cableway vehicle.
Specifically, bottom roller group 13 includes two the second roll wheel assemblies 131, the second roll wheel assembly 131 and the first roller group Part 121 one_to_one corresponding, two the second roll wheel assemblies 131 are spaced along the orientation of the first roll wheel assembly 121 and arrange such that it is able to First roll wheel assembly 121 is cooperated, to reach to clamp the purpose of cableway 100 with the second roll wheel assembly 131.
In above-mentioned implementation, upper roller group 12 includes two the first roll wheel assemblies 121, and bottom roller group 13 includes two Second roll wheel assembly 131, thus in the case of the reliability that improve cableway vehicle, it is ensured that cableway vehicle Structure simplification degree, it is to avoid the deadweight of cableway vehicle is excessive.
It should be noted that the quantity of the first roll wheel assembly 121 and the second roll wheel assembly 131 is not limited in two, In other embodiments, it is also possible to be three, four etc., the present invention is without limitation.
Fig. 3 is the side view cutaway drawing of coaster, and in conjunction with Fig. 3, each first roll wheel assembly 121 all includes the first wheel shaft 122 He With the first wheel shaft 122 first roller 123 one to one, each first wheel shaft 122 is fixing respectively to be inserted in coaster casing 11, respectively First roller 123 is rotatably mounted around on each self-corresponding first wheel shaft 122 respectively.Process in the work of cableway vehicle In, there is rolling friction between the first roll wheel assembly 121 and cableway, so the first roll wheel assembly 121 is after work for a long time Abrasion can be produced, when the first roll wheel assembly 121 changed by needs, owing to the first roll wheel assembly 121 has been divided into the first wheel shaft 122 With 123 two parts of the first roller, it is possible to only change the first roller 123, thus reduce the maintenance of cableway vehicle Cost.Preferably, each first wheel shaft 122 is perpendicular with the sidewall of coaster casing 11 respectively, so that the first roller 123 can Good with cableway 100 contacts.
Preferably, can be installed together by bearing 126 between the first wheel shaft 122 and the first roller 123, bearing 126 Can be ball bearing, thus reduce the coefficient of friction between the first wheel shaft 122 and the first roller 123.
Specifically, the periphery wall of first wheel shaft 122 one end is provided with outward flange 124, and the other end of the first wheel shaft 122 is coaxial Being provided with locating ring 125, the first roller 123 is between outward flange 124 and locating ring 125, thus serves restriction the first rolling The effect of the axial displacement of wheel 123.
Refer again to Fig. 3, each second roll wheel assembly 131 all include the second wheel shaft 132 and with the second wheel shaft 132 one_to_one corresponding The second roller 133, each second wheel shaft 132 is fixing respectively to be inserted in coaster casing 11, and each second roller 133 is the most rotatable Be sleeved on each self-corresponding second wheel shaft 132.During cableway vehicle works, the second roll wheel assembly 131 with There is rolling friction between cableway, so the second roll wheel assembly 131 also can produce abrasion after for a long time work, when needs more When changing the second roll wheel assembly 131, the most only change the second roller 133, thus the maintenance reducing cableway vehicle becomes This.Preferably, each second wheel shaft 132 is respectively perpendicular and is inserted in coaster casing 11, so that the second roller 133 can be with The cooperation that one roller 123 is good.
Preferably due to the first roll wheel assembly 121 needs the load of track rope vehicle, so the first roller 123 Diameter can more than the diameter of the second roller 133, the diameter of the first wheel shaft 122 can also more than the diameter of the second wheel shaft 132, Thus ensure that the reliability of cableway vehicle.It addition, after cableway vehicle is installed to cableway, owing to cableway transports The action of gravity of device self, in cableway, bends so cableway vehicle can oppress cableway concave downward, in the present embodiment, Can avoid because of cableway by two the second roll wheel assemblies 131 being arranged in the both sides of two the first roll wheel assemblies 121 Concave downward bends and departs from the first roll wheel assembly 121.
Alternatively, the first wheel shaft 122 and the second wheel shaft 132 all can be installed on coaster case by clamp 16 (referring to Fig. 2) On body 11, consequently facilitating the first wheel shaft 122 and dismounting of the second wheel shaft 132.
Referring again to Fig. 1, cableway vehicle also includes lifting by crane assembly 3, and lifting assembly 3 includes upending frame 31 and for hanging Dress loading part 2 hook 32, one end of upending frame 31 is fixedly mounted on coaster casing 11, the other end of upending frame 31 with rise Suspension hook 32 connects.Lifting assembly 3 is mainly used in connecting coaster and loading part 2, and realizes quickly tearing open between coaster and loading part 2 Dress.
Fig. 4 be loading part face structural representation, in conjunction with Fig. 4, in the present embodiment, loading part 2 includes suspension ring 21, seat Chair 22 and two suspender belt groups 23, suspension ring 21 are sleeved on hook 32, and one end of each suspender belt group 23 is connected with suspension ring 21, respectively respectively The other end of suspender belt group 23 is connected with seat 22 respectively.By suspender belt group 23 and suspension ring 21 by soft between seat 22 and hook 32 Property connect, not only reduce the deadweight of cableway vehicle, also make seat 22 can in the case of wave rocks, by fortune The body weight of the personnel sent makes certain self-adaptative adjustment.It should be noted that the quantity of suspender belt group 23 is not limited in two, In other embodiments, it is also possible to be three, four etc., the present invention is without limitation
Preferably, each suspender belt group 23 may each comprise two suspender belts 231, to improve the intensity of suspender belt group 23.Need equally It is noted that suspender belt 231 quantity included by each suspender belt group 23 is not limited to above-mentioned preferred value, it is also possible to be three, Four etc., the present invention is without limitation.
In the present embodiment, hook 32 is provided with opening, and opening matches with suspension ring 21, and opening part is provided with for locking The snap close 33 of suspension ring 21, thus improve the security performance of cableway vehicle.Preferably, snap close 33 can be Spring lock catch.
Specifically, suspension ring 21 are provided with link 24, and the middle part of link 24 is connected with suspension ring 21, and suspension ring 21 are by connecting Frame 24 is connected with two suspender belt groups 23, and two suspender belt groups 23 are evenly arranged in the two ends of link 24.
In conjunction with Fig. 5, it is achieved time, the two ends of link 24 align with the dual-side a of seat 22, two in a suspender belt group 23 One end of root suspender belt 231 is connected with one end of link 24, the other end of two suspender belts 231 respectively with the front b of seat 22 and Back c is connected, and one end of two suspender belts 231 in another suspender belt group 23 is connected with the other end of link 24, two suspender belts The other end of 231 is connected with the front a and back c of seat 22 respectively, thus ensure that the stability of seat 22.
Preferably, link 24 can be provided with multiple lightening hole 241, thus create a further reduction cableway and transport dress The deadweight put.
Preferably, in suspender belt group 23, the position near seat 22 is provided with life jacket 25, corresponding life jacket 25 in suspender belt group 23 Position be provided with bandage 251, bandage 251 is arranged around the surrounding of seat 22, thus improves the security performance of cableway vehicle.
Alternatively, the front b of seat 22 can be provided with flap 221, for bandage 251 with the use of, it is to avoid seat 22 On personnel skid off from the front b of seat 22, further increasing the security performance of cableway vehicle.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all spirit in the present invention and Within principle, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.

Claims (10)

1. a cableway vehicle peculiar to vessel, described cableway vehicle includes: loading part and be slidably mounted in two ships The coaster on cableway between oceangoing ship, described loading part is fixedly mounted on described coaster, it is characterised in that described coaster includes sliding Box body, upper roller group and bottom roller group, described upper roller group and described bottom roller group are installed in rotation on described cunning respectively In box body, described cableway through described coaster casing be installed in slidably described upper roller group and described bottom roller group it Between, length direction along described cableway is spaced and is disposed with the first installed part and the second installed part in described coaster casing, and described the One installed part is for being connected with the winch pull rope installed on boats and ships in said two boats and ships, and described second installed part is used In being connected with the winch pull rope installed on another boats and ships in said two boats and ships.
Cableway vehicle the most according to claim 1, it is characterised in that described upper roller group includes at least two first Roll wheel assembly, described at least two the first roll wheel assembly is spaced layout, described bottom roller group bag along the length direction of described cableway Include at least two the second roll wheel assembly, described second roll wheel assembly and described first roll wheel assembly one_to_one corresponding, described at least two Individual second roll wheel assembly is spaced layout along the orientation of described first roll wheel assembly.
Cableway vehicle the most according to claim 2, it is characterised in that each described first roll wheel assembly all includes One wheel shaft and with described first wheel shaft the first roller one to one, each described first wheel shaft is fixing respectively is inserted into described coaster In casing, each described first roller is rotatably mounted around on each self-corresponding described first wheel shaft respectively.
Cableway vehicle the most according to claim 3, it is characterised in that set on the periphery wall of described first wheel shaft one end Having outward flange, the other end of described first wheel shaft to be coaxially arranged with locating ring, described first roller is positioned at described outward flange and institute State between locating ring.
Cableway vehicle the most according to claim 2, it is characterised in that each described second roll wheel assembly all includes second Wheel shaft and with described second wheel shaft the second roller one to one, each described second wheel shaft is fixing respectively is inserted into described coaster case Internal, each described second roller is rotatably mounted around on each self-corresponding described second wheel shaft respectively.
Cableway vehicle the most according to claim 1, it is characterised in that described cableway vehicle also includes lifting group Part, described lifting assembly includes upending frame and for lifting the hook of described loading part, the fixing peace in one end of described upending frame Being contained on described coaster casing, the other end of described upending frame is connected with described hook.
Cableway vehicle the most according to claim 6, it is characterised in that described loading part includes suspension ring, seat and extremely Few two suspender belt groups, described suspension ring are sleeved on described hook, and one end of each described suspender belt group is connected with described suspension ring respectively, The other end of each described suspender belt group is connected with described seat respectively.
Cableway vehicle the most according to claim 7, it is characterised in that described hook is provided with opening, described in open Mouth matches with described suspension ring, and described opening part is provided with the snap close for locking described suspension ring.
Cableway vehicle the most according to claim 7, it is characterised in that described suspension ring are provided with link, described company The middle part connecing frame is connected with described suspension ring, and described suspension ring are connected with described at least two suspender belt group by described link, described At least two suspender belt group is evenly arranged in the two ends of described link.
Cableway vehicle the most according to claim 8, it is characterised in that near described seat in described suspender belt group Position is provided with life jacket, and in described suspender belt group, the position of corresponding described life jacket is provided with bandage, and described bandage is around described seat Surrounding is arranged.
CN201610520512.XA 2016-07-05 2016-07-05 A kind of cableway conveyer peculiar to vessel Active CN106184629B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610520512.XA CN106184629B (en) 2016-07-05 2016-07-05 A kind of cableway conveyer peculiar to vessel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610520512.XA CN106184629B (en) 2016-07-05 2016-07-05 A kind of cableway conveyer peculiar to vessel

Publications (2)

Publication Number Publication Date
CN106184629A true CN106184629A (en) 2016-12-07
CN106184629B CN106184629B (en) 2019-04-02

Family

ID=57466110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610520512.XA Active CN106184629B (en) 2016-07-05 2016-07-05 A kind of cableway conveyer peculiar to vessel

Country Status (1)

Country Link
CN (1) CN106184629B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106741665A (en) * 2016-12-19 2017-05-31 武汉船用机械有限责任公司 A kind of person conveying device suitable for cableway

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4666127A (en) * 1982-11-16 1987-05-19 John Allen Winch system
CN201065285Y (en) * 2007-06-20 2008-05-28 天津大学 Lightweight longitudinal dry cargo supplying system on the sea
CN201091381Y (en) * 2007-09-04 2008-07-30 金海军 Hanging chair
CN201785163U (en) * 2010-03-12 2011-04-06 中国人民解放军总后勤部军事交通运输研究所 Lifting conveying device
US9096294B1 (en) * 2011-06-20 2015-08-04 The United States Of America As Represented By The Secretary Of The Navy Trolley-payload inter-ship transfer system
CN105502162A (en) * 2015-12-21 2016-04-20 武汉船用机械有限责任公司 Cargo transfer device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4666127A (en) * 1982-11-16 1987-05-19 John Allen Winch system
CN201065285Y (en) * 2007-06-20 2008-05-28 天津大学 Lightweight longitudinal dry cargo supplying system on the sea
CN201091381Y (en) * 2007-09-04 2008-07-30 金海军 Hanging chair
CN201785163U (en) * 2010-03-12 2011-04-06 中国人民解放军总后勤部军事交通运输研究所 Lifting conveying device
US9096294B1 (en) * 2011-06-20 2015-08-04 The United States Of America As Represented By The Secretary Of The Navy Trolley-payload inter-ship transfer system
CN105502162A (en) * 2015-12-21 2016-04-20 武汉船用机械有限责任公司 Cargo transfer device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106741665A (en) * 2016-12-19 2017-05-31 武汉船用机械有限责任公司 A kind of person conveying device suitable for cableway
CN106741665B (en) * 2016-12-19 2019-02-01 武汉船用机械有限责任公司 A kind of person conveying device suitable for cableway

Also Published As

Publication number Publication date
CN106184629B (en) 2019-04-02

Similar Documents

Publication Publication Date Title
CN101913416B (en) Inland river salvage container
CN105692464B (en) A kind of incorgruous mobile crane span structure type crane of double trolley
CN107074250B (en) The cable car driven by the close circle rope with traction element and the method for controlling the cable car
CN106184629A (en) A kind of cableway vehicle peculiar to vessel
CN102745579A (en) Lifting driving device and mechanical parking equipment having the same
CN109928166A (en) Conveyer belt transfer and charging crane
CN206654621U (en) Goods draw off gear for unmanned plane
CN205527372U (en) Steady goods system of hoist with adjustable angle
KR101785756B1 (en) Carrier link, conveyor chain comprising a plurality of carrier links and a material handling system comprising a plurality of conveyor chains
CN105060127B (en) A kind of fixed pillar type cantilever crane
CN218595400U (en) Triaxial lifting hook transfer module mechanism
CN116477279A (en) Three-chain type continuous lifter
CN109733753A (en) A kind of retractable roller transmission device of counter weight type
CN204057742U (en) A kind of preventing wire rope from falling pulley groove device
CN206278641U (en) Novel frame transmits upset system
CN109080844A (en) A kind of small drone catapult-assisted take-off unlocking mechanism
CN212222144U (en) Lightweight lifting appliance comprising balancer
CN209974097U (en) Four-rope winding lifting appliance upper frame suitable for main lifting mechanism of field bridge equipment
CN209721444U (en) Four roller type wirerope guiding mechanisms
CN108116299A (en) A kind of modified form logistics container position regulator
CN206156621U (en) Davit formula Y type double -line cable transportation device
CN214935292U (en) Novel helicopter safety sling
CN205187389U (en) Unpowered loading and unloading locomotive
JP6124263B2 (en) Reciprocating drive device for reciprocating carrier
CN209141907U (en) Fire-fighting robot clutch driving unit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant