CN106150529A - 一种多年冻土区隧道的隔热初期支护结构 - Google Patents

一种多年冻土区隧道的隔热初期支护结构 Download PDF

Info

Publication number
CN106150529A
CN106150529A CN201610630757.8A CN201610630757A CN106150529A CN 106150529 A CN106150529 A CN 106150529A CN 201610630757 A CN201610630757 A CN 201610630757A CN 106150529 A CN106150529 A CN 106150529A
Authority
CN
China
Prior art keywords
tunnel
preliminary bracing
heat
thermal insulation
insulation layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610630757.8A
Other languages
English (en)
Inventor
夏才初
安康
杜时贵
韩常领
张计锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
University of Shaoxing
CCCC First Highway Consultants Co Ltd
Original Assignee
Tongji University
University of Shaoxing
CCCC First Highway Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University, University of Shaoxing, CCCC First Highway Consultants Co Ltd filed Critical Tongji University
Priority to CN201610630757.8A priority Critical patent/CN106150529A/zh
Publication of CN106150529A publication Critical patent/CN106150529A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Abstract

本发明公开了一种多年冻土区隧道的隔热初期支护结构,属于建筑领域,该多年冻土区隧道的隔热初期支护结构包括紧密固定于已挖掘出的隧道通道围岩表面的隔热层和覆盖于隔热层的初期支护。通过在初期支护和隧道围岩之间添加了一层用于阻止热量传递、吸收隧道围岩压力的隔热层,阻止初期支护中的混凝土水化热的热量向围岩传递,同时缓解围岩变形的压力,减少围岩对初期支护的作用力,有效解决了现有技术中存在的初衬混凝土水化热向隧道围岩传递而引起的隧道围岩冻土融化的问题,避免了因建设隧道影响隧道围岩动土融化引起隧道整体结构不稳定的风险,减少了隧道围岩对二次衬砌结构的冻胀力和围岩压力,节省二次衬砌的材料成本。

Description

一种多年冻土区隧道的隔热初期支护结构
技术领域
本发明涉及建筑领域,尤其涉及一种多年冻土区隧道的隔热初期支护结构。
背景技术
随着我国经济的蓬勃发展以及西部大开发战略的实施,在西北、西南等多年冻土区修建的公路隧道越来越多。多年冻土区隧道开挖后,造成围岩冻土融化的主要原因是隧道内气温的变化和初期支护喷混凝土的水化热。其中,混凝土水化热是导致围岩融化的主要热量来源之一。在寒区隧道围岩施工过程中,施作喷射混凝土及模筑混凝土后,水泥水化热释放,热量向围岩和空气中传递,浅层围岩温度升高,继而向深层围岩传递,从而引起多年冻土区隧道围岩冻土融化。
目前防止多年冻土区隧道围岩冻土融化的方法主要是在衬砌中加设隔热保温层,比较常见的寒区隧道隔热层结构形式主要有四种:①表面铺设,即隔热层铺设在二衬内表面;②夹层铺设,即隔热层铺设在初衬与二衬之间;③离壁铺设,即隔热层和二衬内表面之间留有一层空气层;④双层铺设,即初衬与二衬之间铺设一层隔热层,二衬内表面再铺设一层隔热层。虽然上述方法能够起到保温隔热效果,但是它们具有一个共同的缺陷,没能解决初衬混凝土水化热向隧道围岩传递而引起的隧道围岩冻土融化的问题。
因此,发明一种可以阻止初衬混凝土的水化热向围岩传递,避免多年冻土区隧道围岩冻土融化的初期支护结构,具有重要的现实意义。
发明内容
针对上述存在的问题,本发明提供一种多年冻土区隧道的隔热初期支护结构,以克服现有技术中初衬混凝土水化热向隧道围岩传递而引起的隧道围岩冻土融化的问题,从而达到阻止热量传递、吸收隧道围岩压力的效果。
为了实现上述目的,本发明采取的技术方案是:
本发明提供了一种多年冻土区隧道的隔热初期支护结构,包括:紧密固定于隧道通道围岩表面的隔热层和覆盖于隔热层的初期支护;所述隔热层阻止所述初期支护中的混凝土水化热的热量向围岩传递,同时缓解围岩变形的压力,减少围岩对所述初期支护的作用力。
上述的多年冻土区隧道的隔热初期支护结构,其中,所述隔热层包括多条具有吸收隧道围岩压力、隔热功能的柔性木屑板,多条所述木屑板沿隧道拱圈拼接成所述隔热层。
上述的多年冻土区隧道的隔热初期支护结构,其中,所述木屑板的固定采用膨胀螺栓固定。
上述的多年冻土区隧道的隔热初期支护结构,其中,所述隔热层厚度为2-3cm。
本发明对比现有技术,具有如下有益效果:
本发明提供的多年冻土区隧道的隔热初期支护结构,包括紧密固定于隧道通道围岩表面的隔热层和覆盖于隔热层的初期支护。通过在初期支护和隧道围岩之间添加一层用于阻止热量传递、吸收隧道围岩压力的隔热层,从而阻止初期支护中的混凝土水化热的热量向围岩传递,同时缓解围岩变形的压力,减少围岩对初期支护的作用力,能够有效解决现有技术中存在的初衬混凝土水化热向隧道围岩传递而引起的隧道围岩冻土融化的问题,避免了因隧道围岩冻土融化导致隧道整体结构不稳定的风险,减小了隧道围岩对二次衬砌结构的冻胀力和围岩压力,节省二次衬砌的材料成本。
附图说明
结合以下附图对非限制性实施例所作的详细描述,能够更好地理解本发明的上述特征和优点。在全部附图中相同的标记指示相同的部分。并未刻意按照比例绘制附图,重点在于示出本发明的主旨。
图1是本发明实施例1提供的多年冻土区隧道的隔热初期支护结构的示意图;
图2是本发明实施例1提供的多年冻土区隧道的隔热初期支护结构的隔热层的结构示意图。
具体实施方式
下面结合附图和具体实施例对本发明作进一步的说明,但是不作为本发明的限定。
实施例1:
图1是本发明实施例1提供的多年冻土区隧道的隔热初期支护结构的示意图;如图1所示,本发明实施例1提供的多年冻土区隧道的隔热初期支护结构包括:紧密固定于已挖掘出的隧道通道围岩1表面的隔热层2和覆盖于隔热层2的初期支护3;隔热层2阻止初期支护3中的混凝土水化热的热量向隧道通道围岩1传递,同时缓解隧道通道围岩1变形的压力,减少隧道通道围岩1对初期支护3的作用力。
图2是本发明实施例1提供的多年冻土区隧道的隔热初期支护结构的隔热层的结构示意图;如图2所示,隔热层2包括多条具有吸收隧道围岩压力、隔热功能的厚度为2~3cm的柔性木屑板201,多条木屑板201沿隧道拱圈拼接成隔热层2,木屑板201的固定采用膨胀螺栓固定。
本发明实施例1提供的多年冻土区隧道的隔热初期支护结构在隧道围岩和初期支护层之间设置了一层用于阻止热量传递、吸收隧道围岩压力的隔热层,当施工过程中,作为隔热层的木屑板的固定完成后,浇灌初期支护层,初期支护层中的混凝土释放的水化热被隔热层吸收,防止热量传递至隧道围岩引起隧道围岩冻土融化,避免了隧道围岩冻土融化导致隧道整体结构不稳定的风险,同时当隧道围岩发生变形产生压力时,隔热层能够吸收隧道围岩压力从而提高支护结构的稳定性。
以上对本发明的较佳实施例进行了描述。需要理解的是,本发明并不局限于上述特定实施方式,其中未尽详细描述元件、结构、方法应该理解为用本领域中的普通方式予以实施;任何熟悉本领域的普通技术人员,在不脱离本发明技术方案作出许多可能的变动和修饰,或修改为等同变化的等效实施例,这并不影响本发明的实质内容。因此,凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所做的任何简单修改、等同变化及修饰,均仍属于本发明技术方案保护的范围内。

Claims (4)

1.一种多年冻土区隧道的隔热初期支护结构,其特征在于,包括:紧密固定于隧道通道围岩表面的隔热层和覆盖于所述隔热层的初期支护;所述隔热层阻止所述初期支护中的混凝土水化热的热量向围岩传递,同时缓解围岩变形的压力,减少围岩对所述初期支护的作用力。
2.如权利要求1所述的多年冻土区隧道的隔热初期支护结构,其特征在于,所述隔热层包括多条具有吸收隧道围岩压力、隔热功能的柔性木屑板,多条所述木屑板沿隧道拱圈拼接成所述隔热层。
3.如权利要求2所述的多年冻土区隧道的隔热初期支护结构,其特征在于,所述木屑板的固定采用膨胀螺栓固定。
4.如权利要求1-3中任意一项所述的多年冻土区隧道的隔热初期支护结构,其特征在于,所述隔热层厚度为2-3cm。
CN201610630757.8A 2016-08-01 2016-08-01 一种多年冻土区隧道的隔热初期支护结构 Pending CN106150529A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610630757.8A CN106150529A (zh) 2016-08-01 2016-08-01 一种多年冻土区隧道的隔热初期支护结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610630757.8A CN106150529A (zh) 2016-08-01 2016-08-01 一种多年冻土区隧道的隔热初期支护结构

Publications (1)

Publication Number Publication Date
CN106150529A true CN106150529A (zh) 2016-11-23

Family

ID=57329088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610630757.8A Pending CN106150529A (zh) 2016-08-01 2016-08-01 一种多年冻土区隧道的隔热初期支护结构

Country Status (1)

Country Link
CN (1) CN106150529A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108166999A (zh) * 2017-09-18 2018-06-15 招商局重庆交通科研设计院有限公司 一种寒区隧道的防水防冻防火结构
CN108222970A (zh) * 2018-02-09 2018-06-29 中国人民解放军陆军工程大学 一种高寒地区人居地下工程保温结构
CN108457655A (zh) * 2018-02-01 2018-08-28 绍兴文理学院 用热棒减少多年冻土区隧道施工期围岩冻融圈范围的方法
CN114033463A (zh) * 2021-07-21 2022-02-11 绍兴文理学院 一种保温结构间隙分段正积温和负积温联合通风调控方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1696474A (zh) * 2004-03-25 2005-11-16 长安大学 用于寒冷地区隧道冻害防治的防冻隔温层及其施工方法
JP2006342518A (ja) * 2005-06-07 2006-12-21 Shimizu Corp 凍結地盤表面の断熱被覆構造および凍結地盤表面の断熱被覆方法
CN104314088A (zh) * 2014-11-06 2015-01-28 兰州理工大学 季节性冻土区自调温回位耗能坡体支护结构及施工方法
CN204386623U (zh) * 2014-12-31 2015-06-10 长安大学 一种隧道排水管保温防冻系统
CN204646252U (zh) * 2015-05-12 2015-09-16 中铁第一勘察设计院集团有限公司 一种特高岩温隧道的支护结构
CN205013018U (zh) * 2015-09-25 2016-02-03 中铁二十局集团有限公司 高寒地区隧道洞口段防水保温层施工结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1696474A (zh) * 2004-03-25 2005-11-16 长安大学 用于寒冷地区隧道冻害防治的防冻隔温层及其施工方法
JP2006342518A (ja) * 2005-06-07 2006-12-21 Shimizu Corp 凍結地盤表面の断熱被覆構造および凍結地盤表面の断熱被覆方法
CN104314088A (zh) * 2014-11-06 2015-01-28 兰州理工大学 季节性冻土区自调温回位耗能坡体支护结构及施工方法
CN204386623U (zh) * 2014-12-31 2015-06-10 长安大学 一种隧道排水管保温防冻系统
CN204646252U (zh) * 2015-05-12 2015-09-16 中铁第一勘察设计院集团有限公司 一种特高岩温隧道的支护结构
CN205013018U (zh) * 2015-09-25 2016-02-03 中铁二十局集团有限公司 高寒地区隧道洞口段防水保温层施工结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赖应得: "能量支护学在冻结法凿井中的应用", 《制冷学报》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108166999A (zh) * 2017-09-18 2018-06-15 招商局重庆交通科研设计院有限公司 一种寒区隧道的防水防冻防火结构
CN108166999B (zh) * 2017-09-18 2023-10-27 招商局重庆交通科研设计院有限公司 一种寒区隧道的防水防冻防火结构
CN108457655A (zh) * 2018-02-01 2018-08-28 绍兴文理学院 用热棒减少多年冻土区隧道施工期围岩冻融圈范围的方法
CN108222970A (zh) * 2018-02-09 2018-06-29 中国人民解放军陆军工程大学 一种高寒地区人居地下工程保温结构
CN114033463A (zh) * 2021-07-21 2022-02-11 绍兴文理学院 一种保温结构间隙分段正积温和负积温联合通风调控方法
CN114033463B (zh) * 2021-07-21 2024-03-15 绍兴文理学院 一种保温结构间隙分段正积温和负积温联合通风调控方法

Similar Documents

Publication Publication Date Title
CN106150529A (zh) 一种多年冻土区隧道的隔热初期支护结构
CN104314088B (zh) 季节性冻土区自调温回位耗能坡体支护结构及施工方法
CN106437789B (zh) 一种隧道衬砌防水接头
CN102322276A (zh) 季节性冻土地区的隧道工程防冻结构
CN202745937U (zh) 一种寒区既有隧道集中渗漏引排水暗槽
CN105735364B (zh) 混凝土接缝防水系统、施工方法及用于该系统的保护构件
CN204572060U (zh) 一种寒区隧道环向排水系统
CN105113489A (zh) 一种多年冻土区降低钻孔灌注桩混凝土水化热的方法
CN104832196A (zh) 管幕冻结法支护结构及其施工方法
CN106049538A (zh) 一种逆作法地下工程围护结构冠梁抗浮节点
CN205013018U (zh) 高寒地区隧道洞口段防水保温层施工结构
CN106065891B (zh) 一种在寒区铁路隧道中使用的保温钉及其施工的隧道保温防水方法
CN106050274A (zh) 一种寒区硬岩隧道防冻胀结构及其施工方法
CN108533273A (zh) 一种用于软弱围岩隧道超前预支护的新型管棚
CN206111210U (zh) 一种严寒地区长隧道冬季混凝土保温抗冻装置
CN205475356U (zh) 一种地下室顶板诱导缝结构
CN110486038B (zh) 一种寒区隧道冻害防控的热量自平衡系统及其施工方法
CN105735517B (zh) 基于热桥隔断技术的装配式钢筋混凝土墙体结构
CN202250107U (zh) 一种季节性冻土地区的隧道工程防冻结构
CN204703363U (zh) 节能墙体用自保温砌块
CN205026223U (zh) 直埋蒸汽管道在阀门检查井处的防水连接结构
CN106885060A (zh) 一种基于纺织技术的水泥基复合材料管
CN207032291U (zh) 一种便于埋地的保护管通道
CN113339873A (zh) 一种寒区高地温隧道新型防寒抗冻系统及方法
CN203361131U (zh) 带囊袋换热器的能源抗浮桩

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161123