CN106142139A - Fixing pipe contiguous block - Google Patents

Fixing pipe contiguous block Download PDF

Info

Publication number
CN106142139A
CN106142139A CN201610613680.3A CN201610613680A CN106142139A CN 106142139 A CN106142139 A CN 106142139A CN 201610613680 A CN201610613680 A CN 201610613680A CN 106142139 A CN106142139 A CN 106142139A
Authority
CN
China
Prior art keywords
installation end
contiguous block
fixing pipe
tool
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610613680.3A
Other languages
Chinese (zh)
Inventor
滑英宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Qu Zhi Automation Science And Technology Ltd
Original Assignee
Suzhou Qu Zhi Automation Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Qu Zhi Automation Science And Technology Ltd filed Critical Suzhou Qu Zhi Automation Science And Technology Ltd
Priority to CN201610613680.3A priority Critical patent/CN106142139A/en
Publication of CN106142139A publication Critical patent/CN106142139A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25JMANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
    • B25J19/00Accessories fitted to manipulators, e.g. for monitoring, for viewing; Safety devices combined with or specially adapted for use in connection with manipulators

Abstract

Present invention is disclosed a kind of fixing pipe contiguous block, including the first installation end and the second installation end, the second installation end be formed around draw-in groove;Described first installation end is used for installing aluminum strip, the draw-in groove of described second installation end is for installing the tool matched with it, owing to the design of draw-in groove makes aluminum strip can be screwed together by a nut with tool, mechanism of the present invention is simple, and an easy for installation and process tightened reduces unnecessary securing member and is hardly damaged tool.

Description

Fixing pipe contiguous block
Technical field
The present invention relates to a kind of mechanical hand field, especially relate to a kind of fixing pipe used in mechanical hand field even Connect block.
Background technology
In recent years, along with progress and the continuous expansion of automated production scale of science and technology, mechanical hand produces at such as household electrical appliances, Being widely used in automobile making and the various fields such as health care, military affairs, these mechanical hands are all by simulation The function of staff is to complete the actions such as the crawl of product, and in use in order to better conform to various environment, its mode connected is also Need more flexible, and the parts connected have very important effect in the process.And existing a kind of connect mechanical hand With the connector of aluminum strip, structure is complicated, and needs multiple screw will in succession in connection procedure to link together, install not just And too much parts of tightening are easily damaged tool just,.
Summary of the invention
It is an object of the invention to overcome the defect of prior art, it is provided that aluminum strip and manipulator jig are connected to one by one The fixing pipe contiguous block risen, and installation process has only in manipulator jig tighten both are fastenedly connected.
For achieving the above object, the present invention proposes following technical scheme: include that the first installation end being connected and second is installed End, described first installation end is used for installing aluminum strip, the tool that described second installation end matches with it for installation, and described second Installation end be formed around draw-in groove, for engaging with described tool.
Preferably, described first installation portion is provided with through hole, is used for passing through aluminum strip.
Preferably, described second installation end includes two gripper shoes, and described gripper shoe is connected to described first installation end The both sides of lower limb.
Further, described first installation end and the second installation end are additionally provided with the gap both run through, and described gap will Gripper shoe is bisected into four plates.
Further, described draw-in groove arranges the outer end being separately positioned on each plate.
The invention has the beneficial effects as follows: by arranging manhole at the first installation end, be connected with aluminum strip, install second End arranges draw-in groove, and draw-in groove is by being attached with manipulator jig, and passes through the nut screwing clamping on tool, thus by aluminum strip and machine Tool hands tool links together, and design is simple, and an easy for installation and process tightened reduces unnecessary securing member and is hardly damaged Tool.
Accompanying drawing explanation
Fig. 1 is the schematic front view that the present invention fixes pipe contiguous block;
Fig. 2 is the left view schematic diagram that the present invention fixes pipe contiguous block;
Fig. 3 is to fix pipe contiguous block the second installation end with the present invention to match the schematic diagram of manipulator jig.
Reference: 1, the first installation end, the 2, second installation end, 3, gap, 11, through hole, 21, gripper shoe, 211, draw-in groove, 1 ', first tool, the 2 ', second tool, 3 ', protruding.
Detailed description of the invention
Below in conjunction with the accompanying drawing of the present invention, the technical scheme of the embodiment of the present invention is carried out clear, complete description.
Fixing pipe contiguous block of the present invention mainly as a kind of connector by the tool of circular aluminum strip with mechanical hand Link together, design fixing pipe contiguous block according to the shape of mechanical hand, as shown in Figure 3 fix pipe even with the present invention The schematic diagram connecing the manipulator jig that block is meshed can find out how both connect more intuitively.
Shown in Fig. 1, Fig. 2, disclosed fixing pipe contiguous block, including the first installation end 1 and the second peace Dress end 2, described second installation end 2 is arranged on the both sides of the lower end of described first installation end 1, and described first installation end 1 is provided with logical Hole 11, described through hole 11 can be used for by aluminum strip, due to aluminum strip for the circular present invention preferably selects manhole, but Difform through hole can be offered according to the shape of aluminum strip in actually used.Second installation end 2 is provided with gripper shoe 21, described The periphery of four ends on fagging 21 is provided with draw-in groove 211, is matched clamping by the design of four draw-in grooves 211 and manipulator jig.
The first installation end 1 and the second installation end 2 as shown in Figure 1, offers a gap 3 between the two, and one end, gap 3 opens Open one end to offer in through hole 11.Owing to gap 3 has been through through hole and two gripper shoes 21, the both sides in gap 3 when mounted When giving pressure to the left or to the right, it is possible to play the deflation to through hole 11, and the locking effect to tool, make tool and aluminum strip Preferably link together, aluminum strip can be linked together with mechanical hand by a nut.
Lower fixing pipe contiguous block is described below in detail by pipe and manipulator jig connection procedure, first by circular aluminum Bar inserts in the through hole 11 of the first installation end 1, the first tool 1 ' as described in Figure 3 and the second tool 2 ' is being respectively provided with and this The projection 3 ' that bright draw-in groove 211 matches, owing to being certain elastic by having of a tension in the centre of two tools Both are connected by rope, by nut, the first tool 1 ' and the second tool 2 ' are connected locking, institute in the upper end of the second tool 2 ' With when being connected with the fixing pipe contiguous block of the present invention, nut of outwarding winding is by second installation end 2 company of putting into of the present invention tool Between, make draw-in groove 211 corresponding with protruding 3 ' positions, by nut three, also locked by the effect aluminum strip in gap 3 simultaneously Tightly, thus three is linked together.
The present invention can use metal material to make.
It is simple that the present invention has installation, easy to use, and is only connected by three parts by a bolt so that mechanical hand Easier for installation fast.
The technology contents of the present invention and technical characteristic have revealed that as above, but those of ordinary skill in the art still may base All replacements without departing substantially from spirit of the present invention and modification, therefore, scope is made in teachings of the present invention and announcement The content disclosed in embodiment should be not limited to, and the various replacement without departing substantially from the present invention and modification should be included, and be this patent Shen Please claim be contained.

Claims (5)

1. a fixing pipe contiguous block, it is characterised in that: include the first installation end and the second installation end being connected, described first Installation end is used for installing aluminum strip, and described second installation end is for installing the tool matched with it, the four of described second installation end Week is provided with draw-in groove, for engaging with described tool.
Fixing pipe contiguous block the most according to claim 1, it is characterised in that described first installation portion is provided with through hole, uses In passing through aluminum strip.
Fixing pipe contiguous block the most according to claim 1, it is characterised in that described second installation end includes two supports Plate, and described gripper shoe is connected to the both sides of described first installation end lower limb.
Fixing pipe contiguous block the most according to claim 3, it is characterised in that described first installation end and the second installation end Being additionally provided with the gap both run through, gripper shoe is bisected into four plates by described gap.
Fixing pipe contiguous block the most according to claim 4, it is characterised in that the setting of described draw-in groove is separately positioned on each The outer end of individual plate.
CN201610613680.3A 2016-07-29 2016-07-29 Fixing pipe contiguous block Pending CN106142139A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610613680.3A CN106142139A (en) 2016-07-29 2016-07-29 Fixing pipe contiguous block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610613680.3A CN106142139A (en) 2016-07-29 2016-07-29 Fixing pipe contiguous block

Publications (1)

Publication Number Publication Date
CN106142139A true CN106142139A (en) 2016-11-23

Family

ID=57327931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610613680.3A Pending CN106142139A (en) 2016-07-29 2016-07-29 Fixing pipe contiguous block

Country Status (1)

Country Link
CN (1) CN106142139A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110124884A (en) * 2010-05-12 2011-11-18 박용현 A drainage pipe clamp fixed board
CN202700709U (en) * 2012-06-08 2013-01-30 东莞钜升塑胶电子制品有限公司 Spraying hanger
CN203887463U (en) * 2014-06-06 2014-10-22 宁波管通机械有限公司 Welding clamp for oil suction pipe assembly
CN203944702U (en) * 2014-07-22 2014-11-19 遵义市凯航机械制造有限公司 A kind of circular pipe workpiece punching auxiliary fixing device
CN205184021U (en) * 2015-12-02 2016-04-27 广州丰桥自动化科技有限公司 Special stud welding tool of high accuracy lightweight
CN205200949U (en) * 2015-12-09 2016-05-04 长春大正博凯汽车设备有限公司 Tongs connecting piece
CN205889249U (en) * 2016-07-29 2017-01-18 苏州驱指自动化科技有限公司 Fixed pipe connecting block

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110124884A (en) * 2010-05-12 2011-11-18 박용현 A drainage pipe clamp fixed board
CN202700709U (en) * 2012-06-08 2013-01-30 东莞钜升塑胶电子制品有限公司 Spraying hanger
CN203887463U (en) * 2014-06-06 2014-10-22 宁波管通机械有限公司 Welding clamp for oil suction pipe assembly
CN203944702U (en) * 2014-07-22 2014-11-19 遵义市凯航机械制造有限公司 A kind of circular pipe workpiece punching auxiliary fixing device
CN205184021U (en) * 2015-12-02 2016-04-27 广州丰桥自动化科技有限公司 Special stud welding tool of high accuracy lightweight
CN205200949U (en) * 2015-12-09 2016-05-04 长春大正博凯汽车设备有限公司 Tongs connecting piece
CN205889249U (en) * 2016-07-29 2017-01-18 苏州驱指自动化科技有限公司 Fixed pipe connecting block

Similar Documents

Publication Publication Date Title
CN104999455B (en) The pulling assembly of mechanical finger
CN104999460B (en) Articulated robot refers to
CN105058405B (en) Articulated robot refers to
CN205889249U (en) Fixed pipe connecting block
CN205565519U (en) A pincers type live working fixture for changing insulator
CN106142139A (en) Fixing pipe contiguous block
CN207104743U (en) A kind of convertible pivot pin assembly tooling
CN205401369U (en) Hoist mechanism base trabecula changes new -type tensioning ware
CN105240360A (en) Furniture connecting piece
CN204708953U (en) A kind of modularization assembling blade plate
CN209261765U (en) The rack of Compressor Group
CN207606726U (en) Maintain convenient well side wall partial shipment positioning fixture of adjustment
CN205889162U (en) New tensioning bracket
CN204220808U (en) The two-sided intermediate plate fixture of bender
CN219041337U (en) Bus duct with good stability for cables
CN204226854U (en) One rigidly fixes folder
CN206883487U (en) A kind of component assembly detent mechanism
CN205668218U (en) A kind of fixture being applied to wheel
CN204992296U (en) A fixed connection structure for installing switch board
CN203777587U (en) Falling-off preventing treadmill easy to assemble
CN103715489B (en) Filter cover board and assembling device and the assembly method thereof of debugging screw arbor assembly
CN215567044U (en) Nondestructive clamping device for pipe connection quick-release clamp assembly
CN208409715U (en) Spanner
CN207795806U (en) One kind carrying step clamping plate tooth screw
CN208840809U (en) A kind of valve deck assembly tension device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161123

WD01 Invention patent application deemed withdrawn after publication