CN106141597B - Gas turbine exhaust thermal insulation layer front processing tool and processing method - Google Patents

Gas turbine exhaust thermal insulation layer front processing tool and processing method Download PDF

Info

Publication number
CN106141597B
CN106141597B CN201610782144.6A CN201610782144A CN106141597B CN 106141597 B CN106141597 B CN 106141597B CN 201610782144 A CN201610782144 A CN 201610782144A CN 106141597 B CN106141597 B CN 106141597B
Authority
CN
China
Prior art keywords
ring
semi
processing tool
workpiece
insulation layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610782144.6A
Other languages
Chinese (zh)
Other versions
CN106141597A (en
Inventor
王嵩
王磊
毕超
孟贤彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yichang Marine Diesel Engine Co Ltd
Original Assignee
Yichang Marine Diesel Engine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yichang Marine Diesel Engine Co Ltd filed Critical Yichang Marine Diesel Engine Co Ltd
Priority to CN201610782144.6A priority Critical patent/CN106141597B/en
Publication of CN106141597A publication Critical patent/CN106141597A/en
Application granted granted Critical
Publication of CN106141597B publication Critical patent/CN106141597B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q3/00Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Turbine Rotor Nozzle Sealing (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The present invention provides a kind of gas turbine exhaust thermal insulation layer front processing tool and processing method, processing tool is made of the first semi-ring and the second semi-ring, the end of first semi-ring and the second semi-ring is equipped with connecting rib, connecting rib is equipped with dowel hole and bolt hole, and the first semi-ring and the second semi-ring are connected as an entirety by bolt passing through bolt hole;The inner ring of first semi-ring and the second semi-ring is equipped with the inner ring liner plate for encircling thermal insulation layer front workpiece.Processing method includes the following steps:Steel plate is rolled into two semicircular workpieces on veneer reeling machine;And it welds and is combined into full circle workpiece;Full circle workpiece is encircled with processing tool, processing water conservancy diversion elbow and sealing ring fixed part on vertical vehicle.By using above-mentioned processing tool, thermal insulation layer front workpiece ring is held to the scheme for increasing intensity, overcomes segmented welding connection in the prior art and is easily deformed, the shortcomings that quality is difficult to ensure.It solves the processing problem of thin-wall workpiece, reduces weld seam quantity and workpiece deformation, improve yield rate.

Description

Gas turbine exhaust thermal insulation layer front processing tool and processing method
Technical field
It is especially a kind of heat-insulated using gas turbine exhaust the present invention relates to gas turbine exhaust manufacture field The processing method of layer front processing tool.
Background technology
Exhaust apparatus is the exhaust passage of gas turbine, and the inside of H-type gas turbine exhaust is heat-insulated with stainless steel Layer, for convenience of combustion engine rotor maintenance, thermal insulation layer front is designed as removable assembling structure, sees Figure 11,12.H-type combustion turbine exhaustion fills It sets the dismantled and assembled front design drawing of thermal insulation layer and sees Fig. 6 ~ 9, formed by four sections:That is eave tile portion 11, cylindrical portion 12, sealing ring fixed part 13 With water conservancy diversion elbow 14.Existing production method is to divide four sections of making, 14 compression molding of water conservancy diversion elbow, sealing ring to fix by design drawing Portion 13 is machining, and first by machining, four sections pass through V in joint for the molding of 12 direct roll bending of cylindrical portion, eave tile portion 11 Type groove welding is at finished product.By existing design and existing production method, complex process, there are three splicing welding joints, welding deformation is big, The thin-wall part due to product but also for two halves structure is so be difficult to ensure that drawing required precision, yield rate are low not only.
Invention content
Technical problem to be solved by the invention is to provide a kind of using the processing of gas turbine exhaust thermal insulation layer front The processing method of tooling can improve yield rate, reduce weld seam, reduce workpiece deformation, improve presentation quality.
In order to solve the above technical problems, the technical solution adopted in the present invention is:A kind of gas turbine exhaust is heat-insulated Layer front processing tool, processing tool are made of the first semi-ring and the second semi-ring, and the end of the first semi-ring and the second semi-ring is equipped with Connecting rib, connecting rib are equipped with dowel hole and bolt hole, and bolt passing through bolt hole connects the first semi-ring and the second semi-ring It is connected in an entirety;
The inner ring of first semi-ring and the second semi-ring is equipped with the inner ring liner plate for encircling thermal insulation layer front workpiece.
It is solid between upper ring plate, inner ring liner plate and lower ring plate in first semi-ring and the second semi-ring in preferred scheme Fixed connection.
In preferred scheme, multiple gussets are additionally provided between upper ring plate and lower ring plate, gusset is uniformly distributed along the circumference.
In preferred scheme, the inner ring liner plate is equipped with multiple processing holes.
In preferred scheme, the bolt hole on connecting rib is two, is located at the upper and lower ends of connecting rib, dowel hole Between bolt hole.
In preferred scheme, the height of processing tool is the height in the eave tile portion and water conservancy diversion elbow of thermal insulation layer front workpiece, When workpiece processed tooling in thermal insulation layer front is encircled, eave tile portion and water conservancy diversion elbow expose except processing tool.
A kind of processing method using above-mentioned processing tool includes the following steps:
One, steel plate forming;Steel plate is rolled into two semicircular workpieces on veneer reeling machine;
Two, semicircular workpieces welding is combined into full circle workpiece;
Three, the outer wall of full circle workpiece is processed;
Four, full circle workpiece is encircled with processing tool, with bolt conjunction between the first semi-ring and the second semi-ring of processing tool Fastening;
Five, processing water conservancy diversion elbow and sealing ring fixed part on vertical vehicle.
In preferred scheme, after processing tool encircles full circle workpiece, cushion block is set in the bottom of processing tool, makes full circle work Part is hanging.
In preferred scheme, eave tile portion is individually machined, eave tile portion is welded to connect with full circle workpiece.
In preferred scheme, eave tile portion and water conservancy diversion elbow expose except processing tool.
A kind of processing method using gas turbine exhaust thermal insulation layer front processing tool provided by the invention, passes through Using above-mentioned processing tool, thermal insulation layer front workpiece ring is held to the scheme for increasing intensity, overcomes and is segmented in the prior art It is welded to connect and is easily deformed, the shortcomings that quality is difficult to ensure.The processing problem for solving thin-wall workpiece reduces two weld seam numbers Amount reduces workpiece deformation, so as to improve yield rate, improves presentation quality.Processing tool using the present invention and processing After method, finished product rate 100%, and molding is more simple, improves processing efficiency.
Description of the drawings
The invention will be further described with reference to the accompanying drawings and examples:
Fig. 1 is the schematic front view of processing tool of the present invention.
Fig. 2 is the C-C schematic cross-sectional views of Fig. 1.
Fig. 3 is the A-A schematic cross-sectional views of Fig. 1.
Fig. 4 is the B-B schematic cross-sectional views of Fig. 1.
Fig. 5 is the E-E schematic cross-sectional views of Fig. 2.
Fig. 6 is the J-J schematic cross-sectional views of Fig. 7.
Fig. 7 is the schematic top plan view of thermal insulation layer front workpiece.
Fig. 8 is the K direction views of Fig. 7.
Fig. 9 is the D-D schematic cross-sectional views of Fig. 8.
Figure 10 is close-up schematic view when processing tool of the invention encircles thermal insulation layer front workpiece.
Figure 11 is the stereogram of gas turbine exhaust.
Figure 12 is the partial sectional view of thermal insulation layer front.
In figure:Thermal insulation layer front workpiece 1, eave tile portion 11, cylindrical portion 12, sealing ring fixed part 13, water conservancy diversion elbow 14, hole 15, processing tool 2, upper ring plate 21, inner ring liner plate 22, lower ring plate 23, gusset 24, processing hole 25, dowel hole 26, bolt hole 27, the first semi-ring 28, the second semi-ring 29, connecting rib 20, cushion block 3.
Specific implementation mode
Embodiment 1:
In Fig. 1 ~ 5,10, a kind of gas turbine exhaust thermal insulation layer front processing tool, processing tool is by the first half Ring 28 and the second semi-ring 29 composition, the end of the first semi-ring 28 and the second semi-ring 29 are equipped with connecting rib 20, on connecting rib 20 Equipped with dowel hole 26 and bolt hole 27, bolt passing through bolt hole 27 by the first semi-ring 28 and the second semi-ring 29 be connected as one it is whole Body;
The inner ring of first semi-ring 28 and the second semi-ring 29 is equipped with the inner ring liner plate 22 for encircling thermal insulation layer front workpiece 1. Thus structure improves the intensity of thermal insulation layer front workpiece, is carried out convenient for thermal insulation layer front workpiece to be placed on numerical control vertical lathe Processing, decreases deformation in the welding process.
In preferred scheme such as Fig. 5, in first semi-ring 28 and the second semi-ring 29, upper ring plate 21, inner ring liner plate 22 It is fixedly connected by welding between lower ring plate 23.
In preferred scheme such as Fig. 2, multiple gussets 24 are additionally provided between upper ring plate 21 and lower ring plate 23, gusset 24 is along circle Zhou Junbu.It uses and is welded to connect between upper ring plate 21, lower ring plate 23 and gusset 24.
In preferred scheme such as Fig. 1, the inner ring liner plate 22 is equipped with multiple processing holes 25.Thus structure, convenient for adding Work such as Fig. 6, the hole 15 being located at shown in 8 in the cylindrical portion 12 of thermal insulation layer front workpiece 1.
In preferred scheme such as Fig. 1, the bolt hole 27 on connecting rib 20 is two, is located at up and down the two of connecting rib 20 End, dowel hole 26 is between bolt hole 27.Dowel hole 26 is used for will be accurate between the first semi-ring 28 and the second semi-ring 29 First semi-ring 28, is then fixedly connected by positioning by bolt passing through bolt hole 27 with the second semi-ring 29.
In preferred scheme such as Figure 10, the height of processing tool be thermal insulation layer front workpiece 1 eave tile portion 11 and water conservancy diversion it is curved First 14 height, thermal insulation layer front workpiece 1 is processed tooling when encircling, and eave tile portion 11 and water conservancy diversion elbow 14 expose in processing tool Except.
Embodiment 2:
It is a kind of using above-mentioned processing tool processing thermal insulation layer front workpiece in Fig. 1 ~ 12 on the basis of embodiment 1 1 processing method, includes the following steps:
One, steel plate forming;Steel plate is rolled into two semicircular workpieces on veneer reeling machine;
By taking GE companies 7HA.01 exhaust apparatus as an example, 28mm stainless steel coiled sheets are selected, two are rolled into using three rolls plate bending machine Semicircular workpieces;The split of semicircular workpieces is processed with boring and milling machine.
Two, semicircular workpieces welding is combined into full circle workpiece;Before welding, it is first set between the inner wall of two semicircular workpieces Multiple positioning bars are set, to position the spatial position between two semicircular workpieces.
Three, commonly to found the outer wall of Vehicle Processing full circle workpiece, processing technology tolerance+0.1mm.
Four, full circle workpiece is encircled with processing tool 2, with bolt between the first semi-ring 28 and the second semi-ring 29 of processing tool It is fastened closing;The tolerance of processing tool 2 is:- 0.1~0mm.
In preferred scheme, after processing tool encircles full circle workpiece, cushion block 3 is set in the bottom of processing tool, makes full circle Workpiece is hanging.
In preferred scheme, eave tile portion 11 is individually machined, eave tile portion 11 is welded to connect with full circle workpiece.
Five, water conservancy diversion elbow 14 and sealing ring fixed part 13 are processed on numerical control vertical lathe.Using processing tool by full circle workpiece After fixation, working height size and all sizes of endoporus become very easy on numerical control vertical lathe, water conservancy diversion elbow 14 and sealing ring Fixed part 13 is directly processed on numerical control vertical lathe, eliminates two weld seams, reduces the deformation of thermal insulation layer front workpiece 1.Numerical control Vertical vehicle is that the simple nc of military weight C534J1 types transformation founds vehicle
In preferred scheme, in numerical control vertical lathe process, eave tile portion 11 and water conservancy diversion elbow 14 expose in processing tool Except.
7HA.01,7HA.02,9HA.01 type exhaust apparatus of GE companies have successfully been manufactured with the method for the present invention.
The above embodiments are only the preferred technical solution of the present invention, and are not construed as the limitation for the present invention, this Shen Please in embodiment and embodiment in feature in the absence of conflict, mutually can arbitrarily combine.The protection model of the present invention Enclose the equivalent replacement side of technical characteristic in the technical solution that should be recorded with claim, including the technical solution of claim record Case is protection domain.Equivalent replacement i.e. within this range is improved, also within protection scope of the present invention.

Claims (4)

1. a kind of processing method using gas turbine exhaust thermal insulation layer front processing tool, processing tool(2)By first Semi-ring(28)With the second semi-ring(29)Composition, the first semi-ring(28)With the second semi-ring(29)End be equipped with connecting rib(20), Connecting rib(20)It is equipped with dowel hole(26)And bolt hole(27), bolt passing through bolt hole(27)By the first semi-ring(28)With Second semi-ring(29)It is connected as an entirety;
First semi-ring(28)With the second semi-ring(29)Inner ring be equipped with for encircling thermal insulation layer front workpiece(1)Inner ring liner plate (22),
First semi-ring(28)With the second semi-ring(29)In, upper ring plate(21), inner ring liner plate(22)With lower ring plate(23)It Between be fixedly connected;
In upper ring plate(21)With lower ring plate(23)Between be additionally provided with multiple gussets(24), gusset(24)It is uniformly distributed along the circumference;
The inner ring liner plate(22)It is equipped with multiple processing holes(25);
It is characterized in that including the following steps:
One, steel plate forming;Steel plate is rolled into two semicircular workpieces on veneer reeling machine;
Two, semicircular workpieces welding is combined into full circle workpiece;
Three, the outer wall of full circle workpiece is processed;
Four, full circle workpiece, the first semi-ring of processing tool are encircled with processing tool(28)With the second semi-ring(29)Between with bolt It is fastened closing;
Individually machining eave tile portion(11), eave tile portion(11)It is welded to connect with full circle workpiece;
Five, water conservancy diversion elbow is processed on vertical vehicle(14)With sealing ring fixed part(13);
Thermal insulation layer front workpiece is obtained by above step.
2. a kind of processing side using gas turbine exhaust thermal insulation layer front processing tool according to claim 1 Method, it is characterized in that:Connecting rib(20)On bolt hole(27)It is two, is located at connecting rib(20)Upper and lower ends, positioning Pin hole(26)Positioned at bolt hole(27)Between.
3. a kind of processing side using gas turbine exhaust thermal insulation layer front processing tool according to claim 1 Method, it is characterized in that:The height of processing tool is thermal insulation layer front workpiece(1)Eave tile portion(11)With water conservancy diversion elbow(14)Height Degree, thermal insulation layer front workpiece(1)When processed tooling is encircled, eave tile portion(11)With water conservancy diversion elbow(14)Expose processing tool it Outside.
4. a kind of processing side using gas turbine exhaust thermal insulation layer front processing tool according to claim 1 Method, it is characterized in that:After processing tool encircles full circle workpiece, cushion block is set in the bottom of processing tool(3), keep full circle workpiece outstanding It is empty.
CN201610782144.6A 2016-08-31 2016-08-31 Gas turbine exhaust thermal insulation layer front processing tool and processing method Active CN106141597B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610782144.6A CN106141597B (en) 2016-08-31 2016-08-31 Gas turbine exhaust thermal insulation layer front processing tool and processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610782144.6A CN106141597B (en) 2016-08-31 2016-08-31 Gas turbine exhaust thermal insulation layer front processing tool and processing method

Publications (2)

Publication Number Publication Date
CN106141597A CN106141597A (en) 2016-11-23
CN106141597B true CN106141597B (en) 2018-08-10

Family

ID=57345452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610782144.6A Active CN106141597B (en) 2016-08-31 2016-08-31 Gas turbine exhaust thermal insulation layer front processing tool and processing method

Country Status (1)

Country Link
CN (1) CN106141597B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107350868B (en) * 2017-08-14 2023-06-23 宜昌船舶柴油机有限公司 Thin-wall hemispherical welding assembly machining tool and machining method
CN113084381B (en) * 2021-03-18 2022-06-14 宜昌船舶柴油机有限公司 Gas turbine exhaust cylinder heat insulation layer assembly assembling tool and assembling and welding method
CN113399951B (en) * 2021-07-13 2022-08-19 温州国乐不锈钢管业有限公司 Processing technology of U-shaped stainless steel pipe

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1317987A1 (en) * 2001-12-06 2003-06-11 Snecma Moteurs Manufacturing process of a turbine rotor ring
CN202570065U (en) * 2012-05-11 2012-12-05 河北英都气化有限公司 Stirring shaft stabilizing device
CN203019063U (en) * 2012-12-20 2013-06-26 沈阳黎明航空发动机(集团)有限责任公司 Device for preventing processing deformation of internal profile of cylindrical thin-walled workpiece
CN203579218U (en) * 2013-09-25 2014-05-07 天津市中重金属结构有限公司 Tool for processing articulation holes
CN203804845U (en) * 2014-03-25 2014-09-03 东方电气集团东方汽轮机有限公司 Steam turbine barrel-shaped internal cylinder upper half and lower half merging and clamping fixture
CN205950177U (en) * 2016-08-31 2017-02-15 宜昌船舶柴油机有限公司 Anterior processing frock of gas turbine exhaust apparatus insulating layer

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1317987A1 (en) * 2001-12-06 2003-06-11 Snecma Moteurs Manufacturing process of a turbine rotor ring
CN202570065U (en) * 2012-05-11 2012-12-05 河北英都气化有限公司 Stirring shaft stabilizing device
CN203019063U (en) * 2012-12-20 2013-06-26 沈阳黎明航空发动机(集团)有限责任公司 Device for preventing processing deformation of internal profile of cylindrical thin-walled workpiece
CN203579218U (en) * 2013-09-25 2014-05-07 天津市中重金属结构有限公司 Tool for processing articulation holes
CN203804845U (en) * 2014-03-25 2014-09-03 东方电气集团东方汽轮机有限公司 Steam turbine barrel-shaped internal cylinder upper half and lower half merging and clamping fixture
CN205950177U (en) * 2016-08-31 2017-02-15 宜昌船舶柴油机有限公司 Anterior processing frock of gas turbine exhaust apparatus insulating layer

Also Published As

Publication number Publication date
CN106141597A (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN106141597B (en) Gas turbine exhaust thermal insulation layer front processing tool and processing method
CN103008998A (en) Superplastic forming (SPF)/diffusion bonding (DB) forming method of titanium alloy cylindrical three-layer structure
CN104028607B (en) A kind ofly improve the processing method that spinning subtracts thick pipe finished quality
CN103182633A (en) Split-type automobile rear-axle housing assembly welding method
CN103736807A (en) Paired-wheel spinning machining method for roll-welded cylindrical part
CA2830793A1 (en) Process for manufacturing a yankee cylinder
CN103818540A (en) Processing method of eccentric full-revolving steering oar device base
CN109604980A (en) A kind of manufacturing method of long cylindrical mould structural member
CN104525660A (en) Device and method for hot forming of titanium alloy corrugated pipe through current assistance
CN109352269A (en) A kind of metal plate forming method of twin columns curved surface
CN205950177U (en) Anterior processing frock of gas turbine exhaust apparatus insulating layer
CN105328398A (en) Method for machining three-section barrel combined faces of large mill
CN215942158U (en) Device for milling head of flame tube
CN209140110U (en) A kind of connection structure of spliced titanium seamless tubes
CN109261816B (en) A kind of plastic joining method and device between metal pipe material and plate
CN110732795A (en) aircraft engine exhaust casing welding method
CN102152070A (en) Method for manufacturing ring-shaped piece
CN108115354B (en) A kind of process controlling thin-walled semicircular ring machining deformation
CN206200424U (en) Tailstock weld jig after a kind of electric motor car
CN103394874B (en) 1200MW level nuclear power Half Speed steam turbine generator outlet box erection welding process
CN113263299B (en) Method for processing cylindrical section of flame tube of gas turbine
CN215200086U (en) Welding tool for flame tube of gas turbine
CN113333549B (en) Method for machining front ring of flame tube of gas turbine
CN202079307U (en) Large concave-convex surface flange external pilot drill mold
CN100519056C (en) Centrifugal concrete pile die production process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant