CN106126934A - 一种光伏发电相关性指标获取方法 - Google Patents
一种光伏发电相关性指标获取方法 Download PDFInfo
- Publication number
- CN106126934A CN106126934A CN201610474617.6A CN201610474617A CN106126934A CN 106126934 A CN106126934 A CN 106126934A CN 201610474617 A CN201610474617 A CN 201610474617A CN 106126934 A CN106126934 A CN 106126934A
- Authority
- CN
- China
- Prior art keywords
- photovoltaic
- oneself
- photovoltaic plant
- headroom
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G16—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
- G16Z—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
- G16Z99/00—Subject matter not provided for in other main groups of this subclass
Landscapes
- Photovoltaic Devices (AREA)
Abstract
本发明提供一种光伏发电相关性指标获取方法,所述方法包括:搜集并整理k个光伏电站光伏出力历史数据;对所述k个光伏电站光伏出力历史数据进行分析整理,找出其中的错误数据和缺失数据;将所述k个光伏电站光伏出力历史数据分别分解为净空理论出力Pc(i)和相对出力Pr(i)的乘积;分别计算k个光伏电站两两之间的净空理论出力的相关系数;分别计算k个光伏电站两两之间的相对出力的相关系数;输出相关性评价指标计算结果。本发明通过实际数据计算光伏发电的相关性特征,为具有相关性的光伏发电时间序列建模提供前期基础。
Description
技术领域
本发明属于新能源发电技术领域,具体涉及一种光伏发电相关性指标获取方法。
背景技术
光伏发电是继风电后具有最大潜力和应用价值的可再生能源技术,在我国一系列配套政策支持下,光伏发电发展迅速。随着光伏发电占整个电力系统电源比重的增加,深刻认识光伏出力本身所具有的特性规律可以准确把握光伏并网对电力系统的影响,使电力系统可以更有效地解决光伏接入难题。
地理位置相近的光伏发电具有很高的相似性,其出力的相似程度可以用出力空间相关性来描述,光伏发电的相关性对于光伏总出力的随机特性有着很大的影响,相关性越弱,总出力的平滑效应越强,进而降低了系统的备用需求、爬坡速率需求以及输电通道容量需求,对于系统运行的安全性与经济性有重要影响。因此研究不同地区光伏电站的相关特性对于研究光伏发电的整体随机特性至关重要。
发明内容
为了克服上述现有技术的不足,本发明提供一种光伏发电相关性指标获取方法,本发明通过实际数据计算光伏发电的相关性特征,为具有相关性的光伏发电时间序列建模提供前期基础。
为了实现上述发明目的,本发明采取如下技术方案:
一种光伏发电相关性指标获取方法,所述方法包括如下步骤:
(1)搜集并整理k个光伏电站光伏出力历史数据;
(2)对所述k个光伏电站光伏出力历史数据进行分析整理,找出其中的错误数据和缺失数据;
(3)将所述k个光伏电站光伏出力历史数据分别分解为净空理论出力Pc(i)和相对出力Pr(i)的乘积;
(4)分别计算k个光伏电站两两之间的净空理论出力的相关系数;
(5)分别计算k个光伏电站两两之间的相对出力的相关系数;
(6)输出相关性评价指标计算结果。
优选的,所述步骤(1)中,所述k个光伏电站直线距离为100km以内,搜集的历史数据时间长度为1年,时间分辨率为15min。优选的,所述步骤(2)中,所述错误数据包括超过光伏电站装机容量、为负值以及夜间不为零的数据,对所述错误数据进行删除操作;所述缺失数据为由于通信故障在规定时间点未能采集到的数据,通过数据对应的时间来判断,用相邻数据代替的方式对所述缺失数据进行补全。
优选的,所述步骤(3)中,所述净空理论出力为忽略实际光伏发电过程中的不确定因素影响的理想出力。
优选的,所述步骤(4)中,计算所述净空理论处理的相关系数的计算公式如下:
式中,rij为第i个光伏电站和第j个光伏电站净空理论出力的相关系数,Pc(i,t)为第i个光伏电站时刻t的净空理论出力,其中t=1,2,...n,n为光伏发电的出力时间段,为第i个光伏电站净空理论出力的平均值。
优选的,所述步骤(5)中,计算所述相对出力的相关系数的计算公式如下:
式中,yij为第i个光伏电站和第j个光伏电站净空理论出力的相关系数,Pr(i,t)为第i个光伏电站时刻t的净空理论出力,其中t=1,2,...n,n为光伏发电的出力时间段,为第i个光伏电站净空理论出力的平均值。
与现有技术相比,本发明的有益效果在于:
本发明提出了一种光伏发电相关性指标获取方法,定量分析了时空因素以及天气特性因素对于光伏发电相关性的影响。可作为前期基础应用在具有相关性的光伏发电时间序列建模中,为含大规模光伏发电的时序生产模拟仿真提供前期技术手段。
附图说明
图1是本发明提供的一种光伏发电相关性指标获取方法的流程图
具体实施方式
下面结合附图对本发明作进一步详细说明。
如图1所示,本发明提供了一种光伏发电相关性指标获取方法,该方法具体步骤如下:
步骤1、搜集并整理k个光伏电站光伏出力历史数据;
搜集并整理直线距离为100km,时间长度为1年,时间分辨率为15min的k个光伏电站光伏出力历史数据。
步骤2、对k个光伏电站光伏出力历史数据进行分析整理,找出其中的错误数据和缺失数据;
错误数据包括超过光伏电站装机容量、为负值以及夜间不为零的数据,缺失数据为由于通信故障等原因规定时间点未能采集到的数据,可通过数据对应的时间来判断。对错误数据进行删除操作,用相邻数据代替的方式对缺失数据进行补全。
步骤3、将k个光伏电站光伏出力历史数据分别分解为净空理论出力Pc(i)和相对出力Pr(i)的乘积。其中净空理论出力为忽略实际光伏发电过程中阴影、云层遮挡、天气过程变化等不确定因素影响的理想出力。
步骤4、分别计算k个光伏电站两两之间的净空理论出力的相关系数,计算公式为式(1):
其中rij为第i个光伏电站和第j个光伏电站净空理论出力的相关系数,Pc(i,t)为第i个光伏电站时刻t的净空理论出力,其中t=1,2,...n,n为光伏发电的出力时间段。为第i个光伏电站净空理论出力的平均值。
该指标为时空相关性指标,主要体现了时空因素如经纬度对光伏发电相关性的影响,其中经度影响的时延特性,纬度影响的是出力大小。
步骤5、分别计算k个光伏电站两两之间的相对出力的相关系数,计算公式为式(2):
其中yij为第i个光伏电站和第j个光伏电站净空理论出力的相关系数,Pr(i,t)为第i个光伏电站时刻t的净空理论出力,其中t=1,2,...n,n为光伏发电的出力时间段。为第i个光伏电站净空理论出力的平均值。
该指标为天气过程相关性指标,主要体现了云层遮挡等气象因素对光伏发电相关性的影响。
步骤6、输出相关性评价指标计算结果。
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制,尽管参照上述实施例对本发明进行了详细的说明,所属领域的普通技术人员应当理解:依然可以对本发明的具体实施方式进行修改或者等同替换,而未脱离本发明精神和范围的任何修改或者等同替换,其均应涵盖在本发明的权利要求范围当中。
Claims (6)
1.一种光伏发电相关性指标获取方法,其特征在于,所述方法包括如下步骤:
(1)搜集并整理k个光伏电站光伏出力历史数据;
(2)对所述k个光伏电站光伏出力历史数据进行分析整理,找出其中的错误数据和缺失数据;
(3)将所述k个光伏电站光伏出力历史数据分别分解为净空理论出力Pc(i)和相对出力Pr(i)的乘积;
(4)分别计算k个光伏电站两两之间的净空理论出力的相关系数;
(5)分别计算k个光伏电站两两之间的相对出力的相关系数;
(6)输出相关性评价指标计算结果。
2.根据权利要求1所述方法,其特征在于,所述步骤(1)中,所述k个光伏电站直线距离为100km以内,搜集的历史数据时间长度为1年,时间分辨率为15min。
3.根据权利要求1所述方法,其特征在于,所述步骤(2)中,所述错误数据包括超过光伏电站装机容量、为负值以及夜间不为零的数据,对所述错误数据进行删除操作;所述缺失数据为由于通信故障在规定时间点未能采集到的数据,通过数据对应的时间来判断,用相邻数据代替的方式对所述缺失数据进行补全。
4.根据权利要求1所述方法,其特征在于,所述步骤(3)中,所述净空理论出力为忽略实际光伏发电过程中的不确定因素影响的理想出力。
5.根据权利要求1所述方法,其特征在于,所述步骤(4)中,计算所述净空理论处理的相关系数的计算公式如下:
式中,rij为第i个光伏电站和第j个光伏电站净空理论出力的相关系数,Pc(i,t)为第i个光伏电站时刻t的净空理论出力,其中t=1,2,...n,n为光伏发电的出力时间段,为第i个光伏电站净空理论出力的平均值。
6.根据权利要求1所述方法,其特征在于,所述步骤(5)中,计算所述相对出力的相关系数的计算公式如下:
式中,yij为第i个光伏电站和第j个光伏电站净空理论出力的相关系数,Pr(i,t)为第i个光伏电站时刻t的净空理论出力,其中t=1,2,...n,n为光伏发电的出力时间段,为第i个光伏电站净空理论出力的平均值。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610474617.6A CN106126934A (zh) | 2016-06-24 | 2016-06-24 | 一种光伏发电相关性指标获取方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610474617.6A CN106126934A (zh) | 2016-06-24 | 2016-06-24 | 一种光伏发电相关性指标获取方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106126934A true CN106126934A (zh) | 2016-11-16 |
Family
ID=57266229
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610474617.6A Pending CN106126934A (zh) | 2016-06-24 | 2016-06-24 | 一种光伏发电相关性指标获取方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106126934A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108808730A (zh) * | 2018-06-12 | 2018-11-13 | 国网山东省电力公司聊城供电公司 | 考虑光伏时空分布规律的配电网系统负荷备用容量计算方法及系统 |
CN109038646A (zh) * | 2018-06-29 | 2018-12-18 | 中国电力科学研究院有限公司 | 一种光伏发电场景构造方法及系统 |
CN111191812A (zh) * | 2018-11-15 | 2020-05-22 | 中国电力科学研究院有限公司 | 一种光伏出力预测方法及系统 |
CN113157769A (zh) * | 2021-04-13 | 2021-07-23 | 成都江泰讯安信息技术有限公司 | 水文报讯缺报检索方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102722760A (zh) * | 2012-05-28 | 2012-10-10 | 中国电力科学研究院 | 一种光伏电站群区域功率预测方法 |
CN105184465A (zh) * | 2015-08-25 | 2015-12-23 | 中国电力科学研究院 | 一种基于净空模型的光伏电站出力分解方法 |
-
2016
- 2016-06-24 CN CN201610474617.6A patent/CN106126934A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102722760A (zh) * | 2012-05-28 | 2012-10-10 | 中国电力科学研究院 | 一种光伏电站群区域功率预测方法 |
CN105184465A (zh) * | 2015-08-25 | 2015-12-23 | 中国电力科学研究院 | 一种基于净空模型的光伏电站出力分解方法 |
Non-Patent Citations (3)
Title |
---|
YING ZI LI 等: "Forecast of power generation for grid -connected photovoltaic system based on markov chain", 《POWER AND ENERGY ENGINEERING CONFERENCE》 * |
张慧玲 等: "间歇性新能源发电相关性分析", 《电气自动化》 * |
陈颖 等: "光伏电站群区域功率预测的统计升尺度方 法", 《可再生能源》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108808730A (zh) * | 2018-06-12 | 2018-11-13 | 国网山东省电力公司聊城供电公司 | 考虑光伏时空分布规律的配电网系统负荷备用容量计算方法及系统 |
CN109038646A (zh) * | 2018-06-29 | 2018-12-18 | 中国电力科学研究院有限公司 | 一种光伏发电场景构造方法及系统 |
CN109038646B (zh) * | 2018-06-29 | 2022-11-25 | 中国电力科学研究院有限公司 | 一种光伏发电场景构造方法及系统 |
CN111191812A (zh) * | 2018-11-15 | 2020-05-22 | 中国电力科学研究院有限公司 | 一种光伏出力预测方法及系统 |
CN113157769A (zh) * | 2021-04-13 | 2021-07-23 | 成都江泰讯安信息技术有限公司 | 水文报讯缺报检索方法 |
CN113157769B (zh) * | 2021-04-13 | 2023-05-02 | 成都江泰讯安信息技术有限公司 | 水文报讯缺报检索方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Hörsch et al. | PyPSA-Eur: An open optimisation model of the European transmission system | |
CN105426956B (zh) | 一种超短期光伏预测方法 | |
CN101728984B (zh) | 并网型光伏电站发电功率预测方法 | |
CN103973203B (zh) | 一种适用于安全稳定分析的大型光伏电站在线等值建模方法 | |
Li et al. | A dynamic assessment based feasibility study of concentrating solar power in China | |
CN103942440A (zh) | 一种光伏电站实时发电效率计算方法 | |
Rafique et al. | Assessment of solar energy potential and its deployment for cleaner production in Pakistan | |
CN104361406B (zh) | 一种光伏电站可利用太阳能发电量预测方法 | |
CN106126934A (zh) | 一种光伏发电相关性指标获取方法 | |
CN103441535A (zh) | 基于sced的日前发电计划光伏发电接纳能力分析方法 | |
CN102073791A (zh) | 用于光伏电站设计的地区太阳能资源丰富程度评估系统 | |
CN103218757A (zh) | 一种确定光伏发电容量可信度的方法 | |
Humada et al. | Modeling and characterization of a grid-connected photovoltaic system under tropical climate conditions | |
CN109344491A (zh) | 一种考虑天气状态变化和云层遮挡的太阳辐照度建模方法 | |
Rafique et al. | Enabling private sector investment in off-grid electrification for cleaner production: Optimum designing and achievable rate of unit electricity | |
CN103400204A (zh) | 基于svm-马尔科夫组合法的太阳能光伏发电量预测方法 | |
CN103678889A (zh) | 一种计及静态电压稳定性的光伏发电接纳能力计算方法 | |
Pasari et al. | Time series auto-regressive integrated moving average model for renewable energy forecasting | |
CN103530473A (zh) | 一种含大规模光伏电站的电力系统随机生产模拟方法 | |
CN104701880A (zh) | 基于调峰约束的电网接纳光伏最大容量的计算方法 | |
CN103208029A (zh) | 基于净空模型的光伏电站超短期功率预测方法 | |
CN112952818B (zh) | 一种基于出力互补性的风光水多能互补容量优化配置方法 | |
CN103440529A (zh) | 一种风电功率预测系统的横向误差平移修正方法 | |
CN105335560A (zh) | 光伏发电功率波动性及其自动发电控制备用需求计算方法 | |
CN103996079A (zh) | 一种基于条件概率的风电功率加权预测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Applicant after: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd. Applicant after: STATE GRID CORPORATION OF CHINA Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Applicant before: China Electric Power Research Institute Applicant before: State Grid Corporation of China |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161116 |