CN106108325A - Construction costs budget workbox based on drawing instrument - Google Patents
Construction costs budget workbox based on drawing instrument Download PDFInfo
- Publication number
- CN106108325A CN106108325A CN201610730380.3A CN201610730380A CN106108325A CN 106108325 A CN106108325 A CN 106108325A CN 201610730380 A CN201610730380 A CN 201610730380A CN 106108325 A CN106108325 A CN 106108325A
- Authority
- CN
- China
- Prior art keywords
- touch panel
- panel device
- installing frame
- frame
- sidewall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 26
- 238000013461 design Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000012937 correction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002372 labelling Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- A—HUMAN NECESSITIES
- A45—HAND OR TRAVELLING ARTICLES
- A45C—PURSES; LUGGAGE; HAND CARRIED BAGS
- A45C11/00—Receptacles for purposes not provided for in groups A45C1/00-A45C9/00
-
- A—HUMAN NECESSITIES
- A45—HAND OR TRAVELLING ARTICLES
- A45C—PURSES; LUGGAGE; HAND CARRIED BAGS
- A45C13/00—Details; Accessories
- A45C13/02—Interior fittings; Means, e.g. inserts, for holding and packing articles
-
- A—HUMAN NECESSITIES
- A47—FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
- A47B—TABLES; DESKS; OFFICE FURNITURE; CABINETS; DRAWERS; GENERAL DETAILS OF FURNITURE
- A47B81/00—Cabinets or racks specially adapted for other particular purposes, e.g. for storing guns or skis
- A47B81/06—Furniture aspects of radio, television, gramophone, or record cabinets
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09F—DISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
- G09F9/00—Indicating arrangements for variable information in which the information is built-up on a support by selection or combination of individual elements
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Primary Health Care (AREA)
- Marketing (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Human Resources & Organizations (AREA)
- General Business, Economics & Management (AREA)
- General Health & Medical Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Drawing Aids And Blackboards (AREA)
Abstract
The invention discloses construction costs budget workbox based on drawing instrument, solve owing to the device for display carried is all separate in prior art, and then easily lose or leave behind part spare and accessory parts, cause showing unsuccessful problem.The present invention includes casing, it is arranged on the touch panel device installing frame on a casing wherein sidewall, it is arranged on the sidewall identical with touch panel device installing frame and the handwriting pad of neighbouring this touch panel device installing frame setting, the projector installing zone being arranged on the sidewall identical with touch panel device installing frame, the support arranged at the sidewall locations relative with touch panel device installing frame and curtain placing frame, it is arranged on the projector between support and curtain placing frame and projector installing zone and video camera installing frame, and the data placing frame being arranged between support and curtain placing frame and handwriting pad.It is convenient that the present invention has explanation, simple in construction, it is simple to the advantage such as carries.
Description
Technical field
The present invention relates to a kind of showing stand, be specifically related to construction costs budget workbox based on drawing instrument.
Background technology
The straight meaning of construction costs is exactly the construction price of engineering.The three elements of engineering valuation: amount, valency, take.Broadly engineering
Cost contains construction engineering cost, highway engineering cost, marine traffic engineering cost, railway engineering cost, total construction cost of water project, electric power
Construction costs, communication engineering cost, Aerospace Engineering cost etc..Construction costs refers to carry out what a certain engineering construction was spent
Full payment, its core content is investment estimate, estimation per design, correction budgetary estimate, working drawing budget, Engineering Settlement, budget needed for the completion of projects
Etc..The main task of construction costs: according to drawing, quota and bill code, calculate the flat cost included in engineering
(artificial, material and equipment, construction equipment use), enterprise administration expense, measure expense, set-fee, profit and tax etc..Thus work morning
During journey cost, need establishment project each stage cost file, such as: investment estimate, estimation per design, correction budgetary estimate, construction drawing
Budget, bid contrul valency (bill of quantities budget), offer by tender, Engineering Settlement, budget needed for the completion of projects etc..
House and the appurtenant work thereof built for meeting the demands of production and living are referred to as architectural engineering.People are to planning to build
House and appurtenant work thereof are before construction, and the objectivized labour required to it and the consumption of flexibe work(labour) all obtain and calculated in advance,
Go to build it either with or without strength to evaluate oneself.Therefore, fixed according to planning to build the design drawing of architectural engineering, engineering budget
Volume, expense standard (i.e. overhead cost quota), construction material budgetary price and matched pertinent regulations etc., count in advance
Calculate and determine each newly-built, extend, reconstruct and rebuild the Technological Economy file of full payment, the most referred to as architectural engineering needed for project
Budget.
And engineering budget is smoothed out being particularly important for whole construction plan, but in prior art, build
The displaying building construction budget is required to be explained by modes such as PPT, when during explanation, pays attention to the class personnel and query occurs
Time, it is typically only capable to oral account, it is impossible to the method showing solution problem of image, there is the problem being not easy to show budget data, nothing
The new budget situation that method occurs during reflecting in time and explaining practice of construction, causes budget data inaccurate.
And in prior art, not necessarily there is the condition of displaying in the place that construction budget is shown, asks to solve this
Topic, needs to carry device for display, such as projector, curtain, video camera, support etc., in prior art, owing to the said equipment is all
Separately carry, easily lose or leave behind part spare and accessory parts, and then cause showing unsuccessful.
Summary of the invention
The technical problem to be solved is: in prior art, the device for display owing to carrying is all separate,
And then easily lose or leave behind part spare and accessory parts, cause showing unsuccessful, it is therefore intended that the base solving the problems referred to above is provided
Construction costs budget workbox in drawing instrument.
The present invention is achieved through the following technical solutions:
Construction costs budget workbox based on drawing instrument, including casing, is arranged on the touch screen on a casing wherein sidewall
Equipment installing frame, is arranged on the sidewall identical with touch panel device installing frame and arranges adjacent to this touch panel device installing frame
Handwriting pad, the projector installing zone being arranged on the sidewall identical with touch panel device installing frame, with touch panel device installing frame
The support arranged at relative sidewall locations and curtain placing frame, be arranged on support and curtain placing frame and projector installing zone it
Between projector and video camera installing frame, and the data placing frame being arranged between support and curtain placing frame and handwriting pad;
Neighbouring described touch panel device installing frame is additionally provided with camera mount mounting groove with the position of handwriting pad.
The present invention is by optimizing body structure, it is possible to be integrated into by all device for display in a casing, it is to avoid show
Situation about losing after leaving behind with equipment or show occurs, and carries quite convenient for arrangement.
This presentation device is gathered simultaneously simultaneously handwriting pad and touch panel device installing frame, can show simultaneously handwritten content and
The content of display in touch panel device, makes display more complete, is preferably easy to the displaying of show staff, and bandwagon effect is more prominent
Go out.
Further, in order to better profit from space in workbox, between described data placing frame and handwriting pad, it is provided with work
Tool places drawer.
In order to avoid handwriting pad and the display device being arranged in touch panel device installing frame damage, described touch is installed
Protection baffle plate also it is hinged with on the sidewall of screen equipment installing frame.
For the ease of carrying, described casing is additionally provided with portable handle.
The present invention compared with prior art, has such advantages as and beneficial effect:
1, the present invention is by optimizing body structure, it is possible to be integrated into by all device for display in a casing, it is to avoid shows and uses
The situation that equipment is lost after leaving behind or showing occurs, and carries quite convenient for arrangement;
2, in the present invention, this presentation device is gathered simultaneously and is had handwriting pad and touch panel device installing frame, can show handwritten content simultaneously
With the content of display in touch panel device, making display more complete, be preferably easy to the displaying of show staff, bandwagon effect is more
Prominent;
3, present configuration is simple and convenient to operate, and is especially suitable for popularization and application.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing being further appreciated by the embodiment of the present invention, constitutes of the application
Point, it is not intended that the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of the present invention.
The parts title of labelling and correspondence in accompanying drawing:
1-casing, 2-touch panel device installing frame, 3-handwriting pad, 4-projector installing zone, 5-support and curtain placing frame, 6-throws
Shadow instrument and video camera installing frame, 7-data placing frame, 8-camera mount mounting groove, 9-instrument placement drawer, 10-protects gear
Plate.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention clearer, below in conjunction with embodiment and accompanying drawing, to this
Invention is described in further detail, and the exemplary embodiment of the present invention and explanation thereof are only used for explaining the present invention, do not make
For limitation of the invention.
Embodiment 1
As it is shown in figure 1, present invention construction costs based on drawing instrument budget workbox, including casing 1, be arranged on casing 1 its
In touch panel device installing frame 2 on a sidewall, be arranged on the sidewall identical with touch panel device installing frame 2 and neighbouring this touch
Touching the handwriting pad 3 that screen equipment installing frame 2 is arranged, the projector being arranged on the sidewall identical with touch panel device installing frame 2 is pacified
Dress district 4, at the sidewall locations relative with touch panel device installing frame 2 arrange support and curtain placing frame 5, be arranged on support and
Projector between curtain placing frame 5 and projector installing zone 4 and video camera installing frame 6, and it is arranged on support and curtain is put
Put the data placing frame 7 between frame 5 and handwriting pad 3;
Neighbouring described touch panel device installing frame 2 is additionally provided with camera mount mounting groove 8 with the position of handwriting pad 3.
Embodiment 2
The present embodiment is with the difference of embodiment 1, optimizes the concrete structure of each parts in the present embodiment, and concrete setting is such as
Under:
Drawer 9 placed by the instrument that is provided with between described data placing frame 7 and handwriting pad 3, and this instrument is placed drawer 9 and be can be used for placing
The instruments such as writing pencil, cleaning brush, measurement apparatus ruler.
It is provided with on the sidewall of described touch panel device installing frame 2 and is also hinged with protection baffle plate 10.
It is additionally provided with portable handle on described casing 1.
Above-described detailed description of the invention, has been carried out the purpose of the present invention, technical scheme and beneficial effect further
Describe in detail, be it should be understood that the detailed description of the invention that the foregoing is only the present invention, be not intended to limit the present invention
Protection domain, all within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. done, all should comprise
Within protection scope of the present invention.
Claims (4)
1. construction costs budget workbox based on drawing instrument, it is characterised in that include casing (1), be arranged on casing (1) its
In touch panel device installing frame (2) on a sidewall, be arranged on the sidewall identical with touch panel device installing frame (2) and neighbouring
The handwriting pad (3) that this touch panel device installing frame (2) is arranged, is arranged on the sidewall identical with touch panel device installing frame (2)
Projector installing zone (4), at the sidewall locations relative with touch panel device installing frame (2) arrange support and curtain placing frame
(5), it is arranged on the projector between support and curtain placing frame (5) and projector installing zone (4) and video camera installing frame (6),
And the data placing frame (7) being arranged between support and curtain placing frame (5) and handwriting pad (3);
Neighbouring described touch panel device installing frame (2) is additionally provided with camera mount mounting groove with the position of handwriting pad (3)
(8).
Construction costs budget workbox based on drawing instrument the most according to claim 1, it is characterised in that described data
Drawer (9) placed by the instrument that is provided with between placing frame (7) and handwriting pad (3).
Construction costs budget workbox based on drawing instrument the most according to claim 1, it is characterised in that installed
State and on the sidewall of touch panel device installing frame (2), be also hinged with protection baffle plate (10).
Construction costs budget workbox based on drawing instrument the most according to claim 1, it is characterised in that described casing
(1) portable handle it is additionally provided with on.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610730380.3A CN106108325A (en) | 2016-08-26 | 2016-08-26 | Construction costs budget workbox based on drawing instrument |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610730380.3A CN106108325A (en) | 2016-08-26 | 2016-08-26 | Construction costs budget workbox based on drawing instrument |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106108325A true CN106108325A (en) | 2016-11-16 |
Family
ID=57274960
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610730380.3A Pending CN106108325A (en) | 2016-08-26 | 2016-08-26 | Construction costs budget workbox based on drawing instrument |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106108325A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203041036U (en) * | 2013-02-18 | 2013-07-10 | 黑龙江建筑职业技术学院 | Constructional engineering cost budgeting facility box convenient for showing budget data |
US20130294021A1 (en) * | 2012-05-02 | 2013-11-07 | Yifan Zhao | Portable Briefcase Office |
CN203801908U (en) * | 2013-11-29 | 2014-09-03 | 金陵科技学院 | Toolkit for construction engineering budget measurement |
CN205334473U (en) * | 2016-01-06 | 2016-06-22 | 兰新铁路新疆有限公司 | Novel way engineering is tested workbench and is used online metaer |
CN206534250U (en) * | 2016-08-26 | 2017-10-03 | 成都晨越造价咨询有限公司 | A kind of construction costs budget tool box |
-
2016
- 2016-08-26 CN CN201610730380.3A patent/CN106108325A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130294021A1 (en) * | 2012-05-02 | 2013-11-07 | Yifan Zhao | Portable Briefcase Office |
CN203041036U (en) * | 2013-02-18 | 2013-07-10 | 黑龙江建筑职业技术学院 | Constructional engineering cost budgeting facility box convenient for showing budget data |
CN203801908U (en) * | 2013-11-29 | 2014-09-03 | 金陵科技学院 | Toolkit for construction engineering budget measurement |
CN205334473U (en) * | 2016-01-06 | 2016-06-22 | 兰新铁路新疆有限公司 | Novel way engineering is tested workbench and is used online metaer |
CN206534250U (en) * | 2016-08-26 | 2017-10-03 | 成都晨越造价咨询有限公司 | A kind of construction costs budget tool box |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20020198755A1 (en) | Integrated quality assurance control system to manage construction projects | |
CN203055137U (en) | On-site handheld comprehensive service terminal of intelligent electric meter | |
WO2005010681A3 (en) | Method and system for managing regulatory information | |
CN203812274U (en) | Electricity marketing mobile operation terminal | |
CN110930025A (en) | Project management system for engineering construction | |
CN206469875U (en) | Road section flexure laser detector | |
CN104599008A (en) | Property management system based on C/S framework | |
CN206534250U (en) | A kind of construction costs budget tool box | |
CN207097062U (en) | Automatic buy one's ticket after normal time system and its compensation ticketing machine | |
CN106108325A (en) | Construction costs budget workbox based on drawing instrument | |
CN113689179A (en) | Informationized internet platform for improving operation efficiency of home industry | |
CN206025514U (en) | Portable engineering cost budget instrument strorage device | |
CN205984221U (en) | Engineering cost budget result shows uses show shelf | |
CN106205429A (en) | A kind of it is easy to the showing stand that construction costs budget result shows | |
CN106343692A (en) | Storage structure for drawing tool based on construction cost budget | |
CN203041036U (en) | Constructional engineering cost budgeting facility box convenient for showing budget data | |
CN207524716U (en) | A kind of construction site pulverized limestone actinobacillus device | |
CN210349095U (en) | Civil engineering cost is with multi-functional show shelf | |
Alajmi et al. | Implementation of IOT based smart energy meter in Oman | |
CN106108333A (en) | There is the construction costs toolbox for budget of expansion link | |
CN205565768U (en) | Parking self -service system that pays of charging | |
CN115796805B (en) | Calculation method and device for electromechanical installation project and storage medium | |
CN209610339U (en) | The with no paper electronic trade platform of calling for tender and bidding of project | |
KR20190084739A (en) | Apparatus and method for synthetically managing resource for cost accounting | |
KR101920431B1 (en) | System for calculating salesman incentive in management agent company |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161116 |