CN106181232A - Environmental protection equipment is by interior external mold mould production technology - Google Patents
Environmental protection equipment is by interior external mold mould production technology Download PDFInfo
- Publication number
- CN106181232A CN106181232A CN201610532797.9A CN201610532797A CN106181232A CN 106181232 A CN106181232 A CN 106181232A CN 201610532797 A CN201610532797 A CN 201610532797A CN 106181232 A CN106181232 A CN 106181232A
- Authority
- CN
- China
- Prior art keywords
- reinforcement
- inner mold
- interior
- mold
- environmental protection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P15/00—Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/22—Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units
Abstract
Environmental protection equipment of the present invention with interior external mold mould production technology relate to a kind of for producing environmental protection equipment time the production technology of the mould with interior external mold double-layer structure that uses.Its purpose is to provide a kind of novel production process, enable the mould produced to process high-quality environmental protection equipment.Environmental protection equipment of the present invention includes processing outer mold, processing inner mold and assembling three key steps by interior external mold mould production technology.Outer mold is formed outer mold body by multiple arch sheets, and die ontology two ends solder up forms all round closure structure outside;Inner mold is formed by multiple arch sheets and is arranged at intervals with arcuate recess on inner mold body, and inner mold body, finally forms all round closure structure at inner mold body two ends solder up;In arcuate recess, first it is positioned to steel bar during assembling, and between inner mold and outer mold, places forming net, finally with connector, inner mold and outer mold are connected fixing.
Description
Technical field
The present invention relates to a kind of mould production technology, particularly relate to a kind of for producing environmental protection equipment time use have
The production technology of the mould of interior external mold double-layer structure.
Background technology
The external shape substantially phase of large-scale environmental protection equipment such as anaerobic tank, cistern, water tank, fire-fighting pond and fire fighting tank
With, it is tank body or half tank body along place, axis plane cutting.Large-scale tank body equipment is adding many employings in man-hour
Concreting, needs first to place the arch mould of what a sealing two ends, then concreting is entered when pouring.Tradition
The mould pouring mould only one of which arch, the shape of more difficult control finished product after concreting progressive die tool, concrete is at mould
Tool exists again the situation that mixing is uneven, leverages intensity and the service life of finished product.And mould is in the course of processing
The most complex, expend a large amount of manpower and materials.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of novel mould production technology, enables the mould produced
Process high-quality environmental protection equipment.
Environmental protection equipment of the present invention by interior external mold mould production technology, comprises the following steps:
1) processing outer mold, concrete steps include
A) use veneer reeling machine that multiple steel plates are rolled into the arch that profile is identical;
B) curved edge of adjacent two arch-shaped steel plates is welded together, form the outer mold of an overall arch originally
Body, and it is machined with several screwed holes on die ontology base outside;
C) two end face solder ups of die ontology outside, form the outer mold of all round closure;
2) processing inner mold, concrete steps include
A) use veneer reeling machine that multiple steel plates are rolled into the arch that profile is identical;
B) multiple arcuate recess is gone out with Plate Welding, and by arcuate recess and be used for manufacturing the steel plate interval of the arch of inner mold and put
Putting, the edge on arcuate recess both sides respectively and the end face welding of the steel plate of arch that is adjacent, forms an overall arch
Inner mold body, the opening of arcuate recess, towards the outside of arch-shaped steel plate, is machined with several screw threads on inner mold body base
Hole, the section radius of described inner mold body is slightly less than the section radius of outer mold body;
C) at two end face solder ups of inner mold body, the inner mold of all round closure is formed;
3) assembling, concrete steps include
A) in each arcuate recess of inner mold, place some become steel bar;
B) between inner mold and outer mold, a forming net is placed;
C) inner mold and outer mold being linked together by connector, connector is provided with multiple bolt, bolt divides
It is not arranged in the screwed hole of inner mold body and outer mold body;
D) one vibrating motor of each connection on inner mold and outer mold.
Environmental protection equipment of the present invention interior external mold mould production technology, wherein step 1) in also include
D) reinforcement lateral out of arc is processed so that it is identical with the arch radian of outer mold body, and lateral out
Leaving several installing holes on reinforcement, the section radius of reinforcement is slightly larger than outer mold body lateral out;
E) placing side by side before and after reinforcement lateral out, it is right vertical external reinforcing ribs to be sequentially passed through on multiple reinforcement lateral out
Answer the installing hole of position, and be welded and fixed;
F) medial surface of reinforcement lateral out and the lateral surface of outer mold body are welded and fixed.
Environmental protection equipment of the present invention is steel pipe by interior external mold mould production technology, wherein said vertical external reinforcing ribs.
Environmental protection equipment of the present invention interior external mold mould production technology, wherein step 2) in also include
D) the interior reinforcement of arc is processed so that it is identical with the arch radian of inner mold body, and within laterally
Leaving several installing holes on reinforcement, the section radius of interior reinforcement is slightly less than inner mold body;
E) placing side by side before and after horizontal interior reinforcement, it is right to be sequentially passed through on interior multiple reinforcement by vertical interior reinforcement
Answer the installing hole of position, and be welded and fixed;
F) the interior lateral surface of reinforcement and the medial surface of inner mold body are welded and fixed.
Environmental protection equipment of the present invention by interior external mold mould production technology, wherein said vertical in reinforcement be steel pipe.
Environmental protection equipment of the present invention interior external mold mould production technology, wherein said vertical interior reinforcement have some, and pacify
Holding position is evenly distributed on the surrounding of interior reinforcement, is wherein positioned at a vertical reinforcement of inner mold tip position
Two ends are provided with interior reinforcement, and in two longitudinal directions, reinforcement is respectively welded on the medial surface of two sealings.
By interior external mold mould production technology difference from prior art, environmental protection equipment of the present invention is that environmental protection of the present invention sets
Standby interior external mold mould production technology is divided into three key steps, carries out the processing of outer mold, the processing of inner mold and group successively
Dress.The mould of this technique production and processing has inside and outside two-layer.Although need to process two molds, but outside required equipment and mold
Shape all similar, inner mold and outer mold can be processed by first post-treatment after determining size the most simultaneously, are independent of each other, and processing
Process steps is simple, work efficiency is high.Two-layer mould only need to be connected by connector by inner mold and outer mold when assembling
Come, easy accessibility.It is formed with working cavity between inside and outside two-layer mould, when casting concrete, only need to be straight in working cavity
Connect casting concrete, and constantly with vibrating motor vibration inner mold and outer mold, concrete just can straight forming, and due to molding
Reinforcing bar and the existence of forming net, the intensity of product can be higher, better quality.
Below in conjunction with the accompanying drawings the environmental protection equipment of the present invention is described further by interior external mold mould production technology.
Accompanying drawing explanation
Fig. 1 protects the structural representation of the interior external mold mould that equipment is produced by interior external mold mould production technology by the present invention;
Fig. 2 protects the structure of outer mold in the interior external mold mould that the interior external mold mould production technology of equipment is produced by the present invention
Schematic diagram;
Fig. 3 protects the section view of inner mold in the interior external mold mould that the interior external mold mould production technology of equipment is produced by the present invention
Figure;
After Fig. 4 protects, by the present invention, the interior external mold mould removing outer mold that the interior external mold mould production technology of equipment is produced
Upward view.
Detailed description of the invention
As Figure 1-Figure 4, environmental protection equipment of the present invention by interior external mold mould production technology mainly include process outer mold 7,
Processing inner mold 9 and three steps of assembling, wherein comprise the following steps during processing outer mold 7:
A) use veneer reeling machine that multiple steel plates are rolled into the arch that profile is identical;
B) curved edge of adjacent two arch-shaped steel plates is welded together, form the outer mold of an overall arch originally
Body, and it is machined with several screwed holes on die ontology base outside;
C) two end face solder ups of die ontology outside, form the outer mold 7 of all round closure;
D) reinforcement 3 lateral out of arc are processed so that it is identical with the arch radian of outer mold body, and lateral out
Leaving several installing holes on reinforcement 3, the section radius of reinforcement 3 is slightly larger than outer mold body lateral out;
E) reinforcement 3 is placed the most side by side lateral out, and vertical external reinforcing ribs 5 is sequentially passed through multiple reinforcement 3 lateral out
The installing hole of upper correspondence position, and be welded and fixed, vertical external reinforcing ribs 5 is steel pipe;
F) medial surface of reinforcement 3 lateral out and the lateral surface of outer mold body are welded and fixed.
Comprise the following steps during processing inner mold 9:
A) use veneer reeling machine that multiple steel plates are rolled into the arch that profile is identical;
B) go out multiple arcuate recess 10 with Plate Welding, and by arcuate recess 10 be used for manufacturing the steel plate of the arch of inner mold 9
Being spaced apart, the edge on arcuate recess 10 both sides respectively and the end face welding of the steel plate of arch that is adjacent, forms an entirety
The inner mold body of arch, the opening of arcuate recess 10, towards the outside of arch-shaped steel plate, is machined with on inner mold body base
Several screwed holes, the section radius of described inner mold body is slightly less than the section radius of outer mold body;
C) at two end face solder ups of inner mold body, the inner mold 9 of all round closure is formed;
D) the interior reinforcement 6 of arc is processed so that it is identical with the arch radian of inner mold body, and within laterally
Leaving several installing holes on reinforcement 6, the section radius of interior reinforcement 6 is slightly less than inner mold body;
E) placement arranged side by side before and after interior reinforcement 6, sequentially passes through interior multiple reinforcement 6 by vertical interior reinforcement 1
The installing hole of upper correspondence position, and be welded and fixed, vertical interior reinforcement 1 is steel pipe, and wherein vertical interior reinforcement 1 has five, and
Installation site is evenly distributed on the surrounding of interior reinforcement 6, is wherein positioned at a vertically reinforcement of inner mold 9 tip position
The two ends of muscle 1` are provided with interior reinforcement 4, and in two longitudinal directions, reinforcement 4 is respectively welded on the medial surface of two sealings.;
F) the interior lateral surface of reinforcement 6 and the medial surface of inner mold body are welded and fixed;
Comprise the following steps during assembling:
A) in each arcuate recess 10 of inner mold 9, place some become steel bar 11;
B) between inner mold 9 and outer mold 7, a forming net 8 is placed;
C) inner mold 9 and outer mold 7 are linked together by connector 2, connector 2 is provided with multiple bolt, spiral shell
Bolt is separately mounted in the screwed hole of inner mold body and outer mold body;
D) one vibrating motor of each connection on inner mold 9 and outer mold 7.
Embodiment described above is only to be described the preferred embodiment of the present invention, the not model to the present invention
Enclose and be defined, on the premise of designing spirit without departing from the present invention, the those of ordinary skill in the art technical side to the present invention
Various deformation that case is made and improvement, all should fall in the protection domain that claims of the present invention determines.
Claims (6)
1. an environmental protection equipment is by interior external mold mould production technology, it is characterised in that: comprise the following steps:
1) processing outer mold, concrete steps include
A) use veneer reeling machine that multiple steel plates are rolled into the arch that profile is identical;
B) curved edge of adjacent two arch-shaped steel plates is welded together, forms the outer mold body of an overall arch,
And it is machined with several screwed holes on die ontology base outside;
C) two end face solder ups of die ontology outside, form the outer mold of all round closure;
2) processing inner mold, concrete steps include
A) use veneer reeling machine that multiple steel plates are rolled into the arch that profile is identical;
B) go out multiple arcuate recess with Plate Welding, and arcuate recess and the steel plate being used for manufacturing the arch of inner mold be spaced apart,
The edge on arcuate recess both sides respectively and the end face welding of the steel plate of arch that is adjacent, forms the interior mould of an overall arch
Tool body, the opening of arcuate recess, towards the outside of arch-shaped steel plate, is machined with several screwed holes, institute on inner mold body base
The section radius stating inner mold body is slightly less than the section radius of outer mold body;
C) at two end face solder ups of inner mold body, the inner mold of all round closure is formed;
3) assembling, concrete steps include
A) in each arcuate recess of inner mold, place some become steel bar;
B) between inner mold and outer mold, a forming net is placed;
C) inner mold and outer mold being linked together by connector, connector is provided with multiple bolt, bolt is pacified respectively
It is contained in the screwed hole of inner mold body and outer mold body;
D) one vibrating motor of each connection on inner mold and outer mold.
Environmental protection equipment the most according to claim 1 is by interior external mold mould production technology, it is characterised in that: step 1) in also wrap
Include
D) process the reinforcement lateral out of arc so that it is identical with the arch radian of outer mold body, and strengthening lateral out
Leaving several installing holes on muscle, the section radius of reinforcement is slightly larger than outer mold body lateral out;
E) place side by side before and after reinforcement lateral out, vertical external reinforcing ribs is sequentially passed through corresponding position on multiple reinforcement lateral out
The installing hole put, and be welded and fixed;
F) medial surface of reinforcement lateral out and the lateral surface of outer mold body are welded and fixed.
Environmental protection equipment the most according to claim 2 is by interior external mold mould production technology, it is characterised in that: described the most additional
Strong muscle is steel pipe.
Environmental protection equipment the most according to claim 1 is by interior external mold mould production technology, it is characterised in that: step 2) in also wrap
Include
D) process the interior reinforcement of arc so that it is identical with the arch radian of inner mold body, and strengthen within laterally
Leaving several installing holes on muscle, the section radius of interior reinforcement is slightly less than inner mold body;
E) place side by side before and after horizontal interior reinforcement, vertical interior reinforcement is sequentially passed through correspondence position on interior multiple reinforcement
The installing hole put, and be welded and fixed;
F) the interior lateral surface of reinforcement and the medial surface of inner mold body are welded and fixed.
Environmental protection equipment the most according to claim 4 is by interior external mold mould production technology, it is characterised in that: described vertical in add
Strong muscle is steel pipe.
Environmental protection equipment the most according to claim 4 is by interior external mold mould production technology, it is characterised in that: described vertical in add
Strong muscle has some, and installation site is evenly distributed on the surrounding of interior reinforcement, is wherein positioned at inner mold tip position
The two ends of a piece vertical interior reinforcement are provided with interior reinforcement, and in two longitudinal directions, reinforcement is respectively welded at two sealings
On medial surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610532797.9A CN106181232A (en) | 2016-07-07 | 2016-07-07 | Environmental protection equipment is by interior external mold mould production technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610532797.9A CN106181232A (en) | 2016-07-07 | 2016-07-07 | Environmental protection equipment is by interior external mold mould production technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106181232A true CN106181232A (en) | 2016-12-07 |
Family
ID=57472471
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610532797.9A Pending CN106181232A (en) | 2016-07-07 | 2016-07-07 | Environmental protection equipment is by interior external mold mould production technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106181232A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108556271A (en) * | 2018-05-30 | 2018-09-21 | 芜湖优聚塑模有限公司 | A kind of lower pool body molding die of leak-proof digestion tank |
CN109853721A (en) * | 2017-11-30 | 2019-06-07 | 陈志宇 | A kind of monolithic reinforced-concrete sewerage treating pond and preparation method thereof |
CN110774423A (en) * | 2019-10-30 | 2020-02-11 | 中国建筑第八工程局有限公司 | Multi-curved surface modeling lining die for concrete structure and manufacturing method thereof |
CN110788970A (en) * | 2019-10-30 | 2020-02-14 | 中国建筑第八工程局有限公司 | Multi-curved surface modeling lining die for concrete structure |
CN110788972A (en) * | 2019-10-30 | 2020-02-14 | 中国建筑第八工程局有限公司 | Method for manufacturing multi-curved surface modeling lining die for concrete structure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0361044A3 (en) * | 1988-09-30 | 1990-09-05 | Jobst Ulrich Gellert | Method of manufacture of an electrical terminal on an injection molding nozzle |
KR20060008510A (en) * | 2004-07-21 | 2006-01-27 | 동국중전기 주식회사 | Manufacture method of a street light control box |
CN102179671A (en) * | 2011-04-15 | 2011-09-14 | 湖北三江航天万峰科技发展有限公司 | Making method of large-scale cavity foaming part molding die and die structure thereof |
CN102319986A (en) * | 2011-08-25 | 2012-01-18 | 四川科新机电股份有限公司 | Method for cold-working double-R curved surface part |
CN102501019A (en) * | 2011-11-09 | 2012-06-20 | 中国核工业华兴建设有限公司 | Method for manufacturing first layer of steel lining dome of nuclear power station |
-
2016
- 2016-07-07 CN CN201610532797.9A patent/CN106181232A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0361044A3 (en) * | 1988-09-30 | 1990-09-05 | Jobst Ulrich Gellert | Method of manufacture of an electrical terminal on an injection molding nozzle |
KR20060008510A (en) * | 2004-07-21 | 2006-01-27 | 동국중전기 주식회사 | Manufacture method of a street light control box |
CN102179671A (en) * | 2011-04-15 | 2011-09-14 | 湖北三江航天万峰科技发展有限公司 | Making method of large-scale cavity foaming part molding die and die structure thereof |
CN102319986A (en) * | 2011-08-25 | 2012-01-18 | 四川科新机电股份有限公司 | Method for cold-working double-R curved surface part |
CN102501019A (en) * | 2011-11-09 | 2012-06-20 | 中国核工业华兴建设有限公司 | Method for manufacturing first layer of steel lining dome of nuclear power station |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853721A (en) * | 2017-11-30 | 2019-06-07 | 陈志宇 | A kind of monolithic reinforced-concrete sewerage treating pond and preparation method thereof |
CN109853721B (en) * | 2017-11-30 | 2021-05-11 | 四川康兴茂环保科技有限公司 | Integral reinforced concrete sewage treatment tank and preparation method thereof |
CN108556271A (en) * | 2018-05-30 | 2018-09-21 | 芜湖优聚塑模有限公司 | A kind of lower pool body molding die of leak-proof digestion tank |
CN110774423A (en) * | 2019-10-30 | 2020-02-11 | 中国建筑第八工程局有限公司 | Multi-curved surface modeling lining die for concrete structure and manufacturing method thereof |
CN110788970A (en) * | 2019-10-30 | 2020-02-14 | 中国建筑第八工程局有限公司 | Multi-curved surface modeling lining die for concrete structure |
CN110788972A (en) * | 2019-10-30 | 2020-02-14 | 中国建筑第八工程局有限公司 | Method for manufacturing multi-curved surface modeling lining die for concrete structure |
CN110774423B (en) * | 2019-10-30 | 2021-06-11 | 中国建筑第八工程局有限公司 | Multi-curved surface modeling lining die for concrete structure and manufacturing method thereof |
CN110788972B (en) * | 2019-10-30 | 2021-06-11 | 中国建筑第八工程局有限公司 | Method for manufacturing multi-curved surface modeling lining die for concrete structure |
CN110788970B (en) * | 2019-10-30 | 2021-06-11 | 中国建筑第八工程局有限公司 | Multi-curved surface modeling lining die for concrete structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106181232A (en) | Environmental protection equipment is by interior external mold mould production technology | |
CN203878615U (en) | Light combined type set-shaped steel formwork for inspection well | |
CN201377141Y (en) | Reinforcing steel bar positioning clamp of reinforced concrete column | |
CN109531784A (en) | A kind of prefabricated components composable mold and application method | |
CN207277847U (en) | A kind of assembled overlapped shear wall fixing templates | |
CN105904580B (en) | Using the mould of the prefabricated concrete hollow slab of rubber tube pore-forming | |
CN105525749B (en) | Substation accident oil sump large form pouring construction method | |
CN204894207U (en) | Square stake tensioning equipment | |
CN106013804A (en) | Internal mold and external mold production mold of environment-friendly equipment | |
CN207206684U (en) | A kind of collapsible cable shaft well head mould | |
CN205804967U (en) | External mold production mould in environmental protection equipment | |
CN106003367B (en) | The method of interior external mold mold production environmental protection equipment | |
CN204525753U (en) | A kind of cement pipe molding mould | |
CN209649040U (en) | A kind of prefabricated components composable mold | |
JP2012172476A (en) | Connection structure and recycle method for precast concrete member | |
CN203438384U (en) | Vertical demolding overhang roller die with one open side | |
CN105058560B (en) | A kind of bolt fast-assembling brick-making mould | |
CN205711982U (en) | Gate dam oil pipe channel forming template | |
JP6151740B2 (en) | Precast concrete member and connecting structure of precast concrete member | |
CN214298702U (en) | Detachable welding wire reel | |
CN205437063U (en) | Double -purpose molding machine | |
CN205735484U (en) | For producing the outer mold of environmental protection equipment | |
CN104264668A (en) | Pile mold of X-shaped model pile and production method thereof | |
CN207058841U (en) | A kind of master mold for making bathroom mould | |
CN211709595U (en) | Novel production mould of environmental protection equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
AD01 | Patent right deemed abandoned | ||
AD01 | Patent right deemed abandoned |