CN106113285B - Construction material punching component - Google Patents

Construction material punching component Download PDF

Info

Publication number
CN106113285B
CN106113285B CN201610577514.2A CN201610577514A CN106113285B CN 106113285 B CN106113285 B CN 106113285B CN 201610577514 A CN201610577514 A CN 201610577514A CN 106113285 B CN106113285 B CN 106113285B
Authority
CN
China
Prior art keywords
top pressure
shell
screw rod
sleeve
screwed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610577514.2A
Other languages
Chinese (zh)
Other versions
CN106113285A (en
Inventor
钱国臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIANYUNGANG ZHENGDA NEW MATERIAL CO., LTD.
Original Assignee
LIANYUNGANG ZHENGDA NEW MATERIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIANYUNGANG ZHENGDA NEW MATERIAL Co Ltd filed Critical LIANYUNGANG ZHENGDA NEW MATERIAL Co Ltd
Priority to CN201610577514.2A priority Critical patent/CN106113285B/en
Publication of CN106113285A publication Critical patent/CN106113285A/en
Application granted granted Critical
Publication of CN106113285B publication Critical patent/CN106113285B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/14Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by boring or drilling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00Accessories specially adapted for use with machines or devices of the preceding groups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00Accessories specially adapted for use with machines or devices of the preceding groups
    • B28D7/02Accessories specially adapted for use with machines or devices of the preceding groups for removing or laying dust, e.g. by spraying liquids; for cooling work

Abstract

A kind of construction material punching component, to the construction material to lower section(94)It is punched, including to be resisted against top fixture(9)Shell(91), the shell(91)Upper side wall on installation there are two top pressure screw rod component(8), described two top pressure screw rod components(8)About the shell(91)Longitudinal axis be symmetrical arranged and include each:It is fixed on the shell(91)Upper side wall on the sleeve that is screwed(82)And the sleeve that is screwed(82)Lower end wall in threaded hole(821)The top pressure screw rod of screw-thread fit(81).

Description

Construction material punching component
Technical field
The present invention relates to perforating device, specially a kind of construction material punching component.
Background technology
The perforating device of construction material generally requires to open up the larger trepanning in aperture.Due to the hardness of construction material it is larger and And it may the orientation uneven respectively, therefore that drill bit Influence from Eccentric may be caused to punch when punching of density.Moreover, the knot of perforating device It is larger that structure often results in external dimensions, it is difficult to form compact structure, and be difficult to stationary positioned.
Invention content
The object of the present invention is to provide a kind of construction material punching components, can overcome defect in the prior art.
A kind of construction material punching component according to the present invention, is punched to the construction material to lower section, including with To be resisted against the shell of top fixture, there are two top pressure screw rod component, described two tops for installation on the upper side wall of the shell Pressure screw arbor assembly is symmetrical arranged about the longitudinal axis of the shell and includes each:It is fixed on the upper side wall of the shell The sleeve that is screwed, with the top pressure screw rod of the threaded hole screw-thread fit in the lower end wall of the sleeve that is screwed, be located at institute State be screwed under sleeve and the screw gear that is fixedly connected with the top pressure screw rod and by lower thrust-bearing with The top pressure screw rod lower end connection connector sleeve cylinder part, the connector sleeve cylinder part by articulated shaft with boring assemblies mounting plate Neighboring edge position it is hinged, the drilling driving device coupled with drill head power is installed on the downside of boring assemblies mounting plate, To drive the drill head to drill the construction material;Wherein, in the top of the screw gear in the shell Be provided with top pressure driving motor lifting erecting bed, be equipped on the downside of the centre position of top pressure driving motor lifting erecting bed with It drives the top pressure driving motor of gear transmission connection and is each passed through the spiral shell of described two top pressure screw rod components in left and right ends The vertical chute in line fixes sleeve and stretch into and be screwed in sleeve and pass through with the upper end of corresponding top pressure screw rod accordingly Up-thrust bearing connects, the upper side of the top pressure driving motor lifting erecting bed by flexible connector with the shell Upper side wall connects;The driving gear is engaged with two screw gears simultaneously, in the shell, positioned at a left side for the shell LED light is both provided on side wall and right side wall, two LED light are to described two top pressure screw rods in the shell Component, which repairs, plays illumination use when safeguarding, while conveniently repairing maintenance to other components in the shell, by This, can be relative to when the top pressure driving motor rotates and the top pressure screw rod of described two top pressure screw rod components is driven to rotate The sleeve that is screwed moves downward and from boring assemblies mounting plate described in the top pressure of both ends, so that the neck of the drill head In sliding eye of the portion in the lower wall of the shell slide downward and make the drill head end pierce the Building wood In material;When described when the top pressure driving motor reversely rotates, the drill head can be driven to rise and leave the building Material,
Wherein, the lower right-hand side of the shell is provided with a high-power blower, and the high-power blower connects an appendix Road, one end of the gas pipeline are connected with the high-power blower, and the other end of the gas pipeline is provided with purge nozzle, The purge nozzle is located at the right of the drill head, and the gas pipeline extends along the bottom of the shell and the gas transmission Pipeline is mutually fixed by lock and the bottom of the shell, and the high-power blower by the end of the drill head piercing institute It states generated building clast when being punched in construction material and blows away and scatter, so that generated building clast when punching The periphery of the drill head will not be deposited in and influence the drill head and drilling operation is carried out to the construction material.
By above-mentioned apparatus, due to can be carried out to plate-like drill bit mounting device using symmetrical two top pressure screw rods Top pressure, therefore it is avoided that the generation of deflection in drill process, stability when punching is provided.Moreover, because entire top pressure driving Device is located at intermediate and is driven simultaneously to the top pressure screw rod of both sides, therefore reduces the quantity of driving part.Since plate-like is installed Device and driving motor trailing type thereon move up and down, therefore can make full use of shell space, reduce entire shell ruler It is very little.Whole device stable structure can effectively solve the problem that the problems of the prior art using reliable.
Description of the drawings
Fig. 1 is a kind of overall structure diagram of construction material punching component of the present invention.
Specific implementation mode
With reference to Fig. 1, the present invention is described in detail.
A kind of construction material punching component according to the embodiment, is punched to the construction material 94 to lower section, including To be resisted against the shell 91 of top fixture 9, there are two top pressure screw rod component 8, institutes for installation on the upper side wall of the shell 91 Two top pressure screw rod components 8 are stated to be symmetrical arranged about the longitudinal axis of the shell 91 and include each:It is fixed on the shell The sleeve 82 that is screwed on the upper side wall of body 91 and 821 screw thread of threaded hole being screwed in the lower end wall of sleeve 82 The top pressure screw rod 81 of cooperation, positioned at the screw rod being screwed under sleeve 82 and be fixedly connected with the top pressure screw rod 81 Gear 813 and the connector sleeve cylinder part 88 being connect with the lower end of the top pressure screw rod 81 by lower thrust-bearing 811, the company Female connector cylinder part 88 is hinged with the neighboring edge position of boring assemblies mounting plate 72 by articulated shaft, boring assemblies mounting plate 72 Downside the drilling driving device 7 coupled with 71 power of drill head is installed, to drive the drill head 7 to the Building wood Material 94 drills;Wherein, the top of the screw gear 813 is provided with top pressure driving motor lifting peace in the shell 91 Platform 62 is filled, is equipped on the downside of the centre position of the top pressure driving motor lifting erecting bed 62 and couples with 61 power of gear is driven Top pressure driving motor 6 and it is each passed through being screwed in sleeve 82 of described two top pressure screw rod components 8 in left and right ends The vertical chute 820 and stretch into and be screwed in sleeve 82 accordingly and pass through lifting force axis with the upper end of corresponding top pressure screw rod 81 Hold 812 connections, the upper side of the top pressure driving motor lifting erecting bed 62 by flexible connector 629 with the shell 91 Upper side wall connection;The driving gear 61 is engaged with two screw gears 813 simultaneously, in the shell 91, is located at institute It states and is both provided with LED light 17 on the left side wall and right side wall of shell 91, two LED light 17 are in the shell 91 Described two top pressure screw rod components 8 repair and play illumination when safeguarding and use, while conveniently to its in the shell 91 Its component repairs maintenance, drives described two top pressure screw rod components 8 when the top pressure driving motor 6 rotates as a result, Top pressure screw rod 81 can be moved downward relative to the sleeve 82 that is screwed when rotating and from boring assemblies described in the top pressure of both ends Mounting plate 72, so that slide downward in sliding eye of the neck of the drill head 71 in the lower wall of the shell 91 And the end of the drill head 71 is pierced in the construction material 94;When described when the top pressure driving motor 6 reversely revolves When turning, the drill head 71 can be driven to rise and leave the construction material 94,
Wherein, the lower right-hand side of the shell 91 is provided with a high-power blower 23, the connection of the high-power blower 23 one Gas pipeline 21, one end of the gas pipeline 21 are connected with the high-power blower 23, the other end of the gas pipeline 21 It is provided with purge nozzle 20, the purge nozzle 20 is located at the right of the drill head 71, and the gas pipeline 21 is along described The bottom of shell 91 extends and the gas pipeline 21 is mutually fixed by lock 22 and the bottom of the shell 91, described high-power Generated building clast when being punched to pierce the end of the drill head 71 in the construction material 94 of wind turbine 23 It blows away and scatters, so that generated building clast will not be deposited in the periphery of the drill head 71 and influence described when punching Drill head 71 carries out drilling operation to the construction material 94.
Valuably or illustratively, the top pressure driving motor lifting erecting bed 62 is screwed with described in sleeve 82 The vertical chute 820 is slidably matched for plane formula, to prevent the top pressure driving motor from lifting erecting bed 62 relative to the spiral shell Line fixes sleeve 82 rotates.
Optionally or illustratively, the flexible connector 629 is spring.
Since top pressure can be carried out to plate-like drill bit mounting device using symmetrical two top pressure screw rods, can keep away The generation for exempting from deflection in drill process provides stability when punching.Moreover, because entire top pressure driving device be located at it is intermediate and The top pressure screw rod of both sides is driven simultaneously, therefore reduces the quantity of driving part.Due to plate-like mounting device and thereon Driving motor trailing type moves up and down, therefore can make full use of shell space, reduces entire shell dimension.It is driven by top pressure Motor lifting erecting bed connect by elastic component with shell upper side wall, therefore can trailing type partly or entirely offset pressure-bearing and spiral shell Load on pit, avoids screw thread from overloading.Whole device stable structure can effectively solve the problem that in the prior art using reliable Problem.
In the above manner, those skilled in the art can be made within the scope of the invention according to operating mode it is various Change.

Claims (1)

1. a kind of construction material punching component, to the construction material to lower section(94)Punched, including to be resisted against on Square fixture(9)Shell(91), the shell(91)Upper side wall on installation there are two top pressure screw rod component(8), described two A top pressure screw rod component(8)About the shell(91)Longitudinal axis be symmetrical arranged and include each:It is fixed on the shell Body(91)Upper side wall on the sleeve that is screwed(82)And the sleeve that is screwed(82)Lower end wall in threaded hole (821)The top pressure screw rod of screw-thread fit(81), positioned at the sleeve that is screwed(82)Under and with the top pressure screw rod (81)The screw gear being fixedly connected(813)And pass through lower thrust-bearing(811)And with the top pressure screw rod(81)Lower end The connector sleeve cylinder part of connection(88), the connector sleeve cylinder part(88)By articulated shaft with boring assemblies mounting plate(72 )Neighbour Proximal edge position is hinged, boring assemblies mounting plate(72 )Downside be equipped with and drill head(71)The drilling driving of power connection Device(7), to drive the drill head(71 )To the construction material(94)It drills;Wherein, the shell(91)It is interior In the screw gear(813)Top be provided with top pressure driving motor lifting erecting bed(62), the top pressure driving motor liter Erecting bed drops(62)Centre position on the downside of be equipped with driving gear(61)The top pressure driving motor of power connection(6)And Left and right ends are each passed through described two top pressure screw rod components(8)The sleeve that is screwed(82)In the vertical chute(820)And Stretch into the corresponding sleeve that is screwed(82)In and with corresponding top pressure screw rod(81)Upper end pass through up-thrust bearing(812)Even It connects, the top pressure driving motor lifts erecting bed(62)Upper side pass through flexible connector(629)And with the shell(91) Upper side wall connection;The driving gear(61)Simultaneously with two screw gears(813)Engagement, the shell(91)Interior, Positioned at the shell(91)Left side wall and right side wall on be both provided with LED light(17), two LED light(17)To right The shell(91)Interior described two top pressure screw rod components(8)It repairs and plays illumination use when safeguarding, while convenient pair The shell(91)Interior other components repair maintenance, as a result, when the top pressure driving motor(6)Rotation and drive described in Two top pressure screw rod components(8)Top pressure screw rod(81)It can be relative to the sleeve that is screwed when rotation(82)It moves downward And from boring assemblies mounting plate described in the top pressure of both ends(72 ), so that the drill head(71)Neck in the shell (91)Lower wall in sliding eye in slide downward and make the drill head(71)End pierce the construction material (94)In;When the top pressure driving motor(6)When reverse rotation, the drill head can be driven(71)Rise and leaves described build Build material(94), wherein the shell(91)Lower right-hand side be provided with a high-power blower(23), the high-power blower (23)Connect a gas pipeline(21), the gas pipeline(21)One end and the high-power blower(23)It is connected, it is described defeated Feed channel(21)The other end be provided with purge nozzle(20), the purge nozzle(20)Positioned at the drill head(71)The right side Side, the gas pipeline(21)Along the shell(91)Bottom extend and the gas pipeline(21)Pass through lock(22)With The shell(91)Bottom mutually fix, the high-power blower(23)To by the drill head(71)End pierce it is described Construction material(94)In when being punched generated building clast blow away and scatter so that generated building is broken when punching Bits will not be deposited in the drill head(71)Periphery and influence the drill head(71)To the construction material(94)It is beaten Hole operation;The top pressure driving motor lifts erecting bed(62)With the sleeve that is screwed(82)In the vertical chute(820) It is slidably matched for plane formula, to prevent the top pressure driving motor from lifting erecting bed(62)Relative to the sleeve that is screwed (82)It rotates.
CN201610577514.2A 2016-07-21 2016-07-21 Construction material punching component Active CN106113285B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610577514.2A CN106113285B (en) 2016-07-21 2016-07-21 Construction material punching component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610577514.2A CN106113285B (en) 2016-07-21 2016-07-21 Construction material punching component

Publications (2)

Publication Number Publication Date
CN106113285A CN106113285A (en) 2016-11-16
CN106113285B true CN106113285B (en) 2018-10-12

Family

ID=57289248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610577514.2A Active CN106113285B (en) 2016-07-21 2016-07-21 Construction material punching component

Country Status (1)

Country Link
CN (1) CN106113285B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110653950B (en) * 2019-09-22 2021-05-11 诸暨正道科技有限公司 Drilling machine for drilling glass products

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56157994A (en) * 1980-05-09 1981-12-05 Tokyo Shibaura Electric Co Drilling machine for paper sheet
CN200995452Y (en) * 2007-01-22 2007-12-26 王菊英 Eccentric-swinging rotary drilling machine
CN102699377B (en) * 2012-06-15 2016-03-09 上海飞机制造有限公司 A kind of lean auto-feed of replacing is bored
CN105196426B (en) * 2015-09-24 2016-10-05 湖北新三友数控机床有限公司 Numerical control four station diamond drilling machine
CN105414599A (en) * 2015-12-16 2016-03-23 嵊州市西格玛科技有限公司 Drilling device applied to graphite mold production

Also Published As

Publication number Publication date
CN106113285A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
KR100609648B1 (en) A drill
CN106113285B (en) Construction material punching component
CN106113146B (en) A kind of construction material perforating device
CN105922460B (en) A kind of punching component for construction material
CN108266161A (en) A kind of high intelligent drilling rig of working efficiency with automatic regulation function
CN209664795U (en) A kind of wheel hub automatic drill valve port machine
CN106042191B (en) Construction material perforating device
CN106217474B (en) A kind of construction material perforating device
CN105946046B (en) A kind of construction material perforating device divulged information
CN105965600A (en) Building material drilling equipment
CN106166798B (en) A kind of safe perforating device of construction material
CN213382345U (en) Wall body slope auxiliary device that punches
CN106182169B (en) A kind of heat radiating type construction material perforating device
CN106182456B (en) A kind of dust removal construction material perforating device
CN106042190B (en) A kind of construction material punching component
CN106180787A (en) A kind of construction material perforating device just
CN106182167B (en) A kind of durable construction material punch device
CN106182454B (en) A kind of noise reducing type construction material punch device
CN106182455B (en) A kind of durable building material perforating device
CN106042194B (en) A kind of energy saving building material punch device
CN106182451A (en) A kind of construction material punching component
CN105965601B (en) A kind of anti-overtravel construction material perforating device
CN106182453A (en) A kind of firm construction material perforating device
CN106113145B (en) A kind of improved construction material perforating device
CN105946045A (en) Perforator for building material

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180827

Address after: 222300 west side of Huaxia Road south of Jixiang Road, Donghai County East West Economic Development Zone, Lianyungang, Jiangsu

Applicant after: LIANYUNGANG ZHENGDA NEW MATERIAL CO., LTD.

Address before: 315040 802, room 23, Bobo City, Shuguang Road, Jiangdong District, Ningbo, Zhejiang, China, 23

Applicant before: Qian Guochen

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant