CN106096217A - The method for designing of a kind of distribution line and design system - Google Patents
The method for designing of a kind of distribution line and design system Download PDFInfo
- Publication number
- CN106096217A CN106096217A CN201610683062.6A CN201610683062A CN106096217A CN 106096217 A CN106096217 A CN 106096217A CN 201610683062 A CN201610683062 A CN 201610683062A CN 106096217 A CN106096217 A CN 106096217A
- Authority
- CN
- China
- Prior art keywords
- distribution line
- design
- coordinate data
- mobile device
- designing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/18—Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Mathematical Analysis (AREA)
- Computational Mathematics (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Road Repair (AREA)
Abstract
The present invention provides method for designing and the design system of a kind of distribution line.Method includes: mobile device gathers each coordinate data measuring point, and draws the preliminary drawings obtaining distribution line based on the coordinate data gathered;Described preliminary drawings is sent the distribution line design software to PC end by mobile device;The distribution line design software of PC end designs standard according to pathway figure, repairs described preliminary drawings, obtains the final design figure of described distribution line.The present invention is automatically drawn out the design drawing of distribution line by mobile device, greatly reduces the job content of interior industry designer, alleviates the operating pressure of interior industry designer.And the mobile device in the present invention is after drawing out the preliminary drawings of distribution line, standard is designed according to pathway figure further by the distribution line design software of PC end, described preliminary drawings is repaired, substantially increases the accuracy of the design drawing of the distribution line of drafting.
Description
Technical field
The present invention relates to distribution line design field, specifically, relate to a kind of distribution line method for designing and
Design system.
Background technology
For the design of distribution line, use at present and used GPS (Global by field operation survey crew
Positioning System, global positioning system) measuring instrument measurement obtains measuring the coordinate data of point, or measured by field operation
Librarian use stadia surveying obtains two distance length measured between point, and then is obtained according to measuring by interior industry designer
The coordinate data of measurement point and/or two distance length measured between point, utilize AutoCAD class drawing tool to draw out distribution line
The design drawing on road.
For above-mentioned existing distribution line method for designing, the drawing process of distribution line places one's entire reliance upon interior industry designer
Member so that the job content of interior industry designer is many, operating pressure is big.And interior industry designer is according to the coordinate data measuring point
And/or two distance length measured between point draw the design drawing of distribution line obtained, its accuracy is the highest.
Summary of the invention
In view of this, the present invention provides method for designing and the design system of a kind of distribution line, with industry designer in reducing
The job content of member, alleviates the operating pressure of interior industry designer, and improves the standard of the design drawing of the distribution line of drafting simultaneously
Exactness.Technical scheme is as follows:
Based on an aspect of of the present present invention, the present invention provides the method for designing of a kind of distribution line, including:
Mobile device gathers each coordinate data measuring point, and obtains distribution line based on the coordinate data drafting gathered
Preliminary drawings;
Described preliminary drawings is sent the distribution line design software to PC PC end by described mobile device;
The distribution line design software of described PC end designs standard according to pathway figure, repaiies described preliminary drawings
Whole, obtain the final design figure of described distribution line.
Preferably, described mobile device includes data acquisition module and distribution line design module;Described mobile .l equipment
Gather each coordinate data measuring point, and draw based on the coordinate data gathered and obtain the preliminary drawings of distribution line and include:
Described data collecting module collected respectively measures coordinate data a little;
Described distribution line design module coordinate data based on described data collecting module collected, draws and obtains distribution line
The preliminary drawings on road.
Preferably, also include:
Each material measuring point and/or model are marked by described distribution line design module.
Preferably, the distribution line design software of described PC end designs standard according to pathway figure, to described preliminary drawings
Repairing, after obtaining the final design figure of described distribution line, described method for designing also includes:
Described final design figure is sent to described mobile device by the distribution line design software of described PC end;
The coordinate data of at least one measurement point of described mobile device Resurvey, and the number of coordinates arrived according to Resurvey
Again repair according to described final design figure.
Preferably, described measurement is put and is at least included following one: shaft tower, special atural object or leap thing.
Based on another aspect of the present invention, the present invention also provides for the design system of a kind of distribution line, including: mobile device
With PC PC end;Wherein,
Described mobile device gathers each coordinate data measuring point, and obtains distribution line based on the coordinate data drafting gathered
The preliminary drawings on road;
Described preliminary drawings is sent the distribution line design software to described PC end by described mobile device;
The distribution line design software of described PC end designs standard according to pathway figure, repaiies described preliminary drawings
Whole, obtain the final design figure of described distribution line.
Preferably, described mobile device includes data acquisition module and distribution line design module;Wherein,
Described data collecting module collected respectively measures coordinate data a little;
Described distribution line design module coordinate data based on described data collecting module collected, draws and obtains distribution line
The preliminary drawings on road.
Preferably, also include:
Each material measuring point and/or model are marked by described distribution line design module.
Preferably, also include:
Described final design figure is sent to described mobile device by the distribution line design software of described PC end;
The coordinate data of at least one measurement point of described mobile device Resurvey, and the number of coordinates arrived according to Resurvey
Again repair according to described final design figure.
Preferably, described measurement is put and is at least included following one: shaft tower, special atural object or leap thing.
The technique scheme of the application present invention, the present invention is gathered each coordinate data measuring point, and base by mobile device
Draw the preliminary drawings obtaining distribution line in the coordinate data gathered, and then described preliminary drawings is sent by mobile device
The distribution line design software held to PC (Personal Computer, PC), now the distribution line design of PC end is soft
Part designs standard according to pathway figure again, repairs described preliminary drawings, obtains the final design figure of distribution line.Cause
This, the present invention is automatically drawn out the design drawing of distribution line by mobile device, greatly reduces in the work of interior industry designer
Hold, alleviate the operating pressure of interior industry designer.And the mobile device in the present invention drawing out tentatively setting of distribution line
After meter figure, designed standard by the distribution line design software of PC end according to pathway figure further, described preliminary drawings is carried out
Finishing, substantially increases the accuracy of the design drawing of the distribution line of drafting.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is only this
Inventive embodiment, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to according to
The accompanying drawing provided obtains other accompanying drawing.
The flow chart of the method for designing of a kind of distribution line that Fig. 1 provides for the present invention;
The flow chart of the method for designing of the another kind of distribution line that Fig. 2 provides for the present invention;
The structural representation of the design system of a kind of distribution line that Fig. 3 provides for the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise
Embodiment, broadly falls into the scope of protection of the invention.
Prior art, when drawing the design drawing of distribution line, is used GPS measuring instrument to measure by field operation survey crew
To the coordinate data of measurement point, and/or use stadia surveying to obtain two distance length measured between point, and then set by interior industry
Meter personnel, according to measuring the coordinate data measuring point obtained and/or two distance length measured between point, utilize AutoCAD class
Drawing tool draws out the design drawing of distribution line.Obviously, the method for designing of the design drawing of existing drafting distribution line is for interior
The requirement of industry designer is higher, and the job content of interior industry designer is many, operating pressure big, and subjective by interior industry designer
The design drawing accuracy drawing the distribution line obtained is the highest.
Based on this, the present invention provides the method for designing of a kind of distribution line, as it is shown in figure 1, include:
Step 101, mobile device gathers each coordinate data measuring point, and is joined based on the coordinate data drafting gathered
The preliminary drawings on netting twine road.
Mobile device in the present invention can include GPS measuring instrument, have the terminal unit etc. of GPS function.Specifically exist
In the present invention, mobile device can include data acquisition module and distribution line design module.Wherein data acquisition module is used for
Real-time Collection respectively measures coordinate data a little, and data acquisition module can be specially GPS module, distribution line design module based on
The coordinate data of described data collecting module collected, draws the preliminary drawings obtaining distribution line.
Wherein, measurement is put and is at least included following one: shaft tower, special atural object or leap thing.In the following embodiment of the present invention
In, illustrate as a example by measuring point specially shaft tower.
In the present invention, field operation survey crew use mobile device go to gather each shaft tower coordinate data (x, y, h), wherein
The earth X-coordinate of the shaft tower that x represents, the earth Y coordinate of the shaft tower that y represents, (elevation is with sea level for the elevation of the shaft tower that h represents
On the basis of calculate).Field operation survey crew is during actual survey, and field operation survey crew uses mobile device to gather the first shaft tower
Coordinate data (x1, y1, h1After), continue to gather the coordinate data (x of the second shaft tower2, y2, h2), the distribution line in mobile device
Road design module is at the coordinate data (x obtaining the second shaft tower2, y2, h2After), according to the coordinate data (x of the first shaft tower1, y1, h1)
Coordinate data (x with the second shaft tower2, y2, h2), the position coordinates point of the first shaft tower and the position coordinates of the second shaft tower are clicked on
Row connects, and obtains a span.When field operation survey crew uses mobile device to collect the coordinate data (x of the 3rd shaft tower3, y3,
h3After), the distribution line design module in mobile device is again according to the coordinate data (x of the second shaft tower2, y2, h2) and the 3rd shaft tower
Coordinate data (x3, y3, h3), the position coordinates point of the second shaft tower and the position coordinates point of the 3rd shaft tower are attached, then
To a span.By that analogy, the design of the distribution line in mobile device module obtains the coordinate data (x of the n-th shaft towern,
yn, hnAfter), according to the coordinate data (x of the n-th shaft towern, yn, hn) and the coordinate data (x of the (n-1)th shaft tower(n-1), y(n-1), h(n-1)),
The position coordinates point of the n-th shaft tower and the position coordinates point of the (n-1)th shaft tower are attached, realize obtaining measurement with this present invention
The position coordinates point of all shaft towers being associated be attached, obtain multiple span, the plurality of span is finally sequentially connected with
To a fullpath, i.e. obtain the preliminary drawings of distribution line.In the present invention, n is positive integer.
Certainly, during exploration, it is starting point that field operation survey crew can also define certain shaft tower flexibly, then follow-up
The coordinate data defined location coordinate points gathered then is sequentially connected with this starting point for starting point.Such as, field operation measures people
Coordinate data (the x of member's definition the 3rd shaft tower3, y3, h3) it is new starting point, then the coordinate of the m shaft tower that follow-up measurement obtains
Data (xm, ym, hm) corresponding position coordinates point, then with the coordinate data (x of the 3rd shaft tower3, y3, h3) corresponding position coordinates
Point is attached, and hereafter, the position coordinates point of m+1 shaft tower and the position coordinates point of m shaft tower is attached.M is the most whole
Number.
By utilizing the data acquisition module in mobile device of the present invention to realize the coordinate data of each shaft tower of Real-time Collection, enter
And designed module coordinate data based on described data collecting module collected by distribution line, will have the bar of incidence relation in real time
The position coordinates point of tower is attached, and final drafting obtains the preliminary drawings of distribution line.
In addition more excellent as the present invention, distribution line design module can also be to each material measuring point and/or model
It is marked, such as, some special materials measuring point is carried out diversity labelling.It is concrete that such as some shaft tower is more special,
So for these special shaft towers, the material of this special shaft tower can also be carried out real-time mark by distribution line design module.
Step 102, described preliminary drawings is sent the distribution line design software to PC end by mobile device.
After mobile device obtains the preliminary drawings of distribution line, this preliminary drawings is sent the distribution line to PC end
Design software.
In the present invention, PC end can include PC terminal, such as notebook personal computer, PAD, portable electric appts etc., joins
Net wiring design software is the design software being built in PC end.In addition in the present invention, PC end is also built-in with AutoCAD etc.
Mapping software.
Step 103, the distribution line design software of PC end designs standard according to pathway figure, carries out described preliminary drawings
Finishing, obtains the final design figure of described distribution line.
In the present invention, after the distribution line design software of PC end receives the preliminary drawings that mobile device sends, depend on
Design standard according to pathway figure, described preliminary drawings is repaired, obtains the final design figure of described distribution line.Wherein,
Pathway figure design standard is the general design criterion that this area carries out using during pathway figure design, and it indicates in different geology etc.
Under the conditions of need to use different types of shaft tower, different meteorologic districts etc. under the conditions of apply different wires.
Additionally, the material of some or all of shaft tower can also be entered by interior industry designer according to the material marking of shaft tower
Row refinement coupling.
Therefore applying the technique scheme of the present invention, the present invention is gathered each coordinate data measuring point by mobile device,
And draw based on the coordinate data gathered and to obtain the preliminary drawings of distribution line, and then mobile device is by described preliminary drawings
Sending the distribution line design software to PC end, the distribution line design software of PC end designs standard according to pathway figure again, to institute
State preliminary drawings to repair, obtain the final design figure of distribution line.Therefore, the present invention is drawn out automatically by mobile device
The design drawing of distribution line, greatly reduces the job content of interior industry designer, alleviates the work pressure of interior industry designer
Power.And the mobile device in the present invention is after drawing out the preliminary drawings of distribution line, further by the distribution line of PC end
Design software designs standard according to pathway figure, repairs described preliminary drawings, substantially increases the distribution line of drafting
The accuracy of design drawing.
In actual application of the present invention, the final design figure of the final distribution line obtained, designs with interior industry sometimes
There is larger difference for the Cognition Understanding of distribution line in personnel, the such as conventional distance length between adjacent two shaft towers should be
Between 50-60 rice, but in the final design figure of distribution line, distance length between certain adjacent two shaft tower is 110 meters, now in
Industry designer cannot determine that mobile device has existed bigger mistake when drawing the preliminary drawings of the distribution line obtained
Difference, or self Cognition Understanding mistake.Based on this, present invention further propose that, on the basis of above-described embodiment, in step
After 103, also include, as shown in Figure 2:
Step 104, described final design figure is sent to mobile device by the distribution line design software of PC end.
Step 105, the coordinate data of at least one measurement point of mobile device Resurvey, and the seat arrived according to Resurvey
Described final design figure is repaired by mark data again.
When interior industry designer cannot determine that mobile device draws the preliminary drawings existence of the distribution line obtained relatively
Big error, or during self Cognition Understanding mistake, interior industry designer control the distribution line design software of PC end by described
Whole design drawing sends back mobile device.Now, field operation survey crew uses at least one measurement of described mobile device Resurvey
Point coordinate data, and according to Resurvey to coordinate data described final design figure is repaired again.
Concrete, such as when in the final design figure of distribution line distance between the first shaft tower and the second shaft tower a length of
When 110 meters, field operation survey crew can use coordinate data and the seat of the second shaft tower of mobile device Resurvey the first shaft tower
Mark data, and then according to Resurvey to the coordinate data of the first shaft tower and the coordinate data of the second shaft tower finally set described
Meter figure is repaired again.Therefore, the data message that the present invention can obtain according to actual survey again, to uncertain measurement point
Coordinate data carry out secondary finishing, further increase the accuracy of the design drawing of distribution line.
Method for designing based on a kind of distribution line that the present invention above provides, the present invention provides setting of a kind of distribution line
Meter systems, as it is shown on figure 3, include: mobile device 100 and PC end 200.Wherein,
Mobile device 100 gathers each coordinate data measuring point, and obtains distribution line based on the coordinate data drafting gathered
The preliminary drawings on road.
Wherein measure point at least include shaft tower, special atural object or cross over thing, mobile device can include GPS measuring instrument,
There is the terminal unit etc. of GPS function.
Described preliminary drawings is sent the distribution line design software to PC end 200 by mobile device 100.
Wherein PC end 200 can include PC terminal, such as notebook personal computer, PAD, portable electric appts etc., distribution
Wiring design software is the design software being built in PC end 200.In addition in the present invention, PC end 200 is also built-in with
The mapping softwares such as AutoCAD.
The distribution line design software of PC end 200 designs standard according to pathway figure, repairs described preliminary drawings,
Obtain the final design figure of described distribution line.
Wherein, described mobile device 100 includes data acquisition module 101 and distribution line design module 102.Described data
Acquisition module 101 gathers each coordinate data measuring point;Distribution line design module 102 is based on described data acquisition module 101
The coordinate data gathered, draws the preliminary drawings obtaining distribution line.
Wherein preferred, also include: each material measuring point is marked by distribution line design module 102.
Additionally, the design system of the distribution line of present invention offer also includes:
Described final design figure is sent to mobile device 100 by the distribution line design software of PC end 200;
The coordinate data of at least one measurement point of mobile device 100 Resurvey, and the number of coordinates arrived according to Resurvey
Again repair according to described final design figure.
It should be noted that each embodiment in this specification all uses the mode gone forward one by one to describe, each embodiment weight
Point explanation is all the difference with other embodiments, and between each embodiment, identical similar part sees mutually.
For system class embodiment, due to itself and embodiment of the method basic simlarity, so describe is fairly simple, relevant part ginseng
See that the part of embodiment of the method illustrates.
Finally, in addition it is also necessary to explanation, in this article, the relational terms of such as first and second or the like be used merely to by
One entity or operation separate with another entity or operating space, and not necessarily require or imply these entities or operation
Between exist any this reality relation or order.And, term " includes ", " comprising " or its any other variant meaning
Containing comprising of nonexcludability, so that include that the process of a series of key element, method, article or equipment not only include that
A little key elements, but also include other key elements being not expressly set out, or also include for this process, method, article or
The key element that equipment is intrinsic.In the case of there is no more restriction, statement " including ... " key element limited, do not arrange
Except there is also other identical element in including the process of described key element, method, article or equipment.
Method for designing and design system to distribution line provided by the present invention are described in detail, herein above
Applying specific case to be set forth principle and the embodiment of the present invention, the explanation of above example is only intended to help
Understand method and the core concept thereof of the present invention;Simultaneously for one of ordinary skill in the art, according to the thought of the present invention,
The most all will change, in sum, this specification content should not be construed as this
The restriction of invention.
Claims (10)
1. the method for designing of a distribution line, it is characterised in that including:
Mobile device gathers each coordinate data measuring point, and obtains the preliminary of distribution line based on the coordinate data drafting gathered
Design drawing;
Described preliminary drawings is sent the distribution line design software to PC PC end by described mobile device;
The distribution line design software of described PC end designs standard according to pathway figure, repairs described preliminary drawings,
Final design figure to described distribution line.
Method for designing the most according to claim 1, it is characterised in that described mobile device includes data acquisition module and joins
Netting twine road design module;Described mobile .l equipment gathers each coordinate data measuring point, and draws based on the coordinate data gathered
The preliminary drawings obtaining distribution line includes:
Described data collecting module collected respectively measures coordinate data a little;
Described distribution line design module coordinate data based on described data collecting module collected, draws and obtains distribution line
Preliminary drawings.
Method for designing the most according to claim 2, it is characterised in that also include:
Each material measuring point and/or model are marked by described distribution line design module.
4. according to the method for designing described in any one of claim 1-3, it is characterised in that the distribution line design of described PC end is soft
Part designs standard according to pathway figure, repairs described preliminary drawings, after obtaining the final design figure of described distribution line,
Described method for designing also includes:
Described final design figure is sent to described mobile device by the distribution line design software of described PC end;
The coordinate data of at least one measurement point of described mobile device Resurvey, and the coordinate data pair arrived according to Resurvey
Described final design figure is repaired again.
Method for designing the most according to claim 1, it is characterised in that described measurement point at least includes following one: shaft tower,
Special atural object or leap thing.
6. the design system of a distribution line, it is characterised in that including: mobile device and PC PC end;Wherein,
Described mobile device gathers each coordinate data measuring point, and obtains distribution line based on the coordinate data drafting gathered
Preliminary drawings;
Described preliminary drawings is sent the distribution line design software to described PC end by described mobile device;
The distribution line design software of described PC end designs standard according to pathway figure, repairs described preliminary drawings,
Final design figure to described distribution line.
Design system the most according to claim 6, it is characterised in that described mobile device includes data acquisition module and joins
Netting twine road design module;Wherein,
Described data collecting module collected respectively measures coordinate data a little;
Described distribution line design module coordinate data based on described data collecting module collected, draws and obtains distribution line
Preliminary drawings.
Design system the most according to claim 7, it is characterised in that also include:
Each material measuring point and/or model are marked by described distribution line design module.
9. according to the design system described in any one of claim 6-8, it is characterised in that also include:
Described final design figure is sent to described mobile device by the distribution line design software of described PC end;
The coordinate data of at least one measurement point of described mobile device Resurvey, and the coordinate data pair arrived according to Resurvey
Described final design figure is repaired again.
Design system the most according to claim 6, it is characterised in that described measurement point at least includes following one: bar
Tower, special atural object or leap thing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610683062.6A CN106096217A (en) | 2016-08-17 | 2016-08-17 | The method for designing of a kind of distribution line and design system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610683062.6A CN106096217A (en) | 2016-08-17 | 2016-08-17 | The method for designing of a kind of distribution line and design system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106096217A true CN106096217A (en) | 2016-11-09 |
Family
ID=58070434
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610683062.6A Pending CN106096217A (en) | 2016-08-17 | 2016-08-17 | The method for designing of a kind of distribution line and design system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106096217A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109558620A (en) * | 2017-09-11 | 2019-04-02 | 应用材料以色列公司 | Generate the method and its system of inspection scheme |
CN113704944A (en) * | 2021-09-18 | 2021-11-26 | 国网冀北电力有限公司经济技术研究院 | Design method based on mobile terminal power transmission line |
CN115499779A (en) * | 2022-09-23 | 2022-12-20 | 山东智源电力设计咨询有限公司 | Line cloud reconnaissance system based on mobile terminal |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102129484A (en) * | 2010-01-18 | 2011-07-20 | 华北电力科学研究院有限责任公司 | Method and device for generating digitalized flat cross-section diagram of transmission line |
CN103399973A (en) * | 2013-06-20 | 2013-11-20 | 广东电网公司电力科学研究院 | Device and method for automatically comparing power grid pollution area maps |
CN104931976A (en) * | 2015-06-17 | 2015-09-23 | 珠江水利委员会珠江流域水土保持监测中心站 | Portable geographic information field real-time mapping method |
CN205139374U (en) * | 2015-12-04 | 2016-04-06 | 中国石油集团工程设计有限责任公司北京分公司 | Pipe -line engineering field operation mobile device |
CN105547265A (en) * | 2015-12-31 | 2016-05-04 | 四川若愚科技有限责任公司 | High-automation engineering measuring method |
-
2016
- 2016-08-17 CN CN201610683062.6A patent/CN106096217A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102129484A (en) * | 2010-01-18 | 2011-07-20 | 华北电力科学研究院有限责任公司 | Method and device for generating digitalized flat cross-section diagram of transmission line |
CN103399973A (en) * | 2013-06-20 | 2013-11-20 | 广东电网公司电力科学研究院 | Device and method for automatically comparing power grid pollution area maps |
CN104931976A (en) * | 2015-06-17 | 2015-09-23 | 珠江水利委员会珠江流域水土保持监测中心站 | Portable geographic information field real-time mapping method |
CN205139374U (en) * | 2015-12-04 | 2016-04-06 | 中国石油集团工程设计有限责任公司北京分公司 | Pipe -line engineering field operation mobile device |
CN105547265A (en) * | 2015-12-31 | 2016-05-04 | 四川若愚科技有限责任公司 | High-automation engineering measuring method |
Non-Patent Citations (1)
Title |
---|
陈显龙 等: "移动智能终端在输电网三维设计中的应用与设计研究", 《地理信息世界》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109558620A (en) * | 2017-09-11 | 2019-04-02 | 应用材料以色列公司 | Generate the method and its system of inspection scheme |
CN113704944A (en) * | 2021-09-18 | 2021-11-26 | 国网冀北电力有限公司经济技术研究院 | Design method based on mobile terminal power transmission line |
CN115499779A (en) * | 2022-09-23 | 2022-12-20 | 山东智源电力设计咨询有限公司 | Line cloud reconnaissance system based on mobile terminal |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106679625B (en) | Wide scope electric power tower high-precision deformation monitoring method based on dipper system | |
CN104933266B (en) | A kind of defining method of overlying strata height of the water conductive fracture zone | |
CN103676667B (en) | Substation project flexible circuit conductor assembles three-dimensional artificial TT&C system | |
CN103177532B (en) | A kind of Subgrade Landslide remote monitoring method and device | |
CN106096217A (en) | The method for designing of a kind of distribution line and design system | |
CN103558611A (en) | Dam detection device based on Beidou satellite | |
CN101929858B (en) | Precise surveying and mapping method of 0.25m contour interval of flat ground with large scale of 1:500 to 1:200 | |
CN103235349A (en) | Three-dimensional measuring method and measuring system for underground deformation | |
CN106568412A (en) | Area measurement method for irregularly-shaped plot | |
CN208780164U (en) | Full depth array inclinometer | |
CN109213749A (en) | A kind of method and device of City Buried Pipeline three-dimension monitor model foundation | |
CN102842265B (en) | Underground pipeline plane and cross section integration showing method | |
CN106228596A (en) | Three-dimensional laser point cloud generates method and device | |
CN103727919A (en) | Digital finder method employing geostationary satellite of stationary orbit | |
CN106871837A (en) | Sag measuring method and device | |
CN109581420A (en) | A kind of integrated electronic gyroscope high-precision Beidou monitoring stake | |
CN207066383U (en) | A kind of geology monitors displacement meter | |
CN206959776U (en) | High-rise building safe monitoring system based on big-dipper satellite | |
CN103438883A (en) | Positioning, navigating and locus plotting apparatus | |
CN105974087B (en) | One kind is applied to close-in seamses water protection mining solid-liquid coupling analog simulation experimental rig | |
CN113914386A (en) | Intelligent monitoring method for deep foundation pit support safety based on BIM +3S technology | |
CN109458924B (en) | Resistance smart grid deformation testing system and method based on ten-axis sensor | |
CN103438873A (en) | Power line surveying and measuring technology | |
CN204613941U (en) | The data acquisition system (DAS) of pipeline facility | |
CN103501359A (en) | Position positioning system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161109 |
|
RJ01 | Rejection of invention patent application after publication |