CN106152410A - Air conditioning control device, control method and air-conditioner - Google Patents

Air conditioning control device, control method and air-conditioner Download PDF

Info

Publication number
CN106152410A
CN106152410A CN201610569801.9A CN201610569801A CN106152410A CN 106152410 A CN106152410 A CN 106152410A CN 201610569801 A CN201610569801 A CN 201610569801A CN 106152410 A CN106152410 A CN 106152410A
Authority
CN
China
Prior art keywords
air
pressure value
conditioning
real
predetermined vacuum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610569801.9A
Other languages
Chinese (zh)
Other versions
CN106152410B (en
Inventor
贺小林
方许丹
唐杰
赖东锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201610569801.9A priority Critical patent/CN106152410B/en
Publication of CN106152410A publication Critical patent/CN106152410A/en
Application granted granted Critical
Publication of CN106152410B publication Critical patent/CN106152410B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/52Indication arrangements, e.g. displays
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data

Abstract

The application relates to a kind of for vacuumizing the control device automatically monitored and control method to air-conditioning duct, and described control device includes: pressure acquisition unit, for gathering the real-time pressure in air-conditioning duct;Memory cell, is used for storing the real-time pressure numerical value that pressure acquisition unit collects, and, the predetermined vacuum pressure that is stored with in this memory cell value;Comparing unit, for comparing the size of the real-time pressure value collecting and predetermined vacuum pressure value;Result output unit, for the comparative result output control signal according to comparing unit, this control signal is used for controlling whether to allow to carry out subsequent operation to air-conditioning.Air-conditioning duct is vacuumized in the control device automatically monitored and control method by being used in the application, force to vacuumize after air-conditioning is installed, before being able to ensure that operation of air conditioner, the vacuum in pipeline reaches perfect condition, avoid owing to vacuumizing the operation of air conditioner effect thoroughly do not brought undesirable, it is ensured that the reliability of operation of air conditioner.

Description

Air conditioning control device, control method and air-conditioner
Technical field
The present invention relates to air-conditioning technical field, be specifically related to a kind of control device and control method, for air-conditioning duct Vacuumize and automatically monitor, and be provided with the air-conditioner of this control device.
Background technology
Air-conditioning is requisite electric equipment in family, and air-conditioning is after mounting, including install first with telephone-moving after It after installation, is required to carry out vacuum pumping, because containing gases such as substantial amounts of nitrogen, oxygen, carbon dioxide in air, these Gas can not be dissolved into inside cold-producing medium, is commonly refereed to as incoagulable gas.In addition, the moisture in air is with cold-producing medium also Cannot dissolve each other.The existence of moisture and incoagulable gas have impact on operation of air conditioner effect, so the purpose vacuumizing seeks to sky Incoagulable gas in adjusting system and moisture are got rid of.According to data analysis after sale, some installation personnels, during in order to shorten installation Between, simplify vacuum pumping flow process, even without carrying out vacuum pumping, this greatly have impact on operation of air conditioner effect, simultaneously Bring hidden danger to air-conditioning reliability, the perils such as blast even can occur.
Content of the invention
In view of this, it is an object of the invention to provide a kind of for vacuumizing the control automatically monitored to air-conditioning duct Device processed and vacuumize, to air-conditioning, the control method automatically monitored with this control device, completes to take out accordingly only on request After vacuumizing, the subsequent operations such as debugging can be booted up.
According to an aspect of the present invention, provide a kind of air conditioning control device, carry out certainly for air-conditioning duct is vacuumized Dynamic monitoring, comprising:
Pressure acquisition unit, for gathering the real-time pressure in air-conditioning duct;
Memory cell, is used for storing the real-time pressure numerical value that pressure acquisition unit collects, and, in this memory cell The predetermined vacuum pressure that is stored with value;
Comparing unit, for comparing the size of the real-time pressure value collecting and predetermined vacuum pressure value;
Result output unit, for the comparative result output control signal according to comparing unit, this control signal is used for controlling Whether system allows to carry out subsequent operation to air-conditioning.
Preferably, described pressure acquisition unit is pressure sensor or Pressure gauge.
Preferably, described Pressure gauge is hand-held, and it can be connected with described memory cell.
Preferably, described memory cell is positioned on the master chip of air-conditioning.
Preferably, described result output unit is alarm or display.
Preferably, described control signal is: when described real-time pressure value is less than or equal to described predetermined vacuum pressure value When, it is allowed to subsequent operation is carried out to air-conditioning;When described real-time pressure value is more than described predetermined vacuum pressure value, do not allow to sky Transfer in row subsequent operation.
Preferably, also include that predetermined vacuum pressure value presets device, for by the predetermined vacuum pressure value in air-conditioning duct Default in described memory cell.
According to the second aspect of the invention, provide a kind of for vacuumizing the control automatically monitored to air-conditioning duct Method, comprises the steps:
Step S01: preset the predetermined vacuum pressure value in air-conditioning duct;
Step S02: gather the real-time pressure value in air-conditioning duct;
Step S03: the real-time pressure value in the pipeline collecting, compare with predetermined vacuum pressure value set in advance Relatively;
Step S04: when the real-time pressure value in the pipeline gathering is less than or equal to described predetermined vacuum pressure value, permit Permitted to carry out subsequent operation to air-conditioning;
Step S05: when the real-time pressure value in the pipeline collecting is more than described predetermined vacuum pressure value, it is right not allow Air-conditioning carries out subsequent operation, and returns step S02.
Preferably, in step S05, when the real-time pressure value in the pipeline collecting is more than described predetermined vacuum pressure value When, report circuit failure;Preferably, while reporting circuit failure, the prompting needing to vacuumize is sent.
Preferably, described circuit failure is loine pressure abnormal failure.
According to the third aspect of the present invention, provide a kind of air-conditioning, be provided with and carry out certainly for air-conditioning duct is vacuumized The control device of dynamic monitoring.
Provided herein is used for vacuumizing air-conditioning duct the control device automatically monitored and control method In, the vacuum after installing air-conditioning is monitored control, according to comparing the real-time pressure value collecting and predetermined vacuum The result of force value determines whether to enter the subsequent operation vacuumizing, and for example, determines whether to allow to boot up air-conditioning Debugging, can realize forcing actively to vacuumize the air in air-conditioner set pipeline, make the vacuum in air-conditioning duct reach predetermined Level of vacuum, it can be ensured that before operation of air conditioner, the vacuum in pipeline reaches perfect condition, it is to avoid not thorough owing to vacuumizing And the operation of air conditioner effect brought is undesirable, it is ensured that the reliability of operation of air conditioner.
Brief description
By the description to the embodiment of the present invention referring to the drawings, above-mentioned and other purposes of the present invention, feature and Advantage will be apparent from, in the accompanying drawings:
Fig. 1 is the structural representation for vacuumizing the control device automatically monitored to air-conditioning duct in the application Figure;
Fig. 2 is the flow chart for vacuumizing the control method automatically monitored to air-conditioning duct in the application.
Detailed description of the invention
Below based on embodiment, present invention is described, but the present invention is not restricted to these embodiments.
Air-conditioning initially install, telephone-moving install or maintenance after, " vacuumizing " is requisite program.Because in air Containing gases such as substantial amounts of nitrogen, oxygen, carbon dioxide, these gases can not be dissolved into inside cold-producing medium, is commonly refereed to as not Solidifying property gas, in addition, the moisture in air also cannot dissolve each other with cold-producing medium.The existence of moisture and incoagulable gas can affect Operation of air conditioner effect, so the purpose vacuumizing seeks to get rid of the incoagulable gas in air-conditioning system and moisture.
Being used in the present invention vacuumizes, to air-conditioning duct, the control device automatically monitored, and initially can pacify at air-conditioning Dress, telephone-moving are installed or after maintenance, are automatically monitored the situation that vacuumizes in air-conditioner set pipeline, force to make air conditioner Vacuum in group pipeline reaches predetermined extent.
As it is shown in figure 1, including for the control device automatically monitored is vacuumized to air-conditioning duct in the present invention:
Predetermined vacuum pressure value presets device 101, for presetting the predetermined vacuum pressure value in air-conditioner set pipeline;This is pre- Determining vacuum pressure is the vacuum pressure needing in pipeline before air-conditioner set runs to reach, namely target vacuum pressure value.This is pre- Determining the situation according to air-conditioning for the vacuum pressure value, such as cold-producing medium situation, operation of air conditioner environment etc. specifically set, for example predetermined vacuum Force value is≤-0.1MPA.This default device 101 can be existing common input unit, for presetting before air-conditioning dispatches from the factory Air-conditioning vacuumizes the predetermined vacuum pressure value needing to reach after installing.This predetermined vacuum pressure value can default in several ways In control device, special predetermined vacuum pressure value can be set and preset device 101, in other examples, it is also possible to do not have There is this default device, for example, preset by equipment such as computers.
Pressure acquisition unit 102, for gathering the real-time pressure in unit pipeline;In a preferred embodiment, described Pressure acquisition unit 102 can be pressure sensor or Pressure gauge, and described Pressure gauge can be hand-held Pressure gauge, In this case, pressure acquisition unit 102 can be provided separately with air conditioner main body, can reduce overall volume and the weight of air-conditioning, When gathering pressure, need to be attached Pressure gauge with air conditioner main body.Above-mentioned to air-conditioning vacuumize detection work can be automatic Carry out, it is also possible to manually carry out.For example, by way of arranging pressure sensor in air-conditioning duct, pressure sensor is automatic Real-time pressure value in signal piping;Or gathering the real-time pressure in unit pipeline by arranging Pressure gauge, Pressure gauge can Think hand-held, now need to be attached Pressure gauge with memory cell described later, complete what compulsory test vacuumized Control process.
Memory cell 103, for storing the real-time pressure numerical value that pressure acquisition unit 102 collects and pre-setting Predetermined vacuum pressure value.Preferably, this memory cell 103 may be located on the master chip of air-conditioning, when air-conditioner set installs After one-tenth or maintenance complete to start power up, mainboard obtains electric starting working, and master chip gathers the pressure in unit pipeline by AD mouth, And be stored in this force value in memory cell 103.This structure is without additionally arranging storage organization so that be provided with the application In the air-conditioner overall structure of control device simple, while being capable of required function, the structure of air-conditioning will not be made Become complicated, and the operational efficiency of air-conditioning can be improved.
Comparing unit 104, for comparing the size of the real-time pressure value collecting and predetermined vacuum pressure value.This is more single Unit 104 can be comparator, it is also possible to is realized by software, as long as real-time pressure value and predetermined vacuum pressure value can be compared Size.
Result output unit 105, for the comparative result output control signal according to comparing unit, this control signal is used for Control whether to allow to carry out subsequent operation to air-conditioning.So, can determine that air-conditioning is according to the real-time pressure situation in air-conditioning duct No can carry out subsequent operation, for example whether debugging of can starting shooting.The situation that vacuumizes of air-conditioning duct can be supervised in real time Control, it is to avoid the situation of debugging of just starting shooting in the case of vacuumizing and do not reach and require occurs.Preferably, when in the pipeline gathering When real-time pressure value is less than or equal to described predetermined vacuum pressure value, then it represents that unit has completed to vacuumize action, meets machine Group job requirement, it is allowed to subsequent operation is carried out to air-conditioning, for example, debugging etc. is booted up to air-conditioning.Now, result output unit 105 outputs allow to carry out air-conditioning the instruction of subsequent operation;When the real-time pressure value in the pipeline collecting is predetermined more than described During vacuum pressure value, represent that unit does not carries out vacuumizing or vacuumize undone, then do not allow to carry out subsequent operation, example to air-conditioning As debugging etc. is booted up to air-conditioning.Preferably, while not allowing to carry out subsequent operation to air-conditioning, can be single in result output Output pipe fault, such as loine pressure abnormal failure in unit 105, and, he operating personnel can be pointed out to carry out vacuumizing work simultaneously Make.The setting of this result output unit, can provide operation instruction, it is simple to vacuum is entered by operating personnel cheer and brightly Row control.
In a preferred embodiment, when allowing to carry out subsequent operation to air-conditioning, can control output control signal is Very, now, program automatic jumps to next step debugging, for example: allow the operations such as input startup password;When not allowing to enter air-conditioning During row subsequent operation, it is false for can controlling output control signal, and now, program jumps out debugging process automatically, and shows Vacuum Pressure Power abnormal failure, prompting need to vacuumize again, during until the real-time vacuum pressure value of pipeline is less than predetermined vacuum pressure value, just allows Perform next step action.
In a preferred embodiment, described result output unit 105 is alarm, real-time when in the pipeline collecting When force value is more than described predetermined vacuum pressure value, send chimes of doom, illustrate that vacuumizing work does not completes, need to continue to take out very Empty;When the real-time pressure value in the pipeline gathering is less than or equal to described predetermined vacuum pressure value, then there is no alarm sound Sending, explanation can carry out subsequent operation to air-conditioning.
In another preferred embodiment, described result output unit 105 is display, the reality in the pipeline gathering When force value less than or equal to described predetermined vacuum pressure value when, represent unit completed to vacuumize action, meet unit work It is required, it is allowed to carrying out subsequent operation to air-conditioning and carrying out subsequent operation to air-conditioning, display over the display vacuumizes and completes;When adopting Collection to pipeline in real-time pressure value more than described predetermined vacuum pressure value when, represent unit vacuumize or vacuumize Do not complete, then do not allow to carry out air-conditioning subsequent operation, and show pipeline pressure anomaly over the display, can point out simultaneously carry out Vacuumize work.
In the case that pressure acquisition unit 102 is pressure sensor, the real-time pressure that described pressure sensor collects Value signal is by wired or be wirelessly transferred in memory cell 103 store, and is input in comparing unit 104 Compare with pre-set predetermined vacuum pressure value, according to comparative result at described result output unit 105, for example aobvious Show the display carrying out next step control content on device.Preferably, the existing display that described display is set on air-conditioning, for example When mounted, this display is used for display control signal, and when air-conditioning is properly functioning, this display is for showing operation of air conditioner Routine information.
Below with a concrete example in the application for vacuumizing the control automatically monitored to air-conditioning duct The course of work of device processed illustrates, in this example, pre-set in air-conditioning predetermined vacuum pressure value for- 0.1MPA.After installation starts power up first at air-conditioning, first display shows pipeline pressure anomaly, and prompting is taken out Vacuum work, does not allow to carry out air-conditioning subsequent operation, and display over the display " loine pressure is abnormal, please vacuumize " or class Like information, symbol etc..Then vacuumizing unit pipeline, vacuumizing during work carries out, this control device is persistently adopted Real-time pressure value in collection unit pipeline, and this real-time pressure value is input to comparing unit is carried out with predetermined vacuum pressure value Relatively, when the real-time pressure value in the pipeline gathering is less than or equal to described predetermined vacuum pressure value, on display always Display " loine pressure is abnormal, please vacuumize " or similar information, symbol etc.;Reality with vacuumizing the carrying out of work, in pipeline When force value reduce, when the real-time pressure value in unit pipeline is less than or equal to-0.1MPA, display in display " is taken out true Sky completes " or similar information, symbol etc., now subsequent operation can be carried out to air-conditioning.
As in figure 2 it is shown, with above-mentioned for vacuumizing the control device automatically monitored to air-conditioning duct accordingly, this Comprising the steps: for the control method vacuumizing the control device automatically monitored to air-conditioning duct in invention
Step S01: preset the predetermined vacuum pressure value in air-conditioning duct;This predetermined vacuum pressure is before air-conditioner set runs Pipeline needs the vacuum pressure reaching, namely target vacuum pressure value.Preset procedures can be carried out in several ways, example Preset the equipment such as device 101 or computer such as by aforementioned predetermined vacuum pressure value to preset;
Step S02: gather the real-time pressure value in air-conditioning duct;
Step S03: the real-time pressure value in the pipeline collecting, compare with predetermined vacuum pressure value set in advance Relatively;
Step S04: when the real-time pressure value in the pipeline gathering is less than or equal to described predetermined vacuum pressure value, permit Permitted to carry out subsequent operation to air-conditioning;Preferably, when allowing to carry out subsequent operation to air-conditioning, the control signal of permission, example are sent As by alarm song or show over the display.For example over the display show " vacuumize and complete " or similar information, Symbol etc.;
Step S05: when the real-time pressure value in the pipeline collecting is more than described predetermined vacuum pressure value, it is right not allow Air-conditioning carries out subsequent operation;Preferably, in this step, can be with Times circuit failure, such as loine pressure abnormal failure, be given Fault-signal, such as, again by alarm song or show over the display, can show that " loine pressure is different over the display Often, please vacuumize " or similar information, symbol etc..
So that rate-determining steps is carried out automatically, it is preferable that while reporting circuit failure, return step S02, again adopt Real-time pressure value in collection pipeline.
This control method after air-conditioning installation, before commencement of commercial operation or, after air-conditioning is keeped in repair, true to taking out of air-conditioning Null process is controlled, for example after air-conditioning is initially installed, after air-conditioning telephone-moving is installed or after air-conditioning is keeped in repair, be used for The vacuum of control air-conditioning and degree, it is ensured that air-conditioning can be properly functioning after installing, improve operational efficiency.
In a preferred embodiment, the real-time pressure value in described predetermined vacuum pressure value and air-conditioning duct is stored in sky On master chip in tune, when starting power up after air-conditioner set installation, air-conditioning mainboard obtains electric starting working, the main core in air-conditioning Piece gathers the real-time pressure in unit pipeline by AD mouth, and this real-time pressure value is stored in the storage list being positioned on master chip In Yuan;Real-time pressure value in pipeline can be measured by the pressure sensor being arranged in pipeline, and storage to storage In unit;Also can be measured by the hand-held Pressure gauge of operating personnel, in this case, Pressure gauge needs the master with air-conditioning Chip is electrically connected, with can by gauge measurement to real-time pressure value be transferred in air-conditioning store, in case with in advance If vacuum pressure value compares, thus vacuum is controlled.
Air-conditioning duct is vacuumized in the control device automatically monitored and control method by being used in the application, right Vacuum after air-conditioning is installed is controlled, and forces actively to vacuumize the air in air-conditioner set pipeline, and reaches pre- Fixed level of vacuum, it can be ensured that before operation of air conditioner, the vacuum in pipeline reaches perfect condition, it is to avoid not thorough owing to vacuumizing The end and the operation of air conditioner effect brought is undesirable, it is ensured that the reliability of operation of air conditioner.
Unless otherwise defined, the those skilled in the art of technology used herein and scientific terminology and the present invention The implication being generally understood that is identical.Term used herein is intended merely to describe concrete enforcement purpose, it is not intended that limit this Invention.Terms such as herein presented " parts " both can represent single part, it is also possible to represents the group of multiple part Close.Terms such as herein presented " installations ", " setting " both can represent that parts were attached directly to another parts, Also can represent that parts are attached to another parts by middleware.The feature describing in one embodiment herein Another embodiment can be applied to individually or with further feature in combination, unless this feature is at this another embodiment In inapplicable or be otherwise noted.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for those skilled in the art For, the present invention can have various change and change.All any modifications, equivalent made within spirit and principles of the present invention Replacement, improvement etc., should be included within the scope of the present invention.

Claims (11)

1. an air conditioning control device, monitors automatically for vacuumizing air-conditioning duct, it is characterised in that
Including:
Pressure acquisition unit (102), for gathering the real-time pressure in air-conditioning duct;
Memory cell (103), is used for storing the real-time pressure numerical value that pressure acquisition unit collects, and, in this memory cell (103) predetermined vacuum pressure that is stored with in value;
Comparing unit (104), for comparing the size of the real-time pressure value collecting and predetermined vacuum pressure value;
Result output unit (105), for the comparative result output control signal according to comparing unit, this control signal is used for controlling Whether system allows to carry out subsequent operation to air-conditioning.
2. air conditioning control device according to claim 1, it is characterised in that described pressure acquisition unit (102) is pressure Sensor or Pressure gauge.
3. air conditioning control device according to claim 2, it is characterised in that described Pressure gauge is hand-held, it can be with Described memory cell (103) is connected.
4. the air conditioning control device according to any one of claim 1-3, it is characterised in that described memory cell (103) position On the master chip of air-conditioning.
5. the air conditioning control device according to any one of claim 1-3, it is characterised in that described result output unit is report Alert device or display.
6. the air conditioning control device according to any one of claim 1-3, it is characterised in that described control signal is:
When described real-time pressure value is less than or equal to described predetermined vacuum pressure value, it is allowed to subsequent operation is carried out to air-conditioning;
When described real-time pressure value is more than described predetermined vacuum pressure value, do not allow to carry out subsequent operation to air-conditioning.
7. the air conditioning control device according to any one of claim 1-6, it is characterised in that also include predetermined vacuum pressure value Preset device (101), for defaulting to the predetermined vacuum pressure value in air-conditioning duct in described memory cell (103).
8. an air conditioning control method, monitors automatically for vacuumizing air-conditioning duct, it is characterised in that include walking as follows Rapid:
Step S01: preset the predetermined vacuum pressure value in air-conditioning duct;
Step S02: gather the real-time pressure value in air-conditioning duct;
Step S03: the real-time pressure value in the pipeline collecting, compare with predetermined vacuum pressure value set in advance;
Step S04: when the real-time pressure value in the pipeline gathering is less than or equal to described predetermined vacuum pressure value, it is allowed to right Air-conditioning carries out subsequent operation;
Step S05: when the real-time pressure value in the pipeline collecting is more than described predetermined vacuum pressure value, do not allow to air-conditioning Carry out subsequent operation, and return step S02.
9. air conditioning control method according to claim 8, it is characterised in that in step S05, when in the pipeline collecting Real-time pressure value more than described predetermined vacuum pressure value when, report circuit failure;Preferably, while reporting circuit failure, send out Go out to need the prompting vacuumizing.
10. air conditioning control method according to claim 9, it is characterised in that described circuit failure is that loine pressure is abnormal Fault.
11. 1 kinds of air-conditionings, are provided with automatically monitoring for vacuumizing air-conditioning duct described in any one of claim 1-7 Control device.
CN201610569801.9A 2016-07-18 2016-07-18 Air conditioning control device, control method and air conditioner Active CN106152410B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610569801.9A CN106152410B (en) 2016-07-18 2016-07-18 Air conditioning control device, control method and air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610569801.9A CN106152410B (en) 2016-07-18 2016-07-18 Air conditioning control device, control method and air conditioner

Publications (2)

Publication Number Publication Date
CN106152410A true CN106152410A (en) 2016-11-23
CN106152410B CN106152410B (en) 2019-07-23

Family

ID=58060379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610569801.9A Active CN106152410B (en) 2016-07-18 2016-07-18 Air conditioning control device, control method and air conditioner

Country Status (1)

Country Link
CN (1) CN106152410B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107421180A (en) * 2017-07-27 2017-12-01 奥克斯空调股份有限公司 A kind of management-control method of the vacuum of production line balance air-conditioning
CN109099555A (en) * 2018-08-21 2018-12-28 宁波奥克斯电气股份有限公司 A kind of vacuum degree measurement judgment method, device and air conditioner

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006090559A (en) * 2004-09-21 2006-04-06 Sharp Corp Air conditioner
CN101336117A (en) * 2006-02-01 2008-12-31 卡尔梅利·阿达汗 Suctioning system, method and kit
CN103674587A (en) * 2012-09-13 2014-03-26 南车青岛四方机车车辆股份有限公司 Test system and method for detection of air conditioning system
CN104266808A (en) * 2014-10-20 2015-01-07 奇瑞汽车股份有限公司 Device and method for detecting leakproofness of automobile system pipelines
CN104315770A (en) * 2014-09-19 2015-01-28 珠海格力电器股份有限公司 Coolant filling system and method
CN104374128A (en) * 2014-10-22 2015-02-25 珠海格力电器股份有限公司 Refrigerant charging device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006090559A (en) * 2004-09-21 2006-04-06 Sharp Corp Air conditioner
CN101336117A (en) * 2006-02-01 2008-12-31 卡尔梅利·阿达汗 Suctioning system, method and kit
CN103674587A (en) * 2012-09-13 2014-03-26 南车青岛四方机车车辆股份有限公司 Test system and method for detection of air conditioning system
CN104315770A (en) * 2014-09-19 2015-01-28 珠海格力电器股份有限公司 Coolant filling system and method
CN104266808A (en) * 2014-10-20 2015-01-07 奇瑞汽车股份有限公司 Device and method for detecting leakproofness of automobile system pipelines
CN104374128A (en) * 2014-10-22 2015-02-25 珠海格力电器股份有限公司 Refrigerant charging device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107421180A (en) * 2017-07-27 2017-12-01 奥克斯空调股份有限公司 A kind of management-control method of the vacuum of production line balance air-conditioning
CN107421180B (en) * 2017-07-27 2019-10-25 奥克斯空调股份有限公司 A kind of management-control method of the vacuum degree of flow line production air-conditioning
CN109099555A (en) * 2018-08-21 2018-12-28 宁波奥克斯电气股份有限公司 A kind of vacuum degree measurement judgment method, device and air conditioner
CN109099555B (en) * 2018-08-21 2019-10-29 宁波奥克斯电气股份有限公司 A kind of vacuum degree measurement judgment method, device and air conditioner

Also Published As

Publication number Publication date
CN106152410B (en) 2019-07-23

Similar Documents

Publication Publication Date Title
US20190171540A1 (en) Apparatus fault detecting system and fault detection device
US11209811B2 (en) Diagnostic device, diagnostic method, and program
EP3726157B1 (en) Air-conditioning system, remote controller, and method for saving a history of operation data of an air conditioner
CN106382726A (en) Fault positioning method and system of precise air conditioner equipment
US20070118253A1 (en) Distributed and adaptive data acquisition system and method
US20220121231A1 (en) Device management system
US11225334B2 (en) Systems and methods for monitoring the health of a rotating machine
CN111322721A (en) Air conditioner fault detection processing method and system, storage medium and air conditioner
CN110825003A (en) Vacuum equipment monitoring control system
CN106152410A (en) Air conditioning control device, control method and air-conditioner
CN110986244A (en) Air conditioner pipeline detection method and device, storage medium, terminal and air conditioner
KR20210012200A (en) Maintenance system for environment test apparatus using machine self check sensor and the control method thereof
JP2013024546A (en) Air-conditioning device management system
JP2006244269A (en) Facility managing device, program update system, facility management program updating method, starting program and facility management program
US10001430B2 (en) Environmental conditioning unit testing
CN102508065A (en) Method, system and engineering machinery for electrical fault diagnosis
CN110719854A (en) Method for debugging air conditioning system, computer-readable storage medium and air conditioning system
CN115111703A (en) Method, terminal and storage medium for detecting filth blockage of water-cooled air conditioner
JP3858827B2 (en) Information management system
EP3220230A1 (en) Data output device, data output system, control method, and program
CN112558539A (en) Energy management system based on panoramic perception, monitoring method and air conditioner
CN112161383A (en) Control method and device of air conditioner, electronic equipment and storage medium
CN110057027B (en) Method and device for monitoring temperature and humidity adjusting equipment and computer storage medium
CN113096269B (en) Information acquisition method and device, electronic equipment and storage medium
CN114216221B (en) Detection method and device for multi-split air conditioner, multi-split air conditioner and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant