CN106152278A - A kind of air filtering purifier - Google Patents

A kind of air filtering purifier Download PDF

Info

Publication number
CN106152278A
CN106152278A CN201610562821.3A CN201610562821A CN106152278A CN 106152278 A CN106152278 A CN 106152278A CN 201610562821 A CN201610562821 A CN 201610562821A CN 106152278 A CN106152278 A CN 106152278A
Authority
CN
China
Prior art keywords
framework
fixing
drainage screen
sponge block
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610562821.3A
Other languages
Chinese (zh)
Inventor
李斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Henglida Technology Co Ltd
Original Assignee
Chengdu Henglida Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Henglida Technology Co Ltd filed Critical Chengdu Henglida Technology Co Ltd
Priority to CN201610562821.3A priority Critical patent/CN106152278A/en
Publication of CN106152278A publication Critical patent/CN106152278A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F8/00Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
    • F24F8/10Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/28Arrangement or mounting of filters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F8/00Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
    • F24F8/10Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
    • F24F8/108Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering using dry filter elements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F8/00Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
    • F24F8/10Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
    • F24F8/192Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering by electrical means, e.g. by applying electrostatic fields or high voltages
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F8/00Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
    • F24F8/20Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by sterilisation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F8/00Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
    • F24F8/20Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by sterilisation
    • F24F8/22Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by sterilisation using UV light

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Disinfection, Sterilisation Or Deodorisation Of Air (AREA)

Abstract

nullA kind of air filtering purifier,Including the first defecator (1)、First air extractor (2)、First decontaminating apparatus (3)、Second defecator (4)、Second air extractor (5)、Second decontaminating apparatus (6) and chiller (7),First defecator (1) includes the first framework (11)、First sponge block (12)、Spin (13)、First bristle (14) and the first drainage screen (15),First air extractor (2) includes the first pipeline (22)、First blower fan (23)、First support (24) and the first support bar (21),First decontaminating apparatus (3) includes the second framework (31)、Second sponge block (32)、First twisted plate (33)、Bell glass (34)、Burdick lamp (35)、3rd sponge block (36)、First spring (37) and the 4th sponge block (38),The present invention can carry out multi-filtering to air,Filter effect is notable.

Description

A kind of air filtering purifier
Technical field
The present invention relates to technical field of air purification, particularly relate to a kind of air filtering purifier.
Background technology
Air purifier at home, medical treatment, industrial circle all have application, field is with the domestic air purification of unit class at home Device is the mainstream product in the market.Topmost function is to remove the particulate matter in air, including anaphylactogen, indoor PM2.5 etc..By Release in the space Air Contamination thing of relative closure has persistency and probabilistic feature, therefore uses air purifier Purifying the air of a room is one of internationally recognized method improving IAQ (indoor air quality).Existing air purifier is mainly by horse Reach, the system such as fan, airstrainer composition, its operation principle is: motor and fan in gas collection make indoor air circulation stream Dynamic, the air of pollution by the airstrainer in machine by various pollution-free removings or absorption, but this air purifier Air can be played a role in filtering, impurity floating in air is filtered or adsorbs, air can not be carried out sterilization and disappear Poison processes.
Chinese patent CN205279281U discloses a kind of air sterillization dust separation device, and it includes casing, described case What body included the purifying box on top and bottom adds wet tank, and described purifying box top is provided with air inlet, and bottom is provided with bleeding point, described The dividing plate being horizontally set inside purifying box is divided into four-level space, and described dividing plate offers vent, and each sheaf space is placed pre- The scavenging material of system, described humidification box top is provided with the air exhauster connecting bleeding point, and the exhaust end of air exhauster is connected by organ Being positioned in water tank the ventilating mechanism of humidification liquid, its scavenging material utilization rate is high, purifies thorough and easy to operate.But it purifies Mode is limited, when in air, the concentration of impurity is higher, it is impossible to effectively remove the impurity that concentration in air is higher;With Time can be heated by resistance heater, but temperature rise limited, sterilization effect is limited, affected by environment relatively Greatly;And directly discharge it after air is heated, it is impossible to it is cooled down, thus affect the temperature of surrounding Degree, even can threaten the safety of exhaust apparatus people around.
Accordingly, it is desirable to provide a kind of new technical scheme solves above-mentioned technical problem.
Summary of the invention
The problem to be solved in the present invention is to provide a kind of air filtering purifier, including the first defecator, first bleeds Device, the first decontaminating apparatus, the second defecator, the second air extractor, the second decontaminating apparatus and chiller, first filters dress Put and include the first framework, the first sponge block, spin, the first bristle and the first drainage screen, the first air extractor include the first pipeline, First blower fan, the first support and the first support bar, the first decontaminating apparatus include the second framework, the second sponge block, the first twisted plate, Bell glass, Burdick lamp, the 3rd sponge block, the first spring, the 4th sponge block and the second spring, air can be carried out by the present invention Multi-filtering, filter effect is notable.
In order to solve above-mentioned technical problem, the present invention adopts the following technical scheme that
A kind of air filtering purifier, described air filtering purifier includes the first defecator, is positioned at described first mistake The first air extractor below filter device, it is positioned at the first decontaminating apparatus below described first air extractor, is positioned at described first The second defecator below decontaminating apparatus, it is positioned at the second air extractor on the right side of described second defecator, is positioned at described The second decontaminating apparatus on the right side of two air extractors and be positioned at the chiller above described second decontaminating apparatus, described first filters Device includes the first framework, the first sponge block being contained in described first framework, is positioned at the rolling above described first sponge block Ball, the first bristle being arranged in described spin and be positioned at the first drainage screen above described first framework, described first bleeds Device includes the first pipeline, the first blower fan being arranged on described first pipeline, is positioned at first on the left of described first blower fan Frame and be positioned at the first support bar of the described first pipeline left and right sides, described first decontaminating apparatus includes the second framework, is contained in The second sponge block in described second framework, be positioned at the first twisted plate below described second sponge block, be positioned at described first curved The bell glass of the left and right sides, the Burdick lamp being contained in described bell glass below bent plate, it is positioned at above described second sponge block The 3rd sponge block, be positioned at the first spring above described 3rd sponge block, be positioned at the 4th sponge block below described bell glass And it being positioned at the second spring below described 4th sponge block, described second defecator includes the 3rd framework, is positioned at the described 3rd Second pipe, the first valve being arranged on described second pipe above framework, it is positioned at the described second pipe left and right sides Second support bar, it is positioned at the second drainage screen of described 3rd framework, is positioned at the first transverse slat below described second drainage screen, position The 5th sponge block below described first transverse slat, it is positioned at the first roller below described 5th sponge block, is positioned at described first The first dividing plate on the right side of roller and be positioned at the 3rd drainage screen on the right side of described first dividing plate, described second air extractor includes the 3rd Pipeline, the second blower fan being arranged on described 3rd pipeline, be arranged on described 3rd pipeline first fix bar, be positioned at described The first cross bar on the left of second blower fan, it is positioned at the second cross bar on the right side of described 3rd pipeline and is positioned at above described second cross bar First montant, described second decontaminating apparatus includes the 4th framework, the second twisted plate being contained in described 4th framework, is positioned at institute State the second transverse slat below the second twisted plate, the 5th drainage screen being arranged on described second transverse slat, be positioned at described second transverse slat Top the 6th drainage screen, the heating rod being contained in described 6th drainage screen, be positioned at first below described second transverse slat erect Plate, it is positioned at the 7th drainage screen above described second twisted plate, is positioned at the 4th pipeline on the left of described 4th framework and is positioned at institute Stating the 3rd cross bar above the 4th pipeline, described chiller includes the 5th framework, is positioned at left and right two below described 5th framework If the 3rd support bar of side, the 5th pipeline between described 3rd support bar, the solid carbon dioxide that is contained in described 5th framework Pipe, it is positioned at the 3rd spring of the described water pipe left and right sides, is positioned at the 8th drainage screen of the described 3rd spring left and right sides, is positioned at institute State the cover plate above the 5th framework, be positioned at the catch bar above described cover plate, be positioned at the cylinder above described catch bar and be positioned at The shell fragment of the described 5th framework left and right sides.
Described first framework is hollow Rotary-table, and the lower surface of described first framework is provided with the first through hole, and described first Sponge block is cylinder and horizontal positioned, and the lower surface of described first sponge block is fixing with the inner surface of described first framework to be connected Connecing, described first sponge block is positioned at the top of described first through hole, and described spin is spheroid, described spin and described first framework Axle turns connection, and described first bristle is provided with several and is evenly distributed in described spin, described first bristle and described spin Fixing connecting, described first drainage screen is hollow hemispherical, the lower surface of described first drainage screen and described first framework Upper surface is fixing to be connected.
Described first support bar is provided with two, and described first support bar is vertical shape, the upper end of described first support bar with The side of described first framework is fixing to be connected, the upper end of described first pipeline be directed at described first through hole and with described first framework Lower surface fixing connect, described first support is L-shaped, and one end of described first support is solid with the lower surface of described first framework Fixed connection, the other end of described first support is fixing with described first blower fan to be connected.
Described second framework is hollow cuboid, and described second framework is vertically placed, and described second framework is positioned at described The lower section of the first framework, described second framework is provided with the second through hole being positioned at its upper surface and the threeway being positioned at its lower surface Hole, the second through hole described in the lower end aligned of described first pipeline and fixing with the upper surface of described second framework be connected, described the The lower end of one support bar is fixing with the upper surface of described second framework to be connected, and described second sponge block is bending, and described second The side of sponge block is fixing with the inner surface of described second framework to be connected, and described second sponge block is provided with and runs through its upper and lower surface Fourth hole, the upper surface of the lower surface of described second sponge block and described first twisted plate is fixing to be connected, described first curved Bent plate is bending, and the side of described first twisted plate is fixing with the inner surface of described second framework to be connected, described first bending Plate is provided with the fifth hole running through its upper and lower surface, and described bell glass is provided with two, and described bell glass is hollow hemispherical, The upper surface of described bell glass is fixing with the lower surface of described first twisted plate to be connected, and the lower surface of described 3rd sponge block leans On the upper surface of described second sponge block, described 3rd sponge block is positioned at the top of described fourth hole, described first spring Being provided with two, described first spring is vertical shape, and the upper end of described first spring is fixing with the inner surface of described second framework to be connected Connecing, the lower end of described first spring is fixing with the upper surface of described 3rd sponge block to be connected, and described 4th sponge block is cuboid And horizontal positioned, the side of described 4th sponge block is fixing with the inner surface of described second framework to be connected, and described second spring sets Having two, described second spring is vertical shape, and the lower end of described second spring is fixing with the inner surface of described second framework to be connected, The upper end of described second spring is fixing with the lower surface of described 4th sponge block to be connected.
Described 3rd framework is hollow cylindrical shape, described 3rd framework horizontal positioned, and described 3rd framework is provided with Clematis stem hole, the 7th through hole and the 8th through hole, described second pipe is vertical shape, the upper end of described second pipe alignment described the Three through holes and fixing with the lower surface of described second framework be connected, clematis stem hole described in the lower end aligned of described second pipe and with The outer surface of described 3rd framework is fixing to be connected, and described second support bar is provided with two, and described second support bar is vertical shape, institute State that the lower surface of the upper end of the second support bar and described second framework is fixing to be connected, the lower end of described second support bar and described the Three frameworks are fixing to be connected, and described second drainage screen is horizontal, the left surface of described second drainage screen and described 3rd framework Inner surface surface is fixing to be connected, and the right surface of described second drainage screen is fixing with the left surface of described first dividing plate to be connected, described First transverse slat is horizontal, and the left surface of described first transverse slat is fixing with the inner surface of described 3rd framework to be connected, and described first The right surface of transverse slat is fixing with the left surface of described first dividing plate to be connected, and described first transverse slat is provided with and runs through its upper and lower surface 9th through hole, described 5th sponge block is cylinder and horizontal positioned, and the upper surface of described 5th sponge block is horizontal with described first The lower surface of plate is fixing to be connected, and described 5th sponge block is positioned at the lower section of described 9th through hole, and described first roller is cylinder, Described first roller turns with described 3rd framework axle and is connected, and described first roller is provided with some second bristles, described second brush Hair is provided with several and is evenly distributed on described first roller, and described second bristle is fixing with described first roller to be connected, institute Stating the first dividing plate is vertical shape, and described first dividing plate is fixing with the inner surface of described 3rd framework to be connected, on described first dividing plate It is provided with and is positioned at the first groove of its lower end and is positioned at the 6th sponge block on the right side of it, the right-hand member of described 6th sponge block and described the The inner surface of three frameworks is fixing to be connected, and described 6th sponge block acts against on the inner surface of described 3rd framework, described 6th sea Continuous block blocks described 7th through hole, and described 3rd drainage screen is vertical shape, the upper surface and the described 3rd of described 3rd drainage screen The inner surface of framework is fixing to be connected, and described 3rd drainage screen is provided with the 4th drainage screen being disposed below, and the described 3rd filters The lower surface of net is fixing with the upper surface of described 4th drainage screen to be connected, and described 4th drainage screen is horizontal, described 4th mistake The inner surface of the right surface of filter screen and described 3rd framework is fixing to be connected, the left surface of described 4th drainage screen and described first every The right surface of plate is fixing to be connected.
Described 3rd pipeline is concave shape, the left end of described 3rd pipeline be directed at described 7th through hole and with described 3rd frame The outer surface of body is fixing to be connected, and the other end of described 3rd pipeline is vertical shape, and described first to fix bar be vertical shape, and described the One fixes that the upper end of bar is fixing with described 3rd framework to be connected, and described 3rd pipeline runs through the described first surface, left and right fixing bar And be secured to connect, described first cross bar is horizontal, and the right-hand member of described first cross bar is fixing with described second blower fan to be connected, The left end of described first cross bar is fixing with described 3rd framework to be connected, and described second cross bar is horizontal, described second cross bar Left end is fixing with described 3rd pipeline to be connected, and described first montant is vertical shape, the lower end of described first montant and described second Cross bar is fixing to be connected.
Described 4th framework is hollow cuboid, and described 4th framework is vertically placed, and described 4th framework is provided with position The first circular hole in its left surface and be positioned at the second circular hole of its upper surface, the right-hand member of described second cross bar and described 4th framework Left surface fixing connect, described second twisted plate is bending, the upper end of described second twisted plate and described 4th framework Inner surface is fixing to be connected, and described second twisted plate is positioned at the right side of described first circular hole, the lower end of described second twisted plate and institute Stating the fixing connection of upper surface of the second transverse slat, described second transverse slat is cuboid and horizontal positioned, the left-handed watch of described second transverse slat Face is fixing with the inner surface of described 4th framework to be connected, and described second transverse slat is provided with the square hole running through its upper and lower surface, described 5th drainage screen is cuboid and horizontal positioned, and it is interior and solid with described second transverse slat that described 5th drainage screen is contained in described square hole Fixed connecting, described 6th drainage screen is hollow rectangular-shaped, the lower surface of described 6th drainage screen and described second transverse slat Upper surface is fixing to be connected, and described 6th drainage screen is positioned at the top of described 5th drainage screen.
Described starting stave is cuboid and vertically places, under the upper surface of described starting stave and described second transverse slat Surface is fixing to be connected, and the lower surface of described first montant is fixing with the inner surface of described 4th framework to be connected, described starting stave Be provided with the 3rd circular hole running through surface around, on the left of described starting stave, be placed with desiccant, described 7th drainage screen in Hollow is hemispherical, and the upper surface of described 7th drainage screen is fixing with the inner surface of described 4th framework to be connected, described 7th mistake Filter screen is positioned at the lower section of described second circular hole, and described 4th pipeline is horizontal, the right-hand member of described 4th pipeline alignment described the One circular hole and fixing with the left surface of described 4th framework is connected, left end described 8th through hole of alignment of described 4th pipeline and with The outer surface of described 3rd framework is fixing to be connected, and the upper end of described first montant is fixed with described 4th pipeline and is connected, and described the Three cross bars are horizontal, and the right-hand member of described 3rd cross bar is fixing with the left surface of described 4th framework to be connected, described 3rd cross bar The right surface of left end and described second support bar fixing be connected, described 3rd cross bar is provided with second be positioned above Frame, described second support is L-shaped, and one end of described second support is fixing with described 3rd cross bar to be connected, described second support The other end is fixing with the right surface of described second framework to be connected.
Described 5th framework is hollow semicylinder shape, and described 5th framework is positioned at the top of described 4th framework, institute Stating the 5th framework and be provided with the 4th circular hole and the 5th circular hole, described 3rd support bar is provided with two, and described 3rd support bar is in perpendicular Straight shape, the upper end of described 3rd support bar is fixing with described 5th framework to be connected, the lower end of described support bar and described 4th frame The upper surface of body is fixing to be connected, and described 5th pipeline is vertical shape, the second circular hole described in the lower end aligned of described 5th pipeline and Fixing with the upper surface of described 4th framework and be connected, the upper end of described 5th pipeline is directed at described 4th circular hole and with the described 5th The outer surface of framework is fixing to be connected, and described water pipe is provided with several, and described 8th drainage screen is provided with two and lays respectively at described The left and right sides in 5th framework, described 8th drainage screen is bending, and described 8th drainage screen is interior with described 5th framework Surface is fixing to be connected, and described 3rd spring is provided with two, and described 3rd spring is vertical shape, the lower end of described 3rd spring and institute Stating the fixing connection of inner surface of the 5th framework, the upper end of described 3rd spring is fixing with the lower surface of described cover plate to be connected, described Cover plate is cuboid and horizontal positioned, the lower surface of described cover plate and the upper surface of described 5th framework.
Described catch bar is cuboid and vertically places, and the lower end of described catch bar is fixing with the upper surface of described cover plate to be connected Connecing, the upper end of described catch bar is connected with described cylinder, and described cylinder is provided with the 4th cross bar being positioned on the left of it, and the described 4th Cross bar is cuboid and horizontal positioned, and the right-hand member of described 4th cross bar is fixing with the left surface of described cylinder to be connected, and the described 4th The left end of cross bar is fixing with the side of described first support bar to be connected, and described shell fragment is provided with two and lays respectively at described 5th frame The left and right sides of body, described shell fragment is bending, and the lower end of described shell fragment is fixing with the side of described 5th framework to be connected, described Shell fragment acts against on the side of described 5th framework, and described shell fragment blocks described 5th circular hole, and described shell fragment is provided with holding rod, One end of described holding rod is fixing with the upper end of described shell fragment to be connected.
After using technique scheme, air filtering purifier of the present invention has the advantage that
Air filtering purifier of the present invention can carry out multi-filtering to air, and filter effect is notable, prevent by with pollution Waste gas discharge;And the effect of preferable sterilizing can be played, kill antibacterial therein, prevent antibacterial to be disseminated to air In cause transmission of disease;The air of heating can be cooled down simultaneously, prevent high temperature on the impact of surrounding and right The security threat of surrounding population, eliminates safe hidden trouble;And when its air pressure inside is bigger, the work that preferably reduces pressure can be played With, prevent from damaging the present invention, extend its life-span used.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings the detailed description of the invention of air filtering purifier of the present invention is described further:
Fig. 1 is the structural representation of air filtering purifier of the present invention;
In figure: 1-the first defecator;11-the first framework;111-the first through hole;12-the first sponge block;13-spin; 14-the first bristle;15-the first drainage screen;2-the first air extractor;21-the first support bar;22-the first pipeline;23-the first wind Machine;24-the first support;3-the first decontaminating apparatus;31-the second framework;311-the second through hole;312-third through-hole;32-the second sea Continuous block;321-fourth hole;33-the first twisted plate;331-fifth hole;34-bell glass;35-Burdick lamp;36-the 3rd sea Continuous block;37-the first spring;38-the 4th sponge block;39-the second spring;4-the second defecator;41-the 3rd framework;411- Clematis stem hole;412-the 7th through hole;413-the 8th through hole;42-second pipe;43-the first valve;44-the second support bar;45- Two drainage screens;46-the first transverse slat;461-the 9th through hole;47-the 5th sponge block;48-the first roller;481-the second bristle;49- 3rd drainage screen;491-the 4th drainage screen;40-the first dividing plate;401-the first groove;402-the 6th sponge block;5-second bleeds Device;51-the 3rd pipeline;52-first fixes bar;53-the first cross bar;54-the second blower fan;55-the second cross bar;56-first erects Bar;6-the second decontaminating apparatus;61-the 4th framework;611-the first circular hole;612-the second circular hole;62-the second twisted plate;63-second Transverse slat;631-square hole;64-the 5th drainage screen;65-the 6th drainage screen;66-heating rod;67-starting stave;671-the 3rd circular hole; 68-the 7th drainage screen;69-the 4th pipeline;60-the 3rd cross bar;601-the second support;7-chiller;71-the 3rd support bar; 72-the 5th pipeline;73-the 5th framework;731-the 4th circular hole;732-the 5th circular hole;74-water pipe;75-the 8th drainage screen;76- Three springs;77-cover plate;78-catch bar;79-cylinder;791-the 4th cross bar;70-shell fragment;701-holding rod.
Detailed description of the invention
As it is shown in figure 1, air filtering purifier of the present invention includes the first defecator 1, is positioned at described first defecator 1 Lower section the first air extractor 2, be positioned at the first decontaminating apparatus 3 below described first air extractor 2, be positioned at described first sterilization The second defecator 4 below device 3, it is positioned at the second air extractor 5 on the right side of described second defecator 4, is positioned at described The second decontaminating apparatus 6 on the right side of two air extractors 5 and be positioned at the chiller 7 above described second decontaminating apparatus 6.
As it is shown in figure 1, described first defecator 1 include the first framework 11, be contained in described first framework 11 One sponge block 12, be positioned at the spin 13 above described first sponge block 12, the first bristle 14 of being arranged in described spin 13 and It is positioned at the first drainage screen 15 above described first framework 11.Described first framework 11 in hollow Rotary-table, described first frame The cross section of body 11 is concave shape, and the lower surface of described first framework 11 is provided with the first through hole 111, described first through hole 111 in Circular and communicate with the inside of described first framework 11.Described first sponge block 12 in cylinder and horizontal positioned, described first The lower surface of sponge block 12 is fixing with the inner surface of described first framework 11 to be connected, and described first sponge block 12 is positioned at described first The top of through hole 111.Described spin 13 is in spheroid, and described spin 13 turns with described first framework 11 axle and is connected so that described rolling Ball 13 can rotate in described first framework 11, and described spin 13 is connected with motor, drives described spin 13 described first Rotate in framework 11.Described first bristle 14 is provided with several and is evenly distributed in described spin 13, described first bristle 14 Fixing with described spin 14 and be connected, described first bristle 14 can contact with described first sponge block 12.Described first drainage screen 15 in hollow hemispherical, and the lower surface of described first drainage screen 15 is fixing with the upper surface of described first framework 11 to be connected, and makes The air in described first framework 11 must be entered into and need the filtration through described first drainage screen 15.
As it is shown in figure 1, described first air extractor 2 include the first pipeline 22, be arranged on described first pipeline 22 One blower fan 23, it is positioned at the first support 24 on the left of described first blower fan 23 and is positioned at the first of described first pipeline 22 left and right sides Support bar 21.Described first support bar 21 is provided with two, described first support bar 21 in vertical shape, described first support bar 21 Upper end is fixing with the side of described first framework 11 to be connected.The upper end of described first pipeline 22 be directed at described first through hole 111 and Fix with the lower surface of described first framework 11 and be connected so that the inside of described first pipeline 22 is interior with described first framework 11 Portion communicates.Described first blower fan 23 is electrically connected with the power supply, and described first blower fan 23 makes the air in described first framework 11 It is drawn in described first pipeline 22.Described first support 24 is L-shaped, one end of described first support 24 and described first frame The lower surface of body 11 is fixing to be connected, and the other end of described first support 24 is fixing with described first blower fan 23 to be connected.
As it is shown in figure 1, described first decontaminating apparatus 3 include the second framework 31, be contained in described second framework 31 Two sponge blocks 32, be positioned at the first twisted plate 33 below described second sponge block 32, be positioned at below described first twisted plate 33 left The bell glass 34 of right both sides, the Burdick lamp 35 being contained in described bell glass 34, it is positioned at above described second sponge block 32 3rd sponge block 36, it is positioned at the first spring 37 above described 3rd sponge block 36, is positioned at the 4th below described bell glass 34 Sponge block 38 and be positioned at the second spring 39 below described 4th sponge block 38.Described second framework 31 in hollow cuboid, Described second framework 31 is vertically placed, and described second framework 31 is positioned at the lower section of described first framework 11, described second framework 31 Be provided with the second through hole 311 being positioned at its upper surface and the third through-hole 312 being positioned at its lower surface, described second framework 311 and Rounded and with described second framework 31 the inside of third through-hole 312 communicates, described in the lower end aligned of described first pipeline 22 Two through holes 311 and fixing with the upper surface of described second framework 31 is connected so that the inside of described first pipeline 22 and described the The inside of two frameworks 31 communicates, and the lower end of described first support bar 21 is fixing with the upper surface of described second framework 31 to be connected.Institute State the second sponge block 32 in bending, the side of described second sponge block 32 with the inner surface of described second framework 31 fixing even Connecing, described second sponge block 32 is provided with the fourth hole 321 running through its upper and lower surface, the lower surface of described second sponge block 32 Fix with the upper surface of described first twisted plate 33 and be connected.Described first twisted plate 33 in bending, described first twisted plate 33 The inner surface of side and described second framework 31 fixing be connected, described first twisted plate 33 is provided with and runs through its upper and lower surface Fifth hole 331, described fifth hole 331 is positioned at the lower section of described fourth hole 321.Described bell glass 34 is provided with two, institute State bell glass 34 in hollow hemispherical, the upper surface of described bell glass 34 with the lower surface of described first twisted plate 33 fixing even Connecing, described bell glass 34 uses glass material to make.Described Burdick lamp 35 is provided with two, described Burdick lamp 35 and power supply electricity Property connect so that described Burdick lamp 35 can send ultraviolet.The lower surface of described 3rd sponge block 35 acts against described On the upper surface of two sponge blocks 32, described 3rd sponge block 35 is positioned at the top of described fourth hole 321.Described first spring 37 Be provided with two, described first spring 37 in vertical shape, the inner surface of the upper end of described first spring 37 and described second framework 31 Fixing connection, the lower end of described first spring 37 is fixing with the upper surface of described 3rd sponge block 36 to be connected, so that described 3rd sponge block 36 acting against on described second sponge block 32 tightly.Described 4th sponge block 38 in cuboid and put by level Putting, the side of described 4th sponge block 38 is fixing with the inner surface of described second framework 31 to be connected.Described second spring 39 is provided with Two, described second spring 39 is in vertical shape, and the inner surface of the lower end of described second spring 39 and described second framework 31 is fixed Connecting, the upper end of described second spring 39 is fixing with the lower surface of described 4th sponge block 38 to be connected.
As it is shown in figure 1, described second defecator 4 includes the 3rd framework 41, is positioned at above described 3rd framework 41 Two pipelines 42, the first valve 43 being arranged on described second pipe 42, it is positioned at the second of described second pipe 42 left and right sides Support bar 44, be positioned at the second drainage screen 45 of described 3rd framework 41, to be positioned at first below described second drainage screen 45 horizontal Plate 46, it is positioned at the 5th sponge block 47 below described first transverse slat 46, is positioned at the first roller below described 5th sponge block 47 48, it is positioned at the first dividing plate 40 on the right side of described first roller 48 and is positioned at the 3rd drainage screen 49 on the right side of described first dividing plate 40. Described 3rd framework 41 is in hollow cylindrical shape, and described 3rd framework 41 horizontal positioned, described 3rd framework 41 is provided with Clematis stem hole the 411, the 7th through hole 412 and the 8th through hole 413, described clematis stem hole the 411, the 7th through hole 412 and the 8th through hole 413 with The inside of described 3rd framework 41 communicates.Described second pipe 42 is in vertical shape, and the upper end alignment of described second pipe 42 is described Third through-hole 312 and fixing with the lower surface of described second framework 31 be connected so that the inside of described second pipe 42 is with described The inside of the second framework 31 communicates, clematis stem hole 411 described in the lower end aligned of described second pipe 42 and with described 3rd framework The outer surface of 41 is fixing to be connected so that the inside of described second pipe 42 communicates with the inside of described 3rd framework 41.Described One valve 43 flow of gas in controlling described second pipe 42.Described second support bar 44 is provided with two, and described second Support bar 44 is in vertical shape, and the upper end of described second support bar 44 is fixing with the lower surface of described second framework 31 to be connected, described The lower end of the second support bar 44 is fixing with described 3rd framework 41 to be connected.Described second drainage screen 45 is horizontal, and described second The left surface of drainage screen 45 is fixing with the inner surface surface of described 3rd framework 41 to be connected, the right surface of described second drainage screen 45 Fix with the left surface of described first dividing plate 40 and be connected.Described first transverse slat 46 is horizontal, the left-handed watch of described first transverse slat 46 Face is fixing with the inner surface of described 3rd framework 41 to be connected, the right surface of described first transverse slat 46 and a left side for described first dividing plate 40 Surface is fixing to be connected, and described first transverse slat 46 is provided with the 9th through hole 461 running through its upper and lower surface, described 9th through hole 461 Rounded.Described 5th sponge block 47 is in cylinder and horizontal positioned, the upper surface and described first of described 5th sponge block 47 The lower surface of transverse slat 46 is fixing to be connected, and described 5th sponge block 47 is positioned at the lower section of described 9th through hole 461.Described first roller 48 in cylinder, and described first roller 48 turns with described 3rd framework 41 axle and is connected so that described first roller 48 can be in institute Rotating in stating the 3rd framework 41, described first roller 48 is connected with motor, drives described first roller 48 to rotate, described first rolling Wheel 48 is provided with some second bristles 481, and described second bristle 481 is provided with several and is evenly distributed on described first roller 48 On, described second bristle 481 is fixing with described first roller 48 to be connected.Described first dividing plate 40 in vertical shape, described first every Plate 40 is fixing with the inner surface of described 3rd framework 41 to be connected, and described first dividing plate 40 is provided with the first groove being positioned at its lower end 401 and be positioned at the 6th sponge block 402 on the right side of it, described first groove 401 runs through the surface, left and right of described first dividing plate 40, institute The inner surface of the right-hand member and described 3rd framework 41 of stating the 6th sponge block 402 is fixed and is connected, and described 6th sponge block 402 acts against On the inner surface of described 3rd framework 41, described 6th sponge block 402 blocks described 7th through hole 412.Described 3rd drainage screen 49 in vertical shape, and the upper surface of described 3rd drainage screen 49 is fixing with the inner surface of described 3rd framework 41 to be connected, and the described 3rd Drainage screen 491 is provided with the 4th drainage screen 491 being disposed below, the lower surface of described 3rd drainage screen 49 and described 4th mistake The upper surface of filter screen 491 is fixing to be connected, and described 4th drainage screen 491 is horizontal, the right surface of described 4th drainage screen 491 with The inner surface of described 3rd framework 41 is fixing to be connected, the left surface of described 4th drainage screen 491 and the right side of described first dividing plate 40 Surface is fixing to be connected.
As it is shown in figure 1, described second air extractor 5 include the 3rd pipeline 51, be arranged on described 3rd pipeline 51 Two blower fans 54, first be arranged on described 3rd pipeline 51 are fixed bar 52, are positioned at the first horizontal stroke on the left of described second blower fan 54 Bar 53, it is positioned at the second cross bar 55 on the right side of described 3rd pipeline 51 and is positioned at the first montant 56 above described second cross bar 55. Described 3rd pipeline 51 in concave shape, the left end of described 3rd pipeline 51 be directed at described 7th through hole 412 and with described 3rd frame The outer surface of body 41 is fixing to be connected so that the inside of described 3rd pipeline 51 communicates with the inside of described 3rd framework 41, described The other end of the 3rd pipeline 51 is vertical shape.Described first fixes bar 52 in vertical shape, described first fix the upper end of bar 52 with Described 3rd framework 41 is fixing to be connected, and described 3rd pipeline 51 runs through the described first surface, left and right fixing bar 52 and is secured to Connecting, described first fixes bar 52 is used for fixing described 3rd pipeline 51.Described second blower fan 54 is electrically connected with the power supply so that Air in described 3rd framework 41 is drawn in described 3rd pipeline 51.Described first cross bar 53 is horizontal, and described The right-hand member of one cross bar 53 is fixing with described second blower fan 54 to be connected, and the left end of described first cross bar 53 is solid with described 3rd framework 41 Fixed connection.Described second cross bar 55 is horizontal, and the left end of described second cross bar 55 is fixing with described 3rd pipeline 51 to be connected.Institute Stating the first montant 56 in vertical shape, the lower end of described first montant 56 is fixing with described second cross bar 55 to be connected.
As it is shown in figure 1, described second decontaminating apparatus 6 include the 4th framework 61, be contained in described 4th framework 61 Two twisted plates 62, be positioned at the second transverse slat 63 below described second twisted plate 62, the be arranged on described second transverse slat 63 the 5th Drainage screen 64, it is positioned at the 6th drainage screen 65 above described second transverse slat 63, is contained in the heating of described 6th drainage screen 65 Rod 66, it is positioned at the starting stave 67 below described second transverse slat 63, is positioned at the 7th drainage screen above described second twisted plate 62 68, it is positioned at the 4th pipeline 69 on the left of described 4th framework 61 and is positioned at the 3rd cross bar 60 above described 4th pipeline 69.Institute Stating the 4th framework 61 in hollow cuboid, described 4th framework 61 is vertically placed, and described 4th framework 61 is provided with and is positioned at it First circular hole 611 of left surface and be positioned at the second circular hole 612 of its upper surface, described first circular hole 611 and the second circular hole 612 in Circular and communicate with the inside of described 4th framework 61, the right-hand member of described second cross bar 55 and the left surface of described 4th framework 61 Fixing connection.Described second twisted plate 62 is in bending, and the upper end of described second twisted plate 62 is interior with described 4th framework 61 Surface is fixing to be connected, and described second twisted plate 62 is positioned at the right side of described first circular hole 611, the lower end of described second twisted plate 62 Fix with the upper surface of described second transverse slat 63 and be connected.Described second transverse slat 63 is in cuboid and horizontal positioned, and described second is horizontal The left surface of plate 63 is fixing with the inner surface of described 4th framework 61 to be connected, and described second transverse slat 63 is provided with and runs through following table on it The square hole 631 in face, described square hole 631 is in rectangular-shaped.Described 5th drainage screen 64 in cuboid and horizontal positioned, the described 5th Fix in drainage screen 64 is contained in described square hole 631 and with described second transverse slat 63 and be connected.Described 6th drainage screen 65 is in hollow Rectangular-shaped, the cross section of described 6th drainage screen 65 is inverted concave shape, the lower surface of described 6th drainage screen 65 with The upper surface of described second transverse slat 63 is fixing to be connected, and described 6th drainage screen 65 is positioned at the top of described 5th drainage screen 64.Institute State heating rod 66 to be electrically connected with the power supply so that described heating rod 66 can produce heat.Described starting stave 67 is in cuboid And vertically place, the upper surface of described starting stave 67 is fixing with the lower surface of described second transverse slat 63 to be connected, and described first erects The lower surface of bar 67 is fixing with the inner surface of described 4th framework 61 to be connected, and described starting stave 67 is provided with and runs through table around 3rd circular hole 671 in face, is placed with desiccant on the left of described starting stave 67.Described 7th drainage screen 68 is in hollow hemisphere Shape, the upper surface of described 7th drainage screen 68 is fixing with the inner surface of described 4th framework 61 to be connected, described 7th drainage screen 68 It is positioned at the lower section of described second circular hole 612.Described 4th pipeline 69 is horizontal, and the right-hand member alignment of described 4th pipeline 69 is described First circular hole 611 and fixing with the left surface of described 4th framework 61 be connected so that the inside of described 4th pipeline 69 is with described The inside of the 4th framework 61 communicates, the left end of described 4th pipeline 69 be directed at described 8th through hole 413 and with described 3rd framework The outer surface of 41 is fixing to be connected so that the inside of described 4th pipeline 69 communicates with the inside of described 3rd framework 41, and described the The upper end of one montant 56 is fixing with described 4th pipeline 69 to be connected.Described 3rd cross bar 60 is horizontal, described 3rd cross bar 60 The left surface of right-hand member and described 4th framework 61 fixing is connected, the left end of described 3rd cross bar 60 and described second support bar 44 Right surface fixing connect, described 3rd cross bar 60 is provided with the second support 601 being positioned above, described second support 601 L-shaped, one end of described second support 601 is fixing with described 3rd cross bar 60 to be connected, the other end of described second support 601 and The right surface of described second framework 31 is fixing to be connected.
As it is shown in figure 1, described chiller 7 includes the 5th framework 73, is positioned at the left and right sides below described 5th framework 73 The 3rd support bar 71, the 5th pipeline 72 between described 3rd support bar 71, be contained in described 5th framework 73 Some water pipes 74, it is positioned at the 3rd spring 76 of described water pipe 74 left and right sides, is positioned at the of described 3rd spring 76 left and right sides Eight drainage screens 75, it is positioned at the cover plate 77 above described 5th framework 73, is positioned at the catch bar 78 above described cover plate 77, is positioned at institute State the cylinder 79 above catch bar 78 and be positioned at the shell fragment 70 of described 5th framework 73 left and right sides.Described 5th framework 73 is in sky The semicylinder shape of the heart, described 5th framework 73 is positioned at the top of described 4th framework 61, and described 5th framework 73 is provided with The inside phase of four circular hole 731 and the 5th circular holes 732, described 4th circular hole 731 and the 5th circular hole 732 and described 5th framework 73 Logical.Described 3rd support bar 71 is provided with two, described 3rd support bar 71 in vertical shape, the upper end of described 3rd support bar 71 with Described 5th framework 73 is fixing to be connected, and the lower end of described support bar 71 is fixing with the upper surface of described 4th framework 61 to be connected.Institute State the 5th pipeline 72 in vertical shape, the second circular hole 612 described in the lower end aligned of described 5th pipeline 72 and with described 4th framework The upper surface of 61 is fixing to be connected so that the inside of described 5th pipeline 72 communicates with the inside of described 4th framework 61, and described the The upper end of five pipelines 72 is directed at described 4th circular hole 731 and fixing with the outer surface of described 5th framework 73 is connected so that described The inside of the 5th pipeline 72 communicates with the inside of described 5th framework 73.Described water pipe 74 is provided with several, in described water pipe 74 Being placed with cooling water, described water pipe 74 uses Heat Conduction Material to make, such that it is able to the heat of air in absorbing described 5th framework 73 Amount.Described 8th drainage screen 75 is provided with two and lays respectively at the left and right sides in described 5th framework 73, and the described 8th filters Net 75 is in bending, and described 8th drainage screen 75 is fixing with the inner surface of described 5th framework 73 to be connected, described 8th drainage screen 75 block described 5th circular hole 732.Described 3rd spring 76 is provided with two, described 3rd spring 76 in vertical shape, the described 3rd The lower end of spring 76 is fixing with the inner surface of described 5th framework 73 to be connected, the upper end of described 3rd spring 76 and described cover plate 77 Lower surface fixing connect, thus described cover plate 77 is played a supporting role.Described cover plate 77 is in cuboid and horizontal positioned, institute State the lower surface of cover plate 77 and the upper surface of described 5th framework 73.Described catch bar 78 in cuboid and is vertically placed, The lower end of described catch bar 78 is fixing with the upper surface of described cover plate 77 to be connected, the upper end of described catch bar 78 and described cylinder 79 Connect so that described cylinder 79 drives described catch bar 78 to move up and down.Described cylinder 79 is provided with the 4th be positioned on the left of it Cross bar 791, described 4th cross bar 791 in cuboid and horizontal positioned, the right-hand member of described 4th cross bar 791 and described cylinder 79 Left surface is fixing to be connected, and the left end of described 4th cross bar 791 is fixing with the side of described first support bar 21 to be connected, thus to institute State cylinder 79 to play a supporting role.Described shell fragment 79 is provided with two and lays respectively at the left and right sides of described 5th framework 73, institute Stating shell fragment 79 in bending, the lower end of described shell fragment 79 is fixing with the side of described 5th framework 73 to be connected, and described shell fragment 79 pushes up Leaning against on the side of described 5th framework 73, described shell fragment 79 blocks described 5th circular hole 732, and described shell fragment 79 is provided with gripping Bar 701, one end of described holding rod 701 is fixing with the upper end of described shell fragment 79 to be connected.
During as it is shown in figure 1, described air filtering purifier of the present invention uses, first place it in and need to purify air In space.Then the first blower fan 23 is started so that extraneous air enters into described the after the filtration of the first drainage screen 15 In one framework 11, owing to described first drainage screen 15 can filter out the impurity that in air, particle diameter is bigger so that particle diameter is bigger Impurity is deposited on the outer surface of described first drainage screen 15.Then the motor being connected with spin 13 is started so that spin 13 is revolved Turn, and then drive described bristle 14 to rotate with, and then the impurity such as the partial impurities in air and cotton-wool can be adsorbed, then empty Gas enters in described first pipeline 22 after the filtration of described first sponge block 12, then into described second framework 31 In.Owing to the 3rd sponge block 36 is pressed on described second sponge block 32 by the first spring 37, and then make described 3rd sponge Block 36 and the second sponge block 32 are compressed, and then the density of described 3rd sponge block 36 and the second sponge block 32 is increased, and make It is more preferable to the filter effect of air, then air after the filtration of the 3rd sponge block 36 and the second sponge block 32 through the 5th Through hole 331 enters into the lower section of described first twisted plate 33, and when air pressure is bigger, partial air is through the mistake of the 3rd sponge block 36 The lower section of described first twisted plate 33 directly it is flow to by fourth hole 321 and fifth hole 331, such that it is able to play after filter The effect of buffering, blood pressure lowering as soon as possible.Then Burdick lamp 35 is started so that it is send ultraviolet, thus ultraviolet can be by air In antibacterial kill, due to the setting of the 4th sponge block 38, the 4th sponge block 38 is relatively slow to the filtration of air, and then makes air Rest on the time above described 4th sponge block 38 longer so that ultraviolet sterilization kill more abundant.Then bacterium has been killed Air after the filtration of the 4th sponge block 38, enter into the lower section of the 4th sponge block 38, then into described second pipe In 42, open the first valve 43 so that the air in second pipe 42 enters in described 3rd framework 41.Then air is first After the filtration of the second drainage screen 45, enter into the lower section of the second drainage screen 45, then pass through the 9th through hole 461 and through The lower section of the 5th sponge block 47 is entered into, owing to the 9th through hole 461 is less so that the 5th sponge block after the filtration of five sponge blocks 47 Air can the most sufficiently be filtered by 47.Then the motor being connected with the first roller 48 is started so that described first rolling Wheel 48 connection, and then drive described second bristle 481 to rotate with, it is possible not only to clean on described 3rd framework 41 inner surface Impurity, it is also possible to absorption air in partial impurities.Then air enters into described first dividing plate 40 through the first groove 401 Right side.If now needing to discharge air, start the second blower fan 54 so that the air in described 3rd framework 41 is through the Enter in described 3rd pipeline 51 after the filtration of six sponge blocks 402, be then discharged out.When the impurity antibacterial in air is more, Enter into the air on the right side of described first dividing plate 40 can enter into after the filtration of the 4th drainage screen 491 and the 3rd drainage screen 49 In described 4th pipeline 69, then in described 4th framework 61, then due to the setting of the second twisted plate 62 so that empty Gas flows downward, and then starts heating rod 66 so that the temperature in the 4th framework 61 rises, when temperature reaches certain value, and can To kill the antibacterial in air.Air is fully contacted with heating rod 66 after the 6th drainage screen 65, is then passed through the 5th filtration Enter into the lower section of the second transverse slat 63 after the filtration of net 64, thus be possible not only to air is filtered, it is also possible to air is entered Row sterilizing.Enter into the air below described second transverse slat 63 to contact with desiccant, such that it is able to air is dried, Then air enters into the right side of described starting stave 67 through the 3rd circular hole 671, flow to described second bending then up The top of plate 62.Enter into after being then passed through the filtration of the 7th drainage screen 68 in described 5th pipeline 72, then into described In 5th framework 73, being then fully contacted with water pipe 74, owing to being placed with cooling water in water pipe 74, and water pipe 74 uses heat conduction material Material is made, such that it is able to lower the temperature the air entered in described 5th framework 73.Then when the gas in the 5th framework 73 When pressing bigger, it can overcome the elastic force of shell fragment 70 to make the air after the purification in the 5th framework 73 through the 8th drainage screen 75 Discharge from the 5th circular hole 732, naturally it is also possible to hold holding rod 701 and move down so that described shell fragment 70 no longer keeps off in institute State on the outer surface of the 5th framework 73, so that the air in described 5th framework 73 is discharged through the 5th circular hole 732, also may be used To start cylinder 79 so that described catch bar 78 moves up, and then described cover plate 77 is moved up, so that described Air in 5th framework 73 is quickly discharged, so that expellant gas proper temperature, it is to avoid the safety of people around is made Become to threaten, and environmental protection, bactericidal effect is notable.So far, air of the present invention extraction purifier uses process prescription complete.
The above, the only detailed description of the invention of the present invention, but protection scope of the present invention is not limited thereto, and any Those skilled in the art, in the technical scope that the invention discloses, can readily occur in change or replace, should contain Within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with described scope of the claims.

Claims (8)

1. an air filtering purifier, including the first defecator (1), is positioned at the of described first defecator (1) lower section One air extractor (2), be positioned at described first air extractor (2) lower section the first decontaminating apparatus (3), be positioned at described first sterilization dress Put (3) lower section the second defecator (4), be positioned at described second defecator (4) right side the second air extractor (5), be positioned at Described second air extractor (5) right side the second decontaminating apparatus (6) and be positioned at described second decontaminating apparatus (6) top cooling dress Put (7), it is characterised in that: described first defecator (1) includes the first framework (11), is contained in described first framework (11) The first sponge block (12), be positioned at described first sponge block (12) top spin (13), be arranged in described spin (13) First bristle (14) and be positioned at described first framework (11) top the first drainage screen (15), described first air extractor (2) wrap Include the first pipeline (22), the first blower fan (23) being arranged on described first pipeline (22), be positioned at described first blower fan (23) left side First support (24) of side and be positioned at first support bar (21) of described first pipeline (22) left and right sides, described second filters dress Put (4) to include the 3rd framework (41), the second pipe (42) being positioned at described 3rd framework (41) top, be arranged at described second pipe The first valve (43) on road (42), be positioned at described second pipe (42) left and right sides the second support bar (44), be positioned at described The second drainage screen (45) in 3rd framework (41), it is positioned at first transverse slat (46) of described second drainage screen (45) lower section, is positioned at Described first transverse slat (46) lower section the 5th sponge block (47), be positioned at described 5th sponge block (47) lower section the first roller (48), it is positioned at first dividing plate (40) on described first roller (48) right side and is positioned at the 3rd mistake on described first dividing plate (40) right side Filter screen (49).
Air filtering purifier the most according to claim 1, it is characterised in that: described chiller (7) includes the 5th frame Body (73), be positioned at described 5th framework (73) lower section the left and right sides the 3rd support bar (71), be positioned at described 3rd support bar (71) the 5th pipeline (72), the some water pipes (74) being contained in described 5th framework (73) between, it is positioned at described water pipe (74) left and right sides the 3rd spring (76), be positioned at the 8th drainage screen (75) of described 3rd spring (76) left and right sides, be positioned at Described 5th framework (73) top cover plate (77), be positioned at described cover plate (77) top catch bar (78), be positioned at described promotion The cylinder (79) of bar (78) top and be positioned at the shell fragment (70) of described 5th framework (73) left and right sides.
Air filtering purifier the most according to claim 1, it is characterised in that: described first decontaminating apparatus (3) includes Two frameworks (31), the second sponge block (32) being contained in described second framework (31) and be positioned under described second sponge block (32) First twisted plate (33) of side, described second framework (31) is in hollow cuboid, and described second framework (31) is vertically placed, institute Stating the second framework (31) and be positioned at the lower section of described first framework (11), described second framework (31) is provided with and is positioned at its upper surface Second through hole (311) and be positioned at the third through-hole (312) of its lower surface, described in the lower end aligned of described first pipeline (22) second Through hole (311) and fixing with the upper surface of described second framework (31) be connected.
Air filtering purifier the most according to claim 3, it is characterised in that: described 3rd framework (41) is in hollow circle Bar shape, described 3rd framework (41) horizontal positioned, described 3rd framework (41) is provided with clematis stem hole (411), the 7th through hole (412) and the 8th through hole (413), described second pipe (42) is in vertical shape, and the upper end alignment of described second pipe (42) is described Third through-hole (312) and fixing with the lower surface of described second framework (31) being connected, the lower end aligned of described second pipe (42) Described clematis stem hole (411) and fixing with the outer surface of described 3rd framework (41) be connected, described second support bar (44) is provided with Two, described second support bar (44) in vertical shape, the upper end of described second support bar (44) and described second framework (31) Lower surface is fixing to be connected, and the lower end of described second support bar (44) is fixing with described 3rd framework (41) to be connected.
Air filtering purifier the most according to claim 1, it is characterised in that: described second drainage screen (45) is in level Shape, the left surface of described second drainage screen (45) is fixing with the inner surface surface of described 3rd framework (41) to be connected, and described second The right surface of drainage screen (45) is fixing with the left surface of described first dividing plate (40) to be connected, and described first transverse slat (46) is in level Shape, the left surface of described first transverse slat (46) is fixing with the inner surface of described 3rd framework (41) to be connected, described first transverse slat (46) right surface is fixing with the left surface of described first dividing plate (40) to be connected, and described first transverse slat (46) is provided with runs through on it 9th through hole (461) of lower surface, described 5th sponge block (47) is in cylinder and horizontal positioned, described 5th sponge block (47) The lower surface of upper surface and described first transverse slat (46) fixing be connected, described 5th sponge block (47) is positioned at described 9th through hole (461) lower section.
Air filtering purifier the most according to claim 1, it is characterised in that: described first roller (48) in cylinder, Described first roller (48) turns with described 3rd framework (41) axle and is connected, and described first roller (48) is provided with some second bristles (481), described second bristle (481) is provided with several and is evenly distributed on described first roller (48), described second bristle (481) fixing with described first roller (48) be connected, described first dividing plate (40) in vertical shape, described first dividing plate (40) and institute State the fixing connection of inner surface of the 3rd framework (41).
Air filtering purifier the most according to claim 1, it is characterised in that: described first dividing plate (40) is provided with and is positioned at First groove (401) of its lower end and be positioned at the 6th sponge block (402) on the right side of it, the right-hand member of described 6th sponge block (401) Fixing with the inner surface of described 3rd framework (41) and be connected, described 6th sponge block (401) acts against described 3rd framework (41) Inner surface on, described 6th sponge block (401) blocks described 7th through hole (412).
Air filtering purifier the most according to claim 1, it is characterised in that: described 3rd drainage screen (49) is in vertically Shape, the upper surface of described 3rd drainage screen (49) is fixing with the inner surface of described 3rd framework (41) to be connected, and the described 3rd filters Net (49) is provided with the 4th drainage screen (491) being disposed below, the lower surface and the described 4th of described 3rd drainage screen (49) The upper surface of drainage screen (491) is fixing to be connected, and described 4th drainage screen (491) is horizontal, described 4th drainage screen (491) The inner surface of right surface and described 3rd framework (41) is fixing to be connected, the left surface of described 4th drainage screen (491) and described the The right surface of one dividing plate (40) is fixing to be connected.
CN201610562821.3A 2016-07-18 2016-07-18 A kind of air filtering purifier Withdrawn CN106152278A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610562821.3A CN106152278A (en) 2016-07-18 2016-07-18 A kind of air filtering purifier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610562821.3A CN106152278A (en) 2016-07-18 2016-07-18 A kind of air filtering purifier

Publications (1)

Publication Number Publication Date
CN106152278A true CN106152278A (en) 2016-11-23

Family

ID=58059417

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610562821.3A Withdrawn CN106152278A (en) 2016-07-18 2016-07-18 A kind of air filtering purifier

Country Status (1)

Country Link
CN (1) CN106152278A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106620806A (en) * 2016-12-07 2017-05-10 王杨 Environment-friendly dedusting and sterilizing system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106620806A (en) * 2016-12-07 2017-05-10 王杨 Environment-friendly dedusting and sterilizing system

Similar Documents

Publication Publication Date Title
CN106051946A (en) Indoor air filtration and sterilization device
CN207980870U (en) A kind of division of respiratory disease air purifier
CN108981014A (en) A kind of ceiling type air purifier
CN106247497A (en) Indoor air cleaner
CN105833613A (en) Waste gas filtration and purification system
CN106310856A (en) Indoor air purification and dust removal device
CN105749678A (en) Air purifying equipment for treating haze
CN2820187Y (en) Sterilizing purifier for air dialysis
CN103925645B (en) Indoor air purification filter
CN105941188B (en) A kind of cultivating system for animal husbandry based on Internet of Things
CN106152278A (en) A kind of air filtering purifier
CN105903054A (en) Air sucking and disinfection device
CN206184498U (en) Test tube frame for mechanical test
CN206018816U (en) A kind of air filtering sterilizer
CN106196281A (en) A kind of air cleaning decontamination equipment capable
CN206094298U (en) Air disinfection and purification equipment
CN208612108U (en) A kind of indoor harmful gas purification device
CN206037265U (en) Indoor air purification and disinfection machine
CN205839855U (en) A kind of air water machine using solar energy heating technology
CN108295618A (en) A kind of double-layer active carbon exhaust gas purification device
CN205279331U (en) Add air humidifier of fever type family
KR102244493B1 (en) A air cleane
CN209877205U (en) Dehumidifier special for basement
CN209623189U (en) A kind of freezer Parallel sets with Waste Heat Recovery
CN208302473U (en) A kind of double-layer active carbon exhaust gas purification device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20161123

WW01 Invention patent application withdrawn after publication