CN106184606A CN201610713242.4A CN201610713242A CN106184606A CN 106184606 A CN106184606 A CN 106184606A CN 201610713242 A CN201610713242 A CN 201610713242A CN 106184606 A CN106184606 A CN 106184606A
Authority
CN
China
Prior art keywords
draconis
lead
segmentation
plate
top board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610713242.4A
Other languages
Chinese (zh)
Other versions
CN106184606B (en
Inventor
劳春邦
孙靖靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Shipyard International Co Ltd
Original Assignee
Guangzhou Shipyard International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Shipyard International Co Ltd filed Critical Guangzhou Shipyard International Co Ltd
Priority to CN201610713242.4A priority Critical patent/CN106184606B/en
Publication of CN106184606A publication Critical patent/CN106184606A/en
Application granted granted Critical
Publication of CN106184606B publication Critical patent/CN106184606B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B3/00Hulls characterised by their structure or component parts
    • B63B3/14Hull parts
    • B63B3/38Keels

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

A kind of vessel keel structure and Os Draconis manufacture method, every section of Os Draconis segmentation all includes the base plate of the top board on top, bottom, and the dividing plate at middle part, web and backing plate, irrigates lead, then close placing box with side plate in the placing box that these sheet materials surround;Wherein, the placing box molten lead in the middle part of Os Draconis segmentation is irrigated, and then installs with prefabricated lead at Os Draconis segment folding.By the Os Draconis of this structure and the method for making Os Draconis, the making precision of Os Draconis can be improved and fill lead degree of compaction, the involutory precision of installation of segmentation Os Draconis before and after simultaneously ensureing, improve linearity and the precision of whole keel, and the follow-up weight center of gravity that more accurately calculate Os Draconis is effectively ensured, and then improve the navigation stability of this ship.

Description

A kind of vessel keel structure and Os Draconis manufacture method
Technical field
The present invention relates to Ship Structure, the structure particularly relating to a kind of vessel keel and the method making Os Draconis.
Background technology
Os Draconis are to connect Stem and a longitudinal member of sternpost in the substrate central authorities of hull, and it is positioned at the end of ship Portion, Main Function is load-bearing, particularly bears the buckling moment of hull, it is ensured that ship's structural strength, in addition also There is stable hull and improve the effect of hull parallel impedance in water.
Existing boats and ships, particularly sail ship keel are box structure, are arranged at below whole ship baseline.In order to improve ship The Os Draconis of boats and ships can be carried out filling lead, but the structure of sail assisted ship is the most elongated, and fill by the weight capacity of oceangoing ship Os Draconis and stability Weight after lead is higher, and the required precision causing Os Draconis to make is high, meanwhile, carries out filling lead according to the casting method of metal current Be difficult to ensure that again and fill the degree of compaction of Os Draconis after lead, furthermore, filling lead needs specific molten lead equipment, these equipment complicated, large-scale and The most prohibitively expensive.These difficulty that result in Os Draconis filling splicer's work are high, but the problem that quality cannot ensure.
Summary of the invention
It is desirable to provide the keel structure of a kind of boats and ships and the method for making Os Draconis, to improve the making essence of Os Draconis Degree and filling lead degree of compaction.
Vessel keel structure of the present invention, the Os Draconis segmentation connected including multistage head and the tail, every section of Os Draconis segmentation is all wrapped Include the base plate of the top board on top, bottom, and the dividing plate at middle part and web, top board and floor level are arranged, compartment of terrain between the two Equipped with polylith dividing plate, divider upright is arranged and plate facial plane is perpendicular with the cephalocaudal direction of Os Draconis segmentation, web both perpendicular to Top board and dividing plate;Top board, base plate, dividing plate and web surround the placing box placing lead, all or part of placement of Os Draconis segmentation Lead it is provided with in case.
Os Draconis manufacture method of the present invention, comprises the following steps:
A, making the skeleton of Os Draconis segmentation, Os Draconis segmentation includes the base plate of the top board on top, bottom, and the dividing plate at middle part and abdomen Plate, top board, base plate, dividing plate and web surround the placing box placing lead;
B, in the placing box of Os Draconis segmentation fill lead;
C, the Os Draconis segmentation after lead will be filled carry out segment folding in order;
D, to the Os Draconis segmentation after closing up close up mouth carry out fill lead;
E, filling lead install side plate after completing.
Vessel keel structure of the present invention and Os Draconis manufacture method, keel structure uses duct keel, and is segmentation Make, wherein top board, base plate, dividing plate and web define one can the casing of placing articles, be placing box, treat the bone of Os Draconis After frame completes, then to filling lead in placing box.By the Os Draconis of this structure and the method for making Os Draconis, the making of Os Draconis can be improved Precision and filling lead degree of compaction, before and after ensureing, the involutory precision of installation of segmentation Os Draconis, improves linearity and the essence of whole keel simultaneously Degree, and the follow-up weight center of gravity that more accurately calculate Os Draconis is effectively ensured, and then improve the navigation stability of this ship.
Accompanying drawing explanation
Fig. 1 be vessel keel structure on boats and ships installation site schematic diagram.
Fig. 2 is the structural representation of vessel keel structure.
Fig. 3 is the structural representation of machine frame.
Fig. 4,5 be Os Draconis segmentation welding time spot welding sequential schematic.
Fig. 6 is the operation chart that Os Draconis segmentation fills lead.
Detailed description of the invention
A kind of vessel keel structure, the Os Draconis segmentation 10 connected including multistage head and the tail, every section of Os Draconis segmentation all includes top Top board 1, the base plate 2 of bottom, and the dividing plate 3 at middle part and web 4, top board and floor level arrange, compartment of terrain dress between the two Having polylith dividing plate, divider upright is arranged and plate facial plane is perpendicular with the cephalocaudal direction of Os Draconis segmentation, and web is both perpendicular to top Plate and dividing plate;Top board, base plate, dividing plate and web surround the placing box 6 placing lead, all or part of placing box of Os Draconis segmentation Inside it is provided with lead (not shown).By the Os Draconis of this structure and make Os Draconis method, can improve Os Draconis making precision and Filling lead degree of compaction, before and after ensureing, the involutory precision of installation of segmentation Os Draconis, improves linearity and the precision of whole keel, and has simultaneously Effect ensures the follow-up weight center of gravity more accurately calculating Os Draconis, and then improves the navigation stability of this ship.
Described vessel keel structure, has and is perpendicular to the backing plate 5 that top board 1 is arranged, outside the plate Middle face of backing plate is with dividing plate 3 Side is connected;Having the side plate (not shown) closing Os Draconis segmentation 10 side, the plate face of side plate is covered on adjacent backing plate, and Placing box 6 and its interior lead are covered in the inner.On the one hand backing plate may be used for strengthening top board, dividing plate and base plate further Bonding strength, on the other hand is connected in the middle part of it with dividing plate so that the direction extension of the lateral placing box opening of the two of backing plate, from And it is easy to the operation of follow-up filling lead;Lead then can be covered in inside placing box by the setting of side plate, it is ensured that structural strength.
Described vessel keel structure, Os Draconis segmentation 10 is less than the height towards ship stern one end towards the height of stem one end Degree;Being equipped with lead in all placing boxes 6 of the Os Draconis segmentation in the middle of vessel keel, the part of the Os Draconis segmentation of bow stern both sides is put It is provided with lead in putting case.The head and the tail two ends of Os Draconis segmentation can be the highest, it is also possible to arranges not according to being actually needed of boats and ships With height, and because the height that is typically all bottom stem of boats and ships is higher, so the Os Draconis of this end being set to height less than ship Stern one end, can better adapt to Ship Structure;Similarly, depending on the circumstances or the needs of the situation lead can be set in some placing boxes in Os Draconis The quantity of block, and adapt to the use needs of different boats and ships.
A kind of Os Draconis manufacture method, comprises the following steps:
A, making the skeleton of Os Draconis segmentation, Os Draconis segmentation includes the base plate of the top board on top, bottom, and the dividing plate at middle part and abdomen Plate, top board, base plate, dividing plate and web surround the placing box placing lead;
B, in the placing box of Os Draconis segmentation fill lead;
C, the Os Draconis segmentation after lead will be filled carry out segment folding in order;
D, to the Os Draconis segmentation after closing up close up mouth carry out fill lead;
E, filling lead install side plate after completing.
This kind of Os Draconis manufacture method is simple, both can improve the making precision of Os Draconis and fill lead degree of compaction, the most permissible Improve the involutory precision of installation and the fabricating quality of segmentation Os Draconis.
As it is shown on figure 3, described Os Draconis manufacture method, before the skeleton making Os Draconis segmentation, first make and be used for making dragon The machine frame of bone segmentation, this machine frame includes two bottom girders being placed in parallel 7, bottom girder has been positioned apart from several door frames, Each door frame all includes that two are respectively perpendicular the column 8 being arranged on two bottom girders, and connects the crossbeam 9 at two column tops.Work Mount structure is simple, it is easy to make, and it only has crossbeam and the top board of Os Draconis segmentation or contacts baseplate, can be easy to workman and grasp Make.
Described Os Draconis manufacture method, step A comprises the following steps:
A1, top board is placed and secured on machine frame, is specially and top board is fixed on machine frame by spot welding;
A2, on top board welding diaphragm, web and backing plate, first carry out spot welding before welding and fix, spot welding order be elder generation welding diaphragm With the middle part of web junction, the then junction of welding diaphragm, web and top board, then welding diaphragm and top board junction Middle part, then the middle part of welding diaphragm and backing plate junction, the outside of last composition backing and top board junction, such as the point on Fig. 4 Shown in A-E order, weld again after spot welding has been fixed;
After A3, dividing plate, web and backing plate have welded, Os Draconis segmentation is carried out hot working;Firer position is at pine bone, i.e. pushes up Plate and dividing plate, web and the back side of backing plate junction;
A4, top board unclamped from machine frame and takes off, then base plate is placed on machine frame, then will weld with top board Dividing plate, web are corresponding with backing plate to be positioned on base plate;
A5, base plate is welded and fixed with dividing plate, web and backing plate, first carries out spot welding before welding and fix, spot welding order first weld every The junction of plate, web and base plate, the then middle part of welding diaphragm and back plate connections, then composition backing and back plate connections Outside, as shown in the some F-H order on Fig. 5, welds after spot welding has been fixed again.
The method is the welding engineering of Os Draconis segmentation sheet material, on top board is placed during machine frame, it is necessary to it is straight wireless The one of type faces up, to ensure Os Draconis quality and follow-up welding job;Then need first to carry out spot welding when welded blank fixed Position, to ensure installation accuracy, also needs to during this adjust the levelness of each sheet material and connect precision, and guarantees top board or base plate Strictly fit with machine frame;During spot welding, according to the principle of first fillet welding in the vertical position flat fillet weld again, form the A-H solder joint of diagram;Dividing plate, abdomen After plate and backing plate have welded, in addition it is also necessary to carry out hot working, to discharge welding stress;After welding completes, also should carry out Integrity check, and check the linearity of entirety.With it, high-precision keel structure can be produced, and its operation Process is convenient, accurately, it is easy to control.
Described Os Draconis manufacture method, the welding of Os Draconis segmentation uses backstep, and by even numbers welder in Os Draconis segmentation Being symmetrically welded of simultaneously operating of both sides.Because the weld seam of sheet material is longer, so on the one hand using backstep, on the one hand adopt With being symmetrically welded, thus effectively reduce welding deformation, improve welding quality.
Described Os Draconis manufacture method, when Os Draconis segmentation carries out filling lead, comprises the following steps:
B1, Os Draconis segmentation is laterally located, make placing box towards;
B2, preheating Os Draconis segmentation from bottom, as shown in Figure 6, arrow show heats;Preheating temperature is 100 DEG C;
B3, multiple placing boxes to Os Draconis segmentation carry out filling lead;The placing box being first spaced part when filling lead carries out filling lead, then Placing box between the placing box filled carries out filling lead again, and as shown in Figure 6, to drawing reference numeral, placing box 1., 2. enters successively Row fills lead;Before filling lead, need first lead to be heated to 360 DEG C, then carry out deslagging process, then come out of the stove at 355 DEG C, then 340 DEG C time carry out fill lead operation;It addition, filling lead process uses from start to end the most progressively slows down filling lead speed;
The casting of B4, lead liquid to composition backing concordant time, stop casting and clear up the scum silica frost of liquid level;
B5, being made the cooling of lead liquid order from lower to upper carry out by insulation, lead liquid temp drops to supplement lead liquid when 310 DEG C to be carried out Feeding, during supplementing lead liquid, supplements lead liquid and carries out below oxide layer;
B6, filling after lead completes until the one side of Os Draconis segmentation, another side is carried out filling lead by anti-body again, fills lead process and repeats above-mentioned B2- B5 step.
First, in order to prevent Os Draconis from deforming, need workpiece is preheated before filling lead, after being preheated to about 100 DEG C more right Keel structure single-frame carries out filling lead, no more than edge on composition backing when filling lead, so that prevent cannot lid side plate;Meanwhile, uniformly Preheating can avoid the relatively Large deflection that Os Draconis cause during filling lead due to variations in temperature inequality;Should use up during filling lead Amount avoids lead water temperature to decline too fast and cause filling lead uneven.Second, lead heating fusion temperature arrives about 360 DEG C and arranges Slag, comes out of the stove for 355 DEG C, and about 340 DEG C carry out filling lead, and casting cycle suitably controls flow, first quick and back slow, the cleaning oxidation of casting limit, limit Slag and impurity due in lead cooling procedure constriction coefficient bigger, constantly to carry out feeding during filling lead.3rd, lead liquid needs Carry out being incubated and feeding: when lead liquid casting to composition backing is concordant, stop casting and clear up rapidly the scum silica frost of liquid level.Made by insulation The cooling of lead liquid order from lower to upper is carried out, and lead liquid temp drops to about 310 DEG C to start to be continuously replenished lead liquid feeding in time;Mend During filling lead liquid, in order to make the smooth of casting face, the oxide layer that liquid level is formed is not destroyed, and supplements lead liquid under oxide layer Face is carried out, it is ensured that final lead face is smooth and the degree of compaction of lead body.4th, after the one side of Os Draconis has been cast, anti-body is again to separately One side is alternately carried out casting to keel structure every one grade again after carrying out being preheated to about 100 DEG C and fills lead.5th, duct keel is tied Structure fills the deviation with ± 6mm of the overall line style data after lead as standard value, and carries out Os Draconis amount of deflection and remember with centerline deviation data Record.Thus improve the making precision of Os Draconis and fill lead degree of compaction.
Described Os Draconis manufacture method, when Os Draconis segmentation being closed up mouth and carrying out filling lead, in advance according to the chi closing up mouth Very little casting makes lead;Until Os Draconis segment folding connect after, then the lead made in advance is put into close up mouth fix.Due to dragon Bone segment folding is typically all and carries out in factory, and fills lead not in segment folding place, therefore closes up the Os Draconis one at mouth Duan Wufa casts, so lead need to be first cast into according to the actual size closing up mouth in Foundry Works workshop, is then being transported to now Field lifting puts in place.The both sides of lead can cast a little hanger more, close up the Os Draconis top board at mouth, weldering first installed by base plate, web Connecing, lid biside plate again after lead stamp installation, lead stamp is installed and is used baking to be finely adjusted lead stamp when there is deviation to reinvent again Install.The method can improve the convenience that Os Draconis make, more to adapt to make restriction and the field fabrication demand in place.

Claims (19)

1. a vessel keel structure, the Os Draconis segmentation (10) connected including multistage head and the tail, it is characterised in that: every section of Os Draconis segmentation All include the base plate (2) of the top board (1) on top, bottom, and the dividing plate (3) at middle part and web (4), top board and floor level set Putting, compartment of terrain is equipped with polylith dividing plate between the two, and divider upright is arranged and plate facial plane is perpendicular with the cephalocaudal direction of Os Draconis segmentation, Web is both perpendicular to top board and dividing plate;Top board, base plate, dividing plate and web surround the placing box (6) placing lead, Os Draconis segmentation All or part of placing box in be provided with lead.
Vessel keel structure the most according to claim 1, it is characterised in that: have and be perpendicular to the backing plate that top board (1) is arranged (5), the plate Middle face of backing plate is connected with the outer side edges of dividing plate (3).
Vessel keel structure the most according to claim 2, it is characterised in that: there is the side closing Os Draconis segmentation (10) side Plate, the plate face of side plate is covered on adjacent backing plate, and placing box (6) and its interior lead is covered in the inner.
4. according to the vessel keel structure described in claim 1,2 or 3, it is characterised in that: the Os Draconis segmentation in the middle of vessel keel All placing boxes (6) in be equipped with lead, be provided with lead in the part placing box of the Os Draconis segmentation of bow stern both sides.
5. an Os Draconis manufacture method, it is characterised in that comprise the following steps:
A, making the skeleton of Os Draconis segmentation, Os Draconis segmentation includes the base plate of the top board on top, bottom, and the dividing plate at middle part and abdomen Plate, top board, base plate, dividing plate and web surround the placing box placing lead;
B, in the placing box of Os Draconis segmentation fill lead;
C, the Os Draconis segmentation after lead will be filled carry out segment folding in order;
D, to the Os Draconis segmentation after closing up close up mouth carry out fill lead;
E, filling lead install side plate after completing.
Os Draconis manufacture method the most according to claim 5, it is characterised in that: step A comprises the following steps:
A1, top board is placed and secured on machine frame;
A2, on top board welding diaphragm, web and backing plate;
A3, top board unclamped from machine frame and takes off, then base plate is placed on machine frame, then will weld with top board Dividing plate, web are corresponding with backing plate to be positioned on base plate;
A4, base plate is welded and fixed with dividing plate, web and backing plate.
Os Draconis manufacture method the most according to claim 6, it is characterised in that: top board, base plate, dividing plate, web and backing plate exist Electric welding location, wherein, the middle part that spot welding order is first welding diaphragm and web junction of step A1 is first carried out, then before welding The junction of welding diaphragm, web and top board, then welding diaphragm and the middle part of top board junction, and then welding diaphragm and backing plate The middle part of junction, then the outside of composition backing and top board junction;Step A4 spot welding order is first welding diaphragm, web and the end The junction of plate, the outside of the then middle part of welding diaphragm and back plate connections, then composition backing and back plate connections.
8. according to the Os Draconis manufacture method described in claim 6 or 7, it is characterised in that: in dividing plate, web and the backing plate of step A2 After having welded, Os Draconis segmentation is carried out hot working.
Os Draconis manufacture method the most according to claim 8, it is characterised in that: firer position be pine bone at, i.e. top board with every Plate, web and the back side of backing plate junction.
10. according to the Os Draconis manufacture method described in claim 5-9 any claim, it is characterised in that: divide making Os Draconis Before the skeleton of section, first making the machine frame for making Os Draconis segmentation, this machine frame includes two bottom girders being placed in parallel (7), Being positioned apart from several door frames on bottom girder, each door frame all includes that two are respectively perpendicular the column being arranged on two bottom girders (8), and connect two column tops crossbeam (9).
11. according to the Os Draconis manufacture method described in claim 5-9 any claim, it is characterised in that: the weldering of Os Draconis segmentation Connect employing backstep, and by even numbers welder being symmetrically welded that the both sides of Os Draconis segmentation operate simultaneously.
12. Os Draconis manufacture methods according to claim 5, it is characterised in that: when Os Draconis segmentation carries out filling lead, including Following steps:
B1, Os Draconis segmentation is laterally located, make placing box towards;
B2, Os Draconis segmentation is preheated from bottom,
B3, multiple placing boxes to Os Draconis segmentation carry out filling lead;
B4, filling after lead completes until the one side of Os Draconis segmentation, another side is carried out filling lead by anti-body again, fills lead process and repeats above-mentioned B2- B5 step.
13. Os Draconis manufacture methods according to claim 12, it is characterised in that: in B2 step, preheating temperature is 100 DEG C.
14. Os Draconis manufacture methods according to claim 12, it is characterised in that: in B3 step, fill lead time first to part between Every placing box carry out fill lead, the placing box between the placing box the most filled is carried out fill lead.
15. according to the Os Draconis manufacture method described in claim 12 or 14, it is characterised in that: before filling lead, need first to be heated by lead To 360 DEG C, then carry out deslagging process, then come out of the stove at 355 DEG C, then carry out when 340 DEG C filling lead operation.
16. Os Draconis manufacture methods according to claim 12, it is characterised in that: when lead liquid casting to composition backing is concordant, Stop casting and clear up the scum silica frost of liquid level.
17. Os Draconis manufacture methods according to claim 12, it is characterised in that: by insulation make the cooling of lead liquid from lower toward On order carry out, lead liquid temp drops to supplement lead liquid when 310 DEG C and carries out feeding.
18. Os Draconis manufacture methods according to claim 17, it is characterised in that: during supplementing lead liquid, supplement lead liquid and exist Carry out below oxide layer.
19. Os Draconis manufacture methods according to claim 5, it is characterised in that: Os Draconis segmentation close up mouth carry out fill lead time, Cast according to the size closing up mouth in advance and make lead;After Os Draconis segment folding connects, then the lead made in advance is put into Fix in closing up mouth.
CN201610713242.4A 2016-08-24 2016-08-24 A kind of vessel keel structure and keel production method Active CN106184606B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610713242.4A CN106184606B (en) 2016-08-24 2016-08-24 A kind of vessel keel structure and keel production method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610713242.4A CN106184606B (en) 2016-08-24 2016-08-24 A kind of vessel keel structure and keel production method

Publications (2)

Publication Number Publication Date
CN106184606A true CN106184606A (en) 2016-12-07
CN106184606B CN106184606B (en) 2018-08-24

Family

ID=57524322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610713242.4A Active CN106184606B (en) 2016-08-24 2016-08-24 A kind of vessel keel structure and keel production method

Country Status (1)

Country Link
CN (1) CN106184606B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107336799A (en) * 2017-06-30 2017-11-10 广船国际有限公司 A kind of cabin storage system foundation beam installation method
CN110479767A (en) * 2019-09-06 2019-11-22 安徽马钢重型机械制造有限公司 A kind of straightening machine base and production method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6532889B1 (en) * 2000-07-14 2003-03-18 Tracker Marine, L.L.P. Aluminum fishing boat
KR20100072152A (en) * 2010-01-22 2010-06-30 조영효 Frp ship equipped with box keel charged with polyester
CN202624600U (en) * 2012-06-28 2012-12-26 厦门瀚盛游艇有限公司 Keel lifting device of glass fiber reinforced plastic sailboat
CN203888998U (en) * 2014-05-28 2014-10-22 福建鸿业船艇有限公司 Large glass fiber reinforced plastic box keel structure of ship
CN204056195U (en) * 2014-04-04 2014-12-31 舟山市普陀岑氏木船作坊(普通合伙) The keel of razshiva
CN104709439A (en) * 2013-12-17 2015-06-17 吴挺 Detachable fishing ship
CN206068077U (en) * 2016-08-24 2017-04-05 广船国际有限公司 A kind of vessel keel structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6532889B1 (en) * 2000-07-14 2003-03-18 Tracker Marine, L.L.P. Aluminum fishing boat
KR20100072152A (en) * 2010-01-22 2010-06-30 조영효 Frp ship equipped with box keel charged with polyester
CN202624600U (en) * 2012-06-28 2012-12-26 厦门瀚盛游艇有限公司 Keel lifting device of glass fiber reinforced plastic sailboat
CN104709439A (en) * 2013-12-17 2015-06-17 吴挺 Detachable fishing ship
CN204056195U (en) * 2014-04-04 2014-12-31 舟山市普陀岑氏木船作坊(普通合伙) The keel of razshiva
CN203888998U (en) * 2014-05-28 2014-10-22 福建鸿业船艇有限公司 Large glass fiber reinforced plastic box keel structure of ship
CN206068077U (en) * 2016-08-24 2017-04-05 广船国际有限公司 A kind of vessel keel structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
于欣等: "渔船刀型龙骨的应用分析", 《船海工程》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107336799A (en) * 2017-06-30 2017-11-10 广船国际有限公司 A kind of cabin storage system foundation beam installation method
CN107336799B (en) * 2017-06-30 2019-03-22 广船国际有限公司 A kind of cabin storage system foundation beam installation method
CN110479767A (en) * 2019-09-06 2019-11-22 安徽马钢重型机械制造有限公司 A kind of straightening machine base and production method

Also Published As

Publication number Publication date
CN106184606B (en) 2018-08-24

Similar Documents

Publication Publication Date Title
CN108146578B (en) A kind of manufacturing method of two phase stainless steel chemical tanker topside segmentation
CN102407921B (en) Mounting method for sectional inversely hung rudder arm
CN104805961B (en) Oblique bracket girders layer steel column of slab abnormity and preparation method thereof
CN102848091B (en) Ship double bottom block assembly welding technology
CN101274386B (en) One side welding device and one side welding method
CN106184606A (en) A kind of vessel keel structure and Os Draconis manufacture method
CN107498269A (en) A kind of large-scale ship reception chamber manufacture method suitable for dry type ship railway carriage or compartment room
CN206305683U (en) The total mounted welder in groups of empty iron roof of train
CN108857127A (en) The welding method of frame-type car body of aluminum alloy top cover
US2176664A (en) Apparatus for fabricating structural elements
CN109131566A (en) The welding method of the bridging arrangement and cross of vehicle beam and stringer, stringer
CN206068077U (en) A kind of vessel keel structure
CN106882326A (en) A kind of molten stainless steel freighter is segmented Quick carrying localization method
CN107254938A (en) A kind of anistree box-shaped king-post suspension column and preparation method thereof
JP6324532B2 (en) Automatic pouring apparatus having automatic pressure function and automatic pouring method
CN207788029U (en) One kind being moved easily formula aluminum alloy pattern plate welding tooling platform
CN106514096B (en) A kind of auxiliary mould and method of manufacture rudder for ship
US2164567A (en) Apparatus for fabricating structural elements
CN102635198A (en) Combined elliptical section component and processing method thereof
CN107378193A (en) The automatic welding method of blade assemblies in rail vehicle truck
CN206047310U (en) For ensureing that inner chamber full penetration weld keeps for the welding auxiliary mould of fixed gap value
CN104959772B (en) A kind of water heater liner apparatus for welding and positioning
US2636968A (en) Waiter
US6460604B1 (en) Apparatus for uphill low pressure casting of molten metal
CN104925226B (en) Liquid tank longitudinal spacing structure of liquid gas carrier

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant