CN106153414B - A kind of indoor sample preparation device rupturing rock sample based on slurries reparation - Google Patents
A kind of indoor sample preparation device rupturing rock sample based on slurries reparation Download PDFInfo
- Publication number
- CN106153414B CN106153414B CN201610462826.9A CN201610462826A CN106153414B CN 106153414 B CN106153414 B CN 106153414B CN 201610462826 A CN201610462826 A CN 201610462826A CN 106153414 B CN106153414 B CN 106153414B
- Authority
- CN
- China
- Prior art keywords
- slurries
- main frame
- reparation
- rock sample
- guide groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N1/00—Sampling; Preparing specimens for investigation
- G01N1/28—Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
- G01N1/286—Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q involving mechanical work, e.g. chopping, disintegrating, compacting, homogenising
Abstract
The present invention relates to a kind of indoor sample preparation devices rupturing rock sample based on slurries reparation, belong to geotechnical engineering field.The device is made of outer framework, horizontal adjustment bolt, vertical adjustment bolt, guide groove, mold and pressing plate.The die hole of mold is round or rectangle.The device adapts it to the slurries reparation of the rupture rock sample within the scope of specific width and allowable error, by adjusting vertical adjustment bolt, adapts it to the slurries reparation of the rupture rock sample within the scope of certain height and allowable error by adjusting horizontal adjustment bolt.The graduation mark of the internal face of the device main frame and the ear tag ruler of pressing plate simulate the main scale and auxiliary scale of vernier caliper respectively, and slurries can control to repair the accurate of layer thickness.The apparatus structure is reasonable, easy to operate, adaptable, and convenient and safe the rock sample based on slurries reparation can be quickly obtained with the device.
Description
The present invention relates to a kind of indoor sample preparation devices rupturing rock sample based on slurries reparation, belong to Geotechnical Engineering neck
Domain.
Background technology
It is well known that there is a large amount of structural plane in natural rock mass, structural plane destroys the integrality of rock mass and continuous
Property, control the mechanical property of rock mass.In engineering, cement grout is commonly used to reinforce rock joint, it is desirable to increase rock joint
Intensity.After cement grout is filled into joint fissure and condenses, a kind of complex structure body is formed, deformation, strength characteristics are both by two
The mechanical property control of kind material itself, and influenced by joint surface appearance feature, while also by glue between two kinds of materials
The effect of power is tied, this just determines the complexity of grouting joint mechanical property.Therefore, it is necessary to carry out detailed laboratory test research
Slurries reparation ruptures the repairing effect and the mechanism of action of rock sample.The particular problem of research includes:Whether intensity is true after the grouting of joint
Just it is improvedThe amplitude that intensity improves is muchIntensity and the mechanical property of grouting material and joint palisades itself have after grouting
What relationshipWhat relationship is intensity have with grouting layer thickness after grouting
Currently, domestic as follows about the repairing effect of slurries reparation rupture rock sample and the present Research of the mechanism of action:
(1) rock-soil mechanics (2011, volume 32, the 9th phase) " experimental study of rock structural face grouting and reinforcing shearing-resistance characteristic "
The rock sample structural plane slip casting reparation that uniaxial compression test is formed in article, then shearing test is carried out to the rock sample of slurries reparation,
Influence of the slip casting to mechanics parameters such as the strength and stiffness of rock sample structural plane is analyzed, to have studied rock sample structural plane
Grouting consolidation effect.
(2) " buried vertical panel splits hole in Structure Rock to Wuhan University Journal (engineering version) (2012, volume 45, the 5th phase)
In room failure mechanism of stability " article to grouting zigzag single-unit reason in the case that compression shear deformation characteristic and peak shear strength into
Numerical experimentation research is gone, emphasis is strong to grouting joint peak value shearing resistance to factors such as grouting packing density, Undulating angle and normal stresses
The influence of degree is analyzed.
(3) " grouting joint press-shear deformation, intensity are special for Wuhan University Journal (engineering version) (2014, volume 47, the 4th phase)
By carrying out cement grout consolidation process to the joint test specimen manually cleaved in point and failure mechanism experiment " paper, and carry out one
Serial interior compression-shear test analyzes packing density and normal stress to the deformation at joint of being in the milk, the affecting laws of strength characteristics.
Since the indoor sample preparation for rupturing rock sample based on slurries reparation level is very simple, and repairs triaxial compressions based on slurries and incline
Tiltedly the indoor sample preparation of rupture rock sample is more difficult, at present also without such device, so it is previous only by carry out numerical experimentation and
Slurries repairing effect and the mechanism of action are studied to the shearing test of the rupture rock sample based on slurries reparation.However, deep rock mass
In the comprehensive function of the multiple factors disturbed in crustal stress and engineering construction, mechanical characteristic is in three-dimensional stress state.Therefore,
Only slurries repairing effect and the mechanism of action of the rupture rock sample of research slurries reparation manually cleaved under shearing condition are not
Completely, the slurries reparation with greater need for the rupture rock sample formed under the three-dimensional stress state of slurries reparation under three-dimensional stress state
Effect and the mechanism of action are studied.
Invention content
In view of the above problems, the purpose of the present invention is to provide a kind of interiors rupturing rock sample based on slurries reparation
Sample preparation device, the convenient and safe indoor sample preparation for quickly completing to rupture rock sample based on slurries reparation on the apparatus, so as into one
The slurries repairing effect and the mechanism of action of rupture rock sample of the step research based on slurries reparation.
In order to achieve the above object, the present invention is achieved by the following technical solutions:
It is a kind of that the indoor sample preparation device of rock sample is ruptured by outer framework, horizontal adjustment bolt, vertical adjusting based on slurries reparation
Bolt, guide groove, fixing mould, moveable die and pressing plate composition, outer framework are made of main frame and connecting plate, and main frame takes the shape of the letter U
Channel-shaped, connecting plate are arranged on the upper surface of main frame, and the upper surface of connecting plate and main frame is bolted, vertical adjustment bolt
Actively spinning is on connecting plate.
Fixing mould is bolted on an internal face of main frame, and guide groove is secured by bolts in main frame
On another internal face, fixing mould, the symmetrical overlapping of axles of guide groove and main frame, moveable die are actively embedded in guide groove, water
Flat adjusting bolt penetrates through guide groove activity spinning in the side wall of main frame, and the upper surface of fixing mould is higher than the upper end of moveable die
Face.
Fixing mould inner wall upper end and the main frame inner wall upper end for being connected to guide groove are symmetrically provided with sliding slot, in sliding slot
The symmetrical overlapping of axles of heart line and main frame, pressing plate both ends are respectively equipped with boss, and boss is actively embedded in sliding slot, pressing plate position
It is symmetrically provided with scale in the both sides of the end face of guide groove one end, is symmetrically set in the both sides of the main frame internal face of top of guide slot
It is equipped with graduation mark.
The die hole of fixing mould and moveable die is round or rectangle.
The precision of scale is 0.1mm.
By adopting the above-described technical solution, convenient and safe quickly complete to repair kataclasite based on slurries in the present invention
The indoor sample preparation of sample.Mainly has the following advantages:
1. the fastening effect of moveable die makes shape and size of the rock sample side before and after slurries reparation remain unchanged, can
Dynamic fixture it is horizontal movably so that the interior sample preparation device is adapted to slurries and repairs breaking within the scope of specific width and allowable error
Split rock sample.
2. pushing clam member by vertical adjustment bolt, squeezing out extra slurries makes slurry layer and the rock sample plane of fracture well glue
It closes, the vertical of pressing plate movably makes the device be adapted to the rupture rock sample within the scope of slurries reparation certain height and allowable error.
3. the graduation mark of scale and main frame internal face simulates the auxiliary scale and main scale of vernier caliper, control rupture rock sample respectively
Slurries repair thickness precision be 0.1mm.
4. most of rock sample plane of fracture is appeared package by the bottom plate of fixing mould, moveable die, pressing plate and main frame
Constraint is got up, and only respectively reserves a bit of serum outlet in former and later two regions of rock sample surface middle part, and constraint slurries are squeezed process
In the rate of outflow, make slurries steady extruding, ensure repairing effect.
The present invention is a kind of indoor sample preparation device rupturing rock sample based on slurries reparation, and the apparatus structure is reasonable, operation letter
It is single, it is adaptable, convenient and safe it can quickly obtain the rock sample based on slurries reparation with the device.
Description of the drawings:
Accompanying drawing 1 is the structural representation of the present invention schemes.
Attached drawing 2 is the vertical view of Fig. 1.
Attached drawing 3 is the A-A sectional views of Fig. 2.
Specific implementation mode:
The present invention is further illustrated with reference to the accompanying drawings and detailed description:
See attached drawing.
A kind of indoor sample preparation device rupturing rock sample based on slurries reparation, indoor sample preparation device is by outer framework, Level tune
Bolt 2, vertical adjustment bolt 4, guide groove 8, mold and pressing plate 6 form, and mold is by fixing mould 3 equipped with symmetrical die hole and movable
Mold 7 is constituted, and the die hole of mold is round or rectangle, and die hole of different shapes makes device be suitable for the kataclasite of respective shapes
Sample reparation, the mold hole dimension of mold are matched with the rock sample size repaired so that mold can clamp repaired rock sample and
Most of rock sample plane of fracture is appeared and wraps up constraint, outer framework is made of main frame 1 and connecting plate 5, and main frame 1 is by two pieces
Rectangle siding and rectangle bottom plate are constituted, and take the shape of the letter U channel-shaped, and connecting plate 5 is arranged on the upper surface of main frame 1,5 He of connecting plate
The upper surface of main frame 1 is bolted, and connecting plate 5 is for installing vertical adjustment bolt 4, the actively spinning of vertical adjustment bolt 4
On connecting plate 5, vertical adjustment bolt 4 is used to adjust the vertical position of pressing plate 6.
Fixing mould 3 is bolted on a rectangle siding internal face of main frame 1, and guide groove 8 passes through bolt
It is fixed on another rectangle siding internal face of main frame 1, fixing mould 3, the horizontal symmetry axis of guide groove 8 and main frame 1
It overlaps, moveable die 7 is actively embedded in guide groove 8, and guide groove 8 constrains the direction that moveable die 7 moves horizontally so that moveable die
7 can only move along its horizontal symmetry axis, and horizontal adjustment bolt 2 penetrates through 8 activity spinning of guide groove in the side wall of main frame 1, water
Flat adjusting bolt 2 is used to adjust the horizontal position of movable clamp plate, and the upper surface of fixing mould 3 is higher than the upper surface of moveable die 7,
The upper surface of fixing mould 3 can constrain extra slurries higher than pressing plate upper surface, prevent slurries from appearing outflow from the top plane of fracture;
3 inner wall upper end of fixing mould and the 1 inner wall upper end of main frame for being connected to guide groove 8 are symmetrically provided with sliding slot, sliding slot
The line of centres and main frame 1 horizontal symmetrical overlapping of axles, 6 both ends of pressing plate are respectively equipped with boss, the shape and size of boss with
Sliding slot matches, and boss is actively embedded in sliding slot, and sliding slot constrains the horizontal position of pressing plate, as guide groove 8 so that pressing plate 6 can only
Along sliding slot vertical motion, the both sides that pressing plate 6 is located at the end face of 8 one end of guide groove are symmetrically provided with scale, scale thickness and steel
Ruler is equally unsuitable blocked up, simulates the auxiliary scale of vernier caliper, the precision of scale is 0.1mm, 1 inner wall of main frame above guide groove 8
The both sides in face are symmetrically provided with graduation mark, simulate the main scale of vernier caliper.
The present invention be it is a kind of based on slurries reparation rupture rock sample indoor sample preparation device, it is specifically used follow these steps into
Row:
(1) position between fixing mould 3 and moveable die 7 is rock sample lay down location, will rupture the upper disk and lower wall of rock sample
Rock sample lay down location is put into above device together, the upper disk of rupture rock sample and lower wall is made to coincide as far as possible.
(2) horizontal adjustment bolt 2 is adjusted, makes it that moveable die 7 be pushed to clamp rock sample along 8 horizontal movement of guide groove, waits for rock
Sample stops precession when being clamped.
(3) disk rock sample in taking-up is stained with suitable slurries with long handle brush, brushes on the plane of fracture of lower wall rock sample, then will
Upper disk rock sample is from top to bottom along cover in moveable die 7 on slurry night layer.
(4) alignment of two boss of pressing plate 6 is embedded in corresponding sliding slot, is then pushed into rock sample upper end from top to bottom
Face.
(5) by connecting plate 5 and 1 upper surface screw connection of main frame, vertical adjustment bolt 4 is screwed into the bolt hole of connecting plate 5,
One side precession vertical adjustment bolt 4 pushes pressing plate 6 that slurries is made to squeeze out, at the same read the graduation mark of 6 one of scale of pressing plate with
The numerical value of the scale overlapping position of the corresponding side of the internal face of main frame 1 repairs the height of rock sample after the rock sample plane of fracture for slurries at this
H1 ' is spent, (preset slurries are repaired the corresponding vertical thickness of thickness and do not repaiied with rupture rock sample when height H1 ' reaches desired value
The sum of height H1 when multiple) when, stop precession vertical adjustment bolt 4, then read another side height H2 ' with same method,
These values are recorded, are averaged the final height H ' for repairing rock sample after the rock sample plane of fracture as slurries, then calculate the difference of H ' and H1
It is worth the vertical thickness for repairing thickness as final slurries, then slurries is become by conversion and repair thickness.
(6) rock sample Jing Guo slurries reparation is taken out after slurries initial set, further maintenance is arrived in suitable environmental conditions
Stipulated time so far completes the indoor sample preparation that rock sample is ruptured based on slurries reparation.
Claims (3)
1. a kind of indoor sample preparation device rupturing rock sample based on slurries reparation, it is characterised in that:Indoor sample preparation device by outer framework,
Horizontal adjustment bolt (2), vertical adjustment bolt (4), guide groove (8), fixing mould (3), moveable die (7) and pressing plate (6) composition,
Outer framework is made of main frame (1) and connecting plate (5), and main frame (1) takes the shape of the letter U channel-shaped, and connecting plate (5) is arranged in main frame (1)
Upper surface on, the upper surface of connecting plate (5) and main frame (1) is bolted, vertical adjustment bolt (4) actively spinning even
On fishplate bar (5);
Fixing mould (3) is bolted on an internal face of main frame (1), and guide groove (8) is secured by bolts in master
On another internal face of frame (1), fixing mould (3), the horizontal symmetrical overlapping of axles of guide groove (8) and main frame (1), But moving die
Have (7) to be actively embedded in guide groove (8), side wall of horizontal adjustment bolt (2) perforation guide groove (8) the activity spinning in main frame (1)
On, the upper surface of fixing mould (3) is higher than the upper surface of moveable die (7);
Fixing mould (3) inner wall upper end and main frame (1) the inner wall upper end for being connected to guide groove (8) are symmetrically provided with sliding slot, sliding
The horizontal symmetrical overlapping of axles of the line of centres and main frame (1) of slot, pressing plate (6) both ends are respectively equipped with boss, and boss is actively embedding
Enter in sliding slot, the both sides that pressing plate (6) is located at the end face of guide groove (8) one end are symmetrically provided with scale, above guide groove (8)
The both sides of main frame (1) internal face are symmetrically provided with graduation mark.
2. a kind of indoor sample preparation device rupturing rock sample based on slurries reparation as described in claim 1, it is characterised in that:It is described
Fixing mould (3) and the die hole of moveable die (7) be round or rectangle.
3. a kind of indoor sample preparation device rupturing rock sample based on slurries reparation as described in claim 1, it is characterised in that:It is described
Scale precision be 0.1mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610462826.9A CN106153414B (en) | 2016-06-22 | 2016-06-22 | A kind of indoor sample preparation device rupturing rock sample based on slurries reparation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610462826.9A CN106153414B (en) | 2016-06-22 | 2016-06-22 | A kind of indoor sample preparation device rupturing rock sample based on slurries reparation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106153414A CN106153414A (en) | 2016-11-23 |
CN106153414B true CN106153414B (en) | 2018-10-12 |
Family
ID=57353735
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610462826.9A Active CN106153414B (en) | 2016-06-22 | 2016-06-22 | A kind of indoor sample preparation device rupturing rock sample based on slurries reparation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106153414B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107941592B (en) * | 2017-11-23 | 2020-06-05 | 河南理工大学 | Simulation prefabrication experimental method for built-in precisely controlled variable fracture rock |
CN110186710A (en) * | 2019-06-28 | 2019-08-30 | 佛山科学技术学院 | A kind of soil sample collector |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62284256A (en) * | 1986-06-02 | 1987-12-10 | Shimadzu Corp | Preparation of sample for laser ionization mass spectrometer and sample base |
CN103278385A (en) * | 2013-05-17 | 2013-09-04 | 中国科学院武汉岩土力学研究所 | Testing device for rock collapse breakdown strength |
CN104626339A (en) * | 2015-01-23 | 2015-05-20 | 河海大学 | Bottom grouting forming die for long and thin column and forming method thereof |
CN204705527U (en) * | 2015-05-29 | 2015-10-14 | 北京市道路工程质量监督站 | A kind of semi-rigid type base core end face is repaired and is used split cavity equipment |
CN105319095A (en) * | 2015-10-28 | 2016-02-10 | 广西大学 | Sample preparation equipment dedicated to triaxial test and capable of preparing high-density disturbed soil sample |
CN105510559A (en) * | 2016-02-03 | 2016-04-20 | 山东科技大学 | Oriented fracturing grouting test system for weakly cemented rock |
-
2016
- 2016-06-22 CN CN201610462826.9A patent/CN106153414B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62284256A (en) * | 1986-06-02 | 1987-12-10 | Shimadzu Corp | Preparation of sample for laser ionization mass spectrometer and sample base |
CN103278385A (en) * | 2013-05-17 | 2013-09-04 | 中国科学院武汉岩土力学研究所 | Testing device for rock collapse breakdown strength |
CN104626339A (en) * | 2015-01-23 | 2015-05-20 | 河海大学 | Bottom grouting forming die for long and thin column and forming method thereof |
CN204705527U (en) * | 2015-05-29 | 2015-10-14 | 北京市道路工程质量监督站 | A kind of semi-rigid type base core end face is repaired and is used split cavity equipment |
CN105319095A (en) * | 2015-10-28 | 2016-02-10 | 广西大学 | Sample preparation equipment dedicated to triaxial test and capable of preparing high-density disturbed soil sample |
CN105510559A (en) * | 2016-02-03 | 2016-04-20 | 山东科技大学 | Oriented fracturing grouting test system for weakly cemented rock |
Also Published As
Publication number | Publication date |
---|---|
CN106153414A (en) | 2016-11-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106153414B (en) | A kind of indoor sample preparation device rupturing rock sample based on slurries reparation | |
CN103674646B (en) | Mould for manufacturing sample with undulated structure surface with controllable undulation degree | |
CN103674723A (en) | Test method for determining uniaxial tensile strength of soil mass | |
CN206515161U (en) | A kind of plate-type ballastless track adhesive property test devices of CRTS III | |
CN205679468U (en) | A kind of anchor rod drawing test hydraulic support device | |
CN104502167B (en) | A kind of mould and method for preparing the artificial core with non-penetrating hole | |
CN102589986A (en) | Small bending-purposed changeable supporting-type experiment tamp for thin-plate material | |
CN105352884A (en) | Experiment method and experiment member for testing bond strength of concrete and coal, rock or concrete | |
CN202442927U (en) | Miniature changeable support type test compression tool for bending thin plate type materials | |
CN103575644A (en) | Test method for matching friction coefficient of contact surface of poured concrete | |
CN201298006Y (en) | Multi-angle pavement structure layer shear testing mold | |
CN204461844U (en) | Be applicable to the sample preparation device of jointed rock mass direct shear test | |
CN204728528U (en) | The I-shaped encased steel plate shear wall of Multicarity | |
Harris | Characterization of punching shear capacity of thin UHPC plates | |
CN204461845U (en) | Be applicable to the sample preparation shear of jointed rock mass direct shear test | |
CN109142007A (en) | A kind of Effective model testing standard test specimen processing mold and its application method | |
WO2020252988A1 (en) | Strength test method for rotary jet grouting-reinforced coal body | |
CN108398319B (en) | Ultra-high water filling material creep test device and use method thereof | |
CN110646583B (en) | Method and device for coal seam water injection similar simulation test | |
CN207074213U (en) | Geotechnical centrifugal model test hydraulic pressure consolidation device | |
CN106950348B (en) | Hydraulic consolidation device and method for geotechnical centrifugal model test | |
Pan | Mechanical properties of Cemented Paste Backfill under low confining stress | |
KR102129410B1 (en) | One-dimension expansive pressure test apparatus | |
CN204188429U (en) | The quick pressure setting of Manual mechanical analog material standard specimen | |
CN209432568U (en) | Containing weak intercalated layer and thickness is adjustable and the structural plane model of rigid constraint makes mold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |