CN106089057A - A kind of from the steady boring device of movable base plate armature boring - Google Patents

A kind of from the steady boring device of movable base plate armature boring Download PDF

Info

Publication number
CN106089057A
CN106089057A CN201610551801.6A CN201610551801A CN106089057A CN 106089057 A CN106089057 A CN 106089057A CN 201610551801 A CN201610551801 A CN 201610551801A CN 106089057 A CN106089057 A CN 106089057A
Authority
CN
China
Prior art keywords
underframe
boring
supporting cylinder
base plate
location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610551801.6A
Other languages
Chinese (zh)
Inventor
徐月明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suqian Huaihai Technology Service Co Ltd
Original Assignee
Suqian Huaihai Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suqian Huaihai Technology Service Co Ltd filed Critical Suqian Huaihai Technology Service Co Ltd
Priority to CN201610551801.6A priority Critical patent/CN106089057A/en
Publication of CN106089057A publication Critical patent/CN106089057A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/003Supports for the drilling machine, e.g. derricks or masts adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/04Supports for the drilling machine, e.g. derricks or masts specially adapted for directional drilling, e.g. slant hole rigs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/04Supports for the drilling machine, e.g. derricks or masts specially adapted for directional drilling, e.g. slant hole rigs
    • E21B15/045Hydraulic, pneumatic or electric circuits for their positioning
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • E21B7/024Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting having means for adapting to inclined terrain; having means for stabilizing the vehicle while drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of from the steady boring device of movable base plate armature boring, including underframe (1), workpiece (2), added (3) and device positioning element (4);Added it is fixedly mounted on underframe;Workpiece is arranged on underframe, including body (21), front and back guiding mechanism (22), front and back detent mechanism (23), left and right guiding mechanism (24), left and right detent mechanism (25), rig installing rack (26) and rig (27);Device positioning element includes location supporting cylinder, top (41), location supporting cylinder, bottom (42) and control valve group and pumping plant (43), and control valve group and pumping plant are connected with top location supporting cylinder and location, bottom supporting cylinder respectively.This is from movable base plate armature boring steady boring device simple in construction, it is possible to realize on the premise of providing reverse holding power in boring procedure roadway floor quickly carries out drilling operation, and then overall raising rockbolt installation speed, is adapted to the requirement of Quick Road-Made.

Description

A kind of from the steady boring device of movable base plate armature boring
Technical field
The present invention relates to a kind of drilling equipment, specifically one be applicable to underground coal mine roadway floor carries out anchor pole of holing Supporting from the steady boring device of movable base plate armature boring, belong to down-hole support equipment technical field.
Background technology
Due to the self-characteristic of different depth rock mass and the difference of residing ambient stress around tunnel, transported by geologic rhythm The factor impacts such as dynamic, ground water pressure, country rock easily produces Incoordinate deformation, exploits especially for underground coal mine, top, tunnel, the end Plate and two helps country rock to be deformed and move in tunnel, and the phenomenon that wherein roadway floor or gob floor upwards swell is i.e. Referred to as pucking, pucking is a kind of dynamic phenomenon often occurred in roadway, it and the character of country rock, mining influence, mining depth And geological structure etc. is directly related, some Floor Heave in Roadway amount of domestic mine even account for top, tunnel, the base plate amount of shifting near 70% with On, bigger particular for mining depth, have that stress is high, temperature is high, subsoil water hydraulic pressure is high, strength of turbulence is high, danger of burst The deep-seated setting of feature, high stress and soft rock mine roadway and the chambers such as height, creep is obvious, deformation is big, pucking makes roadway deformation, section become Little, drastically influence the links such as mine ventilation, transport and personnel's walking, restriction mine safety and high-yield and high-efficiency and produce.
Underground coal mine prevents the generation of pucking phenomenon from not only wanting reinforcement roadway support, reinforced design method, and will be according to specifically Wall rock geology condition take measures pucking amount is reduced to allowed band, generally use method for strengthening, destressing method, combination method and add Gu the methods such as tunnel side, angle reduce pucking phenomenon, wherein method for strengthening is to be enclosed base plate by raising floor rocks intensity or raising The supporting power of rock reaches the purpose of floor lift control, is a kind of the most frequently used pucking control method.
Improve the intensity of floor rocks, mainly have floor grouting, floor bolting etc., base plate is being used suspension roof support Needing during operation first to hole base plate, traditional method need to be with pin or reversely air leg support above drilling rod in boring procedure On back, to provide reverse holding power, but due in order to ensure that roadway floor does not destroys before installing anchor pole, it is necessary to Installing anchor pole in driving face certain distance, the size of this distance is relevant with the character of floor rock, typically should be little In 10 meters, the most unaffected in order to ensure tunnelling speed, the speed of usual rockbolt installation wants fast, and this traditional brill Hole method operation not only complicated, manpower and materials consume big, and hole and install the speed of anchor pole compared with slow, efficiency is low, inadaptable Requirement in Quick Road-Made.
Summary of the invention
For the problems referred to above, the present invention provides a kind of from the steady boring device of movable base plate armature boring, simple in construction, it is possible to Realize on the premise of boring procedure provides reverse holding power roadway floor quickly carries out drilling operation, and then overall raising anchor Bar installation rate, is adapted to the requirement of Quick Road-Made.
For achieving the above object, this includes underframe, workpiece, added and dress from the steady boring device of movable base plate armature boring Put positioning element;
Described added being fixedly mounted on underframe, underframe bottom is provided with the active at least including that one group of coaxial direction is arranged The roller of wheel, drivewheel is provided with driving hydraulic motor;
Described workpiece is arranged on underframe, leads including body, front and back guiding mechanism, front and back detent mechanism, left and right To mechanism, left and right detent mechanism, rig installing rack and rig;Before and after body is arranged by fore-and-aft direction, guiding mechanism is erected at On underframe;Front and back detent mechanism is equipped with on front and back's guiding mechanism;The left and right that rig installing rack is arranged by left and right directions Guiding mechanism is erected on body;Left and right detent mechanism is equipped with on the guiding mechanism of left and right;Rig is vertically arranged and is arranged on On rig installing rack;
Described device positioning element includes location, top supporting cylinder, bottom location supporting cylinder and control valve group And pumping plant;Location, top supporting cylinder is set to four, and location, four tops supporting cylinder piston end sets up, cylinder body Centrosymmetry is vertically fixedly mounted on added diagonally adjacent, and its piston end end is provided with support footstock;Location, bottom Support hydraulic cylinder is set to four, and location, four bottoms supporting cylinder piston end is down-set, location, cylinder body corresponding top supports Position of Hydraulic Cylinder is vertically fixedly mounted on the diagonally adjacent of underframe, and its piston end end is provided with support base;Control valve group And pumping plant be arranged on underframe or added on, the outfan of control valve group and pumping plant is supported by fluid pressure line and top location respectively Hydraulic cylinder, bottom location supporting cylinder and driving hydraulic motor connect.
Scheme as a further improvement on the present invention, described body is by angle regulation positioning device and Guiding machine front and back Structure connects.
Scheme as a further improvement on the present invention, described rig installing rack passes through angle regulation positioning device and left and right Guiding mechanism connects.
Scheme as a further improvement on the present invention, described underframe and added be all frame structure.
Scheme as a further improvement on the present invention, described underframe and/or added frame structure two sides are provided with Supporting rib stiffener arranged in a crossed manner.
Compared with prior art, this from the steady boring device of movable base plate armature boring owing to being provided be arranged on underframe upper Frame, top location supporting cylinder and control valve group and pumping plant are arranged on added, and location, bottom supporting cylinder is arranged on On underframe, therefore it is manipulated by valve group and pumping plant makes top location supporting cylinder and location, bottom supporting cylinder respectively Stretching out, the support footstock of location, top supporting cylinder acts against on top board, the support base top of location, bottom supporting cylinder Leaning against and make underframe form stable rigid support between back and base plate on base plate, during boring, the drilling rod of rig pierces The counteracting force that base plate produces acts on underframe by rig installing rack, body, and active force is supported by underframe by location, top Hydraulic cylinder and location, bottom supporting cylinder directly act on back and base plate, therefore need not above the drilling rod of rig It is supported on back to provide reverse holding power with pin or reverse air leg;Owing to workpiece is provided with before and after's Guiding machine Structure, front and back detent mechanism, left and right guiding mechanism, left and right detent mechanism, therefore will be originally from the steady boring device of movable base plate armature boring Can realize pinpointing a position after having good positioning and can complete the multiple rows of or operation in multiple row hole, i.e. can realize rig and lead front and back All full lines and the bore position of permutation in mechanism and left and right guiding mechanism stroke range carry out location boring;This is from mobile Base plate armature boring steady boring device simple in construction, easily operated control, can carry out rockbolt installation after completing boring, hole and pacify The dress speed of anchor pole, installation effectiveness are high, are adapted to the requirement of Quick Road-Made, are particularly well-suited to when administering Floor Heave in Roadway adopt With the Quick mounting anchor rod of floor bolting.
Accompanying drawing explanation
Fig. 1 is the three dimensional structure schematic diagram of the present invention.
In figure: 1, underframe, 11, drivewheel, 12, drive hydraulic motor, 2, workpiece, 21, body, 22, front and back guide Mechanism, 23, front and back detent mechanism, 24, left and right guiding mechanism, 25, left and right detent mechanism, 26, rig installing rack, 27, rig, 3, Added, 4, device positioning element, 41, location, top supporting cylinder, 42, location, bottom supporting cylinder, 43, control valve group and Pumping plant.
Detailed description of the invention
The present invention will be further described below in conjunction with the accompanying drawings.
As it is shown in figure 1, this includes underframe 1, workpiece 2, added 3 and device from the steady boring device of movable base plate armature boring Positioning element 4.
Described added 3 are fixedly mounted on underframe 1, and underframe 1 bottom is provided with and at least includes what one group of coaxial direction was arranged The roller of drivewheel 11, drivewheel 11 is provided with driving hydraulic motor 12.
Described workpiece 2 is arranged on underframe 1, including body 21, front and back guiding mechanism 22, front and back detent mechanism 23, left and right guiding mechanism 24, left and right detent mechanism 25, rig installing rack 26 and rig 27;Body 21 is arranged by fore-and-aft direction Before and after guiding mechanism 22 be erected on underframe 1;Front and back detent mechanism 23 is equipped with on front and back's guiding mechanism 22, body 21 Can by front and back's guiding mechanism 22 and front and back detent mechanism 23 fore-and-aft direction on underframe 1 move and position;Rig installing rack The 26 left and right guiding mechanisms 24 arranged by left and right directions are erected on body 21;Left and right detent mechanism 25 is equipped with in left and right On guiding mechanism 24, rig installing rack 26 can pass through left and right guiding mechanism 24 and left and right detent mechanism 25 left and right on body 21 Direction is moved and is positioned;Rig 27 is vertically arranged and is arranged on rig installing rack 26.
Described device positioning element 4 includes location, top supporting cylinder 41, bottom location supporting cylinder 42 and control Valve group processed and pumping plant 43;Support more firm on the diagonal supporting leg of support body owing to supporting cylinder is vertically arranged in, therefore push up Location, portion supporting cylinder 41 is set to four, and location, four tops supporting cylinder 41 piston end sets up, cylinder body center Symmetrical be vertically fixedly mounted on added 3 diagonally adjacent, its piston end end is provided with support footstock;Location, bottom supports liquid Cylinder pressure 42 is set to four, and location, four bottoms supporting cylinder 42 piston end is down-set, location, cylinder body corresponding top supports Hydraulic cylinder 41 position is vertically fixedly mounted on the diagonally adjacent of underframe 1, and its piston end end is provided with support base;Control valve Group and pumping plant 43 are arranged on underframe 1 or added 3, and the outfan of control valve group and pumping plant 43 is respectively by fluid pressure line and top Location supporting cylinder 41, bottom location supporting cylinder 42 and driving hydraulic motor 12 connect.
Control to drive hydraulic motor 12 action this surely to be bored from movable base plate armature boring by control valve group and pumping plant 43 Device stays in operation control valve group and pumping plant 43 after need to carrying out on the roadway floor of base plate boring makes top position support hydraulic pressure Cylinder 41 and location, bottom supporting cylinder 42 stretch out respectively, and the support footstock of location, top supporting cylinder 41 acts against top board Support base upper, location, bottom supporting cylinder 42 acts against and makes underframe 1 be formed between back and base plate on base plate Rigid support, then unclamps before and after's detent mechanism 23 and left and right detent mechanism 25, mobile body 21 to fore-and-aft direction needs boring Position after locking before and after detent mechanism 23, then need on mobile drill installing rack 26 to left and right directions boring position after lock Left and right detent mechanism 25, rig 27, the most just to bore position, starts rig 27 and carries out holing, the brill of rig 27 during boring Bar drill enters the counteracting force of base plate generation and acts on underframe 1 by rig installing rack 26, body 21, and active force is passed through by underframe 1 Top location supporting cylinder 41 and location, bottom supporting cylinder 42 directly act on back and base plate;It is drilled first The boring position that Kong Houke directly unclamps before and after's detent mechanism 23 or left and right detent mechanism 25 carries out on fore-and-aft direction or left and right directions Put and adjust the drilling operation realizing a row or string.
In order to realize this equipment can on fore-and-aft direction non-fully the roadway floor of level carry out vertical drilling, Jin Erzeng The suitability of university degree equipment, as a further improvement on the present invention scheme, described body 21 passes through angle regulation positioning device It is connected with front and back guiding mechanism 22, makes the drilling rod of rig 27 be perpendicular in the longitudinal direction by regulation angle regulation positioning device The roadway floor of non-fully level and lock, vertical drilling can be realized.
In order to realize this equipment can on left and right directions non-fully the roadway floor of level carry out vertical drilling, Jin Erzeng The suitability of university degree equipment, as a further improvement on the present invention scheme, described rig installing rack 26 is fixed by angular adjustment Position mechanism is connected with left and right guiding mechanism 24, makes the drilling rod of rig 27 be perpendicular in left and right by regulation angle regulation positioning device The roadway floor of the non-fully level on direction also locks, and can realize vertical drilling.
In order to alleviate the overall weight of whole device so that moving, scheme as a further improvement on the present invention, described Underframe 1 and added 3 be all frame structure.
In order to increase the integrated support intensity of this equipment, scheme as a further improvement on the present invention, described underframe 1 And/or the frame structure two sides of added 3 are provided with supporting rib stiffener arranged in a crossed manner.
This is from the steady boring device of movable base plate armature boring owing to being provided with added 3 be arranged on underframe 1, and location, top supports Hydraulic cylinder 41 and control valve group and pumping plant 43 are arranged on added 3, and location, bottom supporting cylinder 42 is arranged on underframe 1, Therefore it is manipulated by valve group and pumping plant 43 makes top location supporting cylinder 41 and location, bottom supporting cylinder 42 respectively Stretch out, top location supporting cylinder 41 support footstock act against on top board, bottom location supporting cylinder 42 support at the bottom of Seat acts against and makes underframe 1 form stable rigid support between back and base plate on base plate, rig 27 during boring Drilling rod pierces the counteracting force of base plate generation and acts on underframe 1 by rig installing rack 26, body 21, and active force is led to by underframe 1 Cross top location supporting cylinder 41 and location, bottom supporting cylinder 42 directly acts on back and base plate, be therefore not required to To be supported on back to provide reverse holding power with pin or reverse air leg above the drilling rod of rig 27;Due to work Parts 2 are provided with before and after's guiding mechanism 22, front and back detent mechanism 23, left and right guiding mechanism 24, left and right detent mechanism 25, therefore incite somebody to action this Can realize pinpointing a position after the steady boring device of movable base plate armature boring is had good positioning and can complete multiple rows of or multiple row hole Operation, i.e. can realize the rig 27 all full lines in front and back's guiding mechanism 22 and left and right guiding mechanism 24 stroke range and whole The bore position of row carries out location boring;This is complete from movable base plate armature boring steady boring device simple in construction, easily operated control Rockbolt installation can be carried out after becoming boring, hole and the speed of anchor pole, installation effectiveness height are installed, being adapted to Quick Road-Made Requirement, uses the Quick mounting anchor rod of floor bolting when being particularly well-suited to administer Floor Heave in Roadway.

Claims (5)

1. from the steady boring device of movable base plate armature boring, including rig (27), it is characterised in that also include underframe (1), work Make parts (2), added (3) and device positioning element (4);
Described added (3) are fixedly mounted on underframe (1), and underframe (1) bottom is provided with and at least includes that one group of coaxial direction is arranged The roller of drivewheel (11), drivewheel (11) is provided with driving hydraulic motor (12);
Described workpiece (2) is arranged on underframe (1), including body (21), front and back guiding mechanism (22), front and back localization machine Structure (23), left and right guiding mechanism (24), left and right detent mechanism (25), rig installing rack (26) and rig (27);Body (21) leads to Cross guiding mechanism (22) before and after fore-and-aft direction is arranged to be erected on underframe (1);Front and back detent mechanism (23) is equipped with front On rear guiding mechanism (22);The left and right guiding mechanism (24) that rig installing rack (26) is arranged by left and right directions is erected at body (21) on;Left and right detent mechanism (25) is equipped with on left and right guiding mechanism (24);Described rig (27) is vertically arranged peace It is contained on rig installing rack (26);
Described device positioning element (4) include top location supporting cylinder (41), bottom location supporting cylinder (42) and Control valve group and pumping plant (43);Location supporting cylinder, top (41) is set to four, location, four tops supporting cylinder (41) piston end sets up, cylinder body centrosymmetry is vertically fixedly mounted on the diagonally adjacent of added (3), its piston end end Portion is provided with support footstock;Location supporting cylinder, bottom (42) is set to four, and four location supporting cylinder, bottoms (42) are lived Plug end is down-set, the corresponding top of cylinder body positions supporting cylinder (41) position and is vertically fixedly mounted on the diagonal of underframe (1) On direction, its piston end end is provided with support base;Control valve group and pumping plant (43) are arranged on underframe (1) or added (3), control The outfan of valve group processed and pumping plant (43) is supported with location supporting cylinder, top (41), location, bottom by fluid pressure line respectively Hydraulic cylinder (42) and driving hydraulic motor (12) connect.
The most according to claim 1 from the steady boring device of movable base plate armature boring, it is characterised in that described body (21) It is connected with front and back's guiding mechanism (22) by angle regulation positioning device.
The most according to claim 1 and 2 from the steady boring device of movable base plate armature boring, it is characterised in that described rig Installing rack (26) is connected with left and right guiding mechanism (24) by angle regulation positioning device.
The most according to claim 3 from the steady boring device of movable base plate armature boring, it is characterised in that described underframe (1) It is all frame structure with added (3).
The most according to claim 4 from the steady boring device of movable base plate armature boring, it is characterised in that described underframe (1) And/or the frame structure two sides of added (3) are provided with supporting rib stiffener arranged in a crossed manner.
CN201610551801.6A 2016-07-12 2016-07-12 A kind of from the steady boring device of movable base plate armature boring Pending CN106089057A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610551801.6A CN106089057A (en) 2016-07-12 2016-07-12 A kind of from the steady boring device of movable base plate armature boring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610551801.6A CN106089057A (en) 2016-07-12 2016-07-12 A kind of from the steady boring device of movable base plate armature boring

Publications (1)

Publication Number Publication Date
CN106089057A true CN106089057A (en) 2016-11-09

Family

ID=57221307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610551801.6A Pending CN106089057A (en) 2016-07-12 2016-07-12 A kind of from the steady boring device of movable base plate armature boring

Country Status (1)

Country Link
CN (1) CN106089057A (en)

Similar Documents

Publication Publication Date Title
CN106089041A (en) A kind of from the steady platform flatcar of movable base plate armature boring
CN106089072A (en) A kind of coal mine self-moving moves four stud location base plate anchor rod drilling devices
CN106089055A (en) A kind of from mobile four stud location base plate anchor rod drilling devices
CN106089033A (en) A kind of roadway floor anchor rod drilling device
CN106089034A (en) A kind of steady boring device of roadway floor armature boring
CN106089095A (en) A kind of steady boring device of base plate armature boring
CN106089065A (en) A kind of coal mine self-moving moves roadway floor anchor rod drilling device
CN106089076A (en) A kind of coal mine self-moving moves the steady platform flatcar of base plate armature boring
CN106089100A (en) A kind of coal mine self-moving moves the steady boring device of roadway floor armature boring
CN106089073A (en) A kind of coal mine self-moving moves the steady platform flatcar of roadway floor anchor pole
CN106089059A (en) A kind of diagonal angle, colliery cross bearing roadway floor anchor rod drilling device
CN106089057A (en) A kind of from the steady boring device of movable base plate armature boring
CN106089098A (en) A kind of from the mobile steady boring device of roadway floor anchor pole
CN106089097A (en) A kind of from mobile roadway floor anchor rod drilling device
CN106089054A (en) A kind of from movable base plate anchor rod drilling device
CN106089052A (en) A kind of from mobile diagonal orientation roadway floor anchor rod drilling device
CN106089049A (en) A kind of from the mobile steady platform flatcar of roadway floor anchor pole
CN106089046A (en) A kind of from mobile roadway floor armature boring chassis
CN106089051A (en) A kind of from mobile diagonal angle cross bearing roadway floor anchor rod drilling device
CN106089099A (en) A kind of from the mobile steady boring device of roadway floor armature boring
CN106089071A (en) A kind of coal mine self-moving moves base plate anchor rod drilling device
CN106223846A (en) A kind of coal mine self-moving moves the steady boring device of base plate armature boring
CN106089043A (en) A kind of from movable base plate armature boring chassis
CN106089096A (en) A kind of steady boring device of roadway floor anchor pole
CN106089039A (en) A kind of diagonal angle cross bearing roadway floor anchor rod drilling device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161109

WD01 Invention patent application deemed withdrawn after publication