CN106120786A - A kind of overlength cold bending steel sheet piling construction technology - Google Patents

A kind of overlength cold bending steel sheet piling construction technology Download PDF

Info

Publication number
CN106120786A
CN106120786A CN201610503432.3A CN201610503432A CN106120786A CN 106120786 A CN106120786 A CN 106120786A CN 201610503432 A CN201610503432 A CN 201610503432A CN 106120786 A CN106120786 A CN 106120786A
Authority
CN
China
Prior art keywords
steel sheet
pile
sheet pile
steel
cold bending
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610503432.3A
Other languages
Chinese (zh)
Inventor
宋照尚
杨文�
刘海强
于博超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201610503432.3A priority Critical patent/CN106120786A/en
Publication of CN106120786A publication Critical patent/CN106120786A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/26Placing by using several means simultaneously

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The present invention is a kind of overlength cold bending steel sheet piling construction technology, concretely comprises the following steps: first uses long screw auger to loosen the soil steel sheet pile pile sinking position processs according to position, hole, then installs stopping means, by the injection direction of I-steel control steel sheet pile;And overlength cold bending steel sheet piling is welded with steel plate be fixed.Using 80t crawler crane, sling by root steel sheet pile by vibration hammer, make steel sheet pile become plumbness, shift to placement location, Vibration on Start-up hammer pile sinking, startup high-pressure hydraulic pump carries out bath and carries out pile sinking simultaneously.The present invention utilize long screw auger loosen the soil coordinate water jetting arrangement and method for construction, efficiently solve the yielding distortion of cold bending steel sheet piling, pile sinking difficulty etc. problem, obtain extraordinary effect.Simultaneously as the requirement to vibration hammer that reduces of penetrating resistance reduces, reduce construction cost, improve work efficiency.

Description

A kind of overlength cold bending steel sheet piling construction technology
Technical field
The present invention relates to cold bending steel sheet piling construction field, particularly relate to a kind of overlength cold bending steel sheet piling construction technology.
Background technology
General repairing dock coffering mainly includes cofferdam construction platform and double steel sheet-pile cofferdam two parts.Steel sheet pile encloses Weir is made up of outer campshed, interior campshed and tabula stake, and these outer campsheds, interior campshed all use cold bending steel sheet piling.Cold bending steel sheet piling is adopted With relatively thin sheet material (usual thickness is 8mm~14mm), process with cold roll forming unit.Its production cost is relatively low and price Cheaply, scale controls the most more flexible.Cross section most economical, rational can be chosen, it is achieved in engineering design according to engineering practice Optimization, the same performance hot rolled steel plate pile section material saving 10-15% of ratio, greatly reduce construction cost.But processed by clod wash Capacity of equipment restricts, and can only produce the product that steel grade intensity rank is low, thickness is thiner.Along with the increase of steel sheet pile length, cold Curved steel sheet pile construction difficulty is the biggest.
Summary of the invention
Present invention seek to address that the deficiencies in the prior art, and a kind of overlength cold bending steel sheet piling construction technology is provided.
The present invention for achieving the above object, by the following technical solutions:
A kind of overlength cold bending steel sheet piling construction technology, concretely comprises the following steps:
(1) long screw auger loosens the soil:
First arranging position, hole of loosening the soil, arrangement of boring holes is at steel sheet pile axis direction, and the center distance of position, hole is 1m;The longest spiral shell Rotary drill machine is in place, uses GPS to position, and makes drilling axis and steel sheet pile dead in line, drilling rod perpendicular alignmnet Zhuan Wei center, bores After hole starts, move down drilling rod to drill bit when contacting to earth, start motor and creep into, the slowest after fast, check the deviation of boring also simultaneously Correct in time, stop when drilling depth reaches steel sheet pile embedded depth creeping into, at the uniform velocity extract, successively according to the Kong Weijin arranged Capable operation of loosening the soil;
(2) stopping means is installed:
Arranging leading truck in the both sides of steel sheet pile axis direction, leading truck includes support column, and support column is welded with guiding Beam and bracket, constitute single-layer double-side guide frame;Using I-steel to do spacing, I-steel welds with the guide beam of leading truck, greatly Put 2cm outside little limit more every than guide beam, controlled the injection direction of steel sheet pile by I-steel;
(3) steel sheet pile processes:
It is welded with a steel plate every 5m inside steel sheet pile;Between welding steel and steel sheet pile, add 3 diameters of band simultaneously Telescopic joint mode is used to link together for the outlet pipe of 5.0cm, outlet pipe and pile body, the every 3 meters of layouts of sleeve pipe one;To go out Water pipe is connected with high-pressure hydraulic pump by nylon water band;
(4) pile sinking:
Use 80t crawler crane, by vibration hammer, root steel sheet pile is sling, make steel sheet pile become plumbness, shift to assign position Put, Vibration on Start-up hammer pile sinking, start high-pressure hydraulic pump simultaneously and wash by water, if there is pile sinking difficulty in pile driving process, by stake Upwards pull up 0.3m, fall the most again, be so repeated 5 times;During inserted to play, use warp in two mutually perpendicular directions Latitude instrument is observed, it is ensured that steel sheet pile is just being inserted, inserted directly;Steel sheet pile is beaten and is stopped pile sinking to distance designed elevation 30cm, then enters Row secondary strike-on, to designed elevation, completes the pile sinking operation of steel sheet pile, and water pipe is extracted recycling after completing by steel sheet pile pile sinking; Carry out the pile sinking operation of next root steel sheet pile in this manner, until completing the pile sinking of all steel sheet piles.
Described support column uses the spiral steel pipe pile of Φ 430 × 8mm, and longitudinal pitch is 6m, and embedded depth is 5m;Institute State guide beam and use I-shaped steel plate;The described bracket height away from mud face is 1.5m;Between described guide beam and described bracket Using fillet weld, weld width is contact length.
The pile frame height of described long-spiral drilling machine is 40m, and bore diameter is 0.8m.
Described water under high pressure pump lift is 60m, and discharge pressure is 1.5Mpa.
The size of the described steel plate being welded with inside steel sheet pile is 80mm × 80mm × 6mm.
The invention has the beneficial effects as follows: the present invention utilize long screw auger loosen the soil coordinate water jetting arrangement and method for construction, efficient solution The problems such as the yielding distortion of cold bending steel sheet piling of having determined, pile sinking difficulty, obtain extraordinary effect.Simultaneously as penetrating resistance Reduce the requirement to vibration hammer to reduce, reduce construction cost, improve work efficiency.
Detailed description of the invention
Below in conjunction with embodiment, the invention will be further described:
A kind of overlength cold bending steel sheet piling construction technology, concretely comprises the following steps:
(1) long screw auger loosens the soil:
First arranging position, hole of loosening the soil, arrangement of boring holes is at steel sheet pile axis direction, and the center distance of position, hole is 1m;The longest spiral shell Rotary drill machine is in place, uses GPS to position, and makes drilling axis and steel sheet pile dead in line, drilling rod perpendicular alignmnet Zhuan Wei center, bores After hole starts, move down drilling rod to drill bit when contacting to earth, start motor and creep into, the slowest after fast, check the deviation of boring also simultaneously Correct in time, stop when drilling depth reaches steel sheet pile embedded depth creeping into, at the uniform velocity extract, successively according to the Kong Weijin arranged Capable operation of loosening the soil;
(2) stopping means is installed:
Arranging leading truck in the both sides of steel sheet pile axis direction, leading truck includes support column, and support column is welded with guiding Beam and bracket, constitute single-layer double-side guide frame;Using I-steel to do spacing, I-steel welds with the guide beam of leading truck, greatly Put 2cm outside little limit more every than guide beam, controlled the injection direction of steel sheet pile by I-steel;
(3) steel sheet pile processes:
It is welded with a steel plate every 5m inside steel sheet pile;Between welding steel and steel sheet pile, add 3 diameters of band simultaneously Telescopic joint mode is used to link together for the outlet pipe of 5.0cm, outlet pipe and pile body, the every 3 meters of layouts of sleeve pipe one;To go out Water pipe is connected with high-pressure hydraulic pump by nylon water band;
(4) pile sinking:
Use 80t crawler crane, by vibration hammer, root steel sheet pile is sling, make steel sheet pile become plumbness, shift to assign position Put, Vibration on Start-up hammer pile sinking, start high-pressure hydraulic pump simultaneously and wash by water, if there is pile sinking difficulty in pile driving process, by stake Upwards pull up 0.3m, fall the most again, be so repeated 5 times;During inserted to play, use warp in two mutually perpendicular directions Latitude instrument is observed, it is ensured that steel sheet pile is just being inserted, inserted directly;Steel sheet pile is beaten and is stopped pile sinking to distance designed elevation 30cm, then enters Row secondary strike-on, to designed elevation, completes the pile sinking operation of steel sheet pile, and water pipe is extracted recycling after completing by steel sheet pile pile sinking; Carry out the pile sinking operation of next root steel sheet pile in this manner, until completing the pile sinking of all steel sheet piles.
Described support column uses the spiral steel pipe pile of Φ 430 × 8mm, and longitudinal pitch is 6m, and embedded depth is 5m;Institute State guide beam and use I-shaped steel plate;The described bracket height away from mud face is 1.5m;Between described guide beam and described bracket Using fillet weld, weld width is contact length.
The pile frame height of described long-spiral drilling machine is 40m, and bore diameter is 0.8m.
Described water under high pressure pump lift is 60m, and discharge pressure is 1.5Mpa.
The size of the described steel plate being welded with inside steel sheet pile is 80mm × 80mm × 6mm.
Utilize long spire loosen the soil coordinate water jetting construction technology effectively solve the yielding distortion of cold bending steel sheet piling, pile sinking be stranded The problems such as difficulty, obtain extraordinary effect.No longer there is torsional deformation in steel sheet pile, and pile sinking is very well, uses this construction technology Steel sheet pile more than 95% reach designed elevation, not up to the steel sheet pile of absolute altitude also design tolerance in the range of.
Above the present invention is exemplarily described, it is clear that the present invention implements and is not subject to the restrictions described above, As long as have employed method design and the various improvement that carry out of technical scheme of the present invention, or the most improved directly apply to other Close, all within protection scope of the present invention.

Claims (5)

1. an overlength cold bending steel sheet piling construction technology, it is characterised in that concretely comprise the following steps:
(1) long screw auger loosens the soil:
First arranging position, hole of loosening the soil, arrangement of boring holes is at steel sheet pile axis direction, and the center distance of position, hole is 1m;Then long screw auger Machine is in place, uses GPS to position, makes drilling axis and steel sheet pile dead in line, and drilling rod perpendicular alignmnet Zhuan Wei center, boring is opened After beginning, move down drilling rod to drill bit when contacting to earth, start motor and creep into, the slowest after fast, check the deviation in time of boring simultaneously Correct, stop when drilling depth reaches steel sheet pile embedded depth creeping into, at the uniform velocity extract, carry out pine according to the position, hole arranged successively Soil operation;
(2) stopping means is installed:
Arranging leading truck in the both sides of steel sheet pile axis direction, leading truck includes support column, support column is welded with guide beam and Bracket, constitutes single-layer double-side guide frame;Using I-steel to do spacing, I-steel welds with the guide beam of leading truck, size ratio Guide beam puts 2cm outside every limit, is controlled the injection direction of steel sheet pile by I-steel;
(3) steel sheet pile processes:
It is welded with a steel plate every 5m inside steel sheet pile;Between welding steel and steel sheet pile, add 3, band a diameter of simultaneously The outlet pipe of 5.0cm, outlet pipe and pile body use telescopic joint mode to link together, the every 3 meters of layouts of sleeve pipe one;By water outlet Pipe is connected with high-pressure hydraulic pump by nylon water band;
(4) pile sinking:
Use 80t crawler crane, by vibration hammer, root steel sheet pile is sling, make steel sheet pile become plumbness, shift to placement location, open Dynamic vibration hammer pile sinking, starts high-pressure hydraulic pump simultaneously and washes by water, if there is pile sinking difficulty in pile driving process, stake upwards pulled out Play 0.3m, fall the most again, be so repeated 5 times;During inserted to play, theodolite is used to enter in two mutually perpendicular directions Row observation, it is ensured that steel sheet pile is just being inserted, inserted directly;Steel sheet pile is beaten and is stopped pile sinking to distance designed elevation 30cm, then carries out secondary Strike-on, to designed elevation, completes the pile sinking operation of steel sheet pile, and water pipe is extracted recycling after completing by steel sheet pile pile sinking;According to this The mode of kind carries out the pile sinking operation of next root steel sheet pile, until completing the pile sinking of all steel sheet piles.
A kind of overlength cold bending steel sheet piling construction technology the most according to claim 1, it is characterised in that described support column uses Be the spiral steel pipe pile of Φ 430 × 8mm, longitudinal pitch is 6m, and embedded depth is 5m;Described guide beam uses I-steel Plate;The described bracket height away from mud face is 1.5m;Using fillet weld between described guide beam and described bracket, weld width is for connecing Touch length.
A kind of overlength cold bending steel sheet piling construction technology the most according to claim 2, it is characterised in that described long-spiral drilling machine Pile frame height be 40m, bore diameter is 0.8m.
A kind of overlength cold bending steel sheet piling construction technology the most according to claim 3, it is characterised in that described high-pressure hydraulic pump Lift is 60m, and discharge pressure is 1.5Mpa.
A kind of overlength cold bending steel sheet piling construction technology the most according to claim 4, it is characterised in that add inside steel sheet pile The size of the described steel plate of weldering is 80mm × 80mm × 6mm.
CN201610503432.3A 2016-06-30 2016-06-30 A kind of overlength cold bending steel sheet piling construction technology Pending CN106120786A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610503432.3A CN106120786A (en) 2016-06-30 2016-06-30 A kind of overlength cold bending steel sheet piling construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610503432.3A CN106120786A (en) 2016-06-30 2016-06-30 A kind of overlength cold bending steel sheet piling construction technology

Publications (1)

Publication Number Publication Date
CN106120786A true CN106120786A (en) 2016-11-16

Family

ID=57285753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610503432.3A Pending CN106120786A (en) 2016-06-30 2016-06-30 A kind of overlength cold bending steel sheet piling construction technology

Country Status (1)

Country Link
CN (1) CN106120786A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113082A (en) * 2018-08-08 2019-01-01 中交第三航务工程局有限公司南京分公司 One kind water knife in hardpan assists sinking steel sheet pile technique
US20200385948A1 (en) * 2018-06-18 2020-12-10 Bauer Spezialtiefbau Gmbh Construction device and method for operating a construction device
CN113638401A (en) * 2021-08-27 2021-11-12 华汇工程设计集团股份有限公司 Construction method of ultra-long linear HUI combined steel sheet pile

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨加录轩: "《https://wenku.baidu.com/view/2370812d33687e21af45a9af.html》", 27 November 2014 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20200385948A1 (en) * 2018-06-18 2020-12-10 Bauer Spezialtiefbau Gmbh Construction device and method for operating a construction device
US11619021B2 (en) * 2018-06-18 2023-04-04 Bauer Spezialtiefbau Gmbh Construction device and method for operating a construction device
CN109113082A (en) * 2018-08-08 2019-01-01 中交第三航务工程局有限公司南京分公司 One kind water knife in hardpan assists sinking steel sheet pile technique
CN113638401A (en) * 2021-08-27 2021-11-12 华汇工程设计集团股份有限公司 Construction method of ultra-long linear HUI combined steel sheet pile

Similar Documents

Publication Publication Date Title
CN206768813U (en) Grouting behind shaft or drift lining pile for prestressed pipe
CN106120786A (en) A kind of overlength cold bending steel sheet piling construction technology
CN205399418U (en) Sharp structure of stake that reinforcing PHC tubular pile pile sinking broke ground
CN106836213A (en) Grouting behind shaft or drift lining pre-stress hollow square pile and its construction technology
CN105672316A (en) Steel pile sinking damping device and construction method
CN110258571A (en) A kind of bored concrete pile pipe sinking pressure grouting construction method
CN106988308A (en) Grouting behind shaft or drift lining pile for prestressed pipe and its construction technology
CN201172830Y (en) Anchor rod static-pressing pile foundation in tower crane
CN201635082U (en) Cofferdam construction device in deep-water pier cushion cap construction
CN106088092A (en) There is refusing the solution of hammer situation in pile tube piling process
CN110280963A (en) A kind of circumferential weld stainless-steel pipe structure
CN108018867B (en) The method for realizing the construction of coastal waters beach column foot based on trestle method
CN105862902A (en) Steel-concrete nested composite cylinder foundation structure and construction equipment and method thereof
CN207110989U (en) A kind of Novel drilling bored concrete pile drilling rod
CN110206481A (en) Dewatering well constructing device
CN103882859B (en) A kind of original state of Shi Hanzhang fetches earth cast-with-pressure concrete pile and construction method thereof
CN207749518U (en) A kind of high-strength concrete precast pipe pile splicing structure
CN110485510B (en) Fractional press-in type recharging well structure and application method thereof
CN211773577U (en) Pile head structure of prefabricated tubular pile
CN208899473U (en) A kind of uplift pile pile extension connecting node
CN214738025U (en) Framework structure of driving-in type combined anchor rod
CN217105073U (en) Drilling-free grouting anchor
CN202323955U (en) High-pressure water jet system for assisting in inserting and driving steel sheet pile cofferdam
CN112627251A (en) Deep hole bar planting construction method for reinforced concrete structure
CN201581814U (en) Self-advancing drill bit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116

RJ01 Rejection of invention patent application after publication