CN106088647A - The anti-compensating method of concrete cast-in-situ structurally waterproof - Google Patents

The anti-compensating method of concrete cast-in-situ structurally waterproof Download PDF

Info

Publication number
CN106088647A
CN106088647A CN201610486227.0A CN201610486227A CN106088647A CN 106088647 A CN106088647 A CN 106088647A CN 201610486227 A CN201610486227 A CN 201610486227A CN 106088647 A CN106088647 A CN 106088647A
Authority
CN
China
Prior art keywords
leaks
glue
place
work surface
situ
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610486227.0A
Other languages
Chinese (zh)
Inventor
卿安全
卿永洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610486227.0A priority Critical patent/CN106088647A/en
Publication of CN106088647A publication Critical patent/CN106088647A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Sealing Material Composition (AREA)

Abstract

A kind of anti-compensating method of concrete cast-in-situ structurally waterproof, the method is in the place that leaks for concrete cast-in-situ structure, and first with the clogging gap that leaks of leak stopping king, and filling-in is to the outer surface that leaks;Expand as work surface to around centered by the place of leaking again;Place cleaning to concrete layer, clean, after drying cloud stone glue is mixed with firming agent after be coated at work surface, solid after, coating epoxide resin AB glue at once.The present invention uses and first carries out leak stopping open fire process with leak stopping king, first pass water-proofing treatment is carried out again with cloud stone glue and firming agent, finally carry out second time water-proofing treatment with epoxide resin AB glue, first pass time water-proofing treatment can be dried in one minute, and the material filming rear defence pressure of work surface coating is more than 5 MPas.This anti-benefit waterproof method is simple to operation, quick, and the shelf-life is suitable for service life with concrete, by experimental observation for several times, the most nowhere leaks through position of this anti-benefit waterproof method reparation, hinge structure cost-effective more than 80%.

Description

The anti-compensating method of concrete cast-in-situ structurally waterproof
Technical field
The present invention relates to a series of waterproof models such as cast-in-place concrete structure roofing, toilet, tunnel, basement, cistern Enclose interior waterproofing work.
Background technology
The waterproofing works such as the roofing of existing concrete structure, toilet, tunnel, basement, cistern are just to use mostly Face waterproof technology.Such as, roof waterproof, 95% be above use waterproof roll constructs, but, in work progress and construction After finished product protection it is difficult to ensure that put in place, can there is water leakage situation in the overwhelming majority, it is necessary to carries out the construction of secondary waterproof maintenance, Make that difficulty of construction is big, cost increases;For another example, tunnel leak, basement leaking, currently mainly use grouting and water-proof, prevent for this kind The quality guarantee period of water construction is no more than 2 years;And for example, toilet is leaked, and presently the most effective solution is to re-start Waterproof homework, construction cost is high, the longest.Therefore, how the concrete cast-in-situ structure place of leaking is carried out waterproof homework for working as One of front urgent problem.
Summary of the invention
The technical problem to be solved is: for above-mentioned the deficiencies in the prior art, it is provided that a kind of concrete cast-in-situ The anti-compensating method of structurally waterproof, to solve the existing technical barrier that leaks, is greatly shortened the engineering time, and with low cost, more anti-than existing Water operation cost-effective more than 80%.
In order to solve above-mentioned technical problem, the technical solution adopted in the present invention is: a kind of concrete cast-in-situ structurally waterproof Anti-compensating method, the method step is as follows:
A. in the place that leaks for concrete cast-in-situ structure, with the clogging gap that leaks of leak stopping king, and filling-in is to the outer surface that leaks;
B., centered by the place that leaks, 10-15cm is expanded to around, as work surface;Place cleaning is to concrete layer, to remove Material outside concrete layer, and ensure that work surface is clean, be dried;
C., after cloud stone glue being mixed with firming agent by weight 100:2-100:5, stirred, coating 0.3-0.5cm is thicker than work Make at face;
After the most solid, the epoxide resin AB glue by weight 1:1 mix homogeneously thick for coating 0.3-0.5cm at once.
The above-mentioned leak stopping king that mentions, cloud stone glue, epoxide resin AB glue are all commercial products;Firming agent is also commercially available prod, Firming agent in this area all can be applicable to the present invention.
The present invention uses leak stopping king, cloud stone glue, firming agent and epoxide resin AB glue that adhesion strength is high to be material, first with stifled Leakage Wang Jinhang leak stopping open fire processes, then carries out first pass water-proofing treatment, finally with epoxide resin AB glue with cloud stone glue and firming agent Carrying out second time water-proofing treatment, first pass water-proofing treatment can be dried in one minute, the material filming rear defence of work surface coating Pressure is more than 5 MPas.After testing (detection temperature 20 DEG C, reference JC/T894-2001), work surface first pass water-proofing treatment Drying time is 58s, and the impermeability of work surface coating material film forming is 5.5MPa.
This anti-benefit waterproof method is simple to operation, quick, and the shelf-life is suitable, by trying for several times for service life with concrete Test observation, the most nowhere leak through this anti-position mending waterproof method reparation, hinge structure cost-effective more than 80%.
Detailed description of the invention
Embodiment 1
At the tunnel leak for concrete cast-in-situ structure, first with the clogging gap that leaks of leak stopping king, and filling-in is to appearance of leaking Face;Centered by the place of leaking, expand 15cm as work surface to around;With ash cutter place cleaning to concrete layer, scrape off mixed The foreign material such as the cement dust and sand of the coating outside solidifying soil layer, with all dusts of steel brush brushing, then dry with liquefied gas spray gun Work surface, to ensure that work surface is clean, to be dried;Then cloud stone glue is mixed with firming agent by weight 100:5, stirs After, coating 0.5cm is thicker than at work surface;After solid, the asphalt mixtures modified by epoxy resin by weight 1:1 mix homogeneously thick for coating 0.3cm at once Fat AB glue,.
Embodiment 2
At the roof leakage for concrete cast-in-situ structure, first with the clogging gap that leaks of leak stopping king, and filling-in is to appearance of leaking Face;Centered by the place of leaking, expand 12cm as work surface to around;With ash cutter place cleaning to concrete layer, scrape off mixed The foreign material such as the cement dust and sand of the coating outside solidifying soil layer, with the dust of steel brush brushing, then dry work with liquefied gas spray gun Face, to ensure that work surface is clean, to be dried;Then, after cloud stone glue being mixed with firming agent by weight 100:4, stirs, it is coated with Cover 0.3cm to be thicker than at work surface;After solid, the epoxide resin AB by weight 1:1 mix homogeneously thick for coating 0.4cm at once Glue,.
Embodiment 3
Leaking place in the cistern outer surface for concrete cast-in-situ structure, first with the clogging gap that leaks of leak stopping king, and filling-in is extremely Leak outer surface;Centered by the place of leaking, expand 10cm as work surface to around;With ash cutter place cleaning to concrete Layer, scrapes off the foreign material such as cement dust and sand of coating outside concrete layer, with the dust of steel brush brushing, then uses liquefied gas spray gun Dry work surface, to ensure that work surface is clean, to be dried;Then cloud stone glue mixed by weight 100:2 with firming agent, stir all After even, coating 0.4cm is thicker than at work surface;After solid, the epoxy by weight 1:1 mix homogeneously thick for coating 0.5cm at once Resin A B glue,.

Claims (1)

1. the anti-compensating method of concrete cast-in-situ structurally waterproof, it is characterised in that the method step is as follows:
A. in the place that leaks for concrete cast-in-situ structure, with the clogging gap that leaks of leak stopping king, and filling-in is to the outer surface that leaks;
B., centered by the place that leaks, 10-15cm is expanded to around, as work surface;Place cleaning is to concrete layer, to remove Material outside concrete layer, and ensure that work surface is clean, be dried;
C., after cloud stone glue being mixed with firming agent by weight 100:2-100:5, stirred, coating 0.3-0.5cm is thicker than work Make at face;
After the most solid, the epoxide resin AB glue by weight 1:1 mix homogeneously thick for coating 0.3-0.5cm at once.
CN201610486227.0A 2016-06-29 2016-06-29 The anti-compensating method of concrete cast-in-situ structurally waterproof Pending CN106088647A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610486227.0A CN106088647A (en) 2016-06-29 2016-06-29 The anti-compensating method of concrete cast-in-situ structurally waterproof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610486227.0A CN106088647A (en) 2016-06-29 2016-06-29 The anti-compensating method of concrete cast-in-situ structurally waterproof

Publications (1)

Publication Number Publication Date
CN106088647A true CN106088647A (en) 2016-11-09

Family

ID=57214434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610486227.0A Pending CN106088647A (en) 2016-06-29 2016-06-29 The anti-compensating method of concrete cast-in-situ structurally waterproof

Country Status (1)

Country Link
CN (1) CN106088647A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115467262A (en) * 2022-09-22 2022-12-13 何天龙 Construction method of embedded road marking

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101200978A (en) * 2007-12-19 2008-06-18 南通华新建工集团有限公司 Reinforcing measures for balcony crevasse
CN102518285A (en) * 2011-12-06 2012-06-27 华鼎建筑装饰工程有限公司 Old stone floor renovating method
CN102557729A (en) * 2011-12-26 2012-07-11 中国矿业大学 Reinforced concrete structure rapid repairing material and construction method thereof
CN102733620A (en) * 2012-06-19 2012-10-17 中国十七冶集团有限公司 Method for repairing crack of concrete wall body of back-filled bay window
CN104100102A (en) * 2014-06-26 2014-10-15 马明才 Waterproof comprehensive treatment method for flat tops
CN105619549A (en) * 2015-12-30 2016-06-01 卓达新材料科技集团有限公司 Process for repairing substrate

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101200978A (en) * 2007-12-19 2008-06-18 南通华新建工集团有限公司 Reinforcing measures for balcony crevasse
CN102518285A (en) * 2011-12-06 2012-06-27 华鼎建筑装饰工程有限公司 Old stone floor renovating method
CN102557729A (en) * 2011-12-26 2012-07-11 中国矿业大学 Reinforced concrete structure rapid repairing material and construction method thereof
CN102733620A (en) * 2012-06-19 2012-10-17 中国十七冶集团有限公司 Method for repairing crack of concrete wall body of back-filled bay window
CN104100102A (en) * 2014-06-26 2014-10-15 马明才 Waterproof comprehensive treatment method for flat tops
CN105619549A (en) * 2015-12-30 2016-06-01 卓达新材料科技集团有限公司 Process for repairing substrate

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王东梅: "商品混凝土现浇楼板裂缝控制及处理措施探讨", 《中小企业管理与科技(下旬刊)》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115467262A (en) * 2022-09-22 2022-12-13 何天龙 Construction method of embedded road marking

Similar Documents

Publication Publication Date Title
CN103553538B (en) Architecture indoor percdation solidifies not damaged waterproofing agent
CN101792301B (en) Skin-type waterproof coating and construction method
CN104695631A (en) Construction method for spraying polyurea waterproof coating on roof
CN102775956A (en) Asphalt-based non-curable heat-resistant waterproof sealant and preparation method thereof
CN102561686B (en) Construction method of polyurethane waterproof coating film under low-temperature and wet environment
CN102155071B (en) Rigid-soft-rigid compound waterproof process
CN103938656A (en) Building wall surface underground waterproof construction method
KR101804476B1 (en) Waterproof complex repairing method of concrete structures
WO2017101237A1 (en) Efficient aqueous nano-silicon rubber sealing and waterproofing agent
CN106699066A (en) Two-component polyacrylate waterproof coating and waterproof engineering construction method thereof
CN106088647A (en) The anti-compensating method of concrete cast-in-situ structurally waterproof
CN110359677A (en) External wall in-situ spraying polyurethane foamed thermal-insulating construction technology
KR101991363B1 (en) Inorganic elastic liquid-applied membrane waterproofer and method of waterproofing using thereof
CN109183839A (en) A kind of pipe gallery Waterproof Construction Technique
CN104153397B (en) A kind of concrete wall Case Study on Construction Joint Water-proofing
CN112408851A (en) Anti-radiation semi-permanent nano-penetration crystallization sealing compacting agent and use method thereof
CN205242457U (en) Basement bottom plate and outer wall waterproof construction
CN205224089U (en) Basement waterproofing side wall
CN208563402U (en) A kind of pile crown waterproof construction
CN110285266A (en) A kind of pipeline fills out culvert method
CN109723475A (en) Hard rock tunnel water proof type single shell lining sprays Waterproof Construction Technique and its application
CN109958201A (en) A kind of spray polyurea Waterproof Construction Technique
CN109837894A (en) Anti-float anchor rod end multilayer flashing material mating steel plate for sealing water composite water-proof construction technology
CN208152084U (en) A kind of outer waterproof construction of piping lane side wall
CN102733427B (en) Water-proofing and permeability-proofing construction method for coastal civil air-defense constructions

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161109