CN106126957A - 一种水库监测系统的出入库流量计算方法 - Google Patents

一种水库监测系统的出入库流量计算方法 Download PDF

Info

Publication number
CN106126957A
CN106126957A CN201610528913.XA CN201610528913A CN106126957A CN 106126957 A CN106126957 A CN 106126957A CN 201610528913 A CN201610528913 A CN 201610528913A CN 106126957 A CN106126957 A CN 106126957A
Authority
CN
China
Prior art keywords
reservoir
storage
measurement period
period
inflow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610528913.XA
Other languages
English (en)
Inventor
李胜
郑强
张宗旗
张�荣
杨正熙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU EAST CENTURY TECHNOLOGY Co Ltd
Original Assignee
GUIZHOU EAST CENTURY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU EAST CENTURY TECHNOLOGY Co Ltd filed Critical GUIZHOU EAST CENTURY TECHNOLOGY Co Ltd
Priority to CN201610528913.XA priority Critical patent/CN106126957A/zh
Publication of CN106126957A publication Critical patent/CN106126957A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16ZINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
    • G16Z99/00Subject matter not provided for in other main groups of this subclass

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

本发明公开了一种水库监测系统的出入库流量计算方法,它包括:步骤1、测量时段的选择,选择4小时作为测量时段;步骤2、测量水库所有泄流口在测量时段内的出口流量,相加得到水库出库流量q2;步骤3、根据入库流量等于出库流量加上水库增容计算出测量时段内入库流量q1;本发明解决了现有技术中采用水量平衡方程式来计算水库的出入库流量,由于水库的出流点较多,在水量平衡方程式中通常只考虑一两个出流点进行观测,依据这些测站计算必然导致出流量偏小;二是库容查算,通常情况下,时段内水库水位变化较小,而微小的水位变化,可使库容有较大变化,从而使计算结果不精确等技术问题。

Description

一种水库监测系统的出入库流量计算方法
技术领域
本发明属于水库水情监控技术,尤其涉及一种水库监测系统的出入库流量计算方法。
背景技术
在防洪预报系统中,对水库的水情监测是比较重要的一个环节,在水库水情监测系统中,需要对水库的出入库流量进行计算和统计,现有技术采用的计算原理按照“水量平衡方程式”进行,在水量平衡方程式中,影响计算结果精度主要在于:一是出库流量,由于水库的出流点较多,在水量平衡方程式中通常只考虑一两个出流点进行观测,依据这些测站计算必然导致出流量偏小;二是库容查算,通常情况下,时段内水库水位变化较小,而微小的水位变化,可使库容有较大变化,如0.01m使库容变化2~5万m3,而且因水位观测误差、库容查值与取整、时段长短等问题,计算结果易呈锯齿状,甚至数据为负值;从而使计算结果不精确。
发明内容:
本发明要解决的技术问题:提供一种水库监测系统的出入库流量计算方法,以解决现有技术中采用水量平衡方程式来计算水库的出入库流量,由于水库的出流点较多,在水量平衡方程式中通常只考虑一两个出流点进行观测,依据这些测站计算必然导致出流量偏小;二是库容查算,通常情况下,时段内水库水位变化较小,而微小的水位变化,可使库容有较大变化,从而使计算结果不精确等技术问题。本发明技术方案:
一种水库监测系统的出入库流量计算方法,它包括:
步骤1、测量时段的选择,选择4小时作为测量时段;
步骤2、测量水库所有泄流口在测量时段内的出口流量,相加得到水库出库流量q2
步骤3、根据入库流量等于出库流量加上水库增容计算出测量时段内入库流量q1
步骤3所述入库流量的计算方法为:
步骤3.1、以4h为时段,计算增量库容ΔV;
步骤3.2、计算相应平均流量Q=ΔV/(4*0.36);
步骤3.3、以处于时段中间的2h为计算点,入库流量=出库流量+平均流量Q。本发明有益效果:
本发明采用实测水库各个泄流口的出口流量作为入库流量,结果准确可靠,最接近实际情况,本发明测量时段的选择,选择测量时段为4小时,可使因库容查算导致的误差降低,提高精度,现有技术采用的时段为5分钟,利用5分钟进行计算将导致严重的锯齿状,即流量忽大忽小,与实际出入较大;本发明以测量时段为4小时,取中值2小时,这种计算方式,使推算入库流量的时间滞后Δt/2,推算点至当前时间之间的流量,在未计算之前,可以用当前推算值代替,待下个时段修正;本发明解决了现有技术中采用水量平衡方程式来计算水库的出入库流量,由于水库的出流点较多,在水量平衡方程式中通常只考虑一两个出流点进行观测,依据这些测站计算必然导致出流量偏小;二是库容查算,通常情况下,时段内水库水位变化较小,而微小的水位变化,可使库容有较大变化,从而使计算结果不精确等技术问题。
具体实施方式
一种水库监测系统的出入库流量计算方法,它包括:
步骤1、测量时段的选择,选择4小时作为测量时段;
步骤2、测量水库所有泄流口在测量时段内的出口流量,相加得到水库出库流量q2
步骤3、根据入库流量等于出库流量加上水库增容计算出测量时段内入库流量q1
步骤3所述入库流量的计算方法为:
步骤3.1、以4h为时段,计算增量库容ΔV;
步骤3.2、计算相应平均流量Q=ΔV/(4*0.36);
步骤3.3、以处于时段中间的2h为计算点,入库流量=出库流量+平均流量Q。本发明采用入库流量=出口流量+增量库容到方式,使得计算结果准确度高,计算出来的各个时段曲线不呈锯齿线,或出现负值。

Claims (2)

1.一种水库监测系统的出入库流量计算方法,它包括:
步骤1、测量时段的选择,选择4小时作为测量时段;
步骤2、测量水库所有泄流口在测量时段内的出口流量,相加得到水库出库流量q2
步骤3、根据入库流量等于出库流量加上水库增容计算出测量时段内入库流量q1
2.根据权利要求1所述的一种水库监测系统的出入库流量计算方法,其特征在于:步骤3所述入库流量的计算方法为:
步骤3.1、以4h为时段,计算增量库容ΔV;
步骤3.2、计算相应平均流量Q=ΔV/(4*0.36);
步骤3.3、以处于时段中间的2h为计算点,入库流量=出库流量+平均流量Q。
CN201610528913.XA 2016-07-07 2016-07-07 一种水库监测系统的出入库流量计算方法 Pending CN106126957A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610528913.XA CN106126957A (zh) 2016-07-07 2016-07-07 一种水库监测系统的出入库流量计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610528913.XA CN106126957A (zh) 2016-07-07 2016-07-07 一种水库监测系统的出入库流量计算方法

Publications (1)

Publication Number Publication Date
CN106126957A true CN106126957A (zh) 2016-11-16

Family

ID=57282879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610528913.XA Pending CN106126957A (zh) 2016-07-07 2016-07-07 一种水库监测系统的出入库流量计算方法

Country Status (1)

Country Link
CN (1) CN106126957A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109405941A (zh) * 2018-12-21 2019-03-01 白井双 一种出入水量计量方法及出入水量计量仪

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040104007A (ko) * 2003-06-02 2004-12-10 학교법인 인하학원 지리정보시스템(지아이에스)을 기반으로 하는 수문모델링방법
CN102155938A (zh) * 2011-04-07 2011-08-17 武汉大学 一种反推水库入库流量过程的测算方法
CN105089003A (zh) * 2015-08-07 2015-11-25 中国电建集团成都勘测设计研究院有限公司 一种水库调洪计算方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040104007A (ko) * 2003-06-02 2004-12-10 학교법인 인하학원 지리정보시스템(지아이에스)을 기반으로 하는 수문모델링방법
CN102155938A (zh) * 2011-04-07 2011-08-17 武汉大学 一种反推水库入库流量过程的测算方法
CN105089003A (zh) * 2015-08-07 2015-11-25 中国电建集团成都勘测设计研究院有限公司 一种水库调洪计算方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
水利部黄河水利委员会: "《黄河调水调沙试验》", 31 January 2008 *
闵要武 等: "三峡水库入库流量计算方法及调洪演算方法探讨", 《人民长江》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109405941A (zh) * 2018-12-21 2019-03-01 白井双 一种出入水量计量方法及出入水量计量仪

Similar Documents

Publication Publication Date Title
US9895630B2 (en) Allocation measurement systems and methods
FR2947345B1 (fr) Methode pour modifier des proportions de facies lors du calage d'historique d'un modele geologique
CN104929594B (zh) 油井措施效果评价方法
CN104680244B (zh) 一种油气田产能预测方法及装置
US20140152314A1 (en) Mass Distribution Indication of Flow Battery State of Charge
JP2015125665A (ja) 水系計画装置及び方法
ES2842949T3 (es) Procedimiento para operar una instalación de desendurecimiento de agua, con el pesaje del contenedor de almacenamiento
RU2014142599A (ru) Система и способ для определения расхода газлифтного газа
CN105760703B (zh) 一种基于聚合水库蓄放水模拟的洪水预报方法
Davidsen et al. The cost of ending groundwater overdraft on the North China Plain
CN106126957A (zh) 一种水库监测系统的出入库流量计算方法
CN107797969B (zh) 一种洪水重现参数的确定方法及装置
JP6038011B2 (ja) ダム下流河川流量予測システム
CN105807136A (zh) 一种基于加权支持向量机的谐波发射水平估计方法
Yin et al. A reservoir operating model for directing water supply to humans, wetlands, and cones of depression
CN203606014U (zh) 一种称重式液体在线计量系统
CN104091063A (zh) 一种利用回归分析确定地下水控制水位的方法
CN111927410A (zh) 一种井-藏协同分注测试调节设计方法
CN111337111A (zh) 一种用于变水头水流量标准装置的校准装置及方法
CN107542058B (zh) 一种针对承担下游防洪任务的水库的调洪计算方法
CN109469465A (zh) 注水井参数的处理方法、装置及存储介质
CN104964268A (zh) 锅炉dsc系统利用电接点水位计信号实现自动上水的方法
CN104165711A (zh) 一种基于Kalman滤波的检定台测温方法
Yang et al. Impact of water and sediment discharges on subaqueous delta evolution in Yangtze Estuary from 1950 to 2010
CN204201197U (zh) 一种用于油路管道的精确压力平衡阀门

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116

RJ01 Rejection of invention patent application after publication