CN106169752A - Main power source flexible switching method under a kind of micro-capacitance sensor off-network pattern - Google Patents

Main power source flexible switching method under a kind of micro-capacitance sensor off-network pattern Download PDF

Info

Publication number
CN106169752A
CN106169752A CN201610861064.XA CN201610861064A CN106169752A CN 106169752 A CN106169752 A CN 106169752A CN 201610861064 A CN201610861064 A CN 201610861064A CN 106169752 A CN106169752 A CN 106169752A
Authority
CN
China
Prior art keywords
power source
energy storage
main power
platform
pcs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610861064.XA
Other languages
Chinese (zh)
Other versions
CN106169752B (en
Inventor
乔峰
刘千杰
余畅
刘林
吉小鹏
卓玲
吴恒
陈玉峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South Offshore Wind Power Joint Development Co Ltd
NANJING SIFANG EPOWER ELECTRIC POWER AUTOMATION CO Ltd
Original Assignee
South Offshore Wind Power Joint Development Co Ltd
NANJING SIFANG EPOWER ELECTRIC POWER AUTOMATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South Offshore Wind Power Joint Development Co Ltd, NANJING SIFANG EPOWER ELECTRIC POWER AUTOMATION CO Ltd filed Critical South Offshore Wind Power Joint Development Co Ltd
Priority to CN201610861064.XA priority Critical patent/CN106169752B/en
Publication of CN106169752A publication Critical patent/CN106169752A/en
Application granted granted Critical
Publication of CN106169752B publication Critical patent/CN106169752B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/005
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/388Islanding, i.e. disconnection of local power supply from the network

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The invention discloses main power source flexible switching method under a kind of micro-capacitance sensor off-network pattern, belong to power system micro-capacitance sensor and run the technical field controlled.Or VSG technology sagging based on energy storage PCS, uses the flexible smooth-switching method of the progressive transfer of load, it is achieved under micro-capacitance sensor off-network pattern, the flexible smooth and seamless switching between the rotary power source main power source method of operation and the energy storage main power source method of operation.

Description

Main power source flexible switching method under a kind of micro-capacitance sensor off-network pattern
Technical field
The invention discloses main power source flexible switching method under a kind of micro-capacitance sensor off-network pattern, belong to power system micro-capacitance sensor Run the technical field controlled.
Background technology
Due to developing rapidly of power electronics and new energy technology, micro-capacitance sensor technology has obtained increasing application, becomes For solving the important channel of the regional power supply such as island, remote High aititude.Micro-capacitance sensor as one of the important form of distributed power generation, It is an autonomous system being capable of oneself's operational management, both can be incorporated into the power networks with bulk power grid, it is also possible to isolated power grid is (also Claim off-network run or islet operation), therefore micro-capacitance sensor has the method for operation flexibly, improve system run stability and can By property.
Owing to there are grid-connected and two kinds of operational modes of off-network in micro-capacitance sensor, therefore about cutting between grid-connected and off-network operational mode Change into and run, for micro-capacitance sensor, the important research direction controlled.Switching between micro-grid connection and off-network pattern totally can be divided into also Net leaves the switching of net pattern and off-network turns grid-connect mode switching.Carry out the most according to schedule being divided into plan according to pattern switching Switching with unplanned pattern, some, according to whether there is power failure process in handoff procedure, is classified as seamed and seamless switching.Mesh Before, net being left for micro-grid connection and off-network turns in the switching of grid-connected both of which, off-network turns grid-connect mode handoff technique difficulty It is little, it is easy to accomplish, and if grid-connected leaving the switching of net pattern to realize unplanned seamless switching technique difficulty bigger.The most grid-connected Leave net pattern switching correlational study and patent is more, such as " microgrid operational mode seamless switching based on virtual synchronous electromotor Control strategy " a kind of parallel changing method followed based on controller state of middle proposition, i.e. the current source mode of PQ control and VSG Phase place and the electric current of the voltage source mode that (virtual synchronous electromotor, Virtual Synchronous Generator) controls refer to Make all real-time trackings, thus realize the seamless switching of operational mode;" micro-grid connection based on GOOSE leaves net and takes over seamlessly Intelligent control method " patent proposes a kind of realize micro-grid connection based on GOOSE quick control net and leave net and take over seamlessly Intelligent control method.
Although the switching of micro-grid connection and two kinds of operational modes of off-network is most important, but some are only run on from For the micro-capacitance sensor of net pattern, the switching of off-grid stable operation and main power source is to realize the important guarantor that system is run steadily in the long term Card.Some off-network type micro-capacitance sensor both contained tradition rotary power source (such as diesel-driven generator, gas turbine), also containing new distribution type Power supply and energy storage, be in operation and can have rotary power source and energy storage as system main power source, and energy storage is made main power source and run often The operational mode seen is V/F or sagging (VSG) operational mode.After distributed power source accesses micro-capacitance sensor in a large number, for realizing micro-electricity , there is the power work that stops the rotation in net economical operation, the demand that energy storage runs separately as main power source, this and conventional electric rotating Decide the main power source switching control then existing under off-network pattern between power operating mode in source.Currently for containing rotary power source With the micro-capacitance sensor of energy storage, off-network generally uses rotary power source main power source stable operation when running.But it is bigger in some energy storage proportionings Off-network type micro-capacitance sensor in, sometimes because of rotary power source maintenance or failure and other reasons, exist energy storage do main power source run control need Asking, therefore, main power source switching when off-network is run in micro-capacitance sensor is also requisite pattern switching control technology.Due to domestic Longtime running is less in the micro-capacitance sensor of off-network pattern, so the pertinent literature of main power source switching when running off-network and patent are relatively Few." a kind of independent operating micro-grid master control power-supply switching method " patent proposes main electricity when a kind of micro-capacitance sensor off-network is run Source switch method, but this patent primarily focuses on the entry condition illustrating main power source switching, describes rotation briefly simultaneously Power supply dump energy main power source, energy storage turn the switch step of rotary power source main power source, but do not consider in handoff procedure in patent The progressive transfer of load, therefore there may be switch disturbance in the switching of the off-network main power source in extensive micro-capacitance sensor and the most even switches Failed risk, thus be not suitable in extensive micro-capacitance sensor off-network main power source switching control.
Summary of the invention
The goal of the invention of the present invention is the deficiency for above-mentioned background technology, it is provided that main under a kind of micro-capacitance sensor off-network pattern Power supply flexible switching method, it is proposed that based on energy storage PCS (current transformer, Power Control System) is sagging or VSG is (virtual Synchronous generator, Virtual Synchronous Generator) technology, use the flexibility of the progressive transfer of load to take over seamlessly Method, it is achieved under micro-capacitance sensor off-network (or being referred to as " lonely net ") pattern, rotary power source (such as diesel generating set or internal combustion unit) is main Flexible smooth and seamless switching between power operating mode and the energy storage main power source method of operation, solves existing micro-capacitance sensor the biggest When scale micro-capacitance sensor off-network (isolated island) is run, in main power source handoff procedure, system voltage and frequency bear the skill of relatively large disturbances impact Art difficult point.
The present invention adopts the following technical scheme that for achieving the above object
Main power source flexible switching method under a kind of micro-capacitance sensor off-network pattern, including:
The method that rotary power source main power source operational mode switches to energy storage main power source operational mode:
When meeting the switching entry condition of rotary power source dump energy main power source, use the control mode of the progressive transfer of load The load undertaken by rotary power source is gradually transferred to energy storage, regulates energy storage PCS operational mode, controls rotary power source and shuts down;
The method that energy storage main power source operational mode switches to rotary power source main power source operational mode:
When meeting the switching entry condition that energy storage turns rotary power source main power source, start rotary power source, to offset electric rotating The inverse probability occurred after the simultaneous interconnecting of source is the power of target regulation part energy storage PCS, and after inverse probability phenomenon eliminates, regulation is each Energy storage PCS operational mode and meritorious output are with the progressive transfer realizing load.
As the further prioritization scheme of main power source flexible switching method under described a kind of micro-capacitance sensor off-network pattern, rotating During power supply main power source operational mode switches to energy storage main power source operational mode, the control mode using the progressive transfer of load will The load that rotary power source undertakes gradually is transferred to energy storage, method particularly includes: with every rotary power source stop moment to micro-capacitance sensor electricity The disturbance that pressure and frequency produce be target in the range of tolerance, gradually regulates the meritorious output of energy storage PCS until each storage Can export the meritorious calculating desired value that reaches by PCS, each energy storage PCS output meritorious calculating desired value comprises output unit of himself gaining merit Point and the load that undertakes according to himself rated power accounting gain merit transfer amount part, wherein,
Meritorious calculating desired value P of kth platform energy storage PCSbat_goal(k) be: Pbat(k) represent kth platform energy storage PCS in rotary power source main power source operational mode to the main electricity of energy storage Meritorious output before the operational mode switching of source, 1≤k≤N, N are the number of units of energy storage PCS, and Δ P represents that rotary power source main power source runs Pattern load in energy storage main power source operational mode handoff procedure meritorious transfer total amount, Pbat_cap(k)、Pbat_cap(i) table respectively Show kth platform, the rated power of i-th energy storage PCS, PdgRepresent that rotary power source main power source operational mode runs mould to energy storage main power source The total meritorious output of rotary power source, P before formula switchingdg_limitJ () represents that rotary power source main power source operational mode is to energy storage main power source The meritorious output limit value that during operational mode switching, jth platform rotary power source allows before shutting down, 1≤j≤M, M are the platform of rotary power source Number.
Further, under described a kind of micro-capacitance sensor off-network pattern in main power source flexible switching method, energy storage is gradually regulated The meritorious output of PCS until each energy storage PCS output meritorious reach to calculate desired value method be: according to time interval and regulation Step-length gradually regulates the meritorious output of each energy storage PCS by platform until every meritorious reaching of energy storage PCS output calculates desired value, adjusts Joint step-length fixed value adjusting is followed the disturbance that micro-capacitance sensor voltage and frequency produces by the change regulation meritorious change that causes of step-length and is being permitted Permitted in deviation range.
Further, main power source flexible switching method under described a kind of micro-capacitance sensor off-network pattern, rotary power source main power source Operational mode switches in energy storage main power source operational mode method, regulation energy storage PCS operational mode method particularly includes: gradually by Platform controls to run on the energy storage PCS of PQ pattern and transfers sagging or VSG operational mode to.
As the further prioritization scheme of main power source flexible switching method, energy storage master under described a kind of micro-capacitance sensor off-network pattern When power supply operational mode turns the switching startup of rotary power source main power source operational mode, first according to the real-time traffic information meter of micro-capacitance sensor Rotary power source quantity N that calculation should startdg, the most gradually start rotary power source by platform,Wherein, PbatTable Show that energy storage PCS is at energy storage main power source operational mode always gaining merit before rotary power source main power source operational mode switches, Pdg_nomRepresent The rated capacity of separate unit rotary power source, when in micro-grid system, multiple stage rotary power source rated power is inconsistent, Pdg_nomEqual to each Minima in platform rotary power source rated power, β is coefficient, 0≤β≤1, symbolExpression rounds up.
Further, main power source flexible switching method under described a kind of micro-capacitance sensor off-network pattern, gradually starting by platform During rotary power source, gradually regulate energy storage by platform for target offsetting the inverse probability occurred after rotary power source simultaneous interconnecting The power of PCS, method particularly includes:
Regulate l platform energy storage PCS and transferred to PQ pattern by sagging or VSG pattern, after current rotary power source simultaneous interconnecting The inverse probability occurred regulates the meritorious output of l platform energy storage PCS, the target regulation power P of l platform energy storage PCSbat_adjust(l) For: Pbat_adjust(l)=Pbat(l)-(Preverse+ΔPdev), the target at l platform energy storage PCS regulates power and reaches charge power During limit value, regulate l platform energy storage PCS and absorb inverse probability by its charge power limit value,
Control l+1 platform energy storage PCS and transferred to PQ pattern by sagging or VGS pattern, and regulate having of l+1 platform energy storage PCS Merit exports, the target regulation power P of l+1 platform energy storage PCSbat_adjust(l+1) it is: Pbat_adjust(l+1)=Pbat(l+1)- (Preverse+ΔPdev)+Pbat(l)+Pbat_climit(l), on the premise of meeting each energy storage PCS charge power limit value constraint, by Secondary by platform regulation energy storage PCS meritorious output until inverse probability phenomenon eliminate,
Wherein, Pbat(l)、Pbat(l+1) l platform, the current active power of l+1 platform energy storage PCS are represented respectively, Pbat_adjust(l)≥-Pbat_climit(l), Pbat_climitL () represents the charge power limit value that l platform energy storage PCS allows, Preverse The inverse probability occurred after representing rotary power source simultaneous interconnecting, Δ PdevThe biasing being expressed as guaranteeing to eliminate inverse probability phenomenon and increase Amount, l is the positive integer less than energy storage PCS number of units.
Further, main power source flexible switching method under described a kind of micro-capacitance sensor off-network pattern, energy storage main power source runs Pattern switches in the method for rotary power source main power source operational mode, after inverse probability phenomenon eliminates, regulates each energy storage PCS and runs Pattern exports to realize the progressive transfer of load with meritorious, method particularly includes:
First, gradually control to run on sagging or VSG pattern energy storage PCS by platform and transfer PQ pattern to, adjusting each storage The power before and after changing can be kept constant during PCS operational mode;
Then, gradually regulate the meritorious output of each energy storage PCS by step-length by platform further according to energy-storage battery carrying capacity, until respectively The meritorious output of platform energy storage PCS meets regulation desired value, and kth platform energy storage PCS gains merit regulation desired value P of outputbat_target(k) For:Pbat_climitK () represents kth platform energy storage PCS's Charge power limit value, α represents that carrying capacity SOC (k) of kth platform the controlled battery of energy storage PCS is less than himself carrying capacity lower limit SOCminCharging coefficient time (k), 0 < α≤1, Pbat_dlimitK () represents the discharge power limit value of kth platform energy storage PCS, λ represents the Carrying capacity SOC (k) of k platform the controlled battery of energy storage PCS is more than himself carrying capacity higher limit SOCmaxDischarge coefficient time (k), 0 < λ≤1。
As the further prioritization scheme of main power source flexible switching method, electric rotating under described a kind of micro-capacitance sensor off-network pattern The switching entry condition of source dump energy main power source exerts oneself lower limit, energy-storage battery capacity and distributed power source in fact according to rotary power source Time permeability determine.
As the further prioritization scheme of main power source flexible switching method under described a kind of micro-capacitance sensor off-network pattern, energy storage turns The switching entry condition of rotary power source main power source determines according to energy-storage battery carrying capacity and charge-discharge electric power.
The present invention uses technique scheme, has the advantages that the present invention can lead in off-network rotary power source dump Control based on the progressive transfer of load during the switching of power supply flexibility, substantially reduce the impact to system in handoff procedure, it is achieved that soft Property smooth and seamless switching;When off-network energy storage turns the switching of rotary power source main power source flexibility based on rotary power source inverse probability and energy storage merit Rate regulates, and effectively protects rotary power source, it is achieved that the Intelligent adjustment of energy storage PCS power and flexible smooth and seamless switching.Meanwhile, Two kinds of flexible switching controls all have employed gradually by the progressive Controlling principle of platform, can be widely applied to large-scale micro-capacitance sensor (such as MW level Micro-capacitance sensor) off-network main power source smooth and seamless switching when running, strengthen the flexibility in net system switching process and flatness.
Accompanying drawing explanation
Fig. 1 is that micro-capacitance sensor off-network main power source flexibility switches schematic diagram.
Fig. 2 is energy-storage battery SOC interval division schematic diagram.
Fig. 3 is certain island microgrid main electrical scheme schematic diagram.
Fig. 4 is that dump energy main power source flexibility switching curve sent out by bavin.
Fig. 5 be energy storage turn bavin send out main power source flexibility switching curve.
Detailed description of the invention
Main power source flexible switching method under a kind of micro-capacitance sensor off-network pattern that the present invention provides, it is considered to extensive micro-capacitance sensor from Smooth and seamless switching demand in host's power supply handoff procedure, it is proposed that progressive based on the progressive transfer of load and energy storage PCS power The flexible switching method of regulation, and give the computational methods of transfer controlled quentity controlled variable in relevant switching control.Below in conjunction with the accompanying drawings Illustrate the inventive concept of the present invention.
Main power source flexible switching method under micro-capacitance sensor off-network pattern is as it is shown in figure 1, specifically include that rotary power source dump energy The switching of main power source flexibility, energy storage turn the switching of rotary power source main power source flexibility.Rotary power source in micro-capacitance sensor mainly has diesel oil at present Electromotor, small size gas turbine etc..Illustrate below for two kinds of main power source flexibility handoff technique schemes.
1) rotary power source dump energy main power source flexibility handoff technique scheme
(1) when meeting switching entry condition, the switching of rotary power source dump energy main power source flexibility starts
Considering rotary power source performance driving economy and energy-storage battery capacity-constrained in Practical Project, entry condition is typically based on rotation Turn exert oneself lower limit, energy-storage battery capacity and the real-time permeability of distributed power source of power supply to formulate.Such as: entry condition can be arranged For: rotary power source is gained merit and is exerted oneself less than the 10% of rated power, and current energy-storage battery SOC is in the range of [60%, 85%], and The real-time permeability of current photovoltaic and blower fan (real-time permeability=photovoltaic and blower fan output total meritorious/(rotary power source is meritorious+storage Can meritorious+photovoltaic and blower fan output total meritorious), it is stipulated that energy storage discharge power just be) be more than 90%.
(2) the progressive transfer of load controls
First carry out the progressive transfer of load after starting conversion, the most progressively reduce rotary power source and gain merit and idle output, increase Add energy storage to gain merit and idle output, gradually the sub-load that rotary power source undertakes is transferred to energy storage, thus avoids system frequency Greater impact is born, it is to avoid cause unstability in net system switching process, it is achieved flexible smooth and seamless switching with voltage.
Rotary power source does under the operational mode of main power source, and energy storage PCS runs on PQ pattern.Shut down according to every rotary power source Time reduce meritorious system frequency and voltage will not to cause greater impact be target, by being adjusted energy storage PCS power And indirectly realize regulating the purpose of rotary power source power.For load transfer amount, the calculating of energy storage PCS power adjustments desired value, Specifically can be calculated by following formula:
&Delta; P = P d g - &Sigma; j = 1 M P d g _ lim i t ( j ) P b a t _ g o a l ( k ) = P b a t ( k ) + &Delta; P &times; P b a t _ c a p ( k ) / ( &Sigma; i = 1 N P b a t _ c a p ( i ) ) - - - ( 1 )
Wherein, PdgRepresent that switching starts the total meritorious output of front rotary power source;Pdg_limitJth platform rotation when () represents switching j (this limit value is stop moment and micro-capacitance sensor voltage and frequency is produced disturbance the meritorious output limit value allowed before turning power supply shutdown Allow maximum), 1≤j≤M, rotary power source amounts to M platform, M >=1;Δ P represents load meritorious transfer total amount in switching control; PbatK () represents the current kth platform energy storage PCS meritorious output before switching starts, 1≤k≤N, energy storage PCS amount to N platform, N >=1, Regulation electric discharge is for just;Pbat_cap(k)、Pbat_capI () represents kth platform, the rated power of i-th energy storage PCS respectively;Pbat_goal K () represents the meritorious calculating desired value of kth platform energy storage PCS.Note for realizing the progressive transfer of load, it is to avoid system is caused punching Hitting, the power adjustments of energy storage PCS is according at interval of Δ T time, regulation step-length PstepGradually by meritorious to every of platform regulation Desired value, regulation step-length fixed value adjusting follows what micro-capacitance sensor voltage and frequency were produced by the change regulation meritorious change that causes of step-length Disturbance is in the range of tolerance.Therefore, gradually regulating while energy storage PCS has work value, rotary power source have work value the most right Being progressively smaller until rotary power source meets P with answeringdg(j)≤Pdg_limit(j), PdgWhen () represents switching j, jth platform rotary power source stops Meritorious output before machine.
(3) energy storage PCS operational mode adjusts
After load progressive transfer control completes, multiple stage energy storage PCS still runs on PQ pattern, for realizing master when off-network is run Power supply switches, and must gradually control energy storage PCS and transfer sagging or VSG pattern to.Energy storage PCS is sagging and VSG pattern can realize and revolve Turn the cooperation of power supply, and PQ turns meritorious during sagging or VSG pattern and reactive power fluctuation is the least, and V/F pattern can not be with rotation Power supply cooperation, therefore based on energy storage PCS sagging or VSG technology realizes the switching of main power source.
When energy storage PCS operational mode adjusts, for maximizing the impact reduced system, use and gradually control energy storage by platform PCS is transferred to sagging or VSG operational mode by PQ.
(4) rotary power source is shut down and is controlled
After energy storage PCS transfers sagging or VSG operational mode to, postpone a period of time (in Practical Project usually 30s~ Rotary power source can be controlled after 1min) shut down.Similarly, for maximizing the impact reducing rotary power source shutdown to system, use Gradually stop the rotation power supply by platform, only control a rotary power source i.e. every time and shut down, treat that a rotary power source is shut down and postpones Control next rotary power source again after certain time (being usually 30s~1min in Practical Project) to shut down.
2) energy storage turns rotary power source main power source flexibility handoff technique scheme
(1) when meeting switching entry condition, the switching of rotary power source dump energy main power source flexibility starts
Considering energy-storage battery charge-discharge electric power and capacity-constrained in Practical Project, entry condition is typically based on energy-storage battery and puts Electrical power and capacity are formulated.Such as entry condition may be configured as energy-storage battery SOC and is less than 50%, or energy-storage battery electric discharge Power is more than the 60% of nominal discharge power.
(2) rotary power source starts and inverse probability controls
After switching starts, first need to calculate, according to real-time traffic information, the rotary power source quantity that should start, the most gradually by Platform starts rotary power source.The number calculation formula that rotary power source should start is shown below:
Wherein, NdgRepresent the quantity that rotary power source should start;PbatRepresent energy storage PCS before the handover total meritorious;Pdg_nom Represent the rated capacity of separate unit rotary power source, when multiple stage rotary power source rated power is inconsistent in micro-grid system, Pdg_nom= min(Pdg_nom_min,Pdg_nom_max), i.e. Pdg_nomEqual to the minima in each rotary power source rated power, Pdg_nom_max、 Pdg_nom_minRepresent the maximum in each rotary power source rated power, minima respectively;β is coefficient, and 0≤β≤1 generally takes Value scope is in 0.3≤β≤0.8;SymbolExpression rounds up.
(3) energy storage PCS mode adjustment and power adjustments
Before rotary power source starts, micro-grid system is in poised state, and produces in rotary power source simultaneous interconnecting moment Impact may result in energy storage PCS increase output, easily cause rotary power source inverse probability phenomenon, but inverse probability be to rotation Power supply impact is relatively big, unit can be caused to enter equal problem, therefore must carry out inverse probability control after rotary power source simultaneous interconnecting time serious System.During gradually starting rotary power source by platform, for the inverse probability occurred after eliminating every rotary power source simultaneous interconnecting, palpus By regulation energy storage PCS power and then indirect regulation rotary power source power.For reducing storage energy operation patterns of change and changed power Impact, when there is inverse probability in rotary power source simultaneous interconnecting, can by energy storage PCS carry out inverse probability regulation control, the most first Control 1 (as controlled l platform) energy storage PCS and transferred to PQ pattern by sagging or VSG pattern, then inverse according to current rotary power source Power l platform energy storage PCS is carried out power adjustments (actual control during for avoiding power generation larger fluctuation, need to be in energy storage Power adjustment instruction is issued before PCS patten transformation, so that it is guaranteed that directly in response to this instruction after energy storage PCS transfers PQ to).L The target regulation rating formula of platform energy storage PCS is shown below:
Pbat_adjust(l)=Pbat(l)-(Preverse+ΔPdev) (3)
Wherein, PreverseThe inverse probability of outlet after expression rotary power source simultaneous interconnecting, it is stipulated that inverse probability value is just;ΔPdev The amount of bias being expressed as guaranteeing to eliminate inverse probability phenomenon and increase, this value is just;PbatL () represents the l for regulating inverse probability The current active power of platform energy storage PCS, it is stipulated that discharge for just;Pbat_adjustL () represents the target regulation merit of l platform energy storage PCS Rate, and P must be metbat_adjust(l)≥-Pbat_climit(l), Pbat_climitL () represents the charge power that l platform energy storage PCS allows Limit value (charge power is negative, but Pbat_climitL () does not contains negative sign).Work as Pbat_adjust(l)<-Pbat_climitTime (l): then control L platform energy storage PCS reaches maximum charge power;Control other 1 (as controlled l+1 platform) energy storage PCS by sagging or VSG mould simultaneously Formula transfers PQ pattern to, and regulates its output, the target regulation power P of l+1 platform energy storage PCSbat_adjust(l+1) public affairs are calculated Formula is:
Pbat_adjust(l+1)=Pbat(l+1)-(Preverse+ΔPdev)+Pbat(l)+Pbat_climit(l) (4)
Wherein, Pbat(l+1) it is the current active power of l+1 platform energy storage PCS.
(4) after inverse probability phenomenon eliminates, the operational mode of each energy storage PCS and meritorious output are regulated to realize load gradually Enter transfer
Propose to carry out power adjustment based on energy-storage battery difference SOC interval.As in figure 2 it is shown, based on definite value SOCmin(under SOC Limit value) and SOCmaxEnergy-storage battery SOC is divided into 3 region: SOC regions on the low side, normal and higher by (SOC higher limit).Therefore Power Adjustable calculation formula based on SOC scope is shown below:
P b a t _ t arg e t ( k ) = &alpha; &times; P b a t _ c lim i t ( k ) ( S O C ( k ) < SOC min ( k ) ) 0 ( S O C ( k ) &Element; &lsqb; SOC min ( k ) , SOC max ( k ) &rsqb; ) &lambda; &times; P b a t _ d lim i t ( k ) ( S O C ( k ) > SOC max ( k ) ) - - - ( 5 )
Wherein, Pbat_target(k) represent kth platform energy storage PCS gain merit output regulation desired value, it is stipulated that discharge for just; Pbat_climitK () represents the charge power limit value of kth platform energy storage PCS, this value is negative;α represents charging coefficient when SOC is on the low side, 0 <α≤1;Pbat_dlimitK () represents the discharge power limit value of kth platform energy storage PCS, this value is just;λ represents electric discharge when SOC is higher Coefficient, 0 < λ≤1;SOCminK () represents the SOC lower limit of kth platform the controlled battery of energy storage PCS;SOCmaxK () represents kth platform energy storage The SOC higher limit of the controlled battery of PCS.
It addition, when energy storage PCS power adjusts, first power control instruction is issued, controls it the most again and carry out pattern Switching.And for reducing the handoff procedure impact to system, the most gradually (Practical Project leads to according to certain time delay by platform Often for 30s~1min) carry out power instruction and issue and the switching of PCS pattern.
Fig. 3 is China's island microgrid primary connection circuit schematic diagram, and micro-grid system is typical 10kV ring network framework, Time properly functioning, the wire-outgoing breaker of downside in many disconnections diesel generating set station, uses open loop operation.Micro-capacitance sensor is connected to diesel oil Electric station, this electric station has 3 1.25MVA diesel-driven generators, and therefore the rotary power source in this micro-capacitance sensor is this 3 diesel oil Electromotor;System opposite side is connected to 10kV switchyard, and the energy-storage system of 4 set 1.2MWh accesses switchyard through 400V ac bus, Often PCS (i.e. AC/DC bi-directional inverter in the accompanying drawing) rated power in set energy-storage system is 500kW, and Simultaneous Switching station is connected to 3 The stall-controlled wind turbines of 750kW;Looped network has 4 ring main units, in order to power for load on island.
This island microgrid mainly runs on off-network pattern, and the switching of off-network main power source flexibility specifically includes that dump energy sent out by bavin Main power source flexibility switches, and energy storage turns bavin and sends out the switching of main power source flexibility.Soft for two kinds of main power sources below in conjunction with this island microgrid The specific implementation process of property handoff technique scheme illustrates.
1) switching of dump energy main power source flexibility sent out by bavin
(1) dump energy main power source flexibility switching entry condition sent out by bavin
Consider that bavin sends out performance driving economy and energy-storage battery capacity-constrained, simultaneously for triggering flexibility switching, relevant definite value is increased Greatly, in example entry condition be set to only 1 bavin shipping row and meritorious exert oneself less than 600kW, energy-storage battery SOC [60%, 85%] in the range of, the real-time permeability of current blower fan is more than 50%, and current blower fan exports ripple in the range of 600~650kW of gaining merit Dynamic.Entry condition triggers bavin and sends out the switching startup of dump energy main power source flexibility after meeting.
(2) the progressive transfer of load controls
When main power source operation sent out by bavin, energy storage PCS runs on PQ pattern.For reducing when shutdown sent out by bavin system frequency and voltage Impact, P is setdg_limitBeing also configured as 120kW for 150kW, energy storage PCS regulation step-length, control interval set of time is 10s. As shown in Figure 4 (abscissa is the time, unit min), 4 set energy storage are gained merit by based on energy storage PCS PQ pattern the most respectively Regulation, altogether regulation 4 times, and the active power that bavin is sent out declines 4 times the most therewith, system voltage can be caused one during each power adjustments Standing wave moves, but is held in zone of reasonableness, thus avoids and cause system great fluctuation process to even result in system by single regulation The situation of unstability occurs.Make bavin send out after decline meritorious less than 150kW, meet the adjustment of energy storage PCS operational mode and shutdown sent out by bavin Condition.
(3) energy storage PCS operational mode adjusts
As shown in Figure 4,4 set energy storage PCS are the most gradually transferred to sagging operational mode by platform by PQ, in PCS patten transformation work System voltage is not impacted by journey, makes system seamlessly transit.
(4) shutdown control sent out by bavin
As shown in Figure 4, after energy storage PCS all transfers sagging operational mode to, then postpone short period control bavin and send out shutdown. To system voltage substantially without impacting when shutdown sent out by bavin, it is the sagging target voltage of energy storage PCS and bavin shipping that produced voltage raises Target voltage during row exists what certain deviation caused, and when follow-up energy storage main power source runs, voltage is then basically stable at 10.38kV Left and right.
Complete micro-capacitance sensor by above-mentioned steps (1)~(4) and sent out the main power source flexible switching to energy storage main power source by bavin, keep away Exempt from the system unstability risk in handoff procedure, reduced system shock, it is achieved that smooth and seamless has switched.
2) energy storage turn bavin send out main power source flexibility switching
(1) dump energy main power source flexibility switching entry condition sent out by bavin
Considering energy-storage battery charge-discharge electric power and capacity-constrained, simultaneously for triggering flexibility switching, entry condition is set to storage 70% can be less than by battery SOC, or energy-storage battery discharge power is more than 60% (every PCS nominal discharge of nominal discharge power Power is 300kW, and 4 amount to 1.2MW).As it is shown in figure 5,4 set energy storage PCS are always meritorious is about 520kW, battery SOC is 69%, Less than setting value, trigger flexibility switching and start.
(2) rotary power source starts and inverse probability controls
Rated power P sent out by separate unit bavindg_nomBeing set to 0.6 for 1MW, β, energy storage PCS always gains merit PbatCurrency is 500kW. Therefore the number calculation formula that should start according to rotary power source draws and should start 1 Tai Chaifa.
In micro-capacitance sensor, 3 Tai Chaifa parameters are consistent, start bavin when sending out, and select to start the longest bavin downtime and send out.Such as Fig. 5 institute Showing, bavin occurs in that inverse probability phenomenon in short-term after sending out simultaneous interconnecting, and inverse probability maximum is about 25kW, for eliminating inverse probability by adjusting Joint energy storage PCS power realizes.Amount of bias Δ P is setdevFor 150kW, then select the maximum PCS of energy storage discharge power and reduce about 120kW, and control its by the sagging PQ operational mode that transfers to, thus eliminate bavin and send out inverse probability.
(3) energy storage PCS mode adjustment and power adjustments
Bavin send out startup grid-connected after, control other energy storage PCS by the sagging PQ of transferring to operational mode and regulate energy storage PCS power with Eliminate bavin and send out the inverse probability phenomenon starting grid-connected rear appearance.After eliminating inverse probability phenomenon, enter based on energy-storage battery difference SOC interval Row power adjusts.3 regions divided as shown in Figure 2, arrange the SOC of everyminAnd SOCmaxRespectively 65% and 80%, therefore The target of every energy storage PCS is meritorious is all 0kW.Then power control instruction is issued to every energy storage PCS, therefore such as Fig. 5 institute Show, then responded to meritorious regulating command for eliminating the energy storage PCS (having transferred PQ pattern to) of inverse probability.Again according to delay The mode of 10s gradually controls other 3 energy storage PCS by platform and adjusts operational mode (transferring PQ pattern to) and active power.
Complete micro-capacitance sensor by above-mentioned steps (1)~(3) and sent out the flexible switching of main power source by energy storage main power source to bavin, keep away Exempt from bavin and sent out inverse probability operation risk long-time, reduced system shock, it is achieved that smooth and seamless has switched.
In sum, the present invention is controlled based on the progressive transfer of load when off-network rotary power source dump energy main power source flexibility switches System, substantially reduces the impact to system in handoff procedure.Off-network energy storage turn rotary power source main power source flexibility switching time based on Rotary power source inverse probability and energy storage power adjustments, effectively protect rotary power source, it is achieved that the Intelligent adjustment of energy storage PCS power. Meanwhile, have employed gradually by the progressive Controlling principle of platform, reduce the impact to system in handoff procedure to greatest extent, can be extensive It is applied to main power source smooth and seamless switching when large-scale micro-capacitance sensor (such as MW level micro-capacitance sensor) off-network is run, switched strengthening system Flexibility in journey and flatness.

Claims (9)

1. main power source flexible switching method under a micro-capacitance sensor off-network pattern, it is characterised in that including:
The method that rotary power source main power source operational mode switches to energy storage main power source operational mode:
When meeting the switching entry condition of rotary power source dump energy main power source, the control mode using the progressive transfer of load will rotation Turn the load that power supply undertakes and be gradually transferred to energy storage, regulate energy storage PCS operational mode, control rotary power source and shut down;
The method that energy storage main power source operational mode switches to rotary power source main power source operational mode:
When meeting the switching entry condition that energy storage turns rotary power source main power source, start rotary power source, same to offset rotary power source The inverse probability occurred after phase is grid-connected is the power of target regulation part energy storage PCS, after inverse probability phenomenon eliminates, regulates each energy storage PCS operational mode and meritorious output are with the progressive transfer realizing load.
Main power source flexible switching method under a kind of micro-capacitance sensor off-network pattern, it is characterised in that in rotation Turn during power supply main power source operational mode switches to energy storage main power source operational mode, use the control mode of the progressive transfer of load The load undertaken by rotary power source is gradually transferred to energy storage, method particularly includes: with every rotary power source stop moment to micro-capacitance sensor The disturbance that voltage and frequency produce be target in the range of tolerance, gradually regulates the meritorious output of energy storage PCS until each Energy storage PCS output is meritorious reaches to calculate desired value, and each the meritorious desired value that calculates of energy storage PCS output comprises himself meritorious output Part and the load that undertakes according to himself rated power accounting are gained merit transfer amount part, wherein,
Meritorious calculating desired value P of kth platform energy storage PCSbat_goal(k) be: Pbat(k) represent kth platform energy storage PCS in rotary power source main power source operational mode to the main electricity of energy storage Meritorious output before the operational mode switching of source, 1≤k≤N, N are the number of units of energy storage PCS, and Δ P represents that rotary power source main power source runs Pattern load in energy storage main power source operational mode handoff procedure meritorious transfer total amount, Pbat_cap(k)、Pbat_cap(i) table respectively Show kth platform, the rated power of i-th energy storage PCS, PdgRepresent that rotary power source main power source operational mode runs mould to energy storage main power source The total meritorious output of rotary power source, P before formula switchingdg_limitJ () represents that rotary power source main power source operational mode is to energy storage main power source The meritorious output limit value that during operational mode switching, jth platform rotary power source allows before shutting down, 1≤j≤M, M are the platform of rotary power source Number.
Main power source flexible switching method under a kind of micro-capacitance sensor off-network pattern, it is characterised in that gradually The meritorious output of regulation energy storage PCS until each energy storage PCS output meritorious reach to calculate desired value method be: according between the time Every gradually regulating the meritorious output of each energy storage PCS by platform until every meritorious reaching of energy storage PCS output calculates with regulation step-length Desired value, regulation step-length fixed value adjusting follows what micro-capacitance sensor voltage and frequency were produced by the change regulation meritorious change that causes of step-length Disturbance is in the range of tolerance.
4., according to main power source flexible switching method under micro-capacitance sensor off-network pattern a kind of described in claim 1 or 2 or 3, its feature exists In, described rotary power source main power source operational mode switches in energy storage main power source operational mode method, and regulation energy storage PCS runs mould Formula method particularly includes: gradually control to run on the energy storage PCS of PQ pattern by platform and transfer sagging or VSG operational mode to.
Main power source flexible switching method under a kind of micro-capacitance sensor off-network pattern, it is characterised in that energy storage When main power source operational mode turns the switching startup of rotary power source main power source operational mode, first according to the real-time traffic information of micro-capacitance sensor Rotary power source quantity N that calculating should startdg, the most gradually start rotary power source by platform,Wherein, Pbat Represent that energy storage PCS is at energy storage main power source operational mode always gaining merit before rotary power source main power source operational mode switches, Pdg_nomTable Show the rated capacity of separate unit rotary power source, when in micro-grid system, multiple stage rotary power source rated power is inconsistent, Pdg_nomIt is equal to Minima in each rotary power source rated power, β is coefficient, 0≤β≤1, symbolExpression rounds up.
Main power source flexible switching method under a kind of micro-capacitance sensor off-network pattern, it is characterised in that by Secondary start during rotary power source by platform, with the inverse probability that occurs after offsetting rotary power source simultaneous interconnecting for target gradually by platform The power of regulation energy storage PCS, method particularly includes:
Regulate l platform energy storage PCS and transferred to PQ pattern by sagging or VSG pattern, occur according to after current rotary power source simultaneous interconnecting Inverse probability regulate the meritorious output of l platform energy storage PCS, the target regulation power P of l platform energy storage PCSbat_adjust(l) be: Pbat_adjust(l)=Pbat(l)-(Preverse+ΔPdev), the target at l platform energy storage PCS regulates power and reaches charge power limit During value, regulate l platform energy storage PCS and absorb inverse probability by its charge power limit value,
Control l+1 platform energy storage PCS and transferred to PQ pattern by sagging or VGS pattern, and regulate the meritorious defeated of l+1 platform energy storage PCS Go out, the target regulation power P of l+1 platform energy storage PCSbat_adjust(l+1) it is: Pbat_adjust(l+1)=Pbat(l+1)-(Preverse +ΔPdev)+Pbat(l)+Pbat_climitL (), on the premise of meeting each energy storage PCS charge power limit value constraint, gradually by platform Regulate the meritorious output of energy storage PCS until inverse probability phenomenon eliminates,
Wherein, Pbat(l)、Pbat(l+1) l platform, the current active power of l+1 platform energy storage PCS, P are represented respectivelybat_adjust(l) ≥-Pbat_climit(l), Pbat_climitL () represents the charge power limit value that l platform energy storage PCS allows, PreverseRepresent electric rotating The inverse probability occurred after the simultaneous interconnecting of source, Δ PdevThe amount of bias being expressed as guaranteeing to eliminate inverse probability phenomenon and increase, l is for being less than The positive integer of energy storage PCS number of units.
7. according to main power source flexible switching method under micro-capacitance sensor off-network pattern a kind of described in claim 1 or 6, it is characterised in that Energy storage main power source operational mode switches in the method for rotary power source main power source operational mode, after inverse probability phenomenon eliminates, adjusts Save each energy storage PCS operational mode with meritorious output to realize the progressive transfer of load, method particularly includes:
First, gradually control to run on sagging or VSG pattern energy storage PCS by platform and transfer PQ pattern to, adjusting each energy storage PCS Keep the power before and after conversion constant during operational mode;
Then, gradually regulate the meritorious output of each energy storage PCS by step-length by platform further according to energy-storage battery carrying capacity, until each storage The meritorious output of PCS can meet regulation desired value, kth platform energy storage PCS gains merit regulation desired value P of outputbat_target(k) be:Pbat_climitK () represents filling of kth platform energy storage PCS Electrical power limit value, α represents that carrying capacity SOC (k) of kth platform the controlled battery of energy storage PCS is less than himself carrying capacity lower limit SOCmin Charging coefficient time (k), 0 < α≤1, Pbat_dlimitK () represents the discharge power limit value of kth platform energy storage PCS, λ represents that kth platform stores up Carrying capacity SOC (k) of energy the controlled battery of PCS is more than himself carrying capacity higher limit SOCmaxDischarge coefficient time (k), 0 < λ≤1.
Main power source flexible switching method under a kind of micro-capacitance sensor off-network pattern, it is characterised in that described The switching entry condition of rotary power source dump energy main power source is exerted oneself lower limit, energy-storage battery capacity and distributed according to rotary power source The real-time permeability of power supply determines.
Main power source flexible switching method under a kind of micro-capacitance sensor off-network pattern, it is characterised in that described Energy storage turns the switching entry condition of rotary power source main power source and determines according to energy-storage battery carrying capacity and charge-discharge electric power.
CN201610861064.XA 2016-09-28 2016-09-28 Main power source flexible switching method under a kind of micro-capacitance sensor off-network mode Active CN106169752B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610861064.XA CN106169752B (en) 2016-09-28 2016-09-28 Main power source flexible switching method under a kind of micro-capacitance sensor off-network mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610861064.XA CN106169752B (en) 2016-09-28 2016-09-28 Main power source flexible switching method under a kind of micro-capacitance sensor off-network mode

Publications (2)

Publication Number Publication Date
CN106169752A true CN106169752A (en) 2016-11-30
CN106169752B CN106169752B (en) 2019-03-19

Family

ID=57376363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610861064.XA Active CN106169752B (en) 2016-09-28 2016-09-28 Main power source flexible switching method under a kind of micro-capacitance sensor off-network mode

Country Status (1)

Country Link
CN (1) CN106169752B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107453412A (en) * 2017-08-14 2017-12-08 北方工业大学 Based on VSG control device and methods, more VSG presynchronization combination methods
CN107492910A (en) * 2017-10-10 2017-12-19 北京四方继保自动化股份有限公司 A kind of off-network micro-capacitance sensor Self Adaptive Control of the storage containing bavin and main power source switching method
CN108574294A (en) * 2018-03-30 2018-09-25 宁波中科孚奇能源科技有限公司 A kind of active inverse probability guard method
CN108667133A (en) * 2018-05-17 2018-10-16 中国能源建设集团广东省电力设计研究院有限公司 Main power source switching method, apparatus and system
CN109193786A (en) * 2018-10-26 2019-01-11 贵州电网有限责任公司 It is a kind of distribution wind storage system and power distribution network between synthetic operation control method
CN109763935A (en) * 2018-12-20 2019-05-17 明阳智慧能源集团股份公司 A kind of micro wind turbine generator control method of Wind turbines emergency electric system
CN111009928A (en) * 2019-12-16 2020-04-14 深圳合纵能源技术有限公司 Active switching control method for off-grid micro-grid main power supply
CN113141038A (en) * 2021-04-23 2021-07-20 东莞莞能绿色能源服务有限公司 Energy storage control method and device and energy storage control system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1909324A (en) * 2005-06-14 2007-02-07 利伯特公司 Method and apparatus for monitoring UPS power sources
CN102916486A (en) * 2012-09-28 2013-02-06 南方电网科学研究院有限责任公司 Intelligent micro-grid diesel-storage coordination control method
CN103457296A (en) * 2013-08-08 2013-12-18 许继集团有限公司 Method for switching independent operation micro-grid master control power sources
CN105375533A (en) * 2015-09-23 2016-03-02 许继集团有限公司 An operation mode prediction method for an independent micro-grid involving renewable energy sources of wind and light
CN105406520A (en) * 2016-01-06 2016-03-16 重庆邮电大学 Economic dispatch optimization method of independent microgrid on basis of dual master control dynamic cooperation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1909324A (en) * 2005-06-14 2007-02-07 利伯特公司 Method and apparatus for monitoring UPS power sources
CN102916486A (en) * 2012-09-28 2013-02-06 南方电网科学研究院有限责任公司 Intelligent micro-grid diesel-storage coordination control method
CN103457296A (en) * 2013-08-08 2013-12-18 许继集团有限公司 Method for switching independent operation micro-grid master control power sources
CN105375533A (en) * 2015-09-23 2016-03-02 许继集团有限公司 An operation mode prediction method for an independent micro-grid involving renewable energy sources of wind and light
CN105406520A (en) * 2016-01-06 2016-03-16 重庆邮电大学 Economic dispatch optimization method of independent microgrid on basis of dual master control dynamic cooperation

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107453412A (en) * 2017-08-14 2017-12-08 北方工业大学 Based on VSG control device and methods, more VSG presynchronization combination methods
CN107453412B (en) * 2017-08-14 2019-11-26 北方工业大学 Based on VSG control device and method, more VSG presynchronization combination methods
CN107492910A (en) * 2017-10-10 2017-12-19 北京四方继保自动化股份有限公司 A kind of off-network micro-capacitance sensor Self Adaptive Control of the storage containing bavin and main power source switching method
CN108574294A (en) * 2018-03-30 2018-09-25 宁波中科孚奇能源科技有限公司 A kind of active inverse probability guard method
CN108667133A (en) * 2018-05-17 2018-10-16 中国能源建设集团广东省电力设计研究院有限公司 Main power source switching method, apparatus and system
CN109193786A (en) * 2018-10-26 2019-01-11 贵州电网有限责任公司 It is a kind of distribution wind storage system and power distribution network between synthetic operation control method
CN109763935A (en) * 2018-12-20 2019-05-17 明阳智慧能源集团股份公司 A kind of micro wind turbine generator control method of Wind turbines emergency electric system
CN109763935B (en) * 2018-12-20 2020-06-30 明阳智慧能源集团股份公司 Control method for miniature wind driven generator of standby power supply system of wind turbine generator
CN111009928A (en) * 2019-12-16 2020-04-14 深圳合纵能源技术有限公司 Active switching control method for off-grid micro-grid main power supply
CN113141038A (en) * 2021-04-23 2021-07-20 东莞莞能绿色能源服务有限公司 Energy storage control method and device and energy storage control system

Also Published As

Publication number Publication date
CN106169752B (en) 2019-03-19

Similar Documents

Publication Publication Date Title
CN106169752A (en) Main power source flexible switching method under a kind of micro-capacitance sensor off-network pattern
CN105305478B (en) A kind of pair of power grid is friendly and extends flexible grid-connected power generation system
Che et al. DC microgrids: Economic operation and enhancement of resilience by hierarchical control
CN103199542B (en) Method of optimal control of wind power plant reactive voltage
CN103138290B (en) Microgrid seamless switching control method based on improving phase control under peer mode
CN100578911C (en) Electric voltage idle-work fast control method of speed-changing constant frequency wind generator group wind power station
CN112928778B (en) Power and frequency regulation control method for photovoltaic energy storage power station
CN103001223A (en) Off-grid type microgrid frequency adjusting method based on control of energy-storing current converter
CN103178533A (en) Controlling method and controller for variable participation frequency of temperature control load
CN103219726A (en) Microgrid topology structure based on energy storage
CN105978010A (en) Photovoltaic air-conditioning power supply control system and control method based on peak and valley price
CN104218568A (en) Power grid black-start method with participation of regional small hydropower stations and new energy hybrid micro-grids
CN105226675B (en) Prevent the inverter Reactive-power control control method of grid-connected voltage out-of-limit
CN105896603A (en) Power generation system and method in combination with wind energy, photovoltaic energy, and energy storage system,
CN110350538B (en) Micro-grid coordination control method based on active demand side response
CN102780229B (en) Wind turbine power control system applying super capacitor
CN204721000U (en) A kind of friendly and expand grid-connected power generation system flexibly to electrical network
CN109888775A (en) A kind of underrun day power grid structures optimization method considering wind power integration
CN106816889B (en) Gird-connected inverter power decoupled method and device
CN105207270B (en) Improve the inverter power control method for coordinating of grid-connected voltage out-of-limit
Tao et al. Power Control Strategy of Flexible Interconnection System in Distribution Network
CN116599094A (en) Energy storage black start system and control method thereof
CN115021314A (en) Double-fed fan combined control strategy for enhancing system voltage stability
Yao et al. Coordinated frequency support and wind turbine preset restoration scheme of VSC-mtdc integrated offshore wind farms
CN211296204U (en) Thermal power plant frequency modulation auxiliary device based on double electric energy converters

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant