CN106121211A - A kind of low clearance construction scaffold - Google Patents

A kind of low clearance construction scaffold Download PDF

Info

Publication number
CN106121211A
CN106121211A CN201610458353.5A CN201610458353A CN106121211A CN 106121211 A CN106121211 A CN 106121211A CN 201610458353 A CN201610458353 A CN 201610458353A CN 106121211 A CN106121211 A CN 106121211A
Authority
CN
China
Prior art keywords
platform
construction
screw
link slot
spindle motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610458353.5A
Other languages
Chinese (zh)
Other versions
CN106121211B (en
Inventor
沈永根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Shenyongda Equipment Installation Co., Ltd.
Original Assignee
Anqing Haina Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anqing Haina Information Technology Co Ltd filed Critical Anqing Haina Information Technology Co Ltd
Priority to CN201610458353.5A priority Critical patent/CN106121211B/en
Publication of CN106121211A publication Critical patent/CN106121211A/en
Application granted granted Critical
Publication of CN106121211B publication Critical patent/CN106121211B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/28Scaffolds primarily resting on the ground designed to provide support only at a low height
    • E04G1/32Other free-standing supports, e.g. using trestles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/20Scaffolds comprising upright members and provision for supporting cross-members or platforms at different positions therealong
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/02Scaffold feet, e.g. with arrangements for adjustment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

The present invention relates to a kind of low clearance construction scaffold, including: universal wheel, base plate platform, link slot, screw mandrel, spindle motor, fan, cover plate, described base plate bottom symmetrical is provided with four universal wheels, it is connected by guide rail slide block matched in clearance between described platform and link slot, by being weldingly connected between screw mandrel and link slot, described spindle motor drives link slot to move up and down by leading screw, and then drive platform to move up and down, fan is the workman's cooling worked on platform during heat, outdoor construction rain cover or shielded from sunlight when cover plate is rainy day or heat.The present invention needs manually to build simple scaffold, consumes one's strength the difficult problems such as big and construction environment is severe toward placing construction material on scaffold when solving existing low clearance construction, achieve the self-feeding of low clearance construction scaffold, improve the functions such as construction environment, there is the advantages such as efficiency height, little, the good work environment of physical demands.

Description

A kind of low clearance construction scaffold
Technical field
The present invention relates to mechanical equipment technical field for building, particularly to a kind of low clearance construction scaffold.
Background technology
Building scaffold refers to that construction site is operative and solves vertically and horizontally to transport the support set up, Typically it is mainly used in the building-supporting of casting concrete gripper shoe or for the powdering of some exterior walls and work etc. of building a wall, is to build Building the necessary equipment of construction, now, the kind of building scaffold gets more and more, and purposes is more and more extensive.
But, existing powdering exterior wall or the low clearance construction scaffold such as build a wall mainly use the side manually simply built The construction materials such as formula, places fragment of brick on scaffold, cement mainly rely on artificial placement, particularly at height between 1~3 meter Time, workman needs to consume huge muscle power to place construction material, and there is also security risk when placing, this external sweltering heat or When person's rainy day works, master worker generally requires and stands burning sun high temperature or rainwater, work under bad environment.
Summary of the invention
In order to solve the problems referred to above, the invention provides a kind of low clearance construction scaffold, solve existing powder Decorations exterior wall or build a wall and need manually to build simple scaffold when waiting low clearance construction, disappear toward placement construction material on scaffold Big and the construction environment of the expending bodily strength difficult problem such as badly, it is achieved that the self-feeding of low clearance construction scaffold, construction environment The functions such as improvement, have the advantages such as efficiency height, little, the good work environment of physical demands.
To achieve these goals, the present invention realizes by the following technical solutions: a kind of low clearance construction foot Hand cradle, including: universal wheel, base plate, main backstop, platform, link slot, screw mandrel, spindle motor, spindle motor set, middle transverse slat, Upper backup pad, power supply, upper support bar, upper links, fan, cover plate, power supply anchor ear, knob frame and adjustable spin-block, described Base plate bottom symmetrical is provided with four universal wheels, and described universal wheel is lockable motionless, and described base plate is propped up with main by screw Support is connected, and described main backstop is used for supporting whole device, sliding by guide rail between described link slot and main backstop Block gap is connected, and is connected by guide rail slide block matched in clearance between described platform and link slot, between described platform Being connected by bolt, fixed by knob between described platform and link slot, when needs are dismantled, platform and link slot can Unclamp dismounting by knob, described station is provided with antiskid groove;In use can as required platform length select The number of platform, in broad place, for improving work efficiency, as needed many people construction simultaneously or platform on platform to need relatively The number of platform can be increased during length, be connected between platform by bolt, when narrow local construction, Ke Yixuan Select the number reducing platform;
By being weldingly connected between described screw mandrel and link slot, by screw thread phase between described screw mandrel and spindle motor Even, described spindle motor drives link slot to move up and down by leading screw, and then drives platform to move up and down, during use, permissible Driving platform to decline by spindle motor, place the construction articles for use such as fragment of brick of needs on platform, then spindle motor drives station Platform rises to construction height, alleviates the working strength of workman;Described spindle motor is by spindle motor set and middle transverse slat phase Connect, described power supply by power supply anchor ear with centre transverse slat be connected, described power supply is that whole device is powered, described in Between transverse slat, upper backup pad be all connected with main backstop by screw, described knob frame is connected with upper backup pad by screw, Described adjustable spin-block is connected by axis hole matched in clearance with knob frame, and described adjustable spin-block can regulate angle by knob, Described adjustable spin-block is connected by screw with fan, and described fan is the workman's fall worked on platform during heat Temperature.
Described upper support bar is connected with upper backup pad, between described upper support bar and upper links by screw It is connected by axis hole matched in clearance, can be by knob regulation upper links between described upper support bar and upper links Highly, described upper links is connected with cover plate by screw, hides when described cover plate is rainy day or heat during construction Rain or shielded from sunlight.
During work, device is pushed to job site, assemble this device according to construction site environmental requirement, determine that platform closes Suitable length, when constructing feeding, controls spindle motor and drives link slot to move downward by leading screw, and then drive platform downward Motion, places the construction material such as fragment of brick of needs on platform, then controls spindle motor and drives platform to rise to construction height, After construction material is finished, controls spindle motor and drive platform to decline, then on platform, place construction material, same to aforesaid operations;My god During gas sweltering heat, by the angle of adjustable spin-block regulation fan, fan is the workman's cooling worked on platform during heat, profit Outdoor construction rain cover or shielded from sunlight when being rainy day or heat with cover plate.
The beneficial effects of the present invention is: utilize the universal wheel arranged bottom base plate that device pushes job site, root Assemble this device according to construction site environmental requirement, determine the suitable length of platform so that on platform, single is deposited as much as possible Material, improves efficiency of construction;When constructing feeding, link slot is driven to move downward by spindle motor by leading screw, and then band Dynamic platform moves downward, and places the construction material such as fragment of brick of needs on platform, then controls spindle motor and drives platform to rise To construction height, after construction material is finished, controls spindle motor and drive platform to decline, then on platform, place construction material, with Aforesaid operations, alleviates the working strength of workman's loading and unloading, reduces physical demands;During heat, regulate wind by adjustable spin-block The angle of fan, fan is the workman's cooling worked on platform during heat, when utilizing cover plate for rainy day or heat Outdoor construction rain cover or shielded from sunlight, improve workman's construction environment.The present invention solves existing powdering exterior wall or the low height such as build a wall Need manually to build simple scaffold during degree construction, consume one's strength big and construction environment toward placement construction material on scaffold The difficult problem such as severe, it is achieved that the self-feeding of low clearance construction scaffold, improve the functions such as construction environment, has efficiency The advantages such as height, little, the good work environment of physical demands.
Accompanying drawing explanation
The present invention is further described with embodiment below in conjunction with the accompanying drawings.
Fig. 1 is the perspective view one of the present invention;
Fig. 2 is the perspective view two of the present invention;
Fig. 3 is the perspective view three of the present invention;
Fig. 4 is that the I of Fig. 3 of the present invention is to partial enlarged drawing;
Fig. 5 is that the II of Fig. 3 of the present invention is to partial enlarged drawing;
Fig. 6 is the left view of the present invention;
Fig. 7 is that the A-A of Fig. 6 of the present invention is to sectional view.
Specific embodiment
For the technological means making the present invention realize, creation characteristic, reach purpose and be easy to understand with effect, below knot Conjunction is specifically illustrating, and the present invention is expanded on further.It should be noted that in the case of not conflicting, embodiment in the application and Feature in embodiment can be combined with each other.
As shown in Figures 1 to 7, a kind of low clearance construction scaffold, including universal wheel 1, base plate 2, main backstop 3, platform 4, link slot 5, screw mandrel 6, spindle motor 7, spindle motor set 8, middle transverse slat 9, upper backup pad 10, power supply 11, top Support bar 12, upper links 13, fan 14, cover plate 15, power supply anchor ear 16, knob frame 17 and adjustable spin-block 18, described base plate 2 Bottom symmetrical is provided with four universal wheels 1, and described universal wheel 1 is lockable motionless, and described base plate 2 is by screw and main support Frame 3 is connected, and described main backstop 3 is used for supporting whole device, passes through guide rail between described link slot 5 and main backstop 3 Space of slider is connected, and is connected by guide rail slide block matched in clearance between described platform 4 and link slot 5, described platform 4 Between be connected by bolt, fixed by knob between described platform 4 and link slot 5, when needs are dismantled platform 4 with even Access slot 5 can unclamp dismounting by knob, and described station 4 is provided with antiskid groove;In use can platform 4 as required Length select platform 4 number, in broad place, for improve work efficiency, as need many people on platform 4 simultaneously construction or Platform 4 needs can increase during long length the number of platform 4, is connected by bolt, in narrow place between platform 4 During construction, can select to reduce the number of platform 4;
By being weldingly connected between described screw mandrel 6 and link slot 5, between described screw mandrel 6 and spindle motor 7, pass through spiral shell Stricture of vagina is connected, and described spindle motor 7 drives link slot 5 to move up and down by leading screw 6, and then drives platform 4 to move up and down, and uses Time, platform 4 can be driven to decline by spindle motor 7, platform 4 is placed construction articles for use, the then leading screw such as fragment of brick of needs Motor 7 drives platform 4 to rise to construction height, alleviates the working strength of workman;Described spindle motor 7 is by spindle motor set 8 are connected with middle transverse slat 9, and described power supply 11 is connected with middle transverse slat 9 by power supply anchor ear 16, and described power supply 11 is Whole device is powered, and described middle transverse slat 9, upper backup pad 10 are all connected with main backstop 3 by screw, described knob Frame 17 is connected with upper backup pad 10 by screw, and described adjustable spin-block 18 is connected by axis hole matched in clearance with knob frame 17, Described adjustable spin-block 18 can regulate angle by knob, and described adjustable spin-block 18 is connected by screw with fan 14, described Workman's cooling of working on platform 4 when being heat of fan 14.
Described upper support bar 12 is connected with upper backup pad 10 by screw, and described upper support bar 12 is with top even It is connected by axis hole matched in clearance between bar 13, can be adjusted by knob between described upper support bar 12 and upper links 13 The height of joint upper links 13, described upper links 13 is connected with cover plate 15 by screw, described cover plate 15 be the rainy day or Rain cover or shielded from sunlight when constructing during person's heat.
During work, device is pushed to job site, assemble this device according to construction site environmental requirement, determine platform 4 Suitably length, when constructing feeding, controls spindle motor 7 and drives link slot 5 to move downward by leading screw 6, and then drive station Platform 4 moves downward, and places the construction material such as fragment of brick of needs on platform 4, then controls spindle motor 7 and drives platform 4 to rise To construction height, after construction material is finished, controls spindle motor 7 and drive platform 4 to decline, then on platform 4, place construction material, Same aforesaid operations, alleviates the working strength of workman's loading and unloading;During heat, regulated the angle of fan 14 by adjustable spin-block 18 Degree, workman's cooling that fan 14 works when being heat on platform 4, utilize cover plate 15 for room when rainy day or heat Outer construction rain cover or shielded from sunlight.The present invention solve existing powdering exterior wall or build a wall etc. low clearance construction time need artificial Build simple scaffold, consume one's strength the difficult problems such as big and construction environment is severe toward placing construction material on scaffold, it is achieved that be low The self-feeding of rise buildings construction scaffold, improve the functions such as construction environment, have that efficiency is high, physical demands is little, work The advantages such as environment is good.
The ultimate principle of the present invention, principal character and advantage have more than been shown and described.The technical staff of the industry should Understanding, the present invention is not restricted to the described embodiments, the simply explanation present invention's of the description in above-described embodiment and description Principle, without departing from the spirit and scope of the present invention, the present invention also has various changes and modifications, and these change and change Enter to both fall within scope of the claimed invention.Claimed scope is by appending claims and equivalent thereof Define.

Claims (3)

1. a low clearance construction scaffold, it is characterised in that: include universal wheel (1), base plate (2), main backstop (3), platform (4), link slot (5), screw mandrel (6), spindle motor (7), spindle motor set (8), middle transverse slat (9), upper backup pad (10), power supply (11), upper support bar (12), upper links (13), fan (14), cover plate (15), power supply anchor ear (16), knob Frame (17) and adjustable spin-block (18), described base plate (2) bottom symmetrical is provided with four universal wheels (1), and described base plate (2) leads to Cross screw to be connected with main backstop (3), by guide rail slide block matched in clearance between described link slot (5) and main backstop (3) Connect, described platform (4) is connected by guide rail slide block matched in clearance between link slot (5), described platform (4) be connected Groove is fixed by knob between (5), by being weldingly connected between described screw mandrel (6) and link slot (5), and described screw mandrel (6) Being connected by screw thread with between spindle motor (7), described spindle motor (7) is by spindle motor set (8) and middle transverse slat (9) Being connected, described power supply (11) is connected with centre transverse slat (9) by power supply anchor ear (16), described middle transverse slat (9), on Gripper shoe (10) is all connected with main backstop (3) by screw, and described knob frame (17) passes through screw and upper backup pad (10) being connected, described adjustable spin-block (18) is connected by axis hole matched in clearance with knob frame (17), described adjustable spin-block (18) being connected by screw with fan (14), described upper support bar (12) is connected with upper backup pad (10) by screw, institute The upper support bar (12) stated is connected by axis hole matched in clearance between upper links (13), and described upper links (13) is led to Cross screw to be connected with cover plate (15).
2. according to a kind of low clearance construction scaffold described in claim (1), it is characterised in that: described platform (4) can be connected by bolt between, described platform (4) is provided with antiskid groove.
3. according to a kind of low clearance construction scaffold described in claim (1), it is characterised in that: described universal wheel (1) lockable motionless.
CN201610458353.5A 2016-06-22 2016-06-22 A kind of working method of low clearance construction scaffold Active CN106121211B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610458353.5A CN106121211B (en) 2016-06-22 2016-06-22 A kind of working method of low clearance construction scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610458353.5A CN106121211B (en) 2016-06-22 2016-06-22 A kind of working method of low clearance construction scaffold

Publications (2)

Publication Number Publication Date
CN106121211A true CN106121211A (en) 2016-11-16
CN106121211B CN106121211B (en) 2019-02-12

Family

ID=57267967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610458353.5A Active CN106121211B (en) 2016-06-22 2016-06-22 A kind of working method of low clearance construction scaffold

Country Status (1)

Country Link
CN (1) CN106121211B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836779A (en) * 2017-03-21 2017-06-13 无锡市龙海杰机械制造有限公司 Possesses the scaffold of Rest space
CN106869482A (en) * 2017-03-21 2017-06-20 无锡市龙海杰机械制造有限公司 Inner scaffold independence top level structure
CN107023155A (en) * 2017-04-25 2017-08-08 无锡市龙海杰机械制造有限公司 The individual layer scaffold of multifunction board is installed
CN107246136A (en) * 2017-03-21 2017-10-13 无锡市龙海杰机械制造有限公司 Possesses the interval multi-layer scaffold of multifunctional working
CN108625582A (en) * 2018-05-09 2018-10-09 钟利芬 A kind of building height adjustment support device
CN110525605A (en) * 2019-07-10 2019-12-03 沪东中华造船(集团)有限公司 A kind of Novel scaffold board and its building method
CN111706050A (en) * 2020-06-23 2020-09-25 惠安双婉装修设计中心 Lifting device for be used for interior decoration construction

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4088202A (en) * 1976-08-25 1978-05-09 Costello Clifford T Scaffolding cart
GB8909406D0 (en) * 1988-04-25 1989-06-14 Collier Ronald T Improvements in platforms
CN201439639U (en) * 2009-08-10 2010-04-21 美国爱迈斯国际贸易有限公司宁波代表处 multifunctional scaffold
CN104264958A (en) * 2014-10-09 2015-01-07 浙江镜湖建设集团有限公司 Liftable equipment
CN204186054U (en) * 2014-10-08 2015-03-04 金华阜康机电有限公司 Scaffold
CN204401994U (en) * 2015-01-04 2015-06-17 西南交通大学 A kind of travel(l)ing rest for building
CN204876508U (en) * 2015-07-15 2015-12-16 徐伟明 Portable height -adjustable scaffold
CN205141487U (en) * 2015-12-04 2016-04-06 徐彬 Transformer and power distribution cabinet work platform

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4088202A (en) * 1976-08-25 1978-05-09 Costello Clifford T Scaffolding cart
GB8909406D0 (en) * 1988-04-25 1989-06-14 Collier Ronald T Improvements in platforms
CN201439639U (en) * 2009-08-10 2010-04-21 美国爱迈斯国际贸易有限公司宁波代表处 multifunctional scaffold
CN204186054U (en) * 2014-10-08 2015-03-04 金华阜康机电有限公司 Scaffold
CN104264958A (en) * 2014-10-09 2015-01-07 浙江镜湖建设集团有限公司 Liftable equipment
CN204401994U (en) * 2015-01-04 2015-06-17 西南交通大学 A kind of travel(l)ing rest for building
CN204876508U (en) * 2015-07-15 2015-12-16 徐伟明 Portable height -adjustable scaffold
CN205141487U (en) * 2015-12-04 2016-04-06 徐彬 Transformer and power distribution cabinet work platform

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836779A (en) * 2017-03-21 2017-06-13 无锡市龙海杰机械制造有限公司 Possesses the scaffold of Rest space
CN106869482A (en) * 2017-03-21 2017-06-20 无锡市龙海杰机械制造有限公司 Inner scaffold independence top level structure
CN107246136A (en) * 2017-03-21 2017-10-13 无锡市龙海杰机械制造有限公司 Possesses the interval multi-layer scaffold of multifunctional working
CN107023155A (en) * 2017-04-25 2017-08-08 无锡市龙海杰机械制造有限公司 The individual layer scaffold of multifunction board is installed
CN108625582A (en) * 2018-05-09 2018-10-09 钟利芬 A kind of building height adjustment support device
CN110525605A (en) * 2019-07-10 2019-12-03 沪东中华造船(集团)有限公司 A kind of Novel scaffold board and its building method
CN111706050A (en) * 2020-06-23 2020-09-25 惠安双婉装修设计中心 Lifting device for be used for interior decoration construction

Also Published As

Publication number Publication date
CN106121211B (en) 2019-02-12

Similar Documents

Publication Publication Date Title
CN106121211A (en) A kind of low clearance construction scaffold
CN207513319U (en) A kind of adjustable construction guardrail
CN107439336A (en) A kind of garden layout greening seedling transplantation device
CN106829323B (en) A kind of architectural engineering material elevator
CN107297682A (en) A kind of material processing auxiliaring lifting equipment
CN212866792U (en) High altitude workstation is used to fitment convenient to transported substance material
CN105672636A (en) Elevating device for indoor construction
CN205654057U (en) Multi -functional scaffold frame
CN209411656U (en) A kind of solid brick hanging device
CN205153502U (en) Support arrangement for but lifting height for building
CN207228592U (en) One kind is used for construction frame
CN205907006U (en) Electric lift work platform
CN203080880U (en) Rail-mounted wall whitewashing device
CN205476379U (en) Convenient construction frame that removes
CN208380507U (en) A kind of smallpox plate drilling device
CN209413253U (en) A kind of construction bracket
CN207672956U (en) Floor leveling horizon equipment
CN206857843U (en) A kind of adjustable cable reel rest stand
CN206530030U (en) Steel construction operation frame
CN219931552U (en) Multifunctional workbench for heating ventilation installation
CN204531320U (en) One facilitates furred ceiling ascending/decending gypsum plank fitting machine
CN214696722U (en) Convenient building site scaffold frame of adjusting
CN110528795A (en) The light-duty frame board installation system of roofing
CN220203336U (en) Adjustable construction platform for building construction
CN213865216U (en) Liftable support for construction engineering construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181219

Address after: 315000 No. 3136 Airport Road, Lijiaqiao Village, Gulin Town, Haishu District, Ningbo City, Zhejiang Province

Applicant after: Zhejiang Shenyongda Equipment Installation Co., Ltd.

Address before: 246001 409, room 3, 80 Tianzhu Hill Road, Anqing Development Zone, Anhui.

Applicant before: ANQING HAINA INFORMATION TECHNOLOGY CO., LTD.

GR01 Patent grant
GR01 Patent grant