- CN106121144A CN106121144A CN201610531843.3A CN201610531843A CN106121144A CN 106121144 A CN106121144 A CN 106121144A CN 201610531843 A CN201610531843 A CN 201610531843A CN 106121144 A CN106121144 A CN 106121144A
- Authority
- CN
- China
- Prior art keywords
- plate
- concrete
- connecting plate
- lower connecting
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
- E04F11/022—Stairways; Layouts thereof characterised by the supporting structure
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/36—Bearings or like supports allowing movement
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
- E04H9/021—Bearing, supporting or connecting constructions specially adapted for such buildings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
- E04F2011/0203—Miscellaneous features of stairways not otherwise provided for
- E04F2011/0205—Stairways characterised by the use of specific materials for the supporting structure of the treads
- E04F2011/021—Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass
- E04F2011/0212—Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass mainly of concrete
- E04F2011/0214—Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass mainly of concrete cast in situ
Abstract
The present invention relates to a kind of spacing bearing of concrete staircase damping and work progress, these stair include bench, bench is high-end is provided with concrete ladder beam and floor levels plate, bench high-end with corresponding upper concrete ladder beam pouring integral, bench low side is provided with lower concrete ladder beam and halfpace plate, bench low side connects with corresponding lower concrete ladder beam elasticity, and the gangboard of bench is extended with horizontal segment, is provided with the spacing bearing of damping between this horizontal segment and corresponding lower concrete ladder beam.A kind of concrete staircase damping spacing bearing energy-dissipating and shock-absorbing good limit effect of the present invention, easy construction.
Description
Technical field
The present invention relates to the stair of building, be specifically related to a kind of spacing bearing of concrete staircase damping and work progress.
Background technology
Traditional construction design method does not accounts for the impact on integrality performance of the structure of the stair stress, does not the most consider stair
Earthquake load effects.Wenchuan earthquake earthquake shows, under big shake effect, the staircase of building destroys serious, including waist slab, ladder
Beam and the heavy damage of cleat stanchion.
The 6.1.15 article regulation of " seismic design provision in building code " GB50011-2010: " for frame structure, staircase component with
Agent structure is whole when watering, and should count staircase component to geological process and the impact of effect thereof, should carry out staircase component antidetonation carrying
Power checks ".And after staircase component participates in structure overall calculation, staircase component size and the area of reinforcement add senior general and cause staircase
Local stiffness amplifies again, and the shearing that geological process is distributed between going downstairs increases again.In order to weaken stair with integrally-built
Connecting, " the board-like stair of cast-in-place concrete " (11G101-2) proposes the way of slip stair, is connected with low side ladder beam in bench
Place's design sliding support.And the stair that slide design sliding support in bench and low side ladder beam junction, whole bench then becomes outstanding
Arm member, under geological process, bench low side just produces violent jump phenomena of encorbelmenting, and easily makes bench with high-end ladder beam even
Meet place by drawing crack.Notification number is that CN 203569719 U Chinese patent has been invented energy-dissipating and shock-absorbing on the basis of slip stair and propped up
Seat, designs energy-dissipating and shock-absorbing bearing in bench with low side ladder beam junction.But energy-dissipating and shock-absorbing bearing is placed in structure, becomes structure
A part, causes the energy-dissipating and shock-absorbing bearing later stage cannot to be overhauled and change, and energy-dissipating and shock-absorbing pedestal configurations is complicated, difficulty of construction
Greatly." national building standard design atlas " (G310-1~2) give also precast concrete stair according to stair connecting structure
Be slidably connected structure way.But the structure way interior joint that is slidably connected of precast concrete stair connects complexity, difficulty of construction
Greatly.
Summary of the invention
The technical problem to be solved is to provide a kind of spacing bearing of concrete staircase damping and work progress, subtracts
Shake spacing bearing and realize friction energy-dissipating by the displacement difference of upper and lower floor gap, not only suppress vertically encorbelmenting of concrete bench low side
Jump phenomena, and prevent concrete bench low side from coming off and horizontal jitter under big shake, the spacing bearing of damping is positioned at stair knot
Outside structure, easy construction, energy-dissipating and shock-absorbing limit effect is notable.
The technical scheme that the present invention solves the problems referred to above is as follows:
A kind of spacing bearing of concrete staircase damping, stair include bench, and bench is high-end is provided with concrete Ti Lianghe building
Layer landing slab, bench high-end with corresponding upper concrete ladder beam pouring integral, bench low side be provided with lower concrete ladder beam with in
Between landing slab, bench low side and corresponding lower concrete ladder beam elasticity connects, and elastic connection structure is: the gangboard of described bench prolongs
Stretch and have horizontal segment, between this horizontal segment and corresponding lower concrete ladder beam, be provided with the spacing bearing of damping.The spacing bearing of damping includes
Upper junction plate, upper junction plate surface is provided with anchor bolt and caging bolt hole;Lower connecting plate, lower connecting plate surface is provided with anchoring spiral shell
Bolt, and the anchor bolt through lower connecting plate bolt hole;Upper cover plate;Friction plate;High-strength bolt;Lower angle steel.
Upper junction plate is by the anchor bolt of upper junction plate surface soldered and gangboard anchor connection, and the far-end of anchor bolt has
The anchoring cap of expanded radially, the size of anchor bolt, quantity and length shearing resistance as required and stretching resistance determine;Lower connection
Plate is by the anchor bolt of lower connecting plate surface soldered and lower concrete ladder beam anchor connection, the anchoring of lower connecting plate surface soldered
The far-end of bolt has the anchoring cap of expanded radially, the size of the anchor bolt of lower connecting plate surface soldered, quantity and length according to
The shearing resistance needed and stretching resistance determine, weld with lower connecting plate through the anchor bolt after lower connecting plate bolt hole, pass down
The far-end of the anchor bolt after connecting plate bolt hole has the anchoring cap of expanded radially, through the anchoring spiral shell after lower connecting plate bolt hole
The size and number of bolt shearing resistance as required and stretching resistance determine;Friction plate uses asbestos less friction plate, and upper cover plate passes through
Epoxide-resin glue is firmly connected with friction plate, and lower angle steel is firmly connected with friction plate by epoxide-resin glue;High-strength bolt is respectively
Through upper cover plate bolt hole, friction plate hole, the middle and lower angle steel bolt hole in upper junction plate caging bolt hole, executed by nut
Plus-pressure regulates upper junction plate and upper cover plate and lower angle steel friction damping force between the two, the size of high-strength bolt, quantity
Determine with pressure friction damping force, stretching resistance and shearing resistance as required;The anchor bolt that lower connecting plate stretches out passes inferior horn
Steel bolt hole, applies pressure by nut and fixes the position of lower connecting plate and lower angle steel, it is ensured that lower connecting plate and inferior horn
Steel firmly connects.
A kind of concrete staircase damping spacing bearing work progress is as follows:
The most first by the good reinforcing bar of component colligation of lower concrete ladder beam and halfpace plate and integrated connection thereof;
2. by the anchor bolt of lower connecting plate and surface soldered thereof together with the anchor bolt through lower connecting plate bolt hole
It is embedded in lower concrete ladder beam, stretches out anchor bolt;
3. to lower concrete ladder beam and the component formwork of halfpace plate and integrated connection thereof casting concrete, maintenance is arrived
Form removal after some strength, it is ensured that lower connecting plate is firmly connected with lower concrete ladder beam;
4. colligation bench and the gangboard of integrated connection, horizontal segment, upper concrete ladder beam, the steel of floor levels board member
Muscle;
5. the anchor bolt of upper junction plate and welding thereof is embedded in horizontal segment together, the pre-buried length of upper junction plate and water
The development length of flat section is equal, and upper junction plate spacing hole is positioned at outside stair;
6. to bench and the gangboard of integrated connection thereof, horizontal segment, upper concrete ladder beam, floor levels board member formwork and water
Build concrete, form removal after maintenance to some strength, it is ensured that upper junction plate is firmly connected with horizontal segment;
7. the anchor bolt stretched out by lower connecting plate passes lower angle steel bolt hole, it is ensured that lower angle steel bolt hole and upper cover plate spiral shell
Both keyholes alignment upper junction plate spacing hole centre position;
8. high-strength bolt is each passed through upper cover plate bolt hole, friction plate hole, in the middle of upper junction plate caging bolt hole and under
Angle steel bolt hole, applies pressure by nut and fixes upper junction plate and upper cover plate and the position of lower angle steel;
9. apply pressure by nut and fix the position of lower connecting plate and lower angle steel, it is ensured that lower connecting plate and inferior horn
Steel firmly connects.
The useful construction effect of the present invention is: 1. energy-dissipating and shock-absorbing.The damping spacing bearing displacement difference by upper and lower floor gap
Realize friction energy-dissipating, allow the bench of concrete staircase to produce relative displacement with concrete ladder beam during earthquake, effectively prevent ladder
The strong supporting role of equivalence produced when section is compressed or stretches;The most spacing.The spacing bearing of damping not only suppresses concrete bench low
The jump phenomena of vertically encorbelmenting of end, and prevent concrete bench low side from coming off and horizontal jitter under big shake;3. easy construction.
The spacing bearing of damping is positioned at the outside of staircase structure, convenient installation, can overhaul and change.
Accompanying drawing explanation
Fig. 1 is damping of the present invention spacing seat structure schematic diagram.
Fig. 2 is the side view of the spacing bearing of damping of the present invention.
Fig. 3 is the upper junction plate structural representation of the spacing bearing of damping of the present invention.
Fig. 4 is the upper junction plate top view of the spacing bearing of damping of the present invention.
Fig. 5 is the lower connecting plate structural representation of the spacing bearing of damping of the present invention.
Fig. 6 is the lower connecting plate side view of the spacing bearing of damping of the present invention.
Fig. 7 is the upper cover plate structural representation of the spacing bearing of damping of the present invention.
Fig. 8 is the friction plate structural representation of the spacing bearing of damping of the present invention.
Fig. 9 is the lower steel angle structure schematic diagram of the spacing bearing of damping of the present invention.
Figure 10 is upper junction plate and upper cover plate, the attachment structure signal of lower angle steel of the spacing bearing of damping of the present invention
Figure.
Figure 11 is upper junction plate and upper cover plate, the attachment structure side-looking of lower angle steel of the spacing bearing of damping of the present invention
Figure.
Figure 12 is the lower connecting plate attachment structure schematic diagram with lower angle steel of the spacing bearing of damping of the present invention.
Figure 13 is the lower connecting plate attachment structure side view with lower angle steel of the spacing bearing of damping of the present invention.
Figure 14, Figure 15, Figure 16 are the office of a concrete bench of the present invention a kind of concrete staircase spacing bearing of damping
Portion's structural representation, wherein Figure 14 is side view, and Figure 15 is local A schematic enlarged-scale view in Figure 14, and Figure 16 is the A-A section of Figure 15
Figure.
In figure, 1-upper junction plate surface anchoring bolt, 2-upper junction plate, 201-upper junction plate caging bolt hole, 3-is high-strength
Bolt, 4-upper cover plate, 401-upper cover plate bolt hole, 5-friction plate, 501-rubs plate hole, angle steel under 6-, angle steel bolt under 601-
Hole, 7-is through the anchor bolt of lower connecting plate bolt hole, 8-lower connecting plate, 801-lower connecting plate bolt hole, 9-lower connecting plate table
Face anchor bolt, the spacing bearing of 10-damping, 11-floor levels plate, 12-upper concrete ladder beam, 13-gangboard, 14-bench, 15-
Lower concrete ladder beam, 16-horizontal segment, 17-halfpace plate.
Detailed description of the invention
The invention will be further described below in conjunction with the accompanying drawings.
According to Fig. 1 and Fig. 2, the spacing bearing of damping that the present invention provides, including: 1-upper junction plate surface anchoring spiral shell
Bolt, 2-upper junction plate, 3-high-strength bolt, 4-upper cover plate, 5-friction plate, angle steel under 6-, 7-is through the anchor of lower connecting plate bolt hole
Fixing bolt, 8-lower connecting plate, 9-lower connecting plate surface anchoring bolt.
According to Fig. 3 and Fig. 4, the pre-buried length of upper junction plate 2 is identical with gangboard 13 extending level section 16 length, extends water
The development length of flat section 16 is not preferably less than a tread run, weld anchor fixing bolt 1 in the pre-buried length range of upper junction plate, anchoring
The far-end of bolt 1 has the anchoring cap of expanded radially, the size of anchor bolt 1, quantity and length shearing resistance as required and anti-
Pulling force determines, the horizontal slide displacement of gangboard 13 extending level section 16 when the spacing displacement of upper junction plate spacing hole 201 meets big shake.
According to Fig. 5 and Fig. 6, lower connecting plate 8 surface soldered anchor bolt 9, after lower connecting plate bolt hole 801
Anchor bolt 7 welds with lower connecting plate 8, and lower connecting plate 8 is firmly connected integral with both anchor bolt 9 and anchor bolt 7,
The far-end of anchor bolt 9 and anchor bolt 7 has the anchoring cap of expanded radially, and the size of anchor bolt 9, quantity and length are according to need
The stretching resistance wanted and shearing resistance determine, the size and number of anchor bolt 7 stretching resistance as required and shearing resistance determine.
According to Fig. 7, Fig. 8, Fig. 9, Figure 10, Figure 11, friction plate 5 uses asbestos less friction plate, upper cover plate 4 to pass through epoxy
Resin glue is firmly connected with friction plate 5, and lower angle steel 6 is firmly connected with friction plate 5 by epoxide-resin glue, and high-strength bolt 3 is respectively
Through upper cover plate bolt hole 401, friction plate hole 501, the middle and lower angle steel bolt hole 601 in upper junction plate caging bolt hole 201, logical
Cross nut and apply pressure to regulate upper junction plate 2 and upper cover plate 4 and lower angle steel 6 friction damping force between the two, high-strength
The size of bolt 3, quantity and pressure friction damping force, stretching resistance and shearing resistance as required determines.
According to Figure 12, Figure 13, the anchor bolt 7 that lower connecting plate 8 stretches out, through lower angle steel bolt hole 601, passes through spiral shell
Mother screws applying pressure and fixes the position of lower connecting plate 8 and lower angle steel 6, it is ensured that lower connecting plate 8 is firmly connected with lower angle steel 6.
According to Figure 14, Figure 15, Figure 16, concrete staircase includes bench 14, and bench 14 is high-end is provided with concrete ladder
Beam 12 and floor levels plate 11, high-end with the corresponding upper concrete ladder beam 12 of bench 14 waters integral, and bench 14 low side is provided with
Lower concrete ladder beam 15 and halfpace plate 17, bench 14 low side is elastic with corresponding lower concrete ladder beam 15 to be connected, and elasticity is even
Access node structure is: the gangboard 13 of described bench 14 is extended with horizontal segment 16, the development length of extending level section 16 not preferably less than
Tread run, is provided with the spacing bearing of damping 10 between this horizontal segment 16 and corresponding lower concrete ladder beam 15.The spacing bearing of damping
Quantity and the position of 10 are designed according to concrete bench 14 width and required friction damping force, change the order of arrangement
Also fall within the scope and spirit of the invention with quantity.
This concrete staircase damping spacing bearing work progress is as follows:
The most first by the good reinforcing bar of component colligation of lower concrete ladder beam 15 and halfpace plate 17 and integrated connection thereof;
2. by the anchor bolt 9 of lower connecting plate 8 and surface soldered thereof with through the anchor bolt 7 one of lower connecting plate bolt hole
Rise and be embedded in lower concrete ladder beam 15, stretch out anchor bolt 7;
3. to lower concrete ladder beam 15 and the component formwork of halfpace plate 17 and integrated connection thereof casting concrete, support
Protect form removal after some strength, it is ensured that lower connecting plate 8 is firmly connected with lower concrete ladder beam 15;
4. colligation bench 14 and the gangboard 13 of integrated connection, horizontal segment 16, upper concrete ladder beam 12, floor levels plate 11
The reinforcing bar of component;
5. the anchor bolt 1 of upper junction plate 2 and welding thereof is embedded in horizontal segment 16 together, the pre-buried length of upper junction plate 2
Spending equal with the development length of horizontal segment 16, upper junction plate spacing hole 201 is positioned at outside stair;
6. to the gangboard 13 of bench 14 and integrated connection thereof, horizontal segment 16, upper concrete ladder beam 12, floor levels plate 11 structure
Part formwork casting concrete, form removal after maintenance to some strength, it is ensured that upper junction plate 2 is firmly connected with horizontal segment 16;
7. the anchor bolt 7 stretched out by lower connecting plate 8 is through lower angle steel bolt hole 601, it is ensured that lower angle steel bolt hole 601 He
Both upper cover plate bolts hole 401 alignment upper junction plate spacing hole 201 centre position;
8. high-strength bolt 3 is each passed through upper cover plate bolt hole 401, friction plate hole 501, upper junction plate caging bolt hole
With lower angle steel bolt hole 601 in the middle of 201, apply pressure by nut and fix upper junction plate 2 and upper cover plate 4 and lower angle steel
Position both 6;
9. apply pressure by nut and fix the position of lower connecting plate 8 and lower angle steel 6, it is ensured that lower connecting plate 8 with
Lower angle steel 6 firmly connects.
A kind of spacing bearing of concrete staircase damping being formed as described above, it is allowed to floor gap has displacement difference up and down,
Under geological process, horizontal segment 16 drives upper junction plate 2 to slide between the two at upper cover plate 4 and lower angle steel 6 and realizes friction energy-dissipating, subtracts
Shake spacing bearing and not only suppress the jump phenomena of vertically encorbelmenting of concrete bench low side, and prevent concrete bench low side greatly
Coming off and horizontal jitter under shake, the spacing bearing of damping is positioned at outside staircase structure, easy construction, and energy-dissipating and shock-absorbing limit effect shows
Write.
Being above an exemplary embodiments of the present invention, the enforcement of the present invention is not limited to this.
Claims (7)
1. the spacing bearing of concrete staircase damping, it is characterised in that: described stair include bench (14), and bench (14) is high-end
It is provided with concrete ladder beam (12) and floor levels plate (11), upper concrete ladder beam (12) pouring that bench (14) is high-end with corresponding
Integral, bench (14) low side is provided with lower concrete ladder beam (15) and halfpace plate (17), and bench (14) low side is with corresponding
Lower concrete ladder beam (15) is elastic to be connected, and elastic connection structure is: the gangboard (13) of described bench (14) is extended with horizontal segment
(16), it is provided with the spacing bearing of damping (10) between this horizontal segment (16) and corresponding lower concrete ladder beam (15).Spacing of damping
Seat (10) includes upper junction plate (2), and upper junction plate surface is provided with anchor bolt (1) and caging bolt hole (201);Lower connecting plate
(8), lower connecting plate surface is provided with anchor bolt (9), and the anchor bolt (7) through lower connecting plate bolt hole (801);Upper cover
Plate (4);Friction plate (5);High-strength bolt (3);Lower angle steel (6).
A kind of spacing bearing of concrete staircase damping the most according to claim 1, it is characterised in that: described upper junction plate
(2) by the anchor bolt (1) of upper junction plate surface soldered and gangboard (13) anchor connection, the far-end of anchor bolt (1) has footpath
Determine to the anchoring cap expanded, size, quantity and the length of anchor bolt (1) shearing resistance as required and stretching resistance.
A kind of spacing bearing of concrete staircase damping the most according to claim 1, it is characterised in that: described lower connecting plate
(8) by the anchor bolt (9) of lower connecting plate surface soldered and lower concrete ladder beam (15) anchor connection, lower connecting plate surface is welded
The far-end of the anchor bolt (9) connect has the anchoring cap of expanded radially, the size of the anchor bolt (9) of lower connecting plate surface soldered,
Quantity and length shearing resistance as required and stretching resistance determine, through the anchor bolt (7) after lower connecting plate bolt hole (801)
Welding with lower connecting plate (8), the far-end through the anchor bolt (7) after lower connecting plate bolt hole (801) has the anchor of expanded radially
Gu cap, through size and number shearing resistance as required and the tension of the anchor bolt (7) after lower connecting plate bolt hole (801)
Power determines.
A kind of spacing bearing of concrete staircase damping the most according to claim 1, it is characterised in that: described friction plate (5)
Using asbestos less friction plate, upper cover plate (4) is firmly connected with friction plate (5) by epoxide-resin glue, and lower angle steel (6) passes through epoxy
Resin glue is firmly connected with friction plate (5).
A kind of spacing bearing of concrete staircase damping the most according to claim 1, it is characterised in that: described high-strength bolt
(3) it is each passed through in the middle of upper cover plate bolt hole (401), friction plate hole (501), upper junction plate caging bolt hole (201) and inferior horn
Steel bolt hole (601), applies pressure by nut and regulates upper junction plate (2) and both upper cover plate (4) and lower angle steel (6)
Between friction damping force, size, quantity and the pressure of high-strength bolt (3) friction damping force as required, stretching resistance and anti-
Shearing determines.
A kind of spacing bearing of concrete staircase damping the most according to claim 1, it is characterised in that: described lower connecting plate
(8) anchor bolt (7) stretched out passes lower angle steel bolt hole (601), applies pressure by nut and fixes lower connecting plate
(8) with the position of lower angle steel (6), it is ensured that lower connecting plate 8 is firmly connected with lower angle steel 6.
7. a concrete staircase damping spacing bearing work progress, it is characterised in that:
The most first by the good reinforcing bar of component colligation of lower concrete ladder beam (15) and halfpace plate (17) and integrated connection thereof;
2. by the anchor bolt (9) of lower connecting plate (8) and surface soldered thereof with through the anchor bolt (7) of lower connecting plate bolt hole
It is embedded in together in lower concrete ladder beam (15), stretches out anchor bolt (7);
3. to lower concrete ladder beam (15) and halfpace plate (17) and the component formwork of integrated connection thereof casting concrete, support
Protect form removal after some strength, it is ensured that lower connecting plate (8) is firmly connected with lower concrete ladder beam (15);
The gangboard (13) of 4. colligation bench (14) and integrated connection thereof, horizontal segment (16), upper concrete ladder beam (12), floor levels
The reinforcing bar of plate (11) component;
5. being embedded in together in horizontal segment (16) by the anchor bolt (1) of upper junction plate (2) and welding thereof, upper junction plate (2) is pre-
Burying length equal with the development length of horizontal segment (16), upper junction plate spacing hole (201) is positioned at outside stair;
6. to the gangboard (13) of bench (14) and integrated connection thereof, horizontal segment (16), upper concrete ladder beam (12), floor levels plate
(11) component formwork casting concrete, form removal after maintenance to some strength, it is ensured that upper junction plate (2) and horizontal segment (16)
Firmly connect;
7. the anchor bolt (7) stretched out by lower connecting plate (8) passes lower angle steel bolt hole (601), it is ensured that lower angle steel bolt hole
(601) and upper cover plate bolt hole (401) both alignment upper junction plate spacing hole (201) centre positions;
8. high-strength bolt (3) is each passed through upper cover plate bolt hole (401), friction plate hole (501), upper junction plate caging bolt hole
(201) with lower angle steel bolt hole (601) in the middle of, apply pressure by nut and fix upper junction plate (2) and upper cover plate (4)
With lower both positions of angle steel (6);
9. apply pressure by nut and fix the position of lower connecting plate (8) and lower angle steel (6), it is ensured that lower connecting plate (8)
Firmly it is connected with lower angle steel (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610531843.3A CN106121144B (en) | 2016-07-04 | 2016-07-04 | A kind of spacing bearing of concrete staircase damping |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610531843.3A CN106121144B (en) | 2016-07-04 | 2016-07-04 | A kind of spacing bearing of concrete staircase damping |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106121144A true CN106121144A (en) | 2016-11-16 |
CN106121144B CN106121144B (en) | 2018-05-15 |
Family
ID=57282342
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610531843.3A Expired - Fee Related CN106121144B (en) | 2016-07-04 | 2016-07-04 | A kind of spacing bearing of concrete staircase damping |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106121144B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108643489A (en) * | 2018-06-12 | 2018-10-12 | 北京工业大学 | A kind of damping stair using support type sinker |
CN108691380A (en) * | 2018-06-28 | 2018-10-23 | 福州大学 | A kind of damping assembly concrete building cover structure and its construction method |
CN110593500A (en) * | 2019-09-27 | 2019-12-20 | 安徽建筑大学城市建设学院 | Safe and firm assembled earthquake-resistant stair |
CN113026959A (en) * | 2019-12-24 | 2021-06-25 | 成都建工第二建筑工程有限公司 | Installation method of prefabricated staircase |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0369742A (en) * | 1989-08-09 | 1991-03-26 | Haseko Corp | Device for base isolation for building |
CN2685421Y (en) * | 2004-03-16 | 2005-03-16 | 广州大学 | Building shockproof supprot |
CN201762841U (en) * | 2010-09-10 | 2011-03-16 | 辛力 | Stair vibration isolation device |
CN201952934U (en) * | 2010-12-20 | 2011-08-31 | 张蓬勃 | Friction damper filled with aluminum plate friction material |
CN203569719U (en) * | 2013-10-29 | 2014-04-30 | 广州大学 | Energy-dissipation shock-absorption structure of concrete stair |
CN205777188U (en) * | 2016-07-04 | 2016-12-07 | 河北工业大学 | A kind of spacing bearing of concrete staircase damping |
-
2016
- 2016-07-04 CN CN201610531843.3A patent/CN106121144B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0369742A (en) * | 1989-08-09 | 1991-03-26 | Haseko Corp | Device for base isolation for building |
CN2685421Y (en) * | 2004-03-16 | 2005-03-16 | 广州大学 | Building shockproof supprot |
CN201762841U (en) * | 2010-09-10 | 2011-03-16 | 辛力 | Stair vibration isolation device |
CN201952934U (en) * | 2010-12-20 | 2011-08-31 | 张蓬勃 | Friction damper filled with aluminum plate friction material |
CN203569719U (en) * | 2013-10-29 | 2014-04-30 | 广州大学 | Energy-dissipation shock-absorption structure of concrete stair |
CN205777188U (en) * | 2016-07-04 | 2016-12-07 | 河北工业大学 | A kind of spacing bearing of concrete staircase damping |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108643489A (en) * | 2018-06-12 | 2018-10-12 | 北京工业大学 | A kind of damping stair using support type sinker |
CN108643489B (en) * | 2018-06-12 | 2023-10-31 | 北京工业大学 | Damping stair adopting supporting type energy dissipater |
CN108691380A (en) * | 2018-06-28 | 2018-10-23 | 福州大学 | A kind of damping assembly concrete building cover structure and its construction method |
CN108691380B (en) * | 2018-06-28 | 2023-04-18 | 福州大学 | Damping assembly type concrete floor structure and construction method thereof |
CN110593500A (en) * | 2019-09-27 | 2019-12-20 | 安徽建筑大学城市建设学院 | Safe and firm assembled earthquake-resistant stair |
CN113026959A (en) * | 2019-12-24 | 2021-06-25 | 成都建工第二建筑工程有限公司 | Installation method of prefabricated staircase |
Also Published As
Publication number | Publication date |
---|---|
CN106121144B (en) | 2018-05-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106121144A (en) | A kind of spacing bearing of concrete staircase damping and work progress | |
CN105297617B (en) | Double-column type swinging shock-insulation bridge pier structure system | |
US8695142B2 (en) | Partially and fully earth-anchored cable-stayed bridges using main-span prestressing unit and method of constructing the same | |
CN106401018B (en) | A kind of assembled self-resetting swinging steel plate wall structural system | |
CN109853779B (en) | Full-swing structure system containing swing column and swing wall and construction method thereof | |
CN110359633A (en) | A kind of concrete foot joint of the replaceable energy consumption connection component containing high ductility | |
KR102119436B1 (en) | Pedestrian bridge and construction method therefor | |
CN203200914U (en) | Steel structure socle outward exposed connecting structure | |
CN108729344A (en) | A kind of two-columned pier construction waving shock insulation use in conjunction | |
CN205857032U (en) | The toughened internal stress Construction Support device that a kind of floor stand combines with shelf bracket | |
CN102535504A (en) | Seismic isolation foundation for bridge | |
CN202390930U (en) | Vibration-absorbing and anti-collapsing support of staircase | |
JP6058332B2 (en) | Seismic reinforcement structure for concrete column and seismic reinforcement method for concrete column | |
CN202416162U (en) | Rubber shock-insulation limit support with inhaul cables | |
CN205777188U (en) | A kind of spacing bearing of concrete staircase damping | |
CN210288752U (en) | Damping grounding type fabricated reinforced concrete tuned mass damping wall | |
JP2008214973A (en) | Seismic-control bridge pier structure | |
CN206956535U (en) | One kind enhancing antidetonation pier stud | |
CN106760014A (en) | A kind of board-like adjustable damper embedded part of full assembled and installation method | |
CN110331652B (en) | Three-way adjustable anti-seismic system for bridge crossing fracture zone | |
CN104847016A (en) | Suspending transfer layer of stayed cable beam | |
CN109577347A (en) | Damping prestress anchorage cable and its construction method in a kind of Pile-Anchor Supporting for Deep Excavation system | |
JP2003082618A (en) | Bridge earthquake-resistant reinforcing method | |
CN209741641U (en) | Prefabricated assembled concrete structure leisure plank road | |
CN208023855U (en) | A kind of reinforced concrete stairs seismic reinforcing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180515 Termination date: 20190704 |
|
CF01 | Termination of patent right due to non-payment of annual fee |