CN106114760A - Peculiar to vessel automatically control removable LNG fuel tank case and installation method thereof - Google Patents

Peculiar to vessel automatically control removable LNG fuel tank case and installation method thereof Download PDF

Info

Publication number
CN106114760A
CN106114760A CN201610514564.6A CN201610514564A CN106114760A CN 106114760 A CN106114760 A CN 106114760A CN 201610514564 A CN201610514564 A CN 201610514564A CN 106114760 A CN106114760 A CN 106114760A
Authority
CN
China
Prior art keywords
lng
storage tank
fuel
lng storage
vessel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610514564.6A
Other languages
Chinese (zh)
Inventor
于丰杰
丁虎
刘娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Yuchai Energy Co Ltd
SHANGHAI HENGTUO INDUSTRY DEVELOPMENT Co Ltd
Original Assignee
Dalian Yuchai Energy Co Ltd
SHANGHAI HENGTUO INDUSTRY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Yuchai Energy Co Ltd, SHANGHAI HENGTUO INDUSTRY DEVELOPMENT Co Ltd filed Critical Dalian Yuchai Energy Co Ltd
Priority to CN201610514564.6A priority Critical patent/CN106114760A/en
Publication of CN106114760A publication Critical patent/CN106114760A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B17/00Vessels parts, details, or accessories, not otherwise provided for
    • B63B17/0027Tanks for fuel or the like ; Accessories therefor, e.g. tank filler caps
    • B63B17/0036Arrangements for minimizing pollution by accidents

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses and kind peculiar to vessel automatically control removable LNG fuel tank case, a kind of peculiar to vessel automatically controls removable LNG fuel tank case, this fuel tank case includes LNG storage tank and framework, and described LNG storage tank is fixing in the frame;Described LNG storage tank is provided with LNG charging system, LNG supply system, LNG storage tank level monitoring system, signals collecting case and LNG storage tank control chamber, described LNG charging system includes LNG feed tube, and described LNG feed tube one end is connected with LNG storage tank, the LNG feed tube other end is provided with LNG inlet;Described LNG supply system includes LNG feed pipe, and LNG feed pipe one end is connected with LNG storage tank, the LNG feed pipe other end is provided with supply opening, and LNG fuel enters gasifier by LNG feed pipe and then provides power for LNG Power Vessel.The present invention integrates fuel reservoir, container hanging, technique for fixing, automatic control technology, and convenient fuel fills.

Description

Peculiar to vessel automatically control removable LNG fuel tank case and installation method thereof
Technical field
The invention belongs to storage tank for ship field, particularly relate to a kind of peculiar to vessel automatically control removable LNG fuel tank case and Its installation method.
Background technology
China's all kinds of fishing boat recoverable amount reaches more than 100 ten thousand, accounts for 1/4th of World Ship total amount, accounts for China's boats and ships total amount 90%, and China's fishing cruiser is more than 500,000, year oil consumption material reach more than 800 ten thousand tons, polluting that the waste gas of discharge is serious is big Gas and rivers,lakes and seas.Energy-saving and environmental protection have become as the theme leading global economy technology to develop, current a kind of novel replacement energy Source liquefied natural gas (LNG) has been enter into fishery vessel industry, provides another bar road for fishing boat energy-saving and emission-reduction.Along with The iterative method of inland navigation craft " oil to gas " project such as " gasification the Changjiang river ", " the Changjiang river environlnental logistics Innovation project ", liquefied natural gas (LNG) become, as a kind of economy, green, the novel energy of safety, the first-selection of following boats and ships green energy resource generally acknowledged in the industry. Along with LNG being pushed further into as fuels and energy (single fuel or fuel combination), the LNG storage tank as fuels and energy source enjoys Pay close attention to.
At present, owing to fuel tank is integrally fixed on ship, after fuel tank has an accident or heat-insulating property is lost, fuel tank Aboard ship cannot keep in repair or maintenance time is the longest, boats and ships will be out of service because of the source of running out of steam, and bring about great losses to shipowner. How to ensure that boats and ships, after using LNG fuel, remain to run safely and efficiently, do not affected boats and ships by the problem of fuel tank self and transport OK, and ensure the interests of shipowner, be also the problem needing to solve.
Summary of the invention
For problems of the prior art, the present invention provides a kind of and peculiar to vessel automatically controls removable LNG fuel tank case And installation method, by dry type quick connector, it is simple to quickly connect after changing the outfit, reduce boats and ships scene filling number of times, significantly drop Low unexpected disclosure risk.
For achieving the above object, the present invention is by the following technical solutions:
One is peculiar to vessel automatically controls removable LNG fuel tank case, and this fuel tank case includes LNG storage tank and framework, described LNG storage tank Fix in the frame;
Described LNG storage tank be provided with LNG charging system, LNG supply system, LNG storage tank level monitoring system, signals collecting case and LNG storage tank control chamber,
Described LNG charging system includes LNG feed tube, described LNG feed tube one end is connected with LNG storage tank, LNG feed tube another End is provided with LNG inlet;
Described LNG supply system includes LNG feed pipe, and LNG feed pipe one end is connected with LNG storage tank, the LNG feed pipe other end sets Having supply opening, LNG fuel enters gasifier by LNG feed pipe and then provides power for LNG Power Vessel,
Described LNG storage tank level monitoring system includes monitoring pipeline, is provided with valve member, liquidometer, level sensing on monitoring pipeline Device, Pressure gauge and pressure transducer,
Described LNG storage tank top is provided with periodic off-gases pipe and gas phase pipe, and LNG storage tank bottom is provided with thermometer and temperature sensor;
Described signals collecting case includes explosion-proof electric control box, PLC, display screen and explosion-proof screw thread coupling, and described signal is adopted Header gathers on liquid level sensor, pressure transducer and the analog quantity of temperature sensor and on-off model respectively, by LNG storage tank On liquid level, pressure, temperature transfer to PLC, complete the collection of LNG fuel tank case signal.
LNG storage tank control chamber is the Flameproof box of Exd II BT4 grade, is provided with PLC control in described LNG storage tank control chamber System and button man machine interface, described PLC control system gathers LNG storage tank liquid level sensor, temperature sensor, pressure automatically The analog quantity of sensor and on-off model, and after internal processes computing, be converted to process instantaneous value man-machine at button Show in real time on interface and sent to the LNG storage tank control chamber in central station of floating dock by ethernet communication, and being connect by Ethernet By the control signal of LNG storage tank valve, control the action of LNG storage tank pneumatic operated valve, carry out filling operation, be additionally provided with simultaneously high level, Alarm for high voltage display lamp, warning message shows in button man machine interface, and can automatically cut off pneumatic operated valve when reporting to the police, and stops Filling.
Described LNG feed tube is upper liquid phase feed tube or lower liquid phase feed tube.
Described LNG storage tank is provided with from supercharging gasifier.
Described LNG storage tank is Cryo Heat Insulation pressure vessel, and described Cryo Heat Insulation pressure vessel uses double-layer shell structure, institute Stating double-layer shell structure and include outer container and inner pressurd vessel, described outer container is as heat insulation layer protective housing, by outer cylinder body and both sides Butterfly end socket composition;Described inner pressurd vessel is made up of the ellipsoidal head of inner barrel and both sides.
Described fuel tank case is container-type fuel tank case, and described LNG storage tank is c-type fuel reservoir, LNG storage tank and LNG Connection by metal hose is used between Fuel Control System.
Described periodic off-gases pipe is provided with concentration diffusion mouth.
A kind of workflow automatically controlling removable LNG fuel tank case peculiar to vessel, comprises the following steps:
Step 1, LNG fills flow process: fill LNG fuel in LNG storage tank by LNG feed tube, is full of the LNG storage of LNG fuel After tank lifting is ascended the throne, LNG storage tank is arranged on base, and LNG fuel can be incited somebody to action by upper liquid phase feed tube or lower liquid phase feed tube LNG fuel adds in LNG storage tank, completes the filling of LNG fuel;
Step 2, LNG supply chain: as needs supply CNG, LNG fuel is entered gasifier by LNG feed pipe by supply opening, Low temperature LNG is gasified as CNG, then in LNG piping enters into double fuel main frame, provides power for boats and ships.
Compared with prior art, the invention have the benefit that 1. the present invention collects LNG " C " type fuel reservoir technology, packaging Case hoisting technology, technique for fixing, dry type quick connector application technology, automatic control technology, in one, are a kind of novel peculiar to vessel LNG storage device, it designs according to TEU (Twenty-foot Equivalent Unit), and all devices is integrated into a LNG fuel tank formula container, Inoculated shipment on the bank is transported on ship, hard-wired c-type fuel reservoir on alternative ship;2. the present invention fills without scene, from And reduce boats and ships scene filling number of times, it is substantially reduced unexpected disclosure risk, meanwhile, at LNG Fuel Control System to LNG fuel In system, the performance parameter of all parts carries out dynamic monitoring, and man-machine on driver's cabin and central station of floating dock LNG fuel control chamber Show on interface, process values is carried out logical judgment, if any exception, then at driver's cabin and central station of floating dock LNG fuel control chamber simultaneously Upper formation sound and light alarm signal in HMI display alarm information, and automatically perform to turn off action accordingly;3. movable tank case and ship Using connection by metal hose in the middle of upper fuel system, tank case one end arranges dry type quick connector, it is simple to quick links after changing the outfit, liquid Phase LNG flexible pipe is furnished with Pull breaking ualve, it is ensured that in abnormal cases, gets rid of disclosure risk, also can guarantee that safety of ship;4. the present invention is not Need to do particularly transformation in terms of aerating basis, after tank case is gone on board, be connected with boats and ships LNG fuel system, thus play LNG combustion The effect of batch can.Meanwhile, the performance parameter of all parts especially storage tank in whole tank case is moved by LNG control system in real time State monitoring dangerous warning function, it is ensured that the safety in the course of the work of whole tank case.Owing to need not add newly-built Basis, gas station aspect is transformed especially, and do so advantageously reduces construction investment, need not sail to LNG with gas fuel powered ship Filling landing stage, it is possible to supplement fuel, reduces boats and ships scene filling number of times, is substantially reduced unexpected disclosure risk;5. LNG storage tank is put In steel framework, both can reach moveable purpose, framework also plays protective effect to LNG storage tank simultaneously;LNG fuel Control chamber provides DC24V power supply and by Ethernet and LNG fuel control chamber communication, and quick connector uses mounting bracket to be fixed on LNG storage tank marginal position, convenient operation.
Accompanying drawing explanation
Fig. 1 is the front view of fuel tank case in the present invention.
Fig. 2 is the left view of fuel tank case in the present invention.
Fig. 3 is the right view of fuel tank case in the present invention.
Fig. 4 is the flow chart of fuel tank case of the present invention.
Detailed description of the invention
Removable LNG fuel tank case and the technical side of installation method thereof is automatically controlled below in conjunction with the accompanying drawings to the present invention is peculiar to vessel Case is described in further detail.
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, the present embodiment is peculiar to vessel automatically controls removable LNG fuel tank case, this fuel tank Case includes that LNG storage tank 1 and framework 2, described LNG storage tank 1 are fixed in framework 2;Described LNG storage tank 1 is provided with LNG and fills and is System, LNG supply system, LNG storage tank level monitoring system, signals collecting case and LNG storage tank control chamber,
Described LNG charging system includes LNG feed tube 3, and described LNG feed tube 3 one end is connected with LNG storage tank 1, LNG feed tube 3 The other end is provided with LNG inlet 4;Described LNG supply system includes LNG feed pipe 5, LNG feed pipe 5 one end and LNG storage tank 1 phase Connect, LNG feed pipe 5 other end is provided with supply opening 6, and LNG fuel enters gasifier by LNG feed pipe 5 and then is LNG Power Vessel Power is provided,
Described LNG storage tank level monitoring system includes monitoring pipeline 7, is provided with valve member, liquidometer 9, liquid level biography on monitoring pipeline 7 Sensor 10, Pressure gauge 11 and pressure transducer 12,
Described LNG storage tank 1 top is provided with periodic off-gases pipe 13 and gas phase pipe 14, and LNG storage tank 1 bottom is provided with thermometer 15 and temperature passes Sensor 16, is provided with concentration diffusion mouth 8 on periodic off-gases pipe;
Described signals collecting case includes explosion-proof electric control box, PLC, display screen and explosion-proof screw thread coupling, and described signal is adopted Header gathers on liquid level sensor 10, pressure transducer 12 and the analog quantity of temperature sensor 16 and on-off model respectively, will Liquid level in LNG storage tank 1, pressure, temperature transfer, to PLC, complete the collection of LNG fuel tank case signal.
As preferably, the present embodiment LNG storage tank control chamber is the Flameproof box of Exd II BT4 grade, and described LNG storage tank controls Being provided with PLC control system and button man machine interface in case, described PLC control system gathers LNG storage tank level sensing automatically Device, temperature sensor, the analog quantity of pressure transducer and on-off model, and it is real to be converted to process after internal processes computing Duration the LNG storage tank control showing in real time in button man machine interface and sending in central station of floating dock by ethernet communication Case, and the control signal of LNG storage tank valve is accepted by Ethernet, control the action of LNG storage tank pneumatic operated valve, carry out filling behaviour Making, be additionally provided with high level, alarm for high voltage display lamp simultaneously, warning message shows in button man machine interface, and when reporting to the police Pneumatic operated valve can be automatically cut off, stop filling.
In order to meet multiple demand, the present embodiment LNG feed tube 3 uses upper liquid phase feed tube 31 or lower liquid phase feed tube 32。
As further preferably, the present embodiment LNG storage tank is provided with from supercharging gasifier 17, and LNG storage tank is Cryo Heat Insulation Pressure vessel, described Cryo Heat Insulation pressure vessel uses double-layer shell structure, and described double-layer shell structure includes outer container 101 He Inner pressurd vessel 102, described outer container, as heat insulation layer protective housing, is made up of the butterfly end socket of outer cylinder body and both sides;Described content Device is made up of the ellipsoidal head of inner barrel and both sides;Fuel tank case is container-type fuel tank case, and described LNG storage tank is c-type Fuel reservoir, uses connection by metal hose between LNG storage tank and LNG Fuel Control System.
A kind of workflow automatically controlling removable LNG fuel tank case peculiar to vessel, comprises the following steps:
Step 1, LNG fills flow process: fill LNG fuel in LNG storage tank by LNG feed tube, is full of the LNG storage of LNG fuel After tank lifting is ascended the throne, LNG storage tank is arranged on base, and LNG fuel can be incited somebody to action by upper liquid phase feed tube or lower liquid phase feed tube LNG fuel adds in LNG storage tank, completes the filling of LNG fuel;
Step 2, LNG supply chain: as needs supply CNG, LNG fuel is entered gasifier by LNG feed pipe by supply opening, Low temperature LNG is gasified as CNG, then in LNG piping enters into double fuel main frame, provides power for boats and ships.
In the present embodiment, PLC control system is small PLC control system MICROLOGIX 1100 of Rockwell Corporation PLC control system, button man machine interface is PanelView Plus 6 3.5 button man machine interface.
Although the present invention has been made specific descriptions by above-described embodiment, but comes for those of ordinary skill in the art Say, it is understood that can modify based on present disclosure within without departing from the spirit and scope of the present invention Or improve, these amendments and improvement are all within the spirit and scope of the present invention.

Claims (8)

1. one kind peculiar to vessel automatically controls removable LNG fuel tank case, it is characterised in that this fuel tank case include LNG storage tank (1) and Framework (2), described LNG storage tank (1) is fixed in framework (2);
Described LNG storage tank (1) is provided with LNG charging system, LNG supply system, LNG storage tank level monitoring system, signals collecting Case and LNG storage tank control chamber,
Described LNG charging system includes LNG feed tube (3), and described LNG feed tube (3) one end is connected with LNG storage tank (1), LNG Feed tube (3) other end is provided with LNG inlet (4);
Described LNG supply system includes LNG feed pipe (5), and LNG feed pipe (5) one end is connected with LNG storage tank (1), LNG feed flow Pipe (5) other end is provided with supply opening (6), and LNG fuel enters gasifier by LNG feed pipe (5) and then provides for LNG Power Vessel Power,
Described LNG storage tank level monitoring system includes monitoring pipeline (7), monitoring pipeline (7) is provided with valve member, liquidometer (9), Liquid level sensor (10), Pressure gauge (11) and pressure transducer (12),
Described LNG storage tank (1) top is provided with periodic off-gases pipe (13) and gas phase pipe (14), and LNG storage tank (1) bottom is provided with thermometer And temperature sensor (16) (15);
Described signals collecting case includes explosion-proof electric control box, PLC, display screen and explosion-proof screw thread coupling, and described signal is adopted Header gathers that liquid level sensor (10), pressure transducer (12) be upper respectively and the analog quantity of temperature sensor (16) and switching value are believed Number, by the liquid level in LNG storage tank (1), pressure, temperature transfer to PLC, complete the collection of LNG fuel tank case signal.
The most according to claim 1 peculiar to vessel automatically control removable LNG fuel tank case, it is characterised in that LNG storage tank controls Case is the Flameproof box of Exd II BT4 grade, is provided with PLC control system and the man-machine boundary of button in described LNG storage tank control chamber Face, described PLC control system automatically gathers LNG storage tank liquid level sensor, temperature sensor, the analog quantity of pressure transducer and opens Pass amount signal, and after internal processes computing, be converted to process instantaneous value and show in real time and logical in button man machine interface Cross the LNG storage tank control chamber that ethernet communication sends in central station of floating dock, and accepted the control letter of LNG storage tank valve by Ethernet Number, control the action of LNG storage tank pneumatic operated valve, carry out filling operation, be additionally provided with high level, alarm for high voltage display lamp simultaneously, report to the police Information shows in button man machine interface, and can automatically cut off pneumatic operated valve when reporting to the police, and stops filling.
The most according to claim 1 peculiar to vessel automatically control removable LNG fuel tank case, it is characterised in that described LNG feed liquor Pipe (3) is upper liquid phase feed tube (31) or lower liquid phase feed tube (32).
The most according to claim 1 peculiar to vessel automatically control removable LNG fuel tank case, it is characterised in that described LNG storage tank It is provided with from supercharging gasifier (17).
5. described peculiar to vessel automatically control removable LNG fuel tank case according to claim 1-4 is arbitrary, it is characterised in that described LNG storage tank is Cryo Heat Insulation pressure vessel, and described Cryo Heat Insulation pressure vessel uses double-layer shell structure, and described double Shell is tied Structure includes outer container (101) and inner pressurd vessel (102), and described outer container is as heat insulation layer protective housing, by outer cylinder body and both sides Butterfly end socket forms;Described inner pressurd vessel is made up of the ellipsoidal head of inner barrel and both sides.
The most according to claim 1 peculiar to vessel automatically control removable LNG fuel tank case, it is characterised in that: described fuel tank Case is container-type fuel tank case, and described LNG storage tank is c-type fuel reservoir, adopts between LNG storage tank and LNG Fuel Control System Use connection by metal hose.
The most according to claim 1 peculiar to vessel automatically control removable LNG fuel tank case, it is characterised in that: described periodic off-gases Pipe is provided with concentration diffusion mouth (8).
8. the workflow automatically controlling removable LNG fuel tank case peculiar to vessel described in a claim 7, it is characterised in that bag Include following steps:
Step 1, LNG fills flow process: fill LNG fuel in LNG storage tank by LNG feed tube, is full of the LNG storage of LNG fuel After tank lifting is ascended the throne, LNG storage tank is arranged on base, and LNG fuel can be incited somebody to action by upper liquid phase feed tube or lower liquid phase feed tube LNG fuel adds in LNG storage tank, completes the filling of LNG fuel;
Step 2, LNG supply chain: as needs supply CNG, LNG fuel is entered gasifier by LNG feed pipe by supply opening, Low temperature LNG is gasified as CNG, then in LNG piping enters into double fuel main frame, provides power for boats and ships.
CN201610514564.6A 2016-07-04 2016-07-04 Peculiar to vessel automatically control removable LNG fuel tank case and installation method thereof Pending CN106114760A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610514564.6A CN106114760A (en) 2016-07-04 2016-07-04 Peculiar to vessel automatically control removable LNG fuel tank case and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610514564.6A CN106114760A (en) 2016-07-04 2016-07-04 Peculiar to vessel automatically control removable LNG fuel tank case and installation method thereof

Publications (1)

Publication Number Publication Date
CN106114760A true CN106114760A (en) 2016-11-16

Family

ID=57468217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610514564.6A Pending CN106114760A (en) 2016-07-04 2016-07-04 Peculiar to vessel automatically control removable LNG fuel tank case and installation method thereof

Country Status (1)

Country Link
CN (1) CN106114760A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107939554A (en) * 2016-10-12 2018-04-20 恩凯 The small-sized LNG fuel systems of ship
CN107934260A (en) * 2017-11-24 2018-04-20 江苏韩通船舶重工有限公司 A kind of permanent protective property LNG cryogenic tank cases easy to remove
CN109140225A (en) * 2018-09-05 2019-01-04 中国海洋石油集团有限公司 A kind of LNG Distribution Center
CN110745227A (en) * 2019-10-22 2020-02-04 江龙船艇科技股份有限公司 Ship methanol cabin cabinet injection system and method
CN111268026A (en) * 2020-03-25 2020-06-12 青岛科技大学 System and method for using LNG tank as fuel tank of container ship

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08159394A (en) * 1994-12-09 1996-06-21 Tokyo Gas Co Ltd Method for suppressing bog generated in liquified gas storage tank, and device therefor
CN201110457Y (en) * 2007-08-29 2008-09-03 北京天海工业有限公司 Vehicle mounted liquefied natural gas container
CN102200220A (en) * 2011-04-22 2011-09-28 张家港富瑞特种装备股份有限公司 Liquefied natural gas (LNG) filling station and gas filling method of LNG
CN203488979U (en) * 2013-10-09 2014-03-19 山东宏达科技集团有限公司 Skid-mounted full-integrated LNG (Liquefied Natural Gas) and LCNG (Liquefied Compressed Natural Gas) remote control monitored unattended filling station
CN203640865U (en) * 2013-11-28 2014-06-11 石家庄安瑞科气体机械有限公司 Moveable tank-type fuel supply system for LNG power-driven vessel
CN104033726A (en) * 2014-07-03 2014-09-10 深圳城市节能环保科技有限公司 Self-pressurization automatic control LNG skid-mounted station

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08159394A (en) * 1994-12-09 1996-06-21 Tokyo Gas Co Ltd Method for suppressing bog generated in liquified gas storage tank, and device therefor
CN201110457Y (en) * 2007-08-29 2008-09-03 北京天海工业有限公司 Vehicle mounted liquefied natural gas container
CN102200220A (en) * 2011-04-22 2011-09-28 张家港富瑞特种装备股份有限公司 Liquefied natural gas (LNG) filling station and gas filling method of LNG
CN203488979U (en) * 2013-10-09 2014-03-19 山东宏达科技集团有限公司 Skid-mounted full-integrated LNG (Liquefied Natural Gas) and LCNG (Liquefied Compressed Natural Gas) remote control monitored unattended filling station
CN203640865U (en) * 2013-11-28 2014-06-11 石家庄安瑞科气体机械有限公司 Moveable tank-type fuel supply system for LNG power-driven vessel
CN104033726A (en) * 2014-07-03 2014-09-10 深圳城市节能环保科技有限公司 Self-pressurization automatic control LNG skid-mounted station

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107939554A (en) * 2016-10-12 2018-04-20 恩凯 The small-sized LNG fuel systems of ship
CN107934260A (en) * 2017-11-24 2018-04-20 江苏韩通船舶重工有限公司 A kind of permanent protective property LNG cryogenic tank cases easy to remove
CN109140225A (en) * 2018-09-05 2019-01-04 中国海洋石油集团有限公司 A kind of LNG Distribution Center
CN110745227A (en) * 2019-10-22 2020-02-04 江龙船艇科技股份有限公司 Ship methanol cabin cabinet injection system and method
CN110745227B (en) * 2019-10-22 2023-09-26 江龙船艇科技股份有限公司 Ship methanol tank injection system and method
CN111268026A (en) * 2020-03-25 2020-06-12 青岛科技大学 System and method for using LNG tank as fuel tank of container ship

Similar Documents

Publication Publication Date Title
CN106114760A (en) Peculiar to vessel automatically control removable LNG fuel tank case and installation method thereof
CN106184684B (en) It is peculiar to vessel to automatically control removable LNG fuel tank case air supply system
CN105889751B (en) LNG loading systems, BOG processing systems and mobile LNG filling ship
CN105605416B (en) A kind of LNG charging machines peculiar to vessel
CN205327337U (en) LNG gas holder system of arranging of two fuel -power transportation boats and ships in ocean
CN216429806U (en) Methanol fuel supply system for ship
CN114320686A (en) Marine methanol fuel supply system and method
CN204986398U (en) LNG storage tank
CN103696884A (en) Shared vaporizer type LNG (Liquefied Natural Gas) supply system
CN106168328A (en) A kind of removable LNG ship fuel tank case
CN104100389B (en) The fuel transmission & distribution seal modules safe delivery system of double fuel power fishery vessel
CN204240043U (en) A kind of filling liquefied natural gas (LNG) tank peculiar to vessel
CN103615314B (en) Adopt the anti-spike recycling system of fishery vessel storage control prison of gas fuel
CN204755475U (en) Hydraulic pressure pipe leaks emergency device
CN102616347B (en) Automatic anti-heeling system for ballast pump
CN108061240A (en) LNG bottles of group peculiar to vessel
CN203115084U (en) Novel marine pressure tank
CN201660119U (en) Hydraulic system of pressure oil tank of side thruster
CN103615658A (en) Natural gas filling device for LNG (Liquefied Natural Gas) power ship
CN212298579U (en) Electric heating deep sea sunken ship oil pumping device
CN204660843U (en) Granular material delivery system
CN107914860A (en) Intelligent liquefied natural gas generating ship
CN209640698U (en) A kind of supply of grease Intelligent pipe net, which is adjusted, refutes platform monitor surface system
CN203864953U (en) Ship draught measuring device
CN207000750U (en) A kind of LNG ship with replacement function fuel tank case system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116

RJ01 Rejection of invention patent application after publication