CN106089174A - 水压致裂化学膨胀剂充填快速掘进巷道的方法 - Google Patents
水压致裂化学膨胀剂充填快速掘进巷道的方法 Download PDFInfo
- Publication number
- CN106089174A CN106089174A CN201610500837.1A CN201610500837A CN106089174A CN 106089174 A CN106089174 A CN 106089174A CN 201610500837 A CN201610500837 A CN 201610500837A CN 106089174 A CN106089174 A CN 106089174A
- Authority
- CN
- China
- Prior art keywords
- boring
- rock
- water
- country rock
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/02—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by mechanically taking samples of the soil
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/10—Making by using boring or cutting machines
Abstract
一种水压致裂化学膨胀剂充填快速掘进巷道的方法,利用地下岩体工程正常生产中,为了解前方的地质情况在前方钻的探水的钻孔,在钻孔之前严格遵循探水的相关规程。钻孔的布置方式采用扇形布置方式,另一个位于中间位置。采用开槽钻在所有钻孔中开若干个楔形槽,之后再进行高压注水,利用水压在楔形槽的应力集中作用,使得破坏围岩其完整性。利用膨胀剂凝固体积增大的特性,在水压致裂以后注入凝固剂,使得钻孔中裂隙发育更加完善。根据岩石的化学成份配置配制相关的化学溶液,并将其注入钻孔中。化学溶液与围岩的化学反应可以降低岩石的力学强度。在实际应用中既利用了探水需要的钻孔,并将化学物理方法相结合,可以达到快速推进掘进面的目的。
Description
技术领域
本发明涉及一种快速掘进巷道的方法,特别是一种水压致裂化学膨胀剂充填快速掘进巷道的方法水的技术方案。
背景技术
无论在煤矿开采过程中还是在隧道开挖中,岩体或煤岩体中巷道的掘进伴随其始终。在我国大部分矿区,岩巷中的掘进一般采用钻爆法;半岩巷和煤巷中一般采用掘进机掘进。近几年光面爆破技术的推广和大功率掘进机的使用使得巷道掘进的速度加快了很多,但是在岩巷和半岩巷的掘进过程中,岩石的强度大、整体性强仍是制约掘进速度的一个主要因素。除此之外,常见的钻爆法在实际生产过程中程序是相当繁琐的,加之巷道掘进提前探放水,探放瓦斯的环节,需要更多的人力、物力和时间,使得巷道的掘进的速度仍然不容乐观。
发明内容
本发明的目的是解决当前技术条件下,存在巷道掘进速度慢、耗费太多人力和物力的问题,基于这些问题提出了掘进速度快、效率高和安全有效的一种水压致裂化学膨胀剂充填快速掘进巷道的方法。
本发明通过以下技术方案实现的。
一种水压致裂化学膨胀剂充填快速掘进巷道的方法,所述方法是按下列步骤进行的:
(1)利用探水钻在与工作面相距20-30m的掘进面上钻四个钻孔,钻孔的设置方式为三个孔呈扇形形式布置,另一个孔位于中间位置,钻孔的深度为100-500m;
(2)利用开槽钻在边缘钻孔中每隔4-7m开一个楔形槽, 从孔底依次开槽分别为第一个,第二个,……,直至到孔口;
(3)将注水封孔器与高压管路相连接,高压管路的另一端与高压水泵相连,然后将注水封孔器置于每个楔形槽的的底部,最后打开高压注水泵通过封孔器进行注水致裂,注水压力≤50Mpa,注水时间≤200s,注水时对压力仪进行实时监控;
(4)水压致裂完毕后,向三个边缘钻孔中注入膨胀剂,膨胀剂的凝固时间在20min-120min之间,凝固后,向中间孔注入化学溶液;
(5)对巷道围岩进行取样,按照实验规程,测定其单轴抗压强度、孔隙率和透水性的各参数,采用X射线衍射仪进行测定围岩的主要矿物成分,根据围岩的主要化学成分,选择相应的化学溶液,测定在相同的时间内,不同浓度的溶液对围岩单轴抗压强度和三轴抗压强度的影响规律,测定在相同浓度的条件下,不同的时间段对围岩单轴抗压强度和三轴抗压强度的影响规律,经过拟合确定溶液的合适浓度;
(6)根据围岩的孔隙率、吸水性和渗透性等相关参数和膨胀剂致裂的效果确定向孔内注入的液体量和注液时间;
(7)根据试验结果,围岩主要化学成分是SiO2,用化学试剂为NaOH溶液,经骤五的拟合结果确定化学液体浓度的范围为0.3%-0.5%,浸泡时间为7天-10天;进一步确定围岩的单轴抗压强度与化学溶液反应时间的规律为:
δ= -aln(t)+ δ0+Δ
式中,δ为岩体与化学溶液作用后的单轴抗压强度,a为拟合系数,t为化学溶液的作用时间,δ0 为岩体的天然单轴抗压强度,Δ为修正系数。
本发明上述所提供的一种水压致裂化学膨胀剂充填快速掘进巷道的方法,与现有技术相比,在巷道断面钻四个钻孔,其中三个为边缘钻孔,另一个布置在其中央,然后在边缘钻孔中开楔形槽,并进行高压封堵注水,开楔形槽的目的是应力在楔形槽中集中,增大应力对岩石的破坏作用,使岩石的裂隙发育更快,水压致裂之后,再将化学膨胀剂注入外边缘的三个孔中,膨胀剂凝固以后体积会膨胀,加剧了对围岩的作用,使得裂隙在水压致裂的基础上进一步的发展,之后向中间的那个孔注入化学溶液,利用化学溶液与岩石的作用能够降低岩石的力学强度,由于裂隙的发育程度高,使得化学溶液与裂隙接触充分,反应更彻底,该方法可以明显加快掘巷的速度,而且有效利用了原来超前探水的探孔,除此之外,围岩的强度降低,有效地降低了掘巷过程中产生的粉尘,人员和设备得到了安全的保障,确保巷道的安全高效掘进,具有很大的推广和应用价值。
附图说明
图1是本方法的设置平面结构示意图。
图2是本方法的设置平面结构右视图。
图中:1、掘进面;2、钻孔;3、注液孔。
具体实施方式
下面对本发明的具体实施方式作出进一步的说明。
实施一种水压致裂化学膨胀剂充填快速掘进巷道的方法,该方法是按下列步骤进行的。
步骤一、利用探水钻在与工作面相距20-30m的掘进面上钻四个钻孔,钻孔的布置方式为其中三个孔呈现扇形形式布置,另一个孔位于其中间的位置,钻孔的深度为100-500m左右,钻孔的主要目的有两个,其一为超前探水,其二为以下步骤中所述。
步骤二、利用开槽钻在边缘钻孔中每隔4-7m开一个楔形槽,从孔底依次开槽分别为第一个,第二个,……,直至到孔口,开槽钻现在在该领域内使用相当广泛,其结构和性能相关技术人员熟知。
步骤三、将注水封孔器与高压管路相连接,高压管路的另一端与高压水泵相连,然后将注水封孔器置于每个楔形槽的的底部,最后打开高压注水泵通过封孔器进行注水致裂,每个阶段的压力值不能超过50Mpa,注水时间不能超过200 s,在注水工程中,要对压力仪进行实时监控。
步骤四、水压致裂完毕后,向三个边缘钻孔中注入膨胀剂。膨胀剂的凝固时间一般在20min-120min之间,然后等凝固完毕后,向中间的孔注入化学溶液。
步骤五、对巷道围岩进行取样,按照实验规程,测定其单轴抗压强度、孔隙率和透水性的各参数,采用X射线衍射仪进行测定围岩的主要矿物成分,根据围岩的主要化学成分,选择相应的化学溶液。测定在相同的时间内,不同浓度的溶液对围岩单轴抗压强度和三轴抗压强度的影响规律,测定在相同浓度的条件下,不同的时间段对围岩单轴抗压强度和三轴抗压强度的影响规律,经过拟合确定溶液的合适浓度。
步骤六、根据围岩的孔隙率、吸水性和渗透性等相关参数和膨胀剂致裂的效果确定向孔内注入的液体量和注液时间。
步骤七、根据许多试验结果表明,大多数的围岩的主要化学成分是SiO2,大约占总量的50%以上,可以确定其化学试剂为NaOH溶液,经过步骤五的拟合结果最终可以确定化学液体浓度的大致范围为0.3%-0.5%的溶液,浸泡时间在7天-10天左右,进一步可以确定围岩的单轴抗压强度与化学溶液反应时间的规律为:
δ= -aln(t)+ δ0+Δ
上式中,δ为岩体与化学溶液作用后的单轴抗压强度,a为拟合系数,t为化学溶液的作用时间,δ0 为岩体的天然单轴抗压强度,Δ为修正系数。
为了使本发明的目的、优点更加清晰,以下结合附图以及实例对本发明进行详细说明,针对大同某煤矿的开掘面进行试验实施,大同某矿的埋深400m左右,围岩的普氏系数为7.4,实施方法如下:
步骤一、正常的生产过程中,需要在超前采掘面探放水,利用探水钻在掘进面上钻五个钻孔;外缘四个钻孔布置方式呈现扇形形式布置,另一个布置于其中间的位置,钻孔的深度为45m。
步骤二、利用开槽钻在所有钻孔中每隔6m开一个楔形槽,从孔底依次开槽分别为第一个,第二个,……,直至到孔口,开槽完毕后,将注水封孔器与高压管路相连接,高压管路的另一端与高压水泵相连,然后将注水封孔器置于每个楔形槽的的底部,最后打开高压注水泵通过封孔器进行注水致裂,每个阶段的压力峰值为50Mpa,注水时间为120 s,在注水工程中,要对压力仪进行实时监控。
步骤三、水压致裂完毕后,向外边缘四个孔中注入膨胀剂,膨胀剂的凝固时间为60min之间,然后等凝固完毕后,向中间的孔注入化学溶液。
步骤四、对采掘面的围岩进行取样,按照实验规程,测定其单轴抗压强度为52.48MPa、孔隙率为2.69%、吸水性2.58%,采用X射线衍射仪进行测定围岩的主要矿物成分为SiO2,含量占65%,根据围岩的主要化学成分,选择相应的化学溶液NaOH溶液,经过许多试验可以确定溶液的合适浓度为0.5%,注入的液体量为围岩体积的1/3,注液时间2h,浸泡时间在7天-10天左右。
进一步可以确定围岩的单轴抗压强度与化学溶液反应时间的规律为:
δ= -aln(t)+ δ0+Δ
上式中,δ为围岩与化学溶液作用后的单轴抗压强度,a为拟合系数,t为化学溶液的作用时间,δ0 为围岩的天然单轴抗压强度在,此取52.48MPa,Δ为修正系数。
Claims (1)
1.一种水压致裂化学膨胀剂充填快速掘进巷道的方法,所述方法是按下列步骤进行的:
(1)利用探水钻在与工作面相距20-30m的掘进面上钻四个钻孔,钻孔的设置方式为三个孔呈扇形形式布置,另一个孔位于中间位置,钻孔的深度为100-500m;
(2)利用开槽钻在边缘钻孔中每隔4-7m开一个楔形槽, 从孔底依次开槽分别为第一个,第二个,……,直至到孔口;
(3)将注水封孔器与高压管路相连接,高压管路的另一端与高压水泵相连,然后将注水封孔器置于每个楔形槽的的底部,最后打开高压注水泵通过封孔器进行注水致裂,注水压力≤50Mpa,注水时间≤200s,注水时对压力仪进行实时监控;
(4)水压致裂完毕后,向三个边缘钻孔中注入膨胀剂,膨胀剂的凝固时间在20min-120min之间,凝固后,向中间孔注入化学溶液;
(5)对巷道围岩进行取样,按照实验规程,测定其单轴抗压强度、孔隙率和透水性的各参数,采用X射线衍射仪进行测定围岩的主要矿物成分,根据围岩的主要化学成分,选择相应的化学溶液,测定在相同的时间内,不同浓度的溶液对围岩单轴抗压强度和三轴抗压强度的影响规律,测定在相同浓度的条件下,不同的时间段对围岩单轴抗压强度和三轴抗压强度的影响规律,经过拟合确定溶液的合适浓度;
(6)根据围岩的孔隙率、吸水性和渗透性等相关参数和膨胀剂致裂的效果确定向孔内注入的液体量和注液时间;
(7)根据试验结果,围岩主要化学成分是SiO2,用化学试剂为NaOH溶液,经骤五的拟合结果确定化学液体浓度的范围为0.3%-0.5%,浸泡时间为7天-10天;进一步确定围岩的单轴抗压强度与化学溶液反应时间的规律为:
δ= -aln(t)+ δ0+Δ
式中,δ为岩体与化学溶液作用后的单轴抗压强度,a为拟合系数,t为化学溶液的作用时间,δ0 为岩体的天然单轴抗压强度,Δ为修正系数。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610500837.1A CN106089174B (zh) | 2016-06-30 | 2016-06-30 | 水压致裂化学膨胀剂充填快速掘进巷道的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610500837.1A CN106089174B (zh) | 2016-06-30 | 2016-06-30 | 水压致裂化学膨胀剂充填快速掘进巷道的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106089174A true CN106089174A (zh) | 2016-11-09 |
CN106089174B CN106089174B (zh) | 2019-05-14 |
Family
ID=57213995
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610500837.1A Expired - Fee Related CN106089174B (zh) | 2016-06-30 | 2016-06-30 | 水压致裂化学膨胀剂充填快速掘进巷道的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106089174B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109236312A (zh) * | 2018-09-29 | 2019-01-18 | 辽宁工程技术大学 | 一种岩石巷道胀裂与截割联合掘进装置及其控制方法 |
WO2020193960A1 (en) * | 2019-03-22 | 2020-10-01 | hyperTunnel Limited | Method and system of constructing an underground tunnel |
CN114645700A (zh) * | 2022-04-20 | 2022-06-21 | 中国矿业大学 | 一种强塑性材料灌装高压水致裂裂隙岩体的方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4708395A (en) * | 1984-11-05 | 1987-11-24 | Conoco Inc. | Remotely sensing of excavation cavity during mining |
CN102296958A (zh) * | 2011-07-22 | 2011-12-28 | 山东科技大学 | 人造空间缺陷体防治冲击地压方法 |
CN102678117A (zh) * | 2012-05-28 | 2012-09-19 | 中国矿业大学 | 基于聚能爆破的定向水力致裂方法 |
CN102678120A (zh) * | 2012-05-18 | 2012-09-19 | 河南大有能源股份有限公司 | 冲击地压卸压解危方法 |
RU2554605C2 (ru) * | 2011-12-30 | 2015-06-27 | Чайна Юниверсити Оф Майнинг Энд Текнолоджи | Способ предотвращения и контроля внезапных зональных выбросов угля и газа |
CN105003296A (zh) * | 2015-08-10 | 2015-10-28 | 华北理工大学 | 一种处理低透气性煤层瓦斯排放的方法 |
CN105114117A (zh) * | 2015-08-10 | 2015-12-02 | 华北理工大学 | 一种基于膨胀材料的瓦斯抽采方法 |
US20160076350A1 (en) * | 2013-04-28 | 2016-03-17 | Jinmin Zhao | Method and process for extracting shale oil and gas by fracturing and chemical retorting in oil shale in-situ horizontal well |
-
2016
- 2016-06-30 CN CN201610500837.1A patent/CN106089174B/zh not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4708395A (en) * | 1984-11-05 | 1987-11-24 | Conoco Inc. | Remotely sensing of excavation cavity during mining |
CN102296958A (zh) * | 2011-07-22 | 2011-12-28 | 山东科技大学 | 人造空间缺陷体防治冲击地压方法 |
RU2554605C2 (ru) * | 2011-12-30 | 2015-06-27 | Чайна Юниверсити Оф Майнинг Энд Текнолоджи | Способ предотвращения и контроля внезапных зональных выбросов угля и газа |
CN102678120A (zh) * | 2012-05-18 | 2012-09-19 | 河南大有能源股份有限公司 | 冲击地压卸压解危方法 |
CN102678117A (zh) * | 2012-05-28 | 2012-09-19 | 中国矿业大学 | 基于聚能爆破的定向水力致裂方法 |
US20160076350A1 (en) * | 2013-04-28 | 2016-03-17 | Jinmin Zhao | Method and process for extracting shale oil and gas by fracturing and chemical retorting in oil shale in-situ horizontal well |
CN105003296A (zh) * | 2015-08-10 | 2015-10-28 | 华北理工大学 | 一种处理低透气性煤层瓦斯排放的方法 |
CN105114117A (zh) * | 2015-08-10 | 2015-12-02 | 华北理工大学 | 一种基于膨胀材料的瓦斯抽采方法 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109236312A (zh) * | 2018-09-29 | 2019-01-18 | 辽宁工程技术大学 | 一种岩石巷道胀裂与截割联合掘进装置及其控制方法 |
WO2020193960A1 (en) * | 2019-03-22 | 2020-10-01 | hyperTunnel Limited | Method and system of constructing an underground tunnel |
GB2582376B (en) * | 2019-03-22 | 2021-06-09 | Hypertunnel Ip Ltd | Method and system of constructing an underground tunnel |
CN113692476A (zh) * | 2019-03-22 | 2021-11-23 | 超级隧道Ip有限公司 | 建造地下隧道的方法和系统 |
JP2022524893A (ja) * | 2019-03-22 | 2022-05-10 | ハイパートンネル アイピー リミティッド | 地下トンネルを建設する方法及びシステム |
US11591908B2 (en) | 2019-03-22 | 2023-02-28 | Hypertunnel Ip Limited | Method and system of constructing an underground tunnel |
AU2020249771B2 (en) * | 2019-03-22 | 2023-04-27 | Hypertunnel Ip Limited | Method and system of constructing an underground tunnel |
CN114645700A (zh) * | 2022-04-20 | 2022-06-21 | 中国矿业大学 | 一种强塑性材料灌装高压水致裂裂隙岩体的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106089174B (zh) | 2019-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106150507B (zh) | 一种水压致裂分段爆破快速掘进巷道的方法 | |
CN108468538A (zh) | 一种页岩水压裂缝扩展预测方法 | |
CN104763428B (zh) | 分级分区注浆加固陷落柱使综采面直过软陷落柱的方法 | |
CN105181927B (zh) | 多场耦合低渗煤层水力压裂模拟试验方法 | |
AU2016231635B2 (en) | A method of improving the wetted radius of high pressure water injection of lowly permeable coal seams through sublevel presplitting | |
CN108691508B (zh) | 一种坚硬岩体强度弱化的掘进方法 | |
Ma et al. | Experimental study on damage failure mechanical characteristics and crack evolution of water-bearing surrounding rock | |
Huang et al. | Hydraulic fracturing technology for improving permeability in gas-bearing coal seams in underground coal mines | |
CN106089174A (zh) | 水压致裂化学膨胀剂充填快速掘进巷道的方法 | |
CN106930766A (zh) | 大埋深tbm施工隧洞岩爆处理结构 | |
Jun et al. | Elimination of coal and gas outburst risk of low‐permeability coal seam using high‐pressure water jet slotting technology: A case study in Shihuatian Coal Mine in Guizhou Province, China | |
CN103837418A (zh) | 一种测定破裂后岩石三轴流变特性的加载路径方法 | |
CN109252856A (zh) | 通过钻孔孔径变化进行垂向截水和侧向堵水的压水试验止水方法 | |
CN109458214B (zh) | 一种低透气性煤层静态爆破增透瓦斯抽采方法 | |
CN103498478B (zh) | 岩石坝基帷幕灌浆施工方法 | |
Karev et al. | Well stimulation on the basis of preliminary triaxial tests of reservoir rock | |
Zuo et al. | Experimental study on gas adsorption and drainage of gas-bearing coal subjected to tree-type hydraulic fracturing | |
CN112177620B (zh) | 一种地下工程tbm穿越复杂软硬复合地层的施工方法 | |
CN108756883A (zh) | 一种煤矿坚硬顶板注浆压裂方法及系统 | |
CN108166962A (zh) | 一种火驱采油注空气井和采油生产井的沟通方法 | |
WO2019184148A1 (zh) | 一种低渗透性煤层高效注水方法 | |
CN105952448A (zh) | 厚煤层煌斑岩水平分段水压致裂化学改性方法 | |
Dong | Test research on ZMK5530TZJ100 truck-mounted drilling rig | |
Shan et al. | Behavior of Marble At Jinping II Project--Part 1: Intact Rock | |
CN116517553B (zh) | 一种针对破碎岩体长短管交错高低压互补的注浆方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190514 Termination date: 20200630 |