CN106158369B - A kind of capacitor terminal - Google Patents

A kind of capacitor terminal Download PDF

Info

Publication number
CN106158369B
CN106158369B CN201610562067.3A CN201610562067A CN106158369B CN 106158369 B CN106158369 B CN 106158369B CN 201610562067 A CN201610562067 A CN 201610562067A CN 106158369 B CN106158369 B CN 106158369B
Authority
CN
China
Prior art keywords
pipe
pipeline
bulge loop
sleeve
insulation sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610562067.3A
Other languages
Chinese (zh)
Other versions
CN106158369A (en
Inventor
周凡
周一凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Taizhou Tzdr Capacitor Co Ltd
Original Assignee
Zhejiang Taizhou Tzdr Capacitor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Taizhou Tzdr Capacitor Co Ltd filed Critical Zhejiang Taizhou Tzdr Capacitor Co Ltd
Priority to CN201610562067.3A priority Critical patent/CN106158369B/en
Publication of CN106158369A publication Critical patent/CN106158369A/en
Application granted granted Critical
Publication of CN106158369B publication Critical patent/CN106158369B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01GCAPACITORS; CAPACITORS, RECTIFIERS, DETECTORS, SWITCHING DEVICES, LIGHT-SENSITIVE OR TEMPERATURE-SENSITIVE DEVICES OF THE ELECTROLYTIC TYPE
    • H01G4/00Fixed capacitors; Processes of their manufacture
    • H01G4/002Details
    • H01G4/228Terminals
    • H01G4/236Terminals leading through the housing, i.e. lead-through

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Connections Effected By Soldering, Adhesion, Or Permanent Deformation (AREA)

Abstract

The invention discloses a kind of capacitor terminal, including the first pipeline made of red copper, first pipeline outer sheath is provided with second pipe made of brass, the retainer plate for connecting copper bar is provided with the outside of second pipe, second pipe outer sheath is provided with the first insulation sleeve and the second insulation sleeve, first insulation sleeve and the second insulation sleeve, which coordinate, to be fixed on capacitor case, first pipeline and second pipe are welded and fixed, bulge loop has been radially arranged on first pipeline, outside is arranged with first pipeline has externally threaded sleeve pipe, bulge loop is coordinated with sleeve pipe by raised and groove, sleeve pipe includes copper lid and tin tubulation away from bulge loop, internal thread is provided with second pipe, internal thread and external screw thread coordinate, bulge loop welds with second pipe, tin tubulation melts in welding, and solidification forms contact tube after cooling.Using the structure tin is connected with the first pipeline and second pipe even closer so that the electric conductivity and heat conductivility between the first pipeline and second pipe are more preferable.

Description

A kind of capacitor terminal
Technical field
The invention belongs to capacitor technology field, specifically a kind of capacitor terminal.
Background technology
Capacitor is the electronic component commonly used in circuit, and large-scale capacitor is big, it is necessary to using cooling water due to caloric value To cool down ampere wires, cooling water be linked at transformer case need set water-cooling terminal, present water-cooling terminal include by First pipeline made of red copper, cooling water is led in first pipeline, and the outer sheath of the first pipeline is made up provided with one of brass Second pipe, two retainer plates for connecting copper bar are provided with the outside of second pipe, the second pipe outer sheath is provided with First insulation sleeve and the second insulation sleeve, first insulation sleeve and the second insulation sleeve, which coordinate, to be fixed on capacitor case, existing The first pipeline and second pipe typically fixed by brazing, solder joint is located at the end of the second pipe in capacitor protector body, In use, two retainer plate connecting copper bars, be powered on copper bar, electric current by second pipe successively, solder joint and the first pipeline, due to The electric current that water-cooling terminal typically passes through is larger, therefore caloric value is very big, due to gap be present between the first pipeline and second pipe, Therefore the poor effect of heat transfer, radiating effect is less desirable, and existing water-cooling terminal can only typically bear 2000A's or so Electric current, if electric current increases again, then because radiating reason water-cooling terminal can be burned out.
In order to solve the above problems, Chinese patent CN103456488B discloses a kind of Large-current-resisttype type water-cooling terminal, bag The first pipeline made of red copper is included, the first pipeline outer sheath is provided with second pipe made of brass, set on the outside of second pipe It is equipped with the retainer plate for connecting copper bar, the second pipe outer sheath is provided with the first insulation sleeve and the second insulation sleeve, and described One insulation sleeve and the second insulation sleeve, which coordinate, to be fixed on capacitor case, and first pipeline and second pipe welding are solid It is fixed, filler is provided between first pipeline and the second pipe, the filler utilizes the first pipeline and the second pipe Delayed heat melting after road welding is penetrated into the gap of the first pipeline and second pipe, and the filler forms contact tube, capacitor The second pipe end set in outside has bulge loop.The water-cooling terminal passes through the brazing between the first pipeline and second pipe Delayed heat melting scolding tin so that scolding tin is filled in formation contact tube in the gap of the first pipeline and second pipe, and in practical operation During occur that the gap between the first pipeline and second pipe is uneven, and melt scolding tin illiquidity or because First pipeline and second pipe in somewhere are close to and can not flow at solder joint, cause between the first pipeline and second pipe still Space be present.
The content of the invention
In view of the shortcomings of the prior art, providing a kind of capacitor terminal, this binding post can prevent the present invention Gap is produced between first pipeline and second pipe, and it is easier for installation.
In order to solve the above-mentioned technical problem, the present invention is addressed by following technical proposals:A kind of capacitor terminal Son, including the first pipeline made of red copper, the first pipeline outer sheath are provided with second pipe made of brass, outside second pipe Side is provided with the retainer plate for connecting copper bar, and the second pipe outer sheath is provided with the first insulation sleeve and the second insulation sleeve, institute State the first insulation sleeve and the cooperation of the second insulation sleeve is fixed on capacitor case, first pipeline and second pipe welding It is fixed, bulge loop is radially arranged on first pipeline, outside is arranged with first pipeline has externally threaded sleeve pipe, institute State bulge loop with described sleeve pipe by raised and groove to coordinate, described sleeve pipe includes tin tubulation and the copper away from the bulge loop Cover, internal thread is provided with the second pipe, the internal thread and the external screw thread coordinate, the bulge loop and the described second pipe Road welds, and the tin tubulation melts in welding, and solidification forms contact tube after cooling.When mounted will set using the structure Pipe is inserted in the first pipeline, and the first pipeline and sleeve pipe are screwed in second pipe, then welds bulge loop and second pipe, Tin tubulation described in welding process melts, and then rotates the tin of copper lid extruding fusing, gap is reduced, so that tin and first Pipeline connects even closer with second pipe so that electric conductivity and heat conductivility between the first pipeline and second pipe are more Good, copper lid can ensure the axiality of the first pipeline and second pipe simultaneously, ensure between the first pipeline and second pipe Gap uniformity.
In above-mentioned technical proposal, it is preferred that the copper covers the nut being provided with for being inserted in spanner.Covered in copper Nut is set, it is convenient to rotate copper lid.
The present invention compared with prior art, has the advantages that:Sleeve pipe is inserted in when mounted using the structure In one pipeline, and the first pipeline and sleeve pipe are screwed in second pipe, then welded bulge loop and second pipe, in welding process Described in the fusing of tin tubulation, then rotate the tin of copper lid extruding fusing, reduce gap, so that tin and the first pipeline and the The connection of two pipelines is even closer so that the electric conductivity and heat conductivility between the first pipeline and second pipe are more preferable, copper Lid can ensure the axiality of the first pipeline and second pipe simultaneously, ensure that the gap between the first pipeline and second pipe is equal It is even.
Brief description of the drawings
Fig. 1 is the structural representation of the embodiment of the present invention.
Fig. 2 is Fig. 1 partial enlarged drawing.
Embodiment
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings:It is a kind of referring to Fig. 1 to Fig. 2 Capacitor terminal, including the first pipeline 1 made of red copper, the outer sheath of the first pipeline 1 are provided with second made of brass Pipeline 2, the outside of second pipe 2 are provided with the retainer plate 3 for connecting copper bar, and it is exhausted that the outer sheath of second pipe 2 is provided with first Edge set 4 and second insulation sleeve 5, the insulation sleeve 5 of the first insulation sleeve 4 and second cooperation are fixed on capacitor case 6, and described the One pipeline 1 and the second pipe 2 are welded and fixed, and bulge loop 11, first pipeline 1 have been radially arranged on first pipeline 1 On be arranged with outside there is externally threaded sleeve pipe 7, the bulge loop 11 and described sleeve pipe 7 are by the cooperation of raised and groove, specifically It can be that projection is set on bulge loop, groove is set on sleeve pipe, then the phase in raised insertion groove between limitation bulge loop and sleeve pipe Groove mutually is set on rotation or bulge loop, projection is set on sleeve pipe, then the interior limitation bulge loop of raised insertion groove and sleeve pipe Between mutual rotation, described sleeve pipe 7 include tin tubulation 71 and away from the bulge loop 11 copper lid 72, the second pipe Internal thread 21 is provided with 2, the internal thread 21 and the external screw thread coordinate, and the bulge loop 11 welds with the second pipe 2, The tin tubulation 71 melts in welding, and solidification forms contact tube after cooling.Pipe sleeve will be covered using the structure when mounted Enter in the first pipeline, and the first pipeline and sleeve pipe are screwed in second pipe, then bulge loop and second pipe are welded, welded During tin tubulation fusing, then rotate the tin of copper lid extruding fusing, gap reduced, so that tin and the first pipeline Being connected with second pipe even closer so that the electric conductivity and heat conductivility between the first pipeline and second pipe are more preferable, Copper lid can ensure the axiality of the first pipeline and second pipe simultaneously, ensure the gap between the first pipeline and second pipe Uniformly.
In above-mentioned technical proposal, it is preferred that the nut 73 for being inserted in spanner is provided with the copper lid 72.In copper Setting nut is covered, it is convenient to rotate copper lid.

Claims (2)

1. a kind of capacitor terminal, including the first pipeline made of red copper(1), first pipeline(1)Outer sheath is provided with Second pipe made of brass(2), second pipe(2)Outside is provided with the retainer plate for connecting copper bar(3), second pipe Road(2)Outer sheath is provided with the first insulation sleeve(4)With the second insulation sleeve(5), first insulation sleeve(4)With the second insulation sleeve(5) Cooperation is fixed on capacitor case(6)On, first pipeline(1)With the second pipe(2)It is welded and fixed, its feature exists In:First pipeline(1)On be radially arranged bulge loop(11), first pipeline(1)On be arranged with outside there is external screw thread Sleeve pipe(7), the bulge loop(11)With described sleeve pipe(7)Coordinated by raised and groove, described sleeve pipe(7)Including tin tubulation (71)And away from the bulge loop(11)Copper lid(72), the second pipe(2)Inside it is provided with internal thread(21), it is described interior Screw thread(21)Coordinate with the external screw thread, the bulge loop(11)With the second pipe(2)Welding, the tin tubulation(71)Welding Melted when connecing, and solidification forms contact tube after cooling.
A kind of 2. capacitor terminal as claimed in claim 1, it is characterised in that:The copper lid(72)On be provided with use In the nut for being inserted in spanner(73).
CN201610562067.3A 2016-07-18 2016-07-18 A kind of capacitor terminal Active CN106158369B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610562067.3A CN106158369B (en) 2016-07-18 2016-07-18 A kind of capacitor terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610562067.3A CN106158369B (en) 2016-07-18 2016-07-18 A kind of capacitor terminal

Publications (2)

Publication Number Publication Date
CN106158369A CN106158369A (en) 2016-11-23
CN106158369B true CN106158369B (en) 2018-03-16

Family

ID=58059368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610562067.3A Active CN106158369B (en) 2016-07-18 2016-07-18 A kind of capacitor terminal

Country Status (1)

Country Link
CN (1) CN106158369B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113714644B (en) * 2021-09-29 2023-07-25 湖南中南智能激光科技有限公司 Laser welding method for brass and red copper

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201966068U (en) * 2010-12-18 2011-09-07 桂林电力电容器有限责任公司 Electrical leading-out terminal of power capacitor
CN203466073U (en) * 2013-07-18 2014-03-05 成都精容电子有限公司 Capacitor
CN203444973U (en) * 2013-08-21 2014-02-19 宁波海融电器有限公司 Large-current water-cooling terminal
CN205384951U (en) * 2016-03-04 2016-07-13 浙江台州特总电容器有限公司 Divide and be listed as self -healing power capacitor

Also Published As

Publication number Publication date
CN106158369A (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN204954135U (en) Double -deck water -cooling melts argon arc deeply and welds welder
CN103326142B (en) A kind of low-melting-point metal cable continuation device
CN204240104U (en) A kind of lighting device
CN106158369B (en) A kind of capacitor terminal
CN103846537A (en) Welding method of special metal pipes
CN202930576U (en) Copper-aluminium conductor crimping terminal
CN205944461U (en) Ground copper bars connects
CN201871868U (en) Composite metal plastic pipeline welding device
US10821561B2 (en) Exothermic welding cup and exothermic welding capsule
CN207183548U (en) Low-melting-point metal cable connecting arrangement and attachment structure
CN203444973U (en) Large-current water-cooling terminal
CN205373135U (en) Radiating effect adjustable refrigeration chip
CN207021652U (en) Single water inlet integral type water-cooled electric cable joint
CN210866539U (en) Cable connecting device
CN109301513A (en) A kind of haptoreaction formula cable connecting arrangement and connection method
CN209217399U (en) A kind of mold making aluminium alloy conductor connector
US10032561B2 (en) Thermal control for capacitor
JP2006528555A5 (en)
CN202454736U (en) Copper-aluminum equipment wire clip
CN103143808B (en) Tin soldering equipment
CN102886578A (en) Method for welding end cover of total reflecting mirror and straight tube
CN203140937U (en) Soldering device
CN106695054A (en) Heater and current terminal and wire rod welding method
CN202905979U (en) Copper-aluminum lead-pressure connection tube
CN103456488B (en) A kind of withstand large current mode water-cooling terminal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant