CN106149755A - 一种防滑坡专用挡土墙升降搬运设备 - Google Patents

一种防滑坡专用挡土墙升降搬运设备 Download PDF

Info

Publication number
CN106149755A
CN106149755A CN201610524933.XA CN201610524933A CN106149755A CN 106149755 A CN106149755 A CN 106149755A CN 201610524933 A CN201610524933 A CN 201610524933A CN 106149755 A CN106149755 A CN 106149755A
Authority
CN
China
Prior art keywords
lifting
welded
matrix
retaining wall
push away
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610524933.XA
Other languages
English (en)
Other versions
CN106149755B (zh
Inventor
詹晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin University
Original Assignee
詹晨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 詹晨 filed Critical 詹晨
Priority to CN201610524933.XA priority Critical patent/CN106149755B/zh
Publication of CN106149755A publication Critical patent/CN106149755A/zh
Application granted granted Critical
Publication of CN106149755B publication Critical patent/CN106149755B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls

Abstract

本发明涉及一种防滑坡专用挡土墙升降搬运设备,包括减震支撑机构,所述减震支撑机构包括定平台,定平台上端面沿轴线方向均匀安装有三个并联支链,三个并联支链的顶端均安装在动平台的下端面上;所述并联支链包括焊接在定平台上端面的凹型支座,凹型支座的中部之间安装有下限位轴,凹型支座的上端内壁上对称设置有两个弧形限位槽;所述动平台上端面安装有升降推放装置,升降推放装置可以实现对浆砌石稳定的自动升降搬运功能,无需人工上下搬运,搬运速度快,工作效率高。本发明可以实现挡土墙稳定的自动升降搬运功能,提供了一种挡土墙自动化快速升降搬运的新途径。

Description

一种防滑坡专用挡土墙升降搬运设备
技术领域
本发明涉及岩土工程技术领域,具体的说是一种防滑坡专用挡土墙升降搬运设备。
背景技术
在靠近山体的高速公路段、城市公路段两侧一般都会设有挡土墙,挡土墙的种类分为浆砌石挡土墙和混凝土挡土墙两种,挡土墙的作用主要为:1、撑路基填土或山坡土体;2、防止填土或土体变形失稳;3、阻挡山体滑坡和山体塌方,因此挡土墙对公路的安全起到至关重要的作用;由于挡土墙都是设置在山体旁边,浆砌石原料来源丰富,因此采用浆砌石挡土墙方式为主,现有浆砌石挡土墙建造方式主要为主要采用人工方式堆砌,先将加工好的浆砌石人工抓取安放到搬运小车中,操作工人推动搬运小车行驶至输送设备,并将搬运小车内的浆砌石倒入输送设备自动输送到挡土墙底端,然后再将浆砌石从下往上人工手动搬运至挡土墙上放,最后浇筑上混凝土,这种挡土墙人工堆砌方式存在以下缺点:1、人工全程操作、施工效率低下,且经常需要人工上下搬运浆砌石,稍有不慎就会砸到人,存在严重的安全隐患;2、由于在浆砌石搬运施工场所的地面往往比较复杂,有可能凹凸不平或者泥泞不堪,操作工人在操作搬运小车过程中会反正上下抖动或者左右晃动,稳定性能差,严重时会发生侧翻的现象,搬运速度低,工作效率低下;3、需要人工从下往上搬运,劳动强度大,搬运速度慢,工作效率低下。
发明内容
为了解决上述问题,本发明提供了一种防滑坡专用挡土墙升降搬运设备,可以解决现有挡土墙人工堆砌方式存的需要人工全程操作、施工效率低下、存在严重安全隐患、浆砌石搬运过程中存在上下抖动或左右晃动现象、稳定性能差、需要人工上下搬运、搬运速度慢和工作效率低下等难题,可以实现挡土墙稳定的自动升降搬运功能,消除了搬运过程中出现的上下抖动或左右晃动现象,稳定性能好,施工效率高,不存在任何安全隐患,且具有自动升降搬运、搬运速度快和工作效率高等优点,提供了一种挡土墙自动化快速升降搬运的新途径。
为了实现上述目的,本发明采用以下技术方案来实现:一种防滑坡专用挡土墙升降搬运设备,包括减震支撑机构,所述减震支撑机构包括定平台,定平台上端面沿轴线方向均匀安装有三个并联支链,三个并联支链的顶端均安装在动平台的下端面上;所述并联支链包括焊接在定平台上端面的凹型支座,凹型支座的中部之间安装有下限位轴,凹型支座的上端内壁上对称设置有两个弧形限位槽;所述下限位轴上套设有一号液压缸,一号液压缸的底端两侧设置有两个限位杆,两个限位杆的末端与两个弧形限位槽之间通过滑动配合方式相连,两个限位杆与两个弧形限位槽之间的运动起到限定一号液压缸底端的转动范围,也防止了一号液压缸底端左右移动的状况,由于本发明经常在凹凸不平、泥泞不堪的挡土墙施工场所上行走,而通过两个限位杆与两个弧形限位槽可以增强一号液压缸底端在下限位轴转动时的稳定性,提高了工作性能;所述一号液压缸的顶端通过螺纹安装有球形连接头,球形连接头的两端对称设置有两根上限位轴,两根上限位轴分别与一号耳座的两端之间均通过轴承相连,一号耳座的下端面内壁上焊接有定位柱,定位柱的末端为与球形连接头相对应的凹型球面结构,定位柱的末端与球形连接头之间通过滑动配合方式相连,一号耳座的上端面焊接在动平台上,通过定位柱来限定和支撑球形连接头的运动,从而使得球形连接头上的两根上限位轴可以稳定在一号耳座上转动,增强了一号液压缸顶端转动时的稳定性,提高了工作性能,通过一号液压缸在凹型支座转动时形成的R副、一号液压缸工作时形成的P副、一号液压缸在一号耳座转动时形成的R副组成了RPR型的并联支链,且本发明通过定平台、三个RPR型的并联支链和动平台形成了3-RPR并联机构,3-RPR并联机构具有动态响应好、刚度高、承载能力大、稳定性好和运动精度高等优点,借助3-RPR并联机构的优点使得本发明在挡土墙施工场所上行走时具有良好的减震性能和稳定性能,适用范围大;所述动平台上端面安装有升降推放装置,升降推放装置可以实现对浆砌石稳定的自动升降搬运功能,无需人工上下搬运,搬运速度快,工作效率高。
所述升降推放装置包括焊接在动平台上端面的凹型支架,凹型支架的上端面两侧对称设置有四个升降支链,四个升降支链的下端安装有升降板,操作人员抓取的浆砌石安放升降板上,升降板的上端面两侧对称焊接有两个限位滑柱,两个限位滑柱分别与两个限位滑槽之间通过滑动配合方式相连,两个限位滑槽的分别焊接在凹型支架的两侧内壁上,通过两个限位滑柱与两个限位滑槽的限位支撑作用使得升降板在四个升降支链的驱动下可以作稳定的升降搬运运动;所述凹型支架上端焊接有推放机构,当四个升降支链将安放在升降板上的浆砌石升降搬运到顶端时,通过推放机构自动将升降搬运上来的浆砌石推至挡土墙上;所述升降支链包括焊接在凹型支架侧壁上的升降底板,升降底板上端面焊接有电机支架,电机支架上固定安装有升降电机,电机支架起到支撑升降电机的作用,升降电机的输出轴上固定安装有绕线滑轮,所述升降底板上对称焊接有两个升降耳,两个升降耳之间通过销轴安装有传动滑轮,所述升降底板上端面设置有穿绳口,所述绕线滑轮上缠绕有钢丝绳,钢丝绳的上端穿设在上定位旋钮,上定位旋钮起到传输和改变钢丝绳运动方向的作用,上定位旋钮通过螺纹安装在升降底板上,钢丝绳的下端穿过升降底板上的穿绳口缠绕在下定位旋钮上,穿绳口为钢丝绳的传输口,下定位旋钮通过螺纹安装在升降板上,且钢丝绳的中部抵靠在传动滑轮上,传动滑轮起到传动钢丝绳的作用,传动滑轮可在两个升降耳上转动,从而降低钢丝绳的卷绕阻力,通过升降电机带动绕线滑轮转动,绕线滑轮不断缠绕通过穿绳口、上定位旋钮传送上来的钢丝绳,从而使得四个升降支链上的四根钢丝绳稳定的带动升降板往上运动;所述推放机构包括对称焊接在凹型支架上端的两个推放支杆,两个推放支杆内壁上焊接有推放支板,推放支板的内壁上对称安装有两个六号液压缸,两个六号液压缸的顶端安装有推板,两个六号液压缸的中部分别抵靠在两个推放支块,两个推放支块的末端均焊接在推放支板上,两个推放支块起到稳定支撑两个六号液压缸的作用,通过两个六号液压缸带动推板的伸缩运动;所述推板上对称设置有两个推放块,且每个推放块内壁上均设置有推放摩擦块,推放摩擦块为连续尖状结构,大大的增加了推放摩擦块与浆砌石表面的摩擦阻力,增加了浆砌石的推放效率,通过两个推放块上的两个推放摩擦块从两个方向将浆砌石快速推至挡土墙上。工作时,当操作人员抓取的浆砌石安放升降板上后,四个升降支链上的四个升降电机同时开始工作,通过升降电机带动绕线滑轮转动,绕线滑轮不断缠绕通过穿绳口、上定位旋钮传送上来的钢丝绳,从而使得四个升降支链上的四根钢丝绳稳定的带动升降板往上运动,当升降板上的浆砌石运动至顶端后升降电机停止工作,此时推放机构上的两个六号液压缸开始工作,两个六号液压缸同步推动推板运动,推板上两个推放块的两个推放摩擦块将浆砌石快速推至挡土墙上,从而实现了本发明对浆砌石稳定的自动升降搬运功能,无需人工上下搬运,搬运速度快,工作效率高。
使用时,首先将本发明安装在现有移动设备上,通过现有移动设备将本发明移动至挡土墙施工场所上,当本发明运动至所需抓取浆砌石旁边时,然后操作工人手动抓取浆砌石安放到升降板上,此时升降推放装置开始工作,四个升降支链上的四个升降电机同时开始工作,通过升降电机带动绕线滑轮转动,绕线滑轮不断缠绕通过穿绳口、上定位旋钮传送上来的钢丝绳,从而使得四个升降支链上的四根钢丝绳稳定的带动升降板往上运动,当升降板上的浆砌石运动至顶端后升降电机停止工作,此时推放机构上的两个六号液压缸开始工作,两个六号液压缸同步推动推板运动,推板上两个推放块的两个推放摩擦块将浆砌石快速推至挡土墙上,最后操作工人浇筑上混凝土即可成型;同时本发明通过定平台、三个RPR型的并联支链和动平台形成了3-RPR并联机构,3-RPR并联机构具有动态响应好、刚度高、承载能力大、稳定性好和运动精度高等优点,借助3-RPR并联机构的优点使得本发明在挡土墙施工场所上行走时具有良好的减震性能和稳定性能,适用范围大,最终实现了本发明挡土墙稳定的自动升降搬运功能,不存在严重安全隐患,施工效率高。
本发明的有益效果是:
1、本发明通过定平台、三个RPR型的并联支链和动平台形成了3-RPR并联机构,3-RPR并联机构具有动态响应好、刚度高、承载能力大、稳定性好和运动精度高等优点,借助3-RPR并联机构的优点使得本发明在挡土墙施工场所上行走时具有良好的减震性能和稳定性能,适用范围大;
2、本发明上四个升降支链通过四根钢丝绳带动升降板上的浆砌石自动升降搬运至顶端,再通过推放机构自动将浆砌石快速推至挡土墙上,实现了本发明对浆砌石的自动升降搬运功能,无需人工上下搬运,搬运速度快,工作效率高;
3、本发明解决了现有挡土墙人工堆砌方式存的需要人工全程操作、施工效率低下、存在严重安全隐患、浆砌石搬运过程中存在上下抖动或左右晃动现象、稳定性能差、需要人工上下搬运、搬运速度慢和工作效率低下等难题,实现了本发明挡土墙稳定的自动升降搬运功能,消除了搬运过程中出现的上下抖动或左右晃动现象,稳定性能好,施工效率高,不存在任何安全隐患,且具有自动升降搬运、搬运速度快和工作效率高等优点,提供了一种挡土墙自动化快速升降搬运的新途径。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是本发明的立体结构示意图;
图2是本发明并联支链的结构示意图;
图3是本发明并联支链的剖视图;
图4是本发明升降推放装置的结构示意图;
图5是本发明升降推放装置去除推放机构之后的第一结构示意图;
图6是本发明升降推放装置去除推放机构之后的第二结构示意图;
图7是本发明升降推放装置去除推放机构之后的俯视图;
图8是本发明推放机构的结构示意图。
具体实施方式
为了使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体图示,进一步阐述本发明。
如图1至图8所示,一种防滑坡专用挡土墙升降搬运设备,包括减震支撑机构132,所述减震支撑机构132包括定平台136,定平台136上端面沿轴线方向均匀安装有三个并联支链137,三个并联支链137的顶端均安装在动平台138的下端面上;所述并联支链137包括焊接在定平台136上端面的凹型支座1371,凹型支座1371的中部之间安装有下限位轴1372,凹型支座1371的上端内壁上对称设置有两个弧形限位槽1371a;所述下限位轴上1372套设有一号液压缸1373,一号液压缸1373的底端两侧设置有两个限位杆1374,两个限位杆1374的末端与两个弧形限位槽1371a之间通过滑动配合方式相连,两个限位杆1374与两个弧形限位槽1371a之间的运动起到限定一号液压缸1373底端的转动范围,也防止了一号液压缸1373底端左右移动的状况,由于本发明经常在凹凸不平、泥泞不堪的挡土墙施工场所上行走,而通过两个限位杆1374与两个弧形限位槽1371a可以增强一号液压缸1373底端在下限位轴1372转动时的稳定性,提高了工作性能;所述一号液压缸1373的顶端通过螺纹安装有球形连接头1375,球形连接头1375的两端对称设置有两根上限位轴1376,两根上限位轴1376分别与一号耳座1377的两端之间均通过轴承相连,一号耳座1377的下端面内壁上焊接有定位柱1378,定位柱1378的末端为与球形连接头1375相对应的凹型球面结构,定位柱1378的末端与球形连接头1375之间通过滑动配合方式相连,一号耳座1377的上端面焊接在动平台138上,通过定位柱1378来限定和支撑球形连接头1375的运动,从而使得球形连接头1375上的两根上限位轴1376可以稳定在一号耳座1377上转动,增强了一号液压缸1373顶端转动时的稳定性,提高了工作性能,通过一号液压缸1373在凹型支座1371转动时形成的R副、一号液压缸1373工作时形成的P副、一号液压缸1373在一号耳座1377转动时形成的R副组成了RPR型的并联支链137,且本发明通过定平台136、三个RPR型的并联支链137和动平台138形成了3-RPR并联机构,3-RPR并联机构具有动态响应好、刚度高、承载能力大、稳定性好和运动精度高等优点,借助3-RPR并联机构的优点使得本发明在挡土墙施工场所上行走时具有良好的减震性能和稳定性能,适用范围大;所述动平台138上端面安装有升降推放装置4,升降推放装置4可以实现对浆砌石稳定的自动升降搬运功能,无需人工上下搬运,搬运速度快,工作效率高。
所述升降推放装置4包括焊接在动平台138上端面的凹型支架41,凹型支架41的上端面两侧对称设置有四个升降支链42,四个升降支链42的下端安装有升降板43,操作人员抓取的浆砌石安放升降板43上,升降板43的上端面两侧对称焊接有两个限位滑柱44,两个限位滑柱44分别与两个限位滑槽45之间通过滑动配合方式相连,两个限位滑槽45的分别焊接在凹型支架41的两侧内壁上,通过两个限位滑柱44与两个限位滑槽45的限位支撑作用使得升降板43在四个升降支链42的驱动下可以作稳定的升降搬运运动;所述凹型支架41上端焊接有推放机构46,当四个升降支链42将安放在升降板43上的浆砌石升降搬运到顶端时,通过推放机构46自动将升降搬运上来的浆砌石推至挡土墙上;所述升降支链42包括焊接在凹型支架41侧壁上的升降底板421,升降底板421上端面焊接有电机支架422,电机支架422上固定安装有升降电机423,电机支架422起到支撑升降电机423的作用,升降电机423的输出轴上固定安装有绕线滑轮424,所述升降底板421上对称焊接有两个升降耳425,两个升降耳425之间通过销轴安装有传动滑轮426,所述升降底板421上端面设置有穿绳口421a,所述绕线滑轮424上缠绕有钢丝绳427,钢丝绳427的上端穿设在上定位旋钮428,上定位旋钮428起到传输和改变钢丝绳427运动方向的作用,上定位旋钮428通过螺纹安装在升降底板421上,钢丝绳427的下端穿过升降底板421上的穿绳口421a缠绕在下定位旋钮429上,穿绳口421a为钢丝绳427的传输口,下定位旋钮429通过螺纹安装在升降板43上,且钢丝绳427的中部抵靠在传动滑轮426上,传动滑轮426起到传动钢丝绳427的作用,传动滑轮426可在两个升降耳425上转动,从而降低钢丝绳427的卷绕阻力,通过升降电机423带动绕线滑轮424转动,绕线滑轮424不断缠绕通过穿绳口421a、上定位旋钮428传送上来的钢丝绳427,从而使得四个升降支链42上的四根钢丝绳427稳定的带动升降板43往上运动;所述推放机构46包括对称焊接在凹型支架41上端的两个推放支杆461,两个推放支杆461内壁上焊接有推放支板462,推放支板462的内壁上对称安装有两个六号液压缸463,两个六号液压缸463的顶端安装有推板464,两个六号液压缸463的中部分别抵靠在两个推放支块465,两个推放支块465的末端均焊接在推放支板462上,两个推放支块465起到稳定支撑两个六号液压缸463的作用,通过两个六号液压缸463带动推板464的伸缩运动;所述推板464上对称设置有两个推放块466,且每个推放块466内壁上均设置有推放摩擦块467,推放摩擦块467为连续尖状结构,大大的增加了推放摩擦块467与浆砌石表面的摩擦阻力,增加了浆砌石的推放效率,通过两个推放块466上的两个推放摩擦块467从两个方向将浆砌石快速推至挡土墙上。工作时,当操作人员抓取的浆砌石安放升降板43上,后,四个升降支链42上的四个升降电机423同时开始工作,通过升降电机423带动绕线滑轮424转动,绕线滑轮424不断缠绕通过穿绳口421a、上定位旋钮428传送上来的钢丝绳427,从而使得四个升降支链42上的四根钢丝绳427稳定的带动升降板43往上运动,当升降板43上的浆砌石运动至顶端后升降电机423停止工作,此时推放机构46上的两个六号液压缸463开始工作,两个六号液压缸463同步推动推板464运动,推板464上两个推放块466的两个推放摩擦块467将浆砌石快速推至挡土墙上,从而实现了本发明对浆砌石的自动升降搬运功能,无需人工上下搬运,搬运速度快,工作效率高。
使用时,首先将本发明安装在现有移动设备上,通过现有移动设备将本发明移动至挡土墙施工场所上,当本发明运动至所需抓取浆砌石旁边时,然后操作工人手动抓取浆砌石安放到升降板43上,此时升降推放装置4开始工作,四个升降支链42上的四个升降电机423同时开始工作,通过升降电机423带动绕线滑轮424转动,绕线滑轮424不断缠绕通过穿绳口421a、上定位旋钮428传送上来的钢丝绳427,从而使得四个升降支链42上的四根钢丝绳427稳定的带动升降板43往上运动,当升降板43上的浆砌石运动至顶端后升降电机423停止工作,此时推放机构46上的两个六号液压缸463开始工作,两个六号液压缸463同步推动推板464运动,推板464上两个推放块466的两个推放摩擦块467将浆砌石快速推至挡土墙上,最后操作工人浇筑上混凝土即可成型;同时本发明通过定平台136、三个RPR型的并联支链137和动平台138形成了3-RPR并联机构,3-RPR并联机构具有动态响应好、刚度高、承载能力大、稳定性好和运动精度高等优点,借助3-RPR并联机构的优点使得本发明在挡土墙施工场所上行走时具有良好的减震性能和稳定性能,适用范围大,最终实现了本发明挡土墙稳定的自动升降搬运功能,不存在严重安全隐患,施工效率高,解决了现有挡土墙人工堆砌方式存的需要人工全程操作、施工效率低下、存在严重安全隐患、浆砌石搬运过程中存在上下抖动或左右晃动现象、稳定性能差、需要人工上下搬运、搬运速度慢和工作效率低下等难题,达到了目的。
以上显示和描述了本发明的基本原理、主要特征和优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中的描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。

Claims (2)

1.一种防滑坡专用挡土墙升降搬运设备,其特征在于:包括减震支撑机构(132),所述减震支撑机构(132)包括定平台(136),定平台(136)上端面沿轴线方向均匀安装有三个并联支链(137),三个并联支链(137)的顶端均安装在动平台(138)的下端面上;所述并联支链(137)包括焊接在定平台(136)上端面的凹型支座(1371),凹型支座(1371)的中部之间安装有下限位轴(1372),凹型支座(1371)的上端内壁上对称设置有两个弧形限位槽(1371a);所述下限位轴上(1372)套设有一号液压缸(1373),一号液压缸(1373)的底端两侧设置有两个限位杆(1374),两个限位杆(1374)的末端与两个弧形限位槽(1371a)之间通过滑动配合方式相连;所述一号液压缸(1373)的顶端通过螺纹安装有球形连接头(1375),球形连接头(1375)的两端对称设置有两根上限位轴(1376),两根上限位轴(1376)分别与一号耳座(1377)的两端之间均通过轴承相连,一号耳座(1377)的下端面内壁上焊接有定位柱(1378),定位柱(1378)的末端为与球形连接头(1375)相对应的凹型球面结构,定位柱(1378)的末端与球形连接头(1375)之间通过滑动配合方式相连,一号耳座(1377)的上端面焊接在动平台(138)上;所述动平台(138)的上端面安装有升降推放装置(4);
所述升降推放装置(4)包括焊接在动平台(138)上端面的凹型支架(41),凹型支架(41)的上端面两侧对称设置有四个升降支链(42),四个升降支链(42)的下端安装有升降板(43),升降板(43)的上端面两侧对称焊接有两个限位滑柱(44),两个限位滑柱(44)分别与两个限位滑槽(45)之间通过滑动配合方式相连,两个限位滑槽(45)的分别焊接在凹型支架(41)的两侧内壁上;所述凹型支架(41)上端焊接有推放机构(46);所述升降支链(42)包括焊接在凹型支架(41)侧壁上的升降底板(421),升降底板(421)上端面焊接有电机支架(422),电机支架(422)上固定安装有升降电机(423),升降电机(423)的输出轴上固定安装有绕线滑轮(424),所述升降底板(421)上对称焊接有两个升降耳(425),两个升降耳(425)之间通过销轴安装有传动滑轮(426),所述升降底板(421)上端面设置有穿绳口(421a),所述绕线滑轮(424)上缠绕有钢丝绳(427),钢丝绳(427)的上端穿设在上定位旋钮(428),上定位旋钮(428)通过螺纹安装在升降底板(421)上,钢丝绳(427)的下端穿过升降底板(421)上的穿绳口(421a)缠绕在下定位旋钮(429)上,下定位旋钮(429)通过螺纹安装在升降板(43)上,且钢丝绳(427)的中部抵靠在传动滑轮(426)上;所述推放机构(46)包括对称焊接在凹型支架(41)上端的两个推放支杆(461),两个推放支杆(461)内壁上焊接有推放支板(462),推放支板(462)的内壁上对称安装有两个六号液压缸(463),两个六号液压缸(463)的顶端安装有推板(464),两个六号液压缸(463)的中部分别抵靠在两个推放支块(465),两个推放支块(465)的末端均焊接在推放支板(462)上。
2.根据权利要求1所述的一种防滑坡专用挡土墙升降搬运设备,其特征在于:所述推板(464)上对称设置有两个推放块(466),且每个推放块(466)内壁上均设置有推放摩擦块(467)。
CN201610524933.XA 2016-07-06 2016-07-06 一种防滑坡专用挡土墙升降搬运设备 Expired - Fee Related CN106149755B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610524933.XA CN106149755B (zh) 2016-07-06 2016-07-06 一种防滑坡专用挡土墙升降搬运设备

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610524933.XA CN106149755B (zh) 2016-07-06 2016-07-06 一种防滑坡专用挡土墙升降搬运设备

Publications (2)

Publication Number Publication Date
CN106149755A true CN106149755A (zh) 2016-11-23
CN106149755B CN106149755B (zh) 2018-05-01

Family

ID=58061488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610524933.XA Expired - Fee Related CN106149755B (zh) 2016-07-06 2016-07-06 一种防滑坡专用挡土墙升降搬运设备

Country Status (1)

Country Link
CN (1) CN106149755B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301432A (zh) * 2018-01-10 2018-07-20 金华芒果信息技术有限公司 一种通讯信号塔修建用自动打桩设备

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6010299A (en) * 1998-05-08 2000-01-04 Jesswein; Ronald M. Lifting and positioning device
KR101364435B1 (ko) * 2013-07-15 2014-02-18 한국플랜트서비스주식회사 터빈 내부 케이스용 안전 인양장치
CN204030825U (zh) * 2014-08-11 2014-12-17 郑修志 一种并联减震电机套
CN204036464U (zh) * 2014-08-02 2014-12-24 泉州市永茂电子科技有限公司 一种减震式码垛机械爪
CN204237513U (zh) * 2014-11-26 2015-04-01 李恩愿 一种物料提升翻斗车
CN205133043U (zh) * 2015-12-01 2016-04-06 重庆力缆电线有限责任公司 滑动式线缆装载机

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6010299A (en) * 1998-05-08 2000-01-04 Jesswein; Ronald M. Lifting and positioning device
KR101364435B1 (ko) * 2013-07-15 2014-02-18 한국플랜트서비스주식회사 터빈 내부 케이스용 안전 인양장치
CN204036464U (zh) * 2014-08-02 2014-12-24 泉州市永茂电子科技有限公司 一种减震式码垛机械爪
CN204030825U (zh) * 2014-08-11 2014-12-17 郑修志 一种并联减震电机套
CN204237513U (zh) * 2014-11-26 2015-04-01 李恩愿 一种物料提升翻斗车
CN205133043U (zh) * 2015-12-01 2016-04-06 重庆力缆电线有限责任公司 滑动式线缆装载机

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301432A (zh) * 2018-01-10 2018-07-20 金华芒果信息技术有限公司 一种通讯信号塔修建用自动打桩设备

Also Published As

Publication number Publication date
CN106149755B (zh) 2018-05-01

Similar Documents

Publication Publication Date Title
CN106185690A (zh) 一种建筑挡土墙自动升降搬运装置
CN106149754B (zh) 一种岩土工程用挡土墙智能建造机
CN106002952B (zh) 一种防塌方岩土挡土墙用液压抓取机械臂
CN106193108A (zh) 一种混凝土公路专用挡土墙施工设备
CN207672568U (zh) 一种可调式建筑打桩用设备
CN106193107B (zh) 一种城市公路挡土墙智能成型一体机
CN106115555A (zh) 一种岩土工程用浆砌石升降搬运机
CN105922279B (zh) 一种用于岩土浆砌石的自动抓取机械手
CN106193145B (zh) 一种建筑岩土浆砌石用自动液压抓取机
CN204980946U (zh) 带行走机构的塔吊
CN105970981B (zh) 一种高边坡施工升降平台及其施工方法
CN205712146U (zh) 一种高边坡施工升降平台
CN210421062U (zh) 一种建筑建造专用的地基夯实机械
CN107381453A (zh) 一种可移动防坠施工升降机
CN106149755A (zh) 一种防滑坡专用挡土墙升降搬运设备
CN206241610U (zh) 一种皮带机的加带机组
CN106115163B (zh) 一种基于并联机构的建筑浆砌石输送设备
CN107572437A (zh) 一种通信工程用卷扬机
CN203513129U (zh) 一种挖孔桩施工材料运送升降装置
CN202148473U (zh) 一种铁路专用拖拽机
CN105970959A (zh) 一种建筑专用的打桩机
CN106193109B (zh) 一种用于沥青混凝土公路的挡土墙成型设备
CN210048419U (zh) 一种基于强夯机的高效提升滑轮组
CN201883434U (zh) 一种高空复合桁架
CN106149756B (zh) 一种水泥混凝土道路用挡土墙浆砌石输送装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Qin Shengwu

Inventor after: Pu Jing

Inventor before: Zhan Chen

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20180408

Address after: 130012 Changchun Qianjin Street, Jilin, No. 2699

Applicant after: Jilin University

Address before: 246001 room 7-303, Longmen District, Longmen street, Daguan District, Anhui City, Anqing Province

Applicant before: Zhan Chen

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180501

Termination date: 20190706

CF01 Termination of patent right due to non-payment of annual fee