CN105922460B - A kind of punching component for construction material - Google Patents
A kind of punching component for construction material Download PDFInfo
- Publication number
- CN105922460B CN105922460B CN201610577681.7A CN201610577681A CN105922460B CN 105922460 B CN105922460 B CN 105922460B CN 201610577681 A CN201610577681 A CN 201610577681A CN 105922460 B CN105922460 B CN 105922460B
- Authority
- CN
- China
- Prior art keywords
- housing
- top pressure
- sleeve
- screw rod
- construction material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28D—WORKING STONE OR STONE-LIKE MATERIALS
- B28D1/00—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
- B28D1/14—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by boring or drilling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28D—WORKING STONE OR STONE-LIKE MATERIALS
- B28D1/00—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
- B28D1/14—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by boring or drilling
- B28D1/146—Tools therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28D—WORKING STONE OR STONE-LIKE MATERIALS
- B28D7/00—Accessories specially adapted for use with machines or devices of the preceding groups
- B28D7/02—Accessories specially adapted for use with machines or devices of the preceding groups for removing or laying dust, e.g. by spraying liquids; for cooling work
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Processing Of Stones Or Stones Resemblance Materials (AREA)
- Drilling And Boring (AREA)
Abstract
A kind of punching component for construction material, to the construction material to lower section(94)Punched, including to be resisted against top fixture(9)Housing(91), the housing(91)Upper side wall on installation there are two top pressure screw rod component(8), described two top pressure screw rod components(8)About the housing(91)Longitudinal axis be symmetrical arranged and each include:It is fixed on the housing(91)Upper side wall on the sleeve that is screwed(82)And the sleeve that is screwed(82)Lower end wall in threaded hole(821)The top pressure screw rod of thread fitting(81).
Description
Technical field
The present invention relates to perforating devices, specially a kind of punching component for construction material.
Background technology
The perforating device of construction material generally requires to open up the larger trepanning in aperture.Due to the hardness of construction material it is larger and
It and may the orientation uneven respectively, therefore that drill bit Influence from Eccentric may be caused to punch during punching of density.Moreover, the knot of perforating device
It is larger that structure often results in external dimensions, it is difficult to form compact structure, and be difficult to stationary positioned.
Invention content
The object of the present invention is to provide a kind of punching components for construction material, can overcome of the prior art lack
It falls into.
A kind of punching component for construction material according to the present invention, is punched to the construction material to lower section,
Including to be resisted against the housing of top fixture, there are two top pressure screw rod components for installation on the upper side wall of the housing, described
Two top pressure screw rod components are symmetrical arranged about the longitudinal axis of the housing and each include:It is fixed on the upper of the housing
The top pressure screw rod of the sleeve that is screwed on side wall and the threaded hole thread fitting in the lower end wall of the sleeve that is screwed,
Positioned at the screw gear for being screwed under sleeve and being fixedly connected with the top pressure screw rod and by lower thrust axis
The connector sleeve cylinder part for holding and being connect with the lower end of the top pressure screw rod, the connector sleeve cylinder part by articulated shaft and with boring assemblies
The neighboring edge position of installing plate is hinged, and the drilling driving coupled with drill head power is equipped on the downside of boring assemblies installing plate
Device, so as to which the drill head be driven to drill the construction material;Wherein, in the screw gear in the housing
Top is provided with top pressure driving motor lifting erecting bed, is installed on the downside of the centre position of the top pressure driving motor lifting erecting bed
There is the top pressure driving motor coupled with drive gear power and described two top pressure screw rod components are each passed through in left and right ends
The vertical chute being screwed in sleeve and stretch into it is corresponding be screwed in sleeve and with the upper end of corresponding top pressure screw rod
Connected by up-thrust bearing, the upper side of top pressure driving motor lifting erecting bed by flexible connector and with the shell
The upper side wall connection of body;It is provided in a blast pipe and the housing and comes round on the left side wall of the housing, the right side of the housing
It is provided with outside a discharge pipe and the housing and comes round on side wall, the blast pipe is oppositely arranged with the discharge pipe, the air inlet
Pipe, the discharge pipe and the housing form the circuit of a ventilation, so that the housing inner air flow, and can be by institute
It states the partial heat in housing and takes away and distribute, the drive gear engages simultaneously with two screw gears, as a result, when described
Top pressure driving motor can be relative to the screw thread when rotating and the top pressure screw rod of described two top pressure screw rod components being driven to rotate
Fixes sleeve moves downward and from boring assemblies installing plate described in the top pressure of both ends, so that the neck of the drill head is described
In sliding eye in the lower wall of housing slide downward and cause the drill head end pierce in the construction material;Work as institute
It states when the top pressure driving motor reversely rotates, the drill head can be driven to rise and leave the construction material,
Wherein, the lower right-hand side of the housing is provided with a high-power blower, and the high-power blower connects an appendix
Road, one end of the gas pipeline are connected with the high-power blower, and the other end of the gas pipeline is provided with purge nozzle,
The purge nozzle is located at the right of the drill head, and the gas pipeline is along the bottom extension of the housing and the gas transmission
Pipeline is mutually fixed by lock and the bottom of the housing, and the high-power blower by the end of the drill head piercing institute
It states generated building clast when being punched in construction material and blows away and scatter, so that generated building clast during punching
The periphery of the drill head will not be deposited in and influence the drill head and drilling operation is carried out to the construction material.
By above device, due to can be carried out using symmetrical two top pressure screw rods to plate-like drill bit erecting device
Top pressure, therefore it is avoided that the generation of deflection in drill process, stability during punching is provided.Moreover, because entire top pressure driving
Device is located at intermediate and the top pressure screw rod of both sides is driven simultaneously, therefore reduce the quantity of driving part.Since plate-like is installed
Device and driving motor trailing type thereon move up and down, therefore can make full use of shell space, reduce entire housing ruler
It is very little.Whole device stable structure using reliable, can effectively solve the problem that the problems of the prior art.
Description of the drawings
Fig. 1 is a kind of overall structure diagram of punching component for construction material of the present invention.
Specific embodiment
With reference to Fig. 1, the present invention is described in detail.
A kind of punching component for construction material according to the embodiment is beaten to the construction material 94 to lower section
Hole, including to be resisted against the housing 91 of top fixture 9, there are two top pressure screw rod groups for installation on the upper side wall of the housing 91
Part 8, described two top pressure screw rod components 8 are symmetrical arranged about the longitudinal axis of the housing 91 and each include:It is fixed on
The sleeve 82 that is screwed and the threaded hole being screwed in the lower end wall of sleeve 82 on the upper side wall of the housing 91
The top pressure screw rod 81 of 821 thread fittings, positioned at it is described be screwed under sleeve 82 and with the top pressure screw rod 81 fix connect
The screw gear 813 connect and the connector sleeve cylinder part being connect by lower thrust-bearing 811 with the lower end of the top pressure screw rod 81
88, the connector sleeve cylinder part 88 is hinged by articulated shaft and the neighboring edge position with boring assemblies installing plate 72, boring assemblies
The downside of installing plate 72 is equipped with the drilling driving device 7 coupled with 71 power of drill head, so as to drive the drill head 7 right
The construction material 94 drills;Wherein, top pressure driving is provided in the housing 91 in the top of the screw gear 813
Motor lifts erecting bed 62, is equipped with and drive gear 61 on the downside of the centre position of the top pressure driving motor lifting erecting bed 62
Power connection top pressure driving motor 6 and being screwed for described two top pressure screw rod components 8 is each passed through in left and right ends
The vertical chute 820 in sleeve 82 and stretch into and be screwed in sleeve 82 and lead to the upper end of corresponding top pressure screw rod 81 accordingly
Up-thrust bearing 812 is crossed to connect, the upper side of top pressure driving motor lifting erecting bed 62 by flexible connector 629 and with
The upper side wall connection of the housing 91;It is provided in a blast pipe 18 and the housing 91 and thinks on the left side wall of the housing 91
It is logical, a discharge pipe 19 is provided on the right side wall of the housing 91 and is come round outside with the housing 91, the blast pipe 18 with it is described
Discharge pipe 19 is oppositely arranged, and the blast pipe 18, the discharge pipe 19 and the housing 91 form the circuit of a ventilation, so as to
Cause 91 inner air flow of housing, and the partial heat in the housing 91 can be taken away and distribute, the drive gear 61
It is engaged simultaneously with two screw gears 813, as a result, when the top pressure driving motor 6 rotates and drives described two top pressures
The top pressure screw rod 81 of screw arbor assembly 8 can be moved downward when rotating relative to the sleeve 82 that is screwed and from both ends top pressure institute
Boring assemblies installing plate 72 is stated, so that sliding eye of the neck of the drill head 71 in the lower wall of the housing 91
Middle slide downward simultaneously causes the end of the drill head 71 to pierce in the construction material 94;When described when top pressure driving electricity
When machine 6 reversely rotates, the drill head 71 can be driven to rise and leave the construction material 94,
Wherein, the lower right-hand side of the housing 91 is provided with a high-power blower 23, the connection of high-power blower 23 one
Gas pipeline 21, one end of the gas pipeline 21 are connected with the high-power blower 23, the other end of the gas pipeline 21
Purge nozzle 20 is provided with, the purge nozzle 20 is located at the right of the drill head 71, and the gas pipeline 21 is along described
The bottom of housing 91 extends and the gas pipeline 21 is mutually fixed by the bottom of lock 22 and the housing 91, described high-power
Generated building clast when wind turbine 23 is punched the end of the drill head 71 is pierced in the construction material 94
It blows away and scatters, so that generated building clast will not be deposited in the periphery of the drill head 71 and influence described during punching
Drill head 71 carries out drilling operation to the construction material 94.
Valuably or illustratively, the top pressure driving motor lifting erecting bed 62 is screwed with described in sleeve 82
The vertical chute 820 is slidably matched for plane formula, so as to prevent the top pressure driving motor from lifting erecting bed 62 relative to the spiral shell
Line fixes sleeve 82 rotates.
Optionally or illustratively, the flexible connector 629 is spring.
Since top pressure can be carried out to plate-like drill bit erecting device using symmetrical two top pressure screw rods, can keep away
Exempt from the generation of deflection in drill process, stability during punching is provided.Moreover, because entire top pressure driving device be located at it is intermediate and
The top pressure screw rod of both sides is driven simultaneously, therefore reduces the quantity of driving part.Due to plate-like erecting device and thereon
Driving motor trailing type moves up and down, therefore can make full use of shell space, reduces entire shell dimension.It is driven by top pressure
Motor lifting erecting bed connect with housing upper side wall by elastic component, therefore can trailing type partly or entirely offset pressure-bearing and spiral shell
Load on pit, avoids screw thread from overloading.Whole device stable structure using reliable, can effectively solve the problem that of the prior art
Problem.
In the above manner, those skilled in the art can be made within the scope of the invention according to operating mode it is various
Change.
Claims (1)
1. a kind of punching component for construction material, to the construction material to lower section(94)It is punched, including supporting
It is against top fixture(9)Housing(91), the housing(91)Upper side wall on installation there are two top pressure screw rod component(8),
Described two top pressure screw rod components(8)About the housing(91)Longitudinal axis be symmetrical arranged and each include:It is fixed on
The housing(91)Upper side wall on the sleeve that is screwed(82)And the sleeve that is screwed(82)Lower end wall in spiral shell
Pit(821)The top pressure screw rod of thread fitting(81), positioned at the sleeve that is screwed(82)Under and with the top pressure spiral shell
Bar(81)The screw gear being fixedly connected(813)And pass through lower thrust-bearing(811)And with the top pressure screw rod(81)Under
Hold the connector sleeve cylinder part of connection(88), the connector sleeve cylinder part(88)By articulated shaft and with boring assemblies installing plate(72 )'s
Neighboring edge position is hinged, boring assemblies installing plate(72 )Downside be equipped with and drill head(71)The drilling of power connection is driven
Dynamic device(7), so as to drive the drill head(71)To the construction material(94)It drills;Wherein, the housing(91)
The inherent screw gear(813)Top be provided with top pressure driving motor lifting erecting bed(62), the top pressure driving motor
Lift erecting bed(62)Centre position on the downside of be equipped with and drive gear(61)The top pressure driving motor of power connection(6)And
Described two top pressure screw rod components are each passed through in left and right ends(8)The sleeve that is screwed(82)In the vertical chute(820)
And stretch into the corresponding sleeve that is screwed(82)In and with corresponding top pressure screw rod(81)Upper end pass through up-thrust bearing(812)
Connection, the top pressure driving motor lift erecting bed(62)Upper side pass through flexible connector(629)And with the housing
(91)Upper side wall connection;The housing(91)Left side wall on be provided with a blast pipe(18)With the housing(91)Interior phase
It is logical, the housing(91)Right side wall on be provided with a discharge pipe(19)With the housing(91)It is interlinked to the outside, the blast pipe
(18)With the discharge pipe(19)It is oppositely arranged, the blast pipe(18), the discharge pipe(19)With the housing(91)It is formed
The circuit of one ventilation, so that the housing(91)Inner air flow, and can be by the housing(91)Interior partial heat
It takes away and distributes, the drive gear(61)Simultaneously with two screw gears(813)Engagement, as a result, when the top pressure drives
Motor(6)It rotates and drives described two top pressure screw rod components(8)Top pressure screw rod(81)It can be relative to the spiral shell during rotation
Line fixes sleeve(82)It moves downward and from boring assemblies installing plate described in the top pressure of both ends(72 ), so that the drill head
(71)Neck in the housing(91)Lower wall in sliding eye in slide downward and cause the drill head(71)End
End pierces the construction material(94)In;When the top pressure driving motor(6)During reverse rotation, the drill head can be driven
(71)Rise and leave the construction material(94), wherein, the housing(91)Lower right-hand side be provided with a high-power blower
(23), the high-power blower(23)Connect a gas pipeline(21), the gas pipeline(21)One end with it is described high-power
Wind turbine(23)It is connected, the gas pipeline(21)The other end be provided with purge nozzle(20), the purge nozzle(20)It is located at
The drill head(71)The right, the gas pipeline(21)Along the housing(91)Bottom extension and the gas pipeline
(21)Pass through lock(22)With the housing(91)Bottom mutually fix, the high-power blower(23)To by the drill head
(71)End pierce the construction material(94)In when being punched generated building clast blow away and scatter so that beating
Generated building clast will not be deposited in the drill head during hole(71)Periphery and influence the drill head(71)To described
Construction material(94)Carry out drilling operation;The top pressure driving motor lifts erecting bed(62)With the sleeve that is screwed(82)
In the vertical chute(820)It is slidably matched for plane formula, so as to prevent the top pressure driving motor lifting erecting bed(62)Relatively
In the sleeve that is screwed(82)It rotates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610577681.7A CN105922460B (en) | 2016-07-21 | 2016-07-21 | A kind of punching component for construction material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610577681.7A CN105922460B (en) | 2016-07-21 | 2016-07-21 | A kind of punching component for construction material |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105922460A CN105922460A (en) | 2016-09-07 |
CN105922460B true CN105922460B (en) | 2018-07-03 |
Family
ID=56827586
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610577681.7A Active CN105922460B (en) | 2016-07-21 | 2016-07-21 | A kind of punching component for construction material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105922460B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108994339A (en) * | 2018-08-03 | 2018-12-14 | 芜湖市三山龙城新材料有限公司 | A kind of construction decoration plate drilling device |
CN109016180A (en) * | 2018-09-20 | 2018-12-18 | 中冶天工(天津)装备制造有限公司 | A kind of device prefabricated for assembled building module partition wall |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4408934A (en) * | 1980-05-09 | 1983-10-11 | Tokyo Shibaura Denki Kabushiki Kaisha | Drilling machine |
JPH0929698A (en) * | 1995-07-12 | 1997-02-04 | Hitachi Metals Ltd | Motor-driven punch unit |
CN204338939U (en) * | 2014-12-17 | 2015-05-20 | 戴先科 | Multifunctional lock puncher |
CN104802318A (en) * | 2015-04-26 | 2015-07-29 | 北京润泽金松科技发展有限责任公司 | Mute drilling method and mute electric drill |
CN105108822A (en) * | 2015-09-24 | 2015-12-02 | 北京达博创新科技开发有限公司 | Automatic punch and automatic punching method |
CN204869088U (en) * | 2015-07-23 | 2015-12-16 | 苏州农业职业技术学院 | Automatic perpendicular feeding device of puncher |
CN105397922A (en) * | 2015-12-07 | 2016-03-16 | 河海大学 | Clamping type electric drill punching device and punching method adopting same |
CN105563671A (en) * | 2016-03-13 | 2016-05-11 | 谢森涛 | High-efficiency drilling device for spherical jade |
-
2016
- 2016-07-21 CN CN201610577681.7A patent/CN105922460B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4408934A (en) * | 1980-05-09 | 1983-10-11 | Tokyo Shibaura Denki Kabushiki Kaisha | Drilling machine |
JPH0929698A (en) * | 1995-07-12 | 1997-02-04 | Hitachi Metals Ltd | Motor-driven punch unit |
CN204338939U (en) * | 2014-12-17 | 2015-05-20 | 戴先科 | Multifunctional lock puncher |
CN104802318A (en) * | 2015-04-26 | 2015-07-29 | 北京润泽金松科技发展有限责任公司 | Mute drilling method and mute electric drill |
CN204869088U (en) * | 2015-07-23 | 2015-12-16 | 苏州农业职业技术学院 | Automatic perpendicular feeding device of puncher |
CN105108822A (en) * | 2015-09-24 | 2015-12-02 | 北京达博创新科技开发有限公司 | Automatic punch and automatic punching method |
CN105397922A (en) * | 2015-12-07 | 2016-03-16 | 河海大学 | Clamping type electric drill punching device and punching method adopting same |
CN105563671A (en) * | 2016-03-13 | 2016-05-11 | 谢森涛 | High-efficiency drilling device for spherical jade |
Also Published As
Publication number | Publication date |
---|---|
CN105922460A (en) | 2016-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105922460B (en) | A kind of punching component for construction material | |
CN106113146B (en) | A kind of construction material perforating device | |
CN209556932U (en) | A kind of rotary digging enters rock hammering drill bit | |
CN106113285B (en) | Construction material punching component | |
CN105946046B (en) | A kind of construction material perforating device divulged information | |
CN105965600A (en) | Building material drilling equipment | |
CN106217474B (en) | A kind of construction material perforating device | |
CN106166798B (en) | A kind of safe perforating device of construction material | |
CN106182456B (en) | A kind of dust removal construction material perforating device | |
CN106182169B (en) | A kind of heat radiating type construction material perforating device | |
CN103343664A (en) | Hydraulic shock slewing drilling machine | |
CN106042190B (en) | A kind of construction material punching component | |
CN106182454B (en) | A kind of noise reducing type construction material punch device | |
CN106166799A (en) | A kind of perforating device for construction material | |
CN106042194B (en) | A kind of energy saving building material punch device | |
CN106182167B (en) | A kind of durable construction material punch device | |
CN106182455B (en) | A kind of durable building material perforating device | |
CN106042191B (en) | Construction material perforating device | |
CN106182453A (en) | A kind of firm construction material perforating device | |
CN106180787A (en) | A kind of construction material perforating device just | |
CN106182168B (en) | A kind of adjustable construction material perforating device | |
CN106182450A (en) | A kind of New Building Materials punching component | |
CN105965601B (en) | A kind of anti-overtravel construction material perforating device | |
CN106113145B (en) | A kind of improved construction material perforating device | |
CN106112049A (en) | Construction material punch device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180529 Address after: 518101 a 2108 (office space) of Liu Tang building, southwest of Bao min Road, Xixiang, Baoan District, Shenzhen, Guangdong. Applicant after: Shenzhen flan Space Membrane Structure Co., Ltd. Address before: 325213 mein village, Linxi Township, Ruian City, Wenzhou, Zhejiang Applicant before: Lin Bingcai |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |