CN106179806A - A kind of pipe plastic coating apparatus for production line - Google Patents
A kind of pipe plastic coating apparatus for production line Download PDFInfo
- Publication number
- CN106179806A CN106179806A CN201610822966.2A CN201610822966A CN106179806A CN 106179806 A CN106179806 A CN 106179806A CN 201610822966 A CN201610822966 A CN 201610822966A CN 106179806 A CN106179806 A CN 106179806A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- coated
- wall
- plastic
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B5/00—Electrostatic spraying apparatus; Spraying apparatus with means for charging the spray electrically; Apparatus for spraying liquids or other fluent materials by other electric means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B13/00—Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
- B05B13/02—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
- B05B13/0221—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
- B05B13/0235—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts the movement of the objects being a combination of rotation and linear displacement
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B13/00—Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
- B05B13/02—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
- B05B13/0221—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
- B05B13/025—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts the objects or work being present in bulk
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B16/00—Spray booths
- B05B16/90—Spray booths comprising conveying means for moving objects or other work to be sprayed in and out of the booth, e.g. through the booth
- B05B16/95—Spray booths comprising conveying means for moving objects or other work to be sprayed in and out of the booth, e.g. through the booth the objects or other work to be sprayed lying on, or being held above the conveying means, i.e. not hanging from the conveying means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D—PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D3/00—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
- B05D3/002—Pretreatement
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D—PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D3/00—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
- B05D3/007—After-treatment
Abstract
A kind of pipe plastic coating apparatus for production line, includes preheating furnace, meter dried furnace and curing oven successively, includes three heating furnaces with above three members fits, be preheating furnace heating system, meter dried furnace heating system and curing oven heating system respectively according to process flow.Additionally include steel pipe inner wall and be coated with moulding system, steel pipe docking system and outer wall of steel pipe painting moulding system.The present invention uses raw material steel pipe advanced person's row coating for inner wall; inwall surface drying or solidification reach some strength; carry out outer wall plastic-coated again; it is hooked in the steel pipe inner wall of existing some strength, completes whole plastic coating technology for steel tube, thus protect pipe plastic coating layer well; avoid the appearance of steel pipe coating hook fulcrum; solve plastic-coated steel technique fulcrum well and repair problem, simultaneously this equipment can simultaneously two steel pipes of plastic-coated, improve production production capacity.
Description
Technical field
The invention belongs to steel pipe process equipment field, especially relates to a kind of pipe plastic coating apparatus for production line.
Background technology
The plastic coating method of plastic-coated steel is plastic-coated of ectonexine in the market, it is therefore desirable to determines in steel tube surface and props up
Point, is therefore referred to as there is fulcrum plastic-coated steel, and after plastic-coated, fulcrum is simply repaired by workman again, therefore fulcrum
Do not reach the performance of other plastic-coated aspects after reparation, and engineering plastic-coated steel the most always start with a spot corrosion yet,
Then make whole plastic-coated steel corrode rapidly, reduce the service life of plastic-coated steel, thus during pipe plastic coating produces, do not produce
The plastic-coated solution of fulcrum is extremely urgent.On the other hand, pipe plastic coating apparatus for production line the most on the market typically can only do
To a pipe plastic coating, cause production capacity low, energy consumption and the problem such as human cost is high.
Summary of the invention
The problem that the invention is to be solved is to provide a kind of pipe plastic coating apparatus for production line, solves to deposit in prior art
Pipe plastic coating have fulcrum easily to corrode and the problem such as energy consumption and human cost be high.
For solving above-mentioned technical problem, the invention the technical scheme is that
A kind of pipe plastic coating apparatus for production line is provided, includes preheating furnace, preheating furnace according to process flow the most successively
Heating system, steel pipe inner wall are coated with moulding system, meter dried furnace, meter dried furnace heating system, steel pipe docking system, outer wall of steel pipe plastic-coated system
System, curing oven and curing oven heating system;Also including a hook, described workpiece steel pipe is hung on transmission chain by hook.
Further, described outer wall is coated with moulding system and coating for inner wall system all includes being positioned at the steel pipe being coated with moulding system two ends
Clamping rotating seat, and steel pipe clamp and steel pipe electrostatic plastic spraying case, wherein said steel tube clamping rotating seat is interchangeable single tube
Clamping rotating seat or two-tube clamping rotating seat;Described steel pipe clamp is Single pipe clamp or Double tube clamp.
Further, described preheating furnace is tunnel type furnace body with the body of heater of meter dried furnace.
Further, the body of heater of described curing oven is bridge-type body of heater.
The invention design by steel pipe docking system, it is achieved that the plastic-coated without fulcrum of steel pipe, thus protect steel
Pipe coating layer, solves plastic-coated steel technique fulcrum well and repairs problem.Additionally plastic-coated can one steel of a plastic-coated every time
Pipe or two steel pipes, improve production production capacity, reduce energy consumption and human cost.
Accompanying drawing explanation
Fig. 1 is the invention one pipe plastic coating apparatus for production line structural representation
Fig. 2 is that the invention single tube outer wall is coated with moulding system (single tube coating for inner wall system) structural representation
Fig. 3 is that the two-tube outer wall of the invention is coated with moulding system (two-tube coating for inner wall system) structural representation
In figure:
1, original paper steel pipe 2, preheating furnace the 3, first transmission chain
4, workpiece steel pipe 5, preheating furnace heating system 6, steel pipe inner wall are coated with moulding system
7, meter dried furnace 8, meter dried furnace heating system 9, steel pipe docking system
10, outer wall of steel pipe is coated with moulding system 11, curing oven the 12, second driving chain
13, semi-finished product plastic-coated steel 14, hook 15, curing oven heating system
16, finished product plastic-coated steel 17, clamping rotating seat 18, single steel pipe clamp
19, steel pipe electrostatic plastic-coated case 20, single 21 pairs of steel pipe clamps of steel pipe
22, double steel pipes
Detailed description of the invention
Below in conjunction with the accompanying drawings the specific embodiment of the invention is elaborated.
From Fig. 1 to Fig. 3, the invention includes the most successively that according to process flow preheating furnace, preheating furnace add
Hot systems, steel pipe inner wall be coated with moulding system, meter dried furnace, meter dried furnace heating system, steel pipe docking system, outer wall of steel pipe be coated with moulding system,
Curing oven and curing oven heating system;Also including a hook, described workpiece steel pipe is hung on transmission chain by hook.Described
Outer wall be coated with moulding system and coating for inner wall system and all include being positioned at the steel tube clamping rotating seat being coated with moulding system two ends, and steel pipe folder
Tool and steel pipe electrostatic plastic spraying case, wherein said steel tube clamping rotating seat is interchangeable single tube clamping rotating seat or two-tube clamping rotation
Swivel base;Described steel pipe clamp is Single pipe clamp or Double tube clamp.
The invention workflow: original paper steel pipe enters into preheating furnace and preheats, when temperature of steel pipe reaches process warm
Forming workpiece steel pipe after degree, workpiece steel pipe enters steel pipe inner wall painting moulding system under the first transmission chain conveying and carries out plastic-coated, is coated with
The workpiece steel pipe moulded continues on through the first transmission chain and enters into meter dried furnace and carry out surface drying or solidification, when after inwall surface drying or solidification
Having certain hardness, steel pipe is delivered to outer wall of steel pipe painting moulding system through steel pipe docking system and is carried out outer wall plastic-coated, after outer wall plastic-coated
Semi-finished product steel pipe through artificial suspension member use hook hang on the second transmission chain, solidify then into curing oven, steel
After pipe temperature reaches technique solidification temperature, after certain process time, form fished pipe, thus complete inside and outside whole steel pipe
Wall plastic-coated solidification process, during there is not fulcrum, be therefore made without fulcrum reparation.
The invention uses raw material steel pipe one or two and first carries out coating for inner wall, and inwall surface drying or solidification reach
Carry out outer wall plastic-coated after some strength again, be hooked in the steel pipe inner wall of existing some strength, complete whole plastic coating technology for steel tube,
Plastic-coated whole process, without fulcrum, protects pipe plastic coating layer, solves plastic-coated steel technique fulcrum well and repairs problem.A whole set of steel pipe
Plastic-coated apparatus for production line uses preheating furnace, meter dried furnace and 3 stoves of curing oven, and steel pipe inner wall is coated with moulding system simultaneously, outer wall of steel pipe is coated with
Moulding system coordinates automatic docking system, it is possible to meet single tube or two-tube two kinds of different plastic-coated demands, improves production efficiency joint
Save human cost.
Above an embodiment of the invention is described in detail, but described content has been only the invention
Preferred embodiment, it is impossible to be considered the practical range for limiting the invention.All made according to the invention application range
Impartial change and improvement etc., within all should still belonging to the patent covering scope of the invention.
Claims (4)
1. a pipe plastic coating apparatus for production line, it is characterised in that: preheating furnace, pre-is included the most successively according to process flow
Hot stove heating system, steel pipe inner wall are coated with moulding system, meter dried furnace, meter dried furnace heating system, steel pipe docking system, outer wall of steel pipe plastic-coated
System, curing oven and curing oven heating system;Also including a hook, described workpiece steel pipe hangs over transmission chain by hook
On.
A kind of pipe plastic coating apparatus for production line the most according to claim 1, it is characterised in that: described outer wall is coated with moulding system
All include being positioned at the steel tube clamping rotating seat being coated with moulding system two ends with coating for inner wall system, and steel pipe clamp and steel pipe electrostatic
Moulding case, wherein said steel tube clamping rotating seat is interchangeable single tube clamping rotating seat or two-tube clamping rotating seat;Described steel
Pipe clamp is Single pipe clamp or Double tube clamp.
A kind of pipe plastic coating apparatus for production line the most according to claim 1 and 2, it is characterised in that: described preheating furnace with
The body of heater of meter dried furnace is tunnel type furnace body.
A kind of pipe plastic coating apparatus for production line the most according to claim 1 and 2, it is characterised in that: described curing oven
Body of heater is bridge-type body of heater.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610822966.2A CN106179806A (en) | 2016-09-13 | 2016-09-13 | A kind of pipe plastic coating apparatus for production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610822966.2A CN106179806A (en) | 2016-09-13 | 2016-09-13 | A kind of pipe plastic coating apparatus for production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106179806A true CN106179806A (en) | 2016-12-07 |
Family
ID=58066763
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610822966.2A Pending CN106179806A (en) | 2016-09-13 | 2016-09-13 | A kind of pipe plastic coating apparatus for production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106179806A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109107850A (en) * | 2018-10-19 | 2019-01-01 | 高密天机械科技有限公司 | Dual-purpose small-caliber steel pipe plastic-coated equipment |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1557624A (en) * | 2004-02-10 | 2004-12-29 | 广州励进新技术有限公司 | Method and apparatus for producing inside and outside anticorrosion steel-plastic composite pipe |
CN101406870A (en) * | 2008-11-24 | 2009-04-15 | 浙江华立涂装设备有限公司 | Device for spraying internal and external anti-corrosive steel tube |
CN201275525Y (en) * | 2008-04-03 | 2009-07-22 | 杜道龙 | Equipment suitable for technology for coating inside and outside wall of pipeline |
CN203316338U (en) * | 2013-07-16 | 2013-12-04 | 天津市乾丰防腐保温工程有限公司 | Novel intelligent full-automatic steel tube inside and outside plastic coating production line |
CN203767443U (en) * | 2014-04-23 | 2014-08-13 | 天津市富顺钢管镀锌有限公司 | Suspension type coating plastic composite steel pipe transporting frame |
CN204523359U (en) * | 2014-12-30 | 2015-08-05 | 江西安邦德旺铝业有限公司 | A kind of full-automatic stainless steel tube spraying equipment |
CN205146493U (en) * | 2015-11-30 | 2016-04-13 | 浙江五源科技股份有限公司 | Electrostatic spraying curing equipment |
CN205341130U (en) * | 2016-02-03 | 2016-06-29 | 宜昌利民管业科技有限公司 | Synchronous plastic -coated production facility of steel pipe inside and outside wall |
CN206104149U (en) * | 2016-09-13 | 2017-04-19 | 天津友发管道科技股份有限公司 | Steel pipe coating production line equipment |
-
2016
- 2016-09-13 CN CN201610822966.2A patent/CN106179806A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1557624A (en) * | 2004-02-10 | 2004-12-29 | 广州励进新技术有限公司 | Method and apparatus for producing inside and outside anticorrosion steel-plastic composite pipe |
CN201275525Y (en) * | 2008-04-03 | 2009-07-22 | 杜道龙 | Equipment suitable for technology for coating inside and outside wall of pipeline |
CN101406870A (en) * | 2008-11-24 | 2009-04-15 | 浙江华立涂装设备有限公司 | Device for spraying internal and external anti-corrosive steel tube |
CN203316338U (en) * | 2013-07-16 | 2013-12-04 | 天津市乾丰防腐保温工程有限公司 | Novel intelligent full-automatic steel tube inside and outside plastic coating production line |
CN203767443U (en) * | 2014-04-23 | 2014-08-13 | 天津市富顺钢管镀锌有限公司 | Suspension type coating plastic composite steel pipe transporting frame |
CN204523359U (en) * | 2014-12-30 | 2015-08-05 | 江西安邦德旺铝业有限公司 | A kind of full-automatic stainless steel tube spraying equipment |
CN205146493U (en) * | 2015-11-30 | 2016-04-13 | 浙江五源科技股份有限公司 | Electrostatic spraying curing equipment |
CN205341130U (en) * | 2016-02-03 | 2016-06-29 | 宜昌利民管业科技有限公司 | Synchronous plastic -coated production facility of steel pipe inside and outside wall |
CN206104149U (en) * | 2016-09-13 | 2017-04-19 | 天津友发管道科技股份有限公司 | Steel pipe coating production line equipment |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109107850A (en) * | 2018-10-19 | 2019-01-01 | 高密天机械科技有限公司 | Dual-purpose small-caliber steel pipe plastic-coated equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206104149U (en) | Steel pipe coating production line equipment | |
CN102513270B (en) | Vertical type production line of steel-plastic composite pipe | |
CN202962794U (en) | Automatic production device of coating plastic steel pipe | |
CN106179806A (en) | A kind of pipe plastic coating apparatus for production line | |
CN107930946A (en) | The pipeline steel pipe fittings of dustless environment protecting apply moulding system | |
CN106111458A (en) | A kind of full-automatic inside and outside operational approach being coated with coating line of steel conduit | |
CN205926204U (en) | Balancing piece gumming production line | |
CN208343400U (en) | A kind of improved plastic tube extrusion coating head | |
CN205988865U (en) | A kind of automatically inside and outside painting coating line of steel conduit | |
CN203695285U (en) | Automatic spraying and coating device using natural gas as energy | |
CN209726871U (en) | A kind of Sewage heat energy recycle utilizes device | |
CN207579099U (en) | A kind of stator line pencil casing heating unit | |
CN207772405U (en) | A kind of plastic conduit pipe-expanding machine | |
CN207056868U (en) | Automatic wax-spraying device temperature control system | |
CN101862727B (en) | Equipment for coating inner and outer walls of pipeline | |
CN202290504U (en) | Curing, leveling and cooling device of vertical steel-plastic composite pipe | |
CN105537085A (en) | Heating and conveying system of spraying device | |
CN106111965B (en) | Towed ladle iron packet apparatus for baking | |
CN104197674A (en) | Catalyst drying kiln | |
CN205279206U (en) | Dry process floor heating pipe lays template | |
CN105417961B (en) | A kind of infrared heating device | |
CN204657448U (en) | A kind of knuckle casting mould heating furnace | |
CN105371667B (en) | steel ball waste heat recycling system | |
CN109576478A (en) | A kind of pipe fitting heat treatment method | |
CN204398109U (en) | Air entrained concrete steam pressure still recycling tail gas treatment system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161207 |
|
RJ01 | Rejection of invention patent application after publication |