CN106121250A - A kind of toilet casing pressure stone mounting process - Google Patents
A kind of toilet casing pressure stone mounting process Download PDFInfo
- Publication number
- CN106121250A CN106121250A CN201610738288.1A CN201610738288A CN106121250A CN 106121250 A CN106121250 A CN 106121250A CN 201610738288 A CN201610738288 A CN 201610738288A CN 106121250 A CN106121250 A CN 106121250A
- Authority
- CN
- China
- Prior art keywords
- cement mortar
- toilet
- mounting process
- casing pressure
- marble
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Floor Finish (AREA)
Abstract
The present invention relates to a kind of toilet casing pressure stone mounting process, comprise the following steps: the first step, set cement mortar on the upper berth, threshold position of toilet, and take marble, smear cement mortar in bottom, then marble is layed in cement mortar;Second step, on the floor of toilet, position and the cement mortar of cement mortar lay waterproof layer on the one side of toilet respectively in succession;3rd step, is positioned on waterproof layer above the floor of toilet and lays the second cement mortar, and lays floor tile in the second cement mortar, and the upper surface of described second cement mortar is less than marmorean upper surface less than the upper surface of cement mortar, the upper surface of floor tile.
Description
Technical field
The present invention relates to a kind of toilet casing pressure stone mounting process.
Background technology
China Patent No.: CN201420764992.0 discloses a kind of casing pressure stone structure, it is characterised in that tie at room door
It is provided with the casing pressure stone being above the ground level at structure installing port, door pocket is installed on described casing pressure stone.The beneficial effect of this utility model
It is: this structure can be prevented effectively from door pocket and rotten problem occurs, and improves the quality of decorations.But, if door pocket uses
Wood materials, and if this door pocket be provided on bathroom door, then be still easy to make moist.
Summary of the invention
Therefore, for above-mentioned problem, the present invention proposes that a kind of water resistance is good, construction is simple, marble is not easily stripped
Sanitary towel's casing pressure stone mounting process.
For achieving the above object, present invention employs techniques below scheme: a kind of toilet casing pressure stone mounting process, including
Following steps:
The first step, sets cement mortar on the upper berth, threshold position of toilet, and takes marble, smear cement mortar in bottom,
Then marble is layed in cement mortar;
Second step, on the floor of toilet in succession the position of cement mortar and cement mortar near the one side of toilet
Upper lay waterproof layer respectively;
3rd step, is positioned on waterproof layer above the floor of toilet and lays the second cement mortar, and at the second cement bonded sand
Laying floor tile on slurry, the upper surface of described second cement mortar is less than the upper surface of cement mortar, and the upper surface of floor tile is less than big
The upper surface of Gypsum Fibrosum.
Further, described marmorean length is equal to the length at threshold position.
Further, in the 3rd step, floor tile first smears cement mortar on the bottom surface of floor tile when laying, stand 0.5~
2min, is then layed in the second cement mortar.
Further, in the first step, after smearing cement mortar bottom marble, stand 0.5~2min, then spread
If.
Further, the width of described cement mortar is equal to marmorean width.
By using preceding solution, the invention has the beneficial effects as follows: this toilet casing pressure stone mounting process is by big
The change of the paving mode of Gypsum Fibrosum can be effectively improved water resistance, improves the steadiness that marble is installed, and marble is not
Easy to fall off;Further, marmorean length, equal to the length at threshold position, can be effectively improved the goodness of fit of installation;Enter one
Step, floor tile first smears cement mortar on the bottom surface of floor tile when laying, and stands 0.5~2min, is then layed in the second cement
On mortar, by the way of standing, allow cement mortar be in leather hard, but so cement can have certain aridity, from
And the floor tile after laying can tightly be held ground, will not produce hollow, warp, the defective mode such as infiltration;Further,
After smearing cement mortar bottom marble, stand 0.5~2min, then lay, allow cement mortar be in leather hard, but
So cement can have certain aridity, the ground so that the marble after Pu Sheing can tightly be held, and will not produce sky
The heart, warp, the defective mode such as infiltration.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention.
Detailed description of the invention
In conjunction with the drawings and specific embodiments, the present invention is further described.
With reference to Fig. 1, the present embodiment provides a kind of toilet casing pressure stone mounting process, comprises the following steps:
The first step, sets cement mortar 1 on the upper berth, threshold position of toilet, and takes marble 2, smear cement in bottom
Slurry, after smearing cement mortar, stands 1min, is then layed in cement mortar 1 by marble 2, described Dali bottom marble
The length of stone 2 is equal to the length at threshold position, and the width of described cement mortar 1 is equal to the width of marble 2;
Second step, on the floor of toilet in succession the position of cement mortar 1 and cement mortar 1 near the side of toilet
Waterproof layer 3 is laid respectively on face;
3rd step, is positioned on waterproof layer 3 above the floor of toilet and lays the second cement mortar 4, and at the second cement
Laying floor tile 5 on mortar 4, floor tile 5 first smears cement mortar on the bottom surface of floor tile 5 when laying, and stands 1min, is then layed in
In second cement mortar 4, the upper surface of described second cement mortar 4 is less than the upper surface of cement mortar 1, the upper surface 5 of floor tile
Upper surface less than marble 2.
After smearing cement mortar bottom marble or floor tile, time of repose can be 0.5min or 2min or 0.5~2min
Between any value.
This toilet casing pressure stone mounting process can be effectively improved water resistance by the change of marmorean paving mode,
The steadiness that raising marble is installed, and marble difficult drop-off;Further, marmorean length is equal to threshold position
Length, can be effectively improved the goodness of fit of installation;Further, floor tile first smears cement when laying on the bottom surface of floor tile
Slurry, stands 0.5~2min, is then layed in the second cement mortar, by the way of standing, allows cement mortar be in leather hard
State, but so cement can have certain aridity, the ground so that the floor tile after Pu Sheing can tightly be held, and will not produce
Raw hollow, warp, the defective mode such as infiltration;Further, after smearing cement mortar bottom marble, standing 0.5~2min, and
After lay, allow cement mortar be in leather hard, but so cement can have certain aridity, so that after Pu Sheing
Marble can tightly hold ground, will not produce hollow, warp, the defective mode such as infiltration.
Although specifically showing and describe the present invention in conjunction with preferred embodiment, but those skilled in the art should be bright
In vain, in the spirit and scope of the present invention limited without departing from appended claims, in the form and details can be right
The present invention makes a variety of changes, and is protection scope of the present invention.
Claims (5)
1. a toilet casing pressure stone mounting process, it is characterised in that comprise the following steps:
The first step, sets cement mortar on the upper berth, threshold position of toilet, and takes marble, smear cement mortar in bottom, then
Marble is layed in cement mortar;
Second step, on the floor of toilet, position and the cement mortar of cement mortar are divided on the one side of toilet in succession
Do not lay waterproof layer;
3rd step, is positioned on waterproof layer above the floor of toilet and lays the second cement mortar, and in the second cement mortar
Laying floor tile, the upper surface of described second cement mortar is less than marble less than the upper surface of cement mortar, the upper surface of floor tile
Upper surface.
A kind of toilet casing pressure stone mounting process the most according to claim 1, it is characterised in that: described marmorean length
Length equal to threshold position.
A kind of toilet casing pressure stone mounting process the most according to claim 1, it is characterised in that: in the 3rd step, floor tile exists
On the bottom surface of floor tile, first smear cement mortar during laying, stand 0.5~2min, be then layed in the second cement mortar.
A kind of toilet casing pressure stone mounting process the most according to claim 1, it is characterised in that: in the first step, in Dali
After smearing cement mortar bottom stone, stand 0.5~2min, then lay.
A kind of toilet casing pressure stone mounting process the most according to claim 1, it is characterised in that: the width of described cement mortar
Degree is equal to marmorean width.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610738288.1A CN106121250A (en) | 2016-08-26 | 2016-08-26 | A kind of toilet casing pressure stone mounting process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610738288.1A CN106121250A (en) | 2016-08-26 | 2016-08-26 | A kind of toilet casing pressure stone mounting process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106121250A true CN106121250A (en) | 2016-11-16 |
Family
ID=57275428
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610738288.1A Pending CN106121250A (en) | 2016-08-26 | 2016-08-26 | A kind of toilet casing pressure stone mounting process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106121250A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10280662A (en) * | 1997-03-31 | 1998-10-20 | Nippon Sogo Jiyuuseikatsu Kk | Floor material and execution method therefor |
JP2007197921A (en) * | 2006-01-24 | 2007-08-09 | Yuka Sansho Kenzai Kk | Floor structure |
CN203347182U (en) * | 2013-07-18 | 2013-12-18 | 北京丽贝亚建筑装饰工程有限公司 | Water-impermeable structural layer for toilet |
CN104653036A (en) * | 2014-12-23 | 2015-05-27 | 上海聚通装饰集团有限公司 | Moisture-proof and mildew-proof installation method for door pocket line and doorsill stone |
CN205153852U (en) * | 2015-10-30 | 2016-04-13 | 洛阳师范学院 | Type of preventing stumbling is dampproofing structure for bathroom threshold |
-
2016
- 2016-08-26 CN CN201610738288.1A patent/CN106121250A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10280662A (en) * | 1997-03-31 | 1998-10-20 | Nippon Sogo Jiyuuseikatsu Kk | Floor material and execution method therefor |
JP2007197921A (en) * | 2006-01-24 | 2007-08-09 | Yuka Sansho Kenzai Kk | Floor structure |
CN203347182U (en) * | 2013-07-18 | 2013-12-18 | 北京丽贝亚建筑装饰工程有限公司 | Water-impermeable structural layer for toilet |
CN104653036A (en) * | 2014-12-23 | 2015-05-27 | 上海聚通装饰集团有限公司 | Moisture-proof and mildew-proof installation method for door pocket line and doorsill stone |
CN205153852U (en) * | 2015-10-30 | 2016-04-13 | 洛阳师范学院 | Type of preventing stumbling is dampproofing structure for bathroom threshold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104234362B (en) | Outdoor tile construction method | |
CN104653036B (en) | A kind of door sleeve and door stone are moistureproof, the mounting method of mildew-resistant | |
CN106121250A (en) | A kind of toilet casing pressure stone mounting process | |
CN207796262U (en) | A kind of water pipe finishing waterproof assembling structure | |
CN204754074U (en) | Laminate flooring brick with moisture resistance function of preventing fires | |
CN204370762U (en) | A kind of anti-skidding marble tile of easy processing | |
CN208473229U (en) | A kind of overhead type decorative ground | |
CN103806664A (en) | Construction technology of external thermal insulation mortar | |
CN206158102U (en) | Balcony construction site layout structure | |
CN202194324U (en) | Novel specially shaped ceramic brick | |
CN202577809U (en) | Precast stair structure | |
CN205224451U (en) | Roofing parapet flashing protective layer structure | |
CN205421842U (en) | Threshold prevention of seepage control structure between residential sanitation | |
CN205153392U (en) | Install ceramic tile structure of floor drain fast | |
CN204609214U (en) | Composite floor board | |
CN204738498U (en) | Floor tile can seep water | |
CN202936687U (en) | Cement foamed concrete floor | |
CN205348655U (en) | External wall insulation decorates production board's mounting structure | |
CN210508240U (en) | Vibration-damping lateral-movement-preventing structure of stone ground at elevator room | |
CN103790245A (en) | Construction process for interior thermal insulation mortar | |
CN210622230U (en) | Wall brick and ground internal corner line edge | |
CN205276825U (en) | Connecting piece of connecting ceramic tile and wall brick | |
CN203905234U (en) | Integrated decorative heat-insulation board for curtain wall dry hanging | |
CN202899562U (en) | Paving structure of thin-type floor decorative materials | |
CN103216073A (en) | Antiskid waterproof ceramic tile for toilet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161116 |