CN106123344A - A kind of vacuum boiler and to the method for vacuum boiler vacuum pumping, Apparatus and system - Google Patents

A kind of vacuum boiler and to the method for vacuum boiler vacuum pumping, Apparatus and system Download PDF

Info

Publication number
CN106123344A
CN106123344A CN201610561293.XA CN201610561293A CN106123344A CN 106123344 A CN106123344 A CN 106123344A CN 201610561293 A CN201610561293 A CN 201610561293A CN 106123344 A CN106123344 A CN 106123344A
Authority
CN
China
Prior art keywords
boiler
vacuum
vent holes
water
combustor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610561293.XA
Other languages
Chinese (zh)
Inventor
程沧
许立锟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Fulton Thermal Energy Equipment Co Ltd
Original Assignee
Hangzhou Fulton Thermal Energy Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Fulton Thermal Energy Equipment Co Ltd filed Critical Hangzhou Fulton Thermal Energy Equipment Co Ltd
Priority to CN201610561293.XA priority Critical patent/CN106123344A/en
Publication of CN106123344A publication Critical patent/CN106123344A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/0005Details for water heaters

Abstract

The invention discloses a kind of method to vacuum boiler vacuum pumping, in the case of adding the water of scheduled volume in combustor and valve closing and boiler, control combustor heating, and monitor water temperature value in real time, when water temperature value arrives target temperature value, control combustor and stop heating;After combustor stops heating, control electric controller and open vacuum vent holes, and monitor the force value in boiler in real time, when force value is less than target pressure value, controls electric controller and close vacuum vent holes.Present invention, avoiding the installation of vacuum pump, save production cost, and the vacuum vent holes increased makes vacuum pumping have special passage, it is to avoid be mixed with other passage, reduce other passage as the potential safety hazard existed during steam vent.The advantages such as the valve of vacuum vent holes is automatically opened up by electric controller and closes, and has and is swift in response, safety.Additionally, the invention also discloses a kind of boiler, and the Apparatus and system that said method is corresponding, effect is described above.

Description

A kind of vacuum boiler and to the method for vacuum boiler vacuum pumping, Apparatus and system
Technical field
The present invention relates to hot-water boiler technical field, particularly relate to a kind of vacuum boiler and to vacuum boiler vacuum pumping Method, Apparatus and system.
Background technology
Vacuum boiler is described as the new trend in domestic heating field, becomes the fast-selling equipment on market, this boiler and biography The hot-water boiler difference of system is that this boiler vacuum is run, and safety and the thermal efficiency are higher, and wherein vacuum is also shadow Ring the major reason of boiler efficiency.Therefore, in order to ensure the properly functioning of boiler and the thermal efficiency, need to avoid vacuum boiler Vacuum is destroyed.But in actual applications, after vacuum boiler dispatches from the factory, in transport, seal, use may go out during waiting The problem of existing vacuum leak.
For the vacuum leak problem of vacuum boiler, the solution of prior art is installation vacuum pump before dispatching from the factory, by Boiler internal is evacuated by vacuum pump.But the program adds a vacuum pump on the basis of original vacuum boiler, increase The production cost of vacuum boiler, and easily there is the damage problem of generating heat in ropy vacuum pump, and there is potential safety hazard.
As can be seen here, how making vacuum boiler come back to vacuum state on the premise of not increasing cost is this area skill Art personnel's problem demanding prompt solution.
Summary of the invention
It is an object of the invention to provide a kind of vacuum boiler and to the method for vacuum boiler vacuum pumping, Apparatus and system, can To make vacuum boiler come back to vacuum state on the premise of not increasing cost.
For solving above-mentioned technical problem, the present invention provides a kind of method to vacuum boiler vacuum pumping to include:
S10: in the case of adding the water of scheduled volume in combustor and valve closing and boiler, sends out to described combustor Send the heating instructions of the water heated in described boiler;
S11: the water temperature value that monitoring temperature sensor in real time sends, when described water temperature value arrives the target temperature value set Time, send, to described combustor, the stopping heating instructions stopping heating the water in described boiler;
S12: send the open command opening vacuum vent holes to electric controller, wherein said vacuum vent holes independently sets Put on the wall of described boiler;
S13: the force value in boiler described in Real-time Collection, when described force value is less than the target pressure value set, to Described electric controller sends the out code cutting out described vacuum vent holes.
Preferably, before described step S13, repeating said steps S10-S12 tri-times.
Preferably, described scheduled volume is to visor 1/2.
Preferably, described target temperature value is 99 DEG C.
Preferably, the force value in boiler described in described Real-time Collection is particularly as follows: true by be arranged on described boiler Force value in boiler described in hollow pressure gauge Real-time Collection.
Preferably, described target pressure value is 5KPa.
A kind of device to vacuum boiler vacuum pumping, including:
Heating instructions transmitting element, for adding the situation of the water of scheduled volume in combustor and valve closing and boiler Under, the heating instructions of the water heated in described boiler is sent to described combustor;Stop heating instructions transmitting element, in real time The water temperature value that monitoring temperature sensor sends, when described water temperature value arrives the target temperature value set, sends out to described combustor Send the stopping heating instructions stopping heating the water in described boiler;Open command transmitting element, for sending to electric controller Opening the open command of vacuum vent holes, wherein said vacuum vent holes is independently arranged on the wall of described boiler;Out code Transmitting element, the force value in boiler described in Real-time Collection, when described force value is less than the target pressure value set, to Described electric controller sends the out code cutting out described vacuum vent holes.
Preferably, described out code transmitting element is connected with the pressure vacuum gauge being arranged on described boiler, specifically leads to Cross the force value in boiler described in described pressure vacuum gauge Real-time Collection.
A kind of system to vacuum boiler vacuum pumping, including: the described device to vacuum boiler vacuum pumping, also include: with Temperature sensor, pressure vacuum gauge, vacuum vent holes and the electric controller that the described device to vacuum boiler vacuum pumping connects. Described temperature sensor is arranged on described boiler wall, the water temperature value of water in measuring described boiler;Described pressure vacuum gauge It is arranged on described boiler wall, for measuring the force value in described boiler;Described vacuum vent holes is arranged at described boiler wall On, for the steam in described boiler is discharged;Described electric controller is connected with described vacuum vent holes, is used for controlling described The opening and closing of vacuum vent holes.
A kind of vacuum boiler, including boiler body, described boiler body has on the wall being independently arranged at described boiler Vacuum vent holes.
The present invention provides a kind of method to vacuum boiler vacuum pumping, adds in combustor and valve closing and boiler In the case of the water of scheduled volume, the heating instructions of the water in combustor transmission heating boiler.In combustor heating boiler During water, the water temperature value that monitoring temperature sensor in real time sends, when water temperature value arrives the target temperature value set, Xiang Ran Burning machine sends the stopping heating instructions of the water stopped in heating boiler.After water in combustor stops heating boiler, to electronic Controller sends the open command opening vacuum vent holes, and wherein vacuum vent holes is independently arranged on the wall of boiler.By very Force value in hollow pressure gauge Real-time Collection boiler, when force value is less than the target pressure value set, sends out to electric controller Send the out code closing vacuum vent holes.
Thus can release, compared with prior art, present invention, avoiding the installation of vacuum pump, save the life of vacuum boiler Produce cost.And the vacuum vent holes increased makes vacuum pumping have special passage, it is to avoid mixed with other passage, reduce Using other passage as the potential safety hazard existed during steam vent.Additionally, the valve of vacuum vent holes is by electric controller certainly The advantages such as dynamic opening and closing, have and be swift in response, safety.
Additionally, the present invention also provides for a kind of boiler, and the Apparatus and system that said method is corresponding, effect is described above.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention, the accompanying drawing used required in embodiment will be done simply below Introduce, it should be apparent that, the accompanying drawing in describing below is only some embodiments of the present invention, for ordinary skill people From the point of view of Yuan, on the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
The flow chart of a kind of method to vacuum boiler vacuum pumping that Fig. 1 provides for the present invention;
The structure chart of a kind of device to vacuum boiler vacuum pumping that Fig. 2 provides for the present invention;
The structure chart of a kind of system to vacuum boiler vacuum pumping that Fig. 3 provides for the present invention;
The another kind that Fig. 4 provides for the present invention structure chart to the system of vacuum boiler vacuum pumping;
The structure chart of a kind of vacuum boiler that Fig. 5 provides for the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiment wholely.Based on this Embodiment in invention, those of ordinary skill in the art are not under making creative work premise, and obtained is every other Embodiment, broadly falls into scope.
The core of the present invention is to provide a kind of vacuum boiler and to the method for vacuum boiler vacuum pumping, Apparatus and system.
In order to make those skilled in the art be more fully understood that the present invention program, below in conjunction with the accompanying drawings and detailed description of the invention The present invention is described in further detail.
Embodiment one
The flow chart of a kind of method to vacuum boiler vacuum pumping that Fig. 1 provides for the present invention.As it is shown in figure 1, to vacuum The method of boiler vacuum pumping includes:
Step S10: in the case of adding the water of scheduled volume in combustor and valve closing and boiler, send out to combustor Send the heating instructions of water in heating boiler.
Closing combustor and valve, add the water of scheduled volume in boiler, combustor begins to warm up the water in boiler.In combustion During water in burning machine heating boiler, enter step S11.Wherein, the interposition on boiler wall is equipped with visor, for the ease of Observing, scheduled volume is to visor 1/2, it is important to note that scheduled volume is not limited in this numerical value in the present invention.
Step S11: the water temperature value that monitoring temperature sensor in real time sends, when water temperature value arrives the target temperature value set Time, the stopping heating instructions of the water stopped in heating boiler is sent to combustor.
Temperature sensor is the temperature value of water in measuring boiler, in being embodied as, can be arranged by target temperature value It it is 99 DEG C, by the water temperature value in temperature sensor measurement boiler, when water temperature value arrives the target temperature value set, combustor Stop the water in heating boiler, now enter step S12.Wherein target temperature value is 99 DEG C, it is important to note that this Bright middle target temperature value is not limited in this numerical value.
Step S12: send the open command opening vacuum vent holes to electric controller.
Having corresponding valve in vacuum vent holes, electric controller is connected with valve, thus controls vacuum vent holes Open and close.After water in combustor stops heating boiler, electric controller, when receiving open command, opens vacuum Steam vent, the steam in boiler is discharged by vacuum vent holes.
Step S13: the force value in Real-time Collection boiler, when force value is less than the target pressure value set, to electronic Controller sends the out code cutting out vacuum vent holes.
After vacuum vent holes is opened, gas can be discharged by the steam in boiler, and the pressure in boiler is gradually Reduce.In being embodied as, the force value in pressure vacuum gauge Real-time Collection boiler on boiler, when force value is less than setting During target pressure value, electric controller cuts out vacuum vent holes.As a kind of optimal way, target pressure value is set to 5KPa.Need Be noted that target pressure value be set as 5KPa be one preferred embodiment, represent only that this kind of implements Mode, can also is that other numerical value in other embodiments.
In being embodied as, each step can be performed once according to step S10-S13 order, but in order to more abundant The gas discharged in boiler, after step S12 is finished, again return to step S10, i.e. control each valve closing, Boiler restarts.So, circulation performs step S10-S12 tri-times, performs step again when step S12 goes to third time when Rapid S13.
The method to vacuum boiler vacuum pumping that the present embodiment provides, can realize row to the vacuum kettle that vacuum leak occurs Vacuum, it is to avoid the installation of vacuum pump, saves the production cost of vacuum boiler.And the vacuum vent holes increased makes row true Have special passage in vain, it is to avoid mixed with other passage, reduced other passage as the safety existed during steam vent Hidden danger.Additionally, the valve of vacuum vent holes is automatically opened up by electric controller and closes, have and be swift in response, safety etc. excellent Point.
Embodiment two
The structure chart of a kind of device to vacuum boiler vacuum pumping that Fig. 2 provides for the present invention.As in figure 2 it is shown, vacuum kettle The device 1 of fire grate vacuum includes:
Heating instructions transmitting element 10, for adding the feelings of the water of scheduled volume in combustor and valve closing and boiler Under condition, the heating instructions of the water in combustor transmission heating boiler.
Heating instructions transmitting element 10, in the case of adding water, just can send heating instructions to combustor in boiler, this Avoid the situation of boiler dry combustion method, add the safety of operation, it is also possible to the service life of prolonged boiler.
Stopping heating instructions transmitting element 11, the water temperature value sent for monitoring temperature sensor in real time, when water temperature value arrives When reaching the target temperature value of setting, send the stopping heating instructions of the water stopped in heating boiler to combustor.
Stop heating instructions transmitting element 11 to be connected with the temperature sensor being arranged on boiler wall, be used for obtaining temperature and pass The water temperature value that sensor gathers, when water temperature value arrives the target temperature value set, sends to combustor and stops heating instructions.Pass through Target setting temperature value, it is possible to be prevented effectively from the working time that combustor is unnecessary, improve work efficiency.Additionally, necessarily Avoid combustor in degree to work always, thus the water in causing boiler dryouies and steam pressure in boiler is huge causes The bursting of boilers.
Open command transmitting element 12, for sending the open command opening vacuum vent holes, wherein to electric controller Vacuum vent holes is independently arranged on the wall of boiler.
Special vacuum vent holes it is provided with on boiler wall, independent with other steam vents.Vacuum vent holes have corresponding Valve, electric controller is connected with valve, when electric controller receives open command, control valve open.Vacuum is arranged The position of pore may be provided in the top of boiler wall, bottom or side.A large amount of steam can be produced during water in combustor heating boiler, Owing to vapour density is less than air, when vacuum vent holes is opened, steam can the most upwards be discharged, so by vacuum in the present invention Steam vent is located at boiler top, it should be noted that the present invention is not limited in this mode.
Out code transmitting element 13, the force value in Real-time Collection boiler, when force value is less than the target set During force value, send the out code closing vacuum vent holes to electric controller.
Out code transmitting element 13 is connected with the pressure vacuum gauge being arranged on boiler, real especially by pressure vacuum gauge Time gather the force value in boiler.
The device to vacuum boiler vacuum pumping that the present embodiment provides, can realize row to the vacuum kettle that vacuum leak occurs Vacuum, it is to avoid the installation of vacuum pump, saves the production cost of vacuum boiler.And the vacuum vent holes increased makes row true Have special passage in vain, it is to avoid mixed with other passage, reduced other passage as the safety existed during steam vent Hidden danger.Additionally, the valve of vacuum vent holes is automatically opened up by electric controller and closes, have and be swift in response, safety etc. excellent Point.
Can also be integrated on boiler it should be noted that the above-mentioned device to vacuum boiler vacuum pumping can be separately provided In existing electric cabinet, so can be cost-effective.When the device of vacuum boiler vacuum pumping is separately provided, pot can be arranged on Furnace interior can also be arranged on boiler exterior, selects according to the convenience of operation.As a kind of optimal way, in the present invention The device of vacuum boiler vacuum pumping is integrated on boiler in existing electric cabinet, only has this it should be noted that represent A kind of embodiment, can also select alternate manner in other embodiments.
Embodiment three
On the basis of embodiment two, the structure of a kind of system to vacuum boiler vacuum pumping that Fig. 3 provides for the present invention Figure.As it is shown on figure 3, in addition to embodiment two is to the device 1 of vacuum boiler vacuum pumping, the system of vacuum boiler vacuum pumping also includes: Temperature sensor 15, pressure vacuum gauge 16, vacuum vent holes 18 and the electronic control being connected with to the device 1 of vacuum boiler vacuum pumping Device 14 processed.
Temperature sensor 15 is arranged on boiler wall, the water temperature value of water in measuring boiler.
Pressure vacuum gauge 16 is arranged on boiler wall, for measuring the force value in boiler.
Vacuum vent holes 18 is arranged on boiler wall, for being discharged by the steam in boiler.
Electric controller 14 is connected with vacuum vent holes 18, for controlling the opening and closing of vacuum vent holes 18.
In the case of adding the water of scheduled volume in combustor and valve closing and boiler, heating instructions transmitting element 10 Heating instructions is sent to combustor.Stop heating instructions transmitting element 11, the water sent for monitoring temperature sensor 15 in real time Temperature value.And before heating, set target temperature value.Stop heating instructions transmitting element 11 according to temperature sensor 15 The water temperature value sent here, judges, if the water temperature value in boiler is less than target temperature value, then controls combustor and continues heating kettle Water in stove, if the water temperature value in boiler reaches target temperature value, then sends to combustor and stops heating instructions.Work as combustor When stopping the water in heating boiler, open command transmitting element 12 sends to electric controller 14 and opens opening of vacuum vent holes 18 Open instruction.Electric controller 14 receives open command, opens vacuum vent holes 18, meanwhile, out code transmitting element 13 force value that the transmission of monitoring pressure vacuum gauge 16 comes in real time, when force value is less than the target pressure value set, then to electronic Controller 14 sends the out code cutting out vacuum vent holes 18, and electric controller 14 receives out code, closes vacuum row Pore 18.
The another kind that Fig. 4 provides for the present invention structure chart to the system of vacuum boiler vacuum pumping.In being embodied as, also Can arrange a pressure-head switch 17 on boiler, this pressure-head switch 17 is arranged on boiler wall, at boiler Interior pressure reaches to open during pressure limit value.
The system to vacuum boiler vacuum pumping that the present embodiment provides, vacuum vent holes is to be independently arranged on the wall of boiler Steam vent, it is to avoid mixed with other passage, reduces other passage as the potential safety hazard existed during steam vent.Vacuum is arranged Having corresponding valve on pore, electric controller is connected with valve, thus controls the opening and closing of vacuum vent holes, has anti- Should be rapid, safety etc. advantage.Make during vacuum pumping further, since be provided with pressure-head switch, boiler internal pressure A protection device is had, it is to avoid Pressure gauge produces danger the most on time when of excessive.
Embodiment four
The structure chart of a kind of vacuum boiler that Fig. 5 provides for the present invention.As it is shown in figure 5, vacuum boiler 2, including boiler originally Body, boiler body has the vacuum vent holes 18 being independently arranged on boiler wall.
Additionally, be additionally provided with temperature sensor 15, pressure vacuum gauge 16, pressure-head switch 17, automatically controlled on boiler body Case 19, visor 20.The centre position that its mesoscope 20 is positioned on boiler wall, electric cabinet 19 is positioned at boiler internal.
In the case of adding the water of scheduled volume in combustor and valve closing and boiler, electric cabinet 19 is sent out to combustor Send the heating instructions of water in heating boiler, and the water temperature value that monitoring temperature sensor 15 in real time sends.Set when water temperature value arrives During fixed target temperature value, send the stopping heating instructions of the water stopped in heating boiler to combustor.When combustor stops adding After water in heat boiler, send the open command opening vacuum vent holes to electric controller, and monitor pressure vacuum gauge in real time Force value in 16 boilers sent.When force value is less than the target pressure value set, sends to electric controller and close very The out code of idle discharge pore 18.
The vacuum boiler that the present embodiment provides, boiler body has the vacuum vent holes being independently arranged on boiler wall, Make the vacuum pumping to have had special passage, it is to avoid mixed with other passage, deposit when reducing other passage as steam vent Potential safety hazard.
Above to a kind of vacuum boiler provided by the present invention with to the method for vacuum boiler vacuum pumping, Apparatus and system, It is described in detail.What in description, each embodiment stressed is all the difference with other embodiments, and each is real Execute identical similar portion between example to see mutually.For device disclosed in embodiment, owing to it is open with embodiment Method corresponding, so describe fairly simple, relevant part sees method part and illustrates.It should be pointed out that, for this For the those of ordinary skill of technical field, under the premise without departing from the principles of the invention, it is also possible to the present invention is carried out some Improving and modify, these improve and modify in the protection domain also falling into the claims in the present invention.

Claims (10)

1. the method to vacuum boiler vacuum pumping, it is characterised in that including:
S10: in the case of adding the water of scheduled volume in combustor and valve closing and boiler, sends to described combustor and adds The heating instructions of the water in the described boiler of heat;
S11: the water temperature value that monitoring temperature sensor in real time sends, when described water temperature value arrives the target temperature value set, to Described combustor sends the stopping heating instructions stopping heating the water in described boiler;
S12: send the open command opening vacuum vent holes to electric controller, wherein said vacuum vent holes is independently arranged at On the wall of described boiler;
S13: the force value in boiler described in Real-time Collection, when described force value is less than the target pressure value set, to described Electric controller sends the out code cutting out described vacuum vent holes.
2. the method for claim 1, it is characterised in that before described step S13, repeating said steps S10-S12 Three times.
3. method as claimed in claim 2, it is characterised in that described scheduled volume is to visor 1/2.
4. method as claimed in claim 2, it is characterised in that described target temperature value is 99 DEG C.
5. method as claimed in claim 2, it is characterised in that force value in boiler described in described Real-time Collection particularly as follows: By the force value in boiler described in the pressure vacuum gauge Real-time Collection that is arranged on described boiler.
6. the method as described in claim 1 to 5 any one, it is characterised in that described target pressure value is 5KPa.
7. the device to vacuum boiler vacuum pumping, it is characterised in that including:
Heating instructions transmitting element, in the case of the water adding scheduled volume in combustor and valve closing and boiler, to Described combustor sends the heating instructions of the water heated in described boiler;
Stopping heating instructions transmitting element, the water temperature value sent for monitoring temperature sensor in real time, when described water temperature value arrives During the target temperature value set, send, to described combustor, the stopping heating instructions stopping heating the water in described boiler;
Open command transmitting element, opens the open command of vacuum vent holes for sending to electric controller, wherein said very Idle discharge pore is independently arranged on the wall of described boiler;
Out code transmitting element, the force value in boiler described in Real-time Collection, when described force value is less than the mesh set During mark force value, send the out code closing described vacuum vent holes to described electric controller.
8. device as claimed in claim 7, it is characterised in that described out code transmitting element be arranged on described boiler Pressure vacuum gauge connect, especially by the force value in boiler described in described pressure vacuum gauge Real-time Collection.
9. the system to vacuum boiler vacuum pumping, it is characterised in that including: described in claim 7 or 8 to vacuum boiler The device of vacuum pumping, also includes: the temperature sensor that the device of vacuum boiler vacuum pumping is connected with described, pressure vacuum gauge, Vacuum vent holes and electric controller;
Described temperature sensor is arranged on described boiler wall, the water temperature value of water in measuring described boiler;
Described pressure vacuum gauge is arranged on described boiler wall, for measuring the force value in described boiler;
Described vacuum vent holes is arranged on described boiler wall, for being discharged by the steam in described boiler;
Described electric controller is connected with described vacuum vent holes, for controlling the opening and closing of described vacuum vent holes.
10. a vacuum boiler, including boiler body, it is characterised in that have on described boiler body described in being independently arranged at Vacuum vent holes on the wall of boiler.
CN201610561293.XA 2016-07-13 2016-07-13 A kind of vacuum boiler and to the method for vacuum boiler vacuum pumping, Apparatus and system Pending CN106123344A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610561293.XA CN106123344A (en) 2016-07-13 2016-07-13 A kind of vacuum boiler and to the method for vacuum boiler vacuum pumping, Apparatus and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610561293.XA CN106123344A (en) 2016-07-13 2016-07-13 A kind of vacuum boiler and to the method for vacuum boiler vacuum pumping, Apparatus and system

Publications (1)

Publication Number Publication Date
CN106123344A true CN106123344A (en) 2016-11-16

Family

ID=57283428

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610561293.XA Pending CN106123344A (en) 2016-07-13 2016-07-13 A kind of vacuum boiler and to the method for vacuum boiler vacuum pumping, Apparatus and system

Country Status (1)

Country Link
CN (1) CN106123344A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2767903Y (en) * 2005-01-31 2006-03-29 河南德润锅炉有限公司 Automatic control apparatus for vacuum boiler
KR20120020190A (en) * 2012-01-13 2012-03-07 윤종우 Miniaturized vacuum electric hot water boiler
CN203928425U (en) * 2014-06-18 2014-11-05 魏田艳 A kind of automatic temperature control of vacuum hot water unit
CN105004052A (en) * 2015-08-22 2015-10-28 郑州大学 Water tube type vacuum boiler with central reverse flames

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2767903Y (en) * 2005-01-31 2006-03-29 河南德润锅炉有限公司 Automatic control apparatus for vacuum boiler
KR20120020190A (en) * 2012-01-13 2012-03-07 윤종우 Miniaturized vacuum electric hot water boiler
CN203928425U (en) * 2014-06-18 2014-11-05 魏田艳 A kind of automatic temperature control of vacuum hot water unit
CN105004052A (en) * 2015-08-22 2015-10-28 郑州大学 Water tube type vacuum boiler with central reverse flames

Similar Documents

Publication Publication Date Title
CN105674578B (en) A kind of gas heater and its control method of a pressure self-adjusting section
CN107334372B (en) Steaming cabinet
CN104075373A (en) Wall-hanging stove constant temperature control method and system based on chambered temperature control floor heating
CN106322459B (en) Kitchen range steam box all-in-one machine
CN105091349A (en) Outlet water temperature adjusting device, air energy water heater and automatic outlet water temperature adjusting method
CN104180425B (en) A kind of high-power central hot radiator of family expenses Dual-energy source
CN105972814A (en) Wall-mounted gas furnace and water supplementing control method, control device and control system
CN211269978U (en) Steam cooking device capable of continuously supplying water
CN2922711Y (en) Energy-saving electric steaming cabinet
CN106308476B (en) It is a kind of with the food steam box for being rapidly heated and keeping temperature incubation function
CN204806362U (en) Steam generator
CN106123344A (en) A kind of vacuum boiler and to the method for vacuum boiler vacuum pumping, Apparatus and system
CN209325756U (en) A kind of boiler flue gas leak detecting device
CN208735887U (en) A kind of burnt gas wall hanging furnace of waste gas residual heat heat preservation
CN106073473B (en) A kind of novel high-efficiency and energy-saving steamer
CN205560912U (en) Coordinated control device of kitchen appliance product
CN207317237U (en) A kind of adaptive environment temperature change and automatically adjust the constant temp gas water heater of shower temperature
CN107736804A (en) Cooker cover, pot body and cooker
CN111219776A (en) Gas heating furnace and preparation method thereof
CN106642294B (en) Energy-saving waterway system for heat supply system
CN208957662U (en) A kind of novel high-efficiency and energy-saving steam box
CN210374104U (en) Gas wall-mounted furnace based on accurate temperature control of two combustion chambers
CN109681917A (en) A kind of integrated kitchen range with gas heater
CN210204482U (en) Heating structure of instant noodle pot
CN208435239U (en) Double end energy conservation steam stove

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116