CN106093637A - The removing method of dead band defect between intelligent substation primary equipment and secondary device - Google Patents

The removing method of dead band defect between intelligent substation primary equipment and secondary device Download PDF

Info

Publication number
CN106093637A
CN106093637A CN201610397087.XA CN201610397087A CN106093637A CN 106093637 A CN106093637 A CN 106093637A CN 201610397087 A CN201610397087 A CN 201610397087A CN 106093637 A CN106093637 A CN 106093637A
Authority
CN
China
Prior art keywords
intelligent substation
primary equipment
phase
actual samples
dead band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610397087.XA
Other languages
Chinese (zh)
Other versions
CN106093637B (en
Inventor
王大兴
林波
何彬
王东
石涛
刘学文
李廷宾
钟威
李汶蒿
杨康
黄迎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN TONGYUAN ELECTRIC POWER TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Original Assignee
SICHUAN TONGYUAN ELECTRIC POWER TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN TONGYUAN ELECTRIC POWER TECHNOLOGY Co Ltd, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd filed Critical SICHUAN TONGYUAN ELECTRIC POWER TECHNOLOGY Co Ltd
Priority to CN201610397087.XA priority Critical patent/CN106093637B/en
Publication of CN106093637A publication Critical patent/CN106093637A/en
Application granted granted Critical
Publication of CN106093637B publication Critical patent/CN106093637B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere

Abstract

The invention discloses the removing method of dead band defect between a kind of intelligent substation primary equipment and secondary device, including: apply the three-phase electricity signal of preset phase and predetermined amplitude to intelligent substation primary equipment so that intelligent substation is in charging operation state;Measure the actual samples data of secondary circuit;Theoretical sampled data is obtained according to described predetermined amplitude and mutual inductor ratio;Judge that the actual samples data of secondary circuit are the most consistent with described theoretical sampled data;When the actual samples data of secondary circuit are consistent with described theoretical sampled data, determine that mutual inductor ratio is correct, otherwise investigate and eliminate circuit defect.The present invention is by measuring the actual samples data of secondary circuit, the relatively actual samples data of secondary circuit are the most consistent with calculating the theoretical sampled data obtained, thus judge that the no-load voltage ratio of transformer is whether correct, it is effectively prevented from newly-built intelligent substation and causes because mutual inductor ratio is incorrect putting into operation the problem of failure.

Description

The removing method of dead band defect between intelligent substation primary equipment and secondary device
Technical field
The present invention relates to intelligent substation debugging technique field, be specifically related to a kind of intelligent substation primary equipment and secondary The removing method of equipment room dead band defect.
Background technology
Along with country greatly develops clean energy resource implementation, as the intelligent grid construction of clean energy resource transfer passage Raising the curtain, the construction of the hinge-intelligent substation of contact intelligent grid is particularly important.Intelligent substation is to use first Enter, reliable, the integrated and smart machine of environmental protection, be standardized as with information digitalization of entirely standing, communications platform networking, information sharing Basic demand, is automatically performed information gathering, measures, controls, protects, measures and the basic function such as detection, be provided simultaneously with supporting Electrical network automatically controls in real time, Intelligent adjustment, on-line analysis decision-making and the transformer station of the Premium Features such as collaborative interactive.
During intelligent substation debugging, the inferior every specialty test of metering, high pressure and two is separate, and secondary debugging is Secondary device is made promptly and accurately to reflect the key of primary equipment state.Owing to every specialty test is independently carried out, exist and once set Dead band between standby and secondary device does not has end-to-end, newly-built intelligent substation is charged put into operation time produce defect or malfunction Make, cause the intelligent substation failure intelligent grid strong to nation-building that put into operation to cause huge loss, therefore carry out intelligence change Whole matching degree research between power station primary equipment and secondary device is significant.
Summary of the invention
The technical problem to be solved is to provide dead band between a kind of intelligent substation primary equipment and secondary device The removing method of defect, by sampling the intelligent substation secondary loop being in charging operation state, compares the signal of telecommunication Theoretical sampled data the most consistent with actual samples data, determine that mutual inductor ratio is whether correct, verify primary equipment and two The matching degree of secondary device, thus eliminate the dead band defect between primary equipment and secondary device.
The present invention is achieved through the following technical solutions:
The removing method of dead band defect between a kind of intelligent substation primary equipment and secondary device, including: apply preset phase and The three-phase electricity signal of predetermined amplitude is to intelligent substation primary equipment so that intelligent substation is in charging operation state;Measure two The actual samples data of minor loop;Theoretical sampled data is obtained according to described predetermined amplitude and mutual inductor ratio;Judge secondary returning The actual samples data on road are the most consistent with described theoretical sampled data;Actual samples data and described theory at secondary circuit When sampled data is consistent, determines that mutual inductor ratio is correct, otherwise investigate and eliminate circuit defect.The present invention allows at intelligent substation In charging operation state, by measuring the actual samples data of secondary circuit, compare actual samples data and the meter of secondary circuit Calculate the theoretical sampled data obtained whether consistent, thus judge that the no-load voltage ratio of transformer is the most correct, with this verify primary equipment with The matching degree of secondary device, is effectively prevented from newly-built intelligent substation and causes because mutual inductor ratio is incorrect putting into operation the asking of failure Topic.
Optionally, between described intelligent substation primary equipment and secondary device, the removing method of dead band defect also includes: read Take the actual samples data of IED sampling apparatus;Judge that the actual samples data of IED sampling apparatus with described theoretical sampled data are No unanimously;When the actual samples data of IED sampling apparatus are all consistent with described theoretical sampled data, determine IED sampling apparatus There is not current-voltage sampling defect, otherwise investigate and eliminate circuit defect.By reading the actual samples number of IED sampling apparatus According to, the actual samples data comparing IED sampling apparatus are the most consistent with calculating the theoretical sampled data obtained, thus judge IED Whether sampling apparatus exists current-voltage sampling defect, is effectively prevented from newly-built intelligent substation electric because IED sampling apparatus exists Stream voltage sample defect causes putting into operation the problem of failure.
Optionally, described IED sampling apparatus includes that protection device, measure and control device, analysis of network tester, failure wave-recording fill Put, kilowatt-hour meter and electrical energy collecting device.
Optionally, the described signal of telecommunication is current signal, and described transformer is current transformer, applies preset phase and presets The three-phase electricity signal of amplitude to intelligent substation primary equipment is: use current feedback circuit to apply preset phase and predetermined amplitude Three-phase current signal is to primary circuit.
Optionally, the actual samples data measuring secondary circuit are: use AC clip-on ammeter to measure convergence control cabinet secondary The current value of current terminal.
Optionally, between described intelligent substation primary equipment and secondary device, the removing method of dead band defect also includes: root Polarity and the current phase of current transformer is judged according to the three-phase current waveform on analysis of network tester and fault wave recording device Relation is the most correct.By analyzing the three-phase current waveform on analysis of network tester and fault wave recording device, it can be determined that electricity The polarity of current transformer and current phase relation are the most correct, are effectively prevented from newly-built intelligent substation because of the pole of current transformer Property and the problem of the incorrect failure that causes putting into operation of current phase relation.
Optionally, the described signal of telecommunication is voltage signal, and described transformer is voltage transformer, applies preset phase and presets The three-phase electricity signal of amplitude to intelligent substation primary equipment is: use voltage generator to apply preset phase and predetermined amplitude Three-phase voltage signal is to the low-pressure side of intelligent substation.
Optionally, the actual samples data measuring secondary circuit are: use circuit tester to measure convergence control cabinet secondary voltage terminal Magnitude of voltage.
Optionally, between described intelligent substation primary equipment and secondary device, the removing method of dead band defect also includes: root Judge that mutual relation of electric voltage is the most correct according to the three-phase voltage waveform on analysis of network tester and fault wave recording device.By dividing Three-phase voltage waveform on analysis analysis of network tester and fault wave recording device, it can be determined that mutual relation of electric voltage is the most correct, It is effectively prevented from newly-built intelligent substation to cause because mutual relation of electric voltage is incorrect putting into operation the problem of failure.
Optionally, between described intelligent substation primary equipment and secondary device, the removing method of dead band defect also includes: root Configuration file according to IED sampling apparatus, it is judged that the empty terminal of IED sampling apparatus connects the most correct.By analyzing IED sampling cartridge The configuration file put, it can be determined that the empty terminal of IED sampling apparatus connects the most correct, is effectively prevented from newly-built intelligent substation Because the empty terminal malunion of IED sampling apparatus really causes putting into operation the problem of failure.
The present invention compared with prior art, has such advantages as and beneficial effect:
The removing method of dead band defect between the intelligent substation primary equipment of present invention offer and secondary device, by checking IED Whether sampling apparatus exists current-voltage sampling defect, voltage transformer summation current transformer secondary circuit whether correct, voltage Current phase relation the most correctly instructs newly-built intelligent substation to put into operation, and both can ensure that the success of newly-built intelligent substation puts into operation And safe operation, be prevented effectively from newly-built intelligent substation puts into operation unsuccessfully, and newly-built intelligent substation safety can be avoided again the most hidden Suffer from and the appearance of defect, improve the strong intelligence effect of newly-built intelligent substation.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing being further appreciated by the embodiment of the present invention, constitutes of the application Point, it is not intended that the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the flow process of the removing method of dead band defect between the intelligent substation primary equipment of the embodiment of the present invention and secondary device Schematic diagram.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention clearer, below in conjunction with embodiment and accompanying drawing, to this Invention is described in further detail, and the exemplary embodiment of the present invention and explanation thereof are only used for explaining the present invention, do not make For limitation of the invention.
Embodiment 1
Fig. 1 is the flow process signal of the removing method of dead band defect between the intelligent substation primary equipment of the present embodiment and secondary device Figure, between described intelligent substation primary equipment and secondary device, the removing method of dead band defect includes:
Step S11, applies the three-phase electricity signal of preset phase and predetermined amplitude to intelligent substation primary equipment so that intelligence becomes Power station is in charging operation state.Implementing before this removing method, intelligent substation completed high pressure, measure, to change ring etc. every Specialty test, secondary debugging is fully completed, and intelligent substation is in SBR before putting into operation.
Between intelligent substation primary equipment and secondary device, dead band defect includes current defects and voltage effects.Eliminating electricity During stream defect, the signal of telecommunication of applying is current signal, applies the three-phase electricity signal of preset phase and predetermined amplitude to intelligence power transformation Primary equipment of standing is: use current feedback circuit to apply the three-phase current signal of preset phase and predetermined amplitude to primary circuit, one After minor loop adds three-phase current signal, intelligent substation is in charging operation state.When eliminating voltage effects, the electricity of applying Signal is voltage signal, and the three-phase electricity signal applying preset phase and predetermined amplitude to intelligent substation primary equipment is: use Voltage generator applies the three-phase voltage signal low-pressure side to intelligent substation of preset phase and predetermined amplitude, the three of low-pressure side Phase voltage signal makes high-pressure side and medium voltage side entirety charged through main transformer, and intelligent substation is in charging operation state.For example, it is possible to Apply 400V three-phase alternating current and be depressed into the low-pressure side of intelligent substation.
Step S12, measures the actual samples data of secondary circuit.Specifically, when eliminating current defects, pincer is used to hand over The current value of convergence control cabinet secondary current terminal measured by stream ammeter;When eliminating voltage effects, circuit tester is used to measure convergence control cabinet The magnitude of voltage of secondary voltage terminal.
Step S13, obtains theoretical sampled data according to described predetermined amplitude and mutual inductor ratio.Specifically, electricity is being eliminated During stream defect, described theoretical sampled data is the no-load voltage ratio of current transformer on predetermined current Amplitude Ratio;When eliminating voltage effects, Described theoretical sampled data is the no-load voltage ratio of voltage transformer on predeterminated voltage Amplitude Ratio.
Step S14, it is judged that the actual samples data of secondary circuit are the most consistent with described theoretical sampled data.In preferable feelings Under condition, the most there is not error in the equipment in secondary circuit, the actual samples data of secondary circuit and described theoretical sampled data one Cause the actual samples data referring to secondary circuit equal with described theoretical sampled data.But in a practical situation, in secondary circuit Equipment error cannot eliminate.Therefore, in the present embodiment, the actual samples data of secondary circuit and described theoretical sampling The difference of data in preset range, then judges that the actual samples data of secondary circuit are consistent with described theoretical sampled data, institute State preset range to be configured according to practical situation.
When the actual samples data of secondary circuit are consistent with described theoretical sampled data, perform step S15, determine mutual inductance Device no-load voltage ratio is correct;When the actual samples data of secondary circuit are consistent with described theoretical sampled data, perform step S16, investigation And eliminate circuit defect.When eliminating current defects, investigation current loop also eliminates current loop defect;Eliminating voltage effects Time, investigation voltage circuit also eliminates voltage circuit defect.
Embodiment 2
With continued reference to Fig. 1, the present embodiment is with the difference of embodiment 1, also includes:
Step S17, reads the actual samples data of IED sampling apparatus.Specifically, described IED sampling apparatus include protection device, Measure and control device, analysis of network tester, fault wave recording device, kilowatt-hour meter and electrical energy collecting device.Intelligent substation is divided into Primary equipment and secondary device, by the voltage transformer summation current transformer being arranged on primary equipment, can will once set Standby upper high-voltage large current obtains double sampling value through certain no-load voltage ratio conversion and monitors with protection once for secondary device sampling Equipment state.Eliminate current defects time, read protection device, measure and control device, analysis of network tester, fault wave recording device, Electric current actual samples data on kilowatt-hour meter and electrical energy collecting device;When eliminating voltage effects, read protection device, survey Voltage actual samples number on control device, analysis of network tester, fault wave recording device, kilowatt-hour meter and electrical energy collecting device According to.
Step S18, it is judged that the actual samples data of IED sampling apparatus are the most consistent with described theoretical sampled data.Disappearing During except current defects, will be from protection device, measure and control device, analysis of network tester, fault wave recording device, kilowatt-hour meter and electric energy The electric current actual samples data read on amount harvester contrast with described theoretical sampled data respectively;Lack eliminating voltage When falling into, will fill from protection device, measure and control device, analysis of network tester, fault wave recording device, kilowatt-hour meter and generated energy acquisition The voltage actual samples data putting reading contrast with described theoretical sampled data respectively.Concrete determination methods and embodiment In 1, step S14 is similar to, and does not repeats them here.
When the actual samples data of IED sampling apparatus are all consistent with described theoretical sampled data, perform step S19, really Determine IED sampling apparatus and there is not current-voltage sampling defect, such as, the voltage actual samples data read from protection device with When described theoretical sampled data is consistent, determine the voltage sample function not existing defects of protection device;Reality at IED sampling apparatus When border sampled data is all inconsistent with described theoretical sampled data, performs step S16, investigate and eliminate circuit defect.
Embodiment 3
The present embodiment compared with Example 2, also includes: according to the three-phase current on analysis of network tester and fault wave recording device Waveform judges that the polarity of current transformer and current phase relation are the most correct, fills according to analysis of network tester and failure wave-recording The three-phase voltage waveform put judges that mutual relation of electric voltage is the most correct.If on analysis of network tester and fault wave recording device Phase relation between three-phase electricity signal waveform keeps consistent, then with the three-phase electricity signal of the preset phase of applying and predetermined amplitude Illustrate that correct and current transformer the polarity of current phase relation/mutual relation of electric voltage is correct, otherwise need to get rid of and eliminate back Road defect.
Embodiment 4
The present embodiment compared with Example 2, also includes: according to the configuration file of IED sampling apparatus, it is judged that IED sampling apparatus Empty terminal connects the most correct.Tradition transformer station is to be sampled by cable simulation amount, and intelligent substation is to pass through optical fiber Transmission signal carries out digital quantity sampling, by virtually connecting line realization sampling between two IED sampling apparatuses.Combining unit is to receive Current/voltage secondary analog quantity is converted into digital quantity and sends, current/voltage send fixing current/voltage void terminal number, Protection device, measure and control device etc. receive current/voltage also fixing empty terminal number.Such as, protection device A phase protective current Receiving terminal must connect the empty terminal that combining unit A phase protective current sends, it is necessary to one_to_one corresponding.
Being converted to two sub-values by transformer, sampled value and wave file according to protection device can check that merging is single Empty terminal line between unit and protection device is the most correct.Such as, primary equipment adds the phase place of A, B, C three-phase current respectively Be 0 degree ,-120 degree ,+120 degree, the phase place of the three-phase current that combining unit sampling sends be respectively 0 degree ,-120 degree ,+120 degree, But protection device receive A, B, C three-phase current phase place be shown as 0 degree ,+120 degree ,-120 degree, electric with actual primary equipment electric current Press inconsistent.This phenomenon is i.e. B phase and the empty terminal reversal connection of C phase protection device reception, and protection device B Phase Receiver is connected to conjunction And unit C phase sends, protection device C Phase Receiver is connected to combining unit B phase and sends.
Above-described detailed description of the invention, has been carried out the purpose of the present invention, technical scheme and beneficial effect further Describe in detail, be it should be understood that the detailed description of the invention that the foregoing is only the present invention, be not intended to limit the present invention Protection domain, all within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. done, all should comprise Within protection scope of the present invention.

Claims (10)

1. the removing method of dead band defect between an intelligent substation primary equipment and secondary device, it is characterised in that including:
Apply the three-phase electricity signal of preset phase and predetermined amplitude to intelligent substation primary equipment so that intelligent substation is in Charging operation state;
Measure the actual samples data of secondary circuit;
Theoretical sampled data is obtained according to described predetermined amplitude and mutual inductor ratio;
Judge that the actual samples data of secondary circuit are the most consistent with described theoretical sampled data;
When the actual samples data of secondary circuit are consistent with described theoretical sampled data, determine that mutual inductor ratio is correct, otherwise Investigate and eliminate circuit defect.
The removing method of dead band defect between intelligent substation primary equipment the most according to claim 1 and secondary device, its It is characterised by, also includes:
Read the actual samples data of IED sampling apparatus;
Judge that the actual samples data of IED sampling apparatus are the most consistent with described theoretical sampled data;
When the actual samples data of IED sampling apparatus are all consistent with described theoretical sampled data, determine that IED sampling apparatus is not deposited In current-voltage sampling defect, otherwise investigate and eliminate circuit defect.
The removing method of dead band defect between intelligent substation primary equipment the most according to claim 2 and secondary device, its Being characterised by, described IED sampling apparatus includes protection device, measure and control device, analysis of network tester, fault wave recording device, electricity Degree table and electrical energy collecting device.
The removing method of dead band defect between intelligent substation primary equipment the most according to claim 3 and secondary device, its Being characterised by, the described signal of telecommunication is current signal, and described transformer is current transformer, applies preset phase and predetermined amplitude Three-phase electricity signal to intelligent substation primary equipment is: use current feedback circuit to apply preset phase and the three-phase electricity of predetermined amplitude Stream signal is to primary circuit.
The removing method of dead band defect between intelligent substation primary equipment the most according to claim 4 and secondary device, its Being characterised by, the actual samples data measuring secondary circuit are: use AC clip-on ammeter to measure convergence control cabinet secondary current end The current value of son.
The removing method of dead band defect between intelligent substation primary equipment the most according to claim 4 and secondary device, its It is characterised by, also includes:
Polarity and the electricity of current transformer is judged according to the three-phase current waveform on analysis of network tester and fault wave recording device Stream phase relation is the most correct.
The removing method of dead band defect between intelligent substation primary equipment the most according to claim 3 and secondary device, its Being characterised by, the described signal of telecommunication is voltage signal, and described transformer is voltage transformer, applies preset phase and predetermined amplitude Three-phase electricity signal to intelligent substation primary equipment is: use voltage generator to apply preset phase and the three-phase electricity of predetermined amplitude Press signal to the low-pressure side of intelligent substation.
The removing method of dead band defect between intelligent substation primary equipment the most according to claim 7 and secondary device, its Being characterised by, the actual samples data measuring secondary circuit are: use circuit tester to measure the voltage of convergence control cabinet secondary voltage terminal Value.
The removing method of dead band defect between intelligent substation primary equipment the most according to claim 7 and secondary device, its It is characterised by, also includes:
Judge that mutual relation of electric voltage is the most correct according to the three-phase voltage waveform on analysis of network tester and fault wave recording device.
The removing method of dead band defect between intelligent substation primary equipment the most according to claim 2 and secondary device, its It is characterised by, also includes:
Configuration file according to IED sampling apparatus, it is judged that the empty terminal of IED sampling apparatus connects the most correct.
CN201610397087.XA 2016-06-07 2016-06-07 The removing method of dead zone defect between intelligent substation primary equipment and secondary device Active CN106093637B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610397087.XA CN106093637B (en) 2016-06-07 2016-06-07 The removing method of dead zone defect between intelligent substation primary equipment and secondary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610397087.XA CN106093637B (en) 2016-06-07 2016-06-07 The removing method of dead zone defect between intelligent substation primary equipment and secondary device

Publications (2)

Publication Number Publication Date
CN106093637A true CN106093637A (en) 2016-11-09
CN106093637B CN106093637B (en) 2019-04-23

Family

ID=57448469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610397087.XA Active CN106093637B (en) 2016-06-07 2016-06-07 The removing method of dead zone defect between intelligent substation primary equipment and secondary device

Country Status (1)

Country Link
CN (1) CN106093637B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106645931A (en) * 2016-11-29 2017-05-10 国网四川省电力公司电力科学研究院 Current transformer secondary circuit monitoring module and method, and specific transformer acquiring terminal
CN109283406A (en) * 2018-08-13 2019-01-29 中国南方电网有限责任公司超高压输电公司梧州局 Current loop based on whole station date comprision monitors system
CN109991493A (en) * 2019-03-25 2019-07-09 珠海格力电器股份有限公司 Energy monitor method, apparatus, equipment and system
CN110703029A (en) * 2019-11-06 2020-01-17 国网河北省电力有限公司保定供电分公司 Fault detection system and method for primary and secondary systems of intelligent substation
CN113866526A (en) * 2021-08-09 2021-12-31 大唐水电科学技术研究院有限公司 One-time simulation live test system and method for intelligent substation

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10313531A (en) * 1997-05-07 1998-11-24 Toshiba Corp Ratio differential relay
CN102089667A (en) * 2008-09-24 2011-06-08 Abb研究有限公司 Method and device for supervising secondary circuit of instrument transformer in power system
CN102323563A (en) * 2011-09-30 2012-01-18 安徽省电力公司淮南供电公司 Secondary current loop checking method of sealing type switching cabinet in power substation
CN102539960A (en) * 2011-12-19 2012-07-04 上海市电力公司 Method for measuring variable ratio nonlinear primary current threshold value of current transformer
CN102879662A (en) * 2011-09-15 2013-01-16 湖北省电力公司电力科学研究院 Device and method for detecting secondary virtual loop of intelligent transformer substation
CN102901881A (en) * 2011-07-26 2013-01-30 上海市电力公司 On-site debugging method for digital substation
CN203909262U (en) * 2014-01-15 2014-10-29 云南电力试验研究院(集团)有限公司电力研究院 Device for verifying intelligent electronic mutual inductor based on IEC61850
CN104459600A (en) * 2014-12-05 2015-03-25 国家电网公司 Portable intelligent electronic energy meter field calibration device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10313531A (en) * 1997-05-07 1998-11-24 Toshiba Corp Ratio differential relay
CN102089667A (en) * 2008-09-24 2011-06-08 Abb研究有限公司 Method and device for supervising secondary circuit of instrument transformer in power system
CN102901881A (en) * 2011-07-26 2013-01-30 上海市电力公司 On-site debugging method for digital substation
CN102879662A (en) * 2011-09-15 2013-01-16 湖北省电力公司电力科学研究院 Device and method for detecting secondary virtual loop of intelligent transformer substation
CN102323563A (en) * 2011-09-30 2012-01-18 安徽省电力公司淮南供电公司 Secondary current loop checking method of sealing type switching cabinet in power substation
CN102539960A (en) * 2011-12-19 2012-07-04 上海市电力公司 Method for measuring variable ratio nonlinear primary current threshold value of current transformer
CN203909262U (en) * 2014-01-15 2014-10-29 云南电力试验研究院(集团)有限公司电力研究院 Device for verifying intelligent electronic mutual inductor based on IEC61850
CN104459600A (en) * 2014-12-05 2015-03-25 国家电网公司 Portable intelligent electronic energy meter field calibration device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
程强 等: "一种智能变电站典型设计方案中的保护死区研究", 《山西电力》 *
高峥 等: "智能变电站典型设计方案中的死区问题及可行性解决方案", 《科技与企业》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106645931A (en) * 2016-11-29 2017-05-10 国网四川省电力公司电力科学研究院 Current transformer secondary circuit monitoring module and method, and specific transformer acquiring terminal
CN109283406A (en) * 2018-08-13 2019-01-29 中国南方电网有限责任公司超高压输电公司梧州局 Current loop based on whole station date comprision monitors system
CN109283406B (en) * 2018-08-13 2021-04-23 中国南方电网有限责任公司超高压输电公司梧州局 Current loop monitoring system based on total station data contrastive analysis
CN109991493A (en) * 2019-03-25 2019-07-09 珠海格力电器股份有限公司 Energy monitor method, apparatus, equipment and system
CN109991493B (en) * 2019-03-25 2020-05-19 珠海格力电器股份有限公司 Electric energy monitoring method, device, equipment and system
CN110703029A (en) * 2019-11-06 2020-01-17 国网河北省电力有限公司保定供电分公司 Fault detection system and method for primary and secondary systems of intelligent substation
CN110703029B (en) * 2019-11-06 2022-03-08 国网河北省电力有限公司保定供电分公司 Fault detection system and method for primary and secondary systems of intelligent substation
CN113866526A (en) * 2021-08-09 2021-12-31 大唐水电科学技术研究院有限公司 One-time simulation live test system and method for intelligent substation

Also Published As

Publication number Publication date
CN106093637B (en) 2019-04-23

Similar Documents

Publication Publication Date Title
CN106093637A (en) The removing method of dead band defect between intelligent substation primary equipment and secondary device
CN102901881B (en) On-site debugging method for digital substation
CN101943719B (en) Shared-frequency asynchronous phase-checking method
CN101762799B (en) System for online detection of voltage transformer precision
CN105785144B (en) A kind of whole station detecting system of wireless distributed substation's electrical quantity and method
CN103885438B (en) The Auto-Test System of a kind of transformer station measuring and controlling equipment and method
CN103852697B (en) Cable partial discharge detection device
CN106093820A (en) The Performance Test System of distribution line failure positioner and method
CN102565618A (en) Method for detecting zero-sequence voltage circuit of transformer substation
CN103983895B (en) The online N line multipoint earth faults detection method of PT secondary circuit
CN105510859A (en) System and method for evaluating electronic transformer
CN206411250U (en) A kind of DC electronic current transformer digitizes real-time calibration equipment
CN105467192B (en) A kind of method for measuring current conversion station ground potential and rising
CN104898081A (en) On-site calibration method for alternating-current high-voltage cable distributed partial discharge detection system
CN107121622A (en) The method that novel fault is indicated system and earth fault is indicated using the system
CN101852844A (en) Data calibration device of AC sampling and measuring device and method thereof
CN205961116U (en) With electric information collection fault detection of system device
CN107290583A (en) A kind of transformer high frequency partial electric discharge and power-frequency earthing electric current monitoring device combining
CN104034977A (en) Capacitive voltage transformer electrified detector
CN105203886A (en) Capacitive type current transformer online detection device and method
CN206618805U (en) A kind of super-huge Grounding impedance measurement device
CN104166048B (en) Power frequency interference resistant insulation resistor testing apparatus and testing method based on resonance network
CN110082633A (en) A kind of grounding net of transformer substation on-line monitoring system and method
Kharraz et al. Characterization of the input impedance of household appliances in the FCC frequency band
CN105785149A (en) Network tester for undercurrent grounding line selection apparatus of smart substation and network testing method therefor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant