CN106088311B - Urban discharging pipeline dredging system - Google Patents

Urban discharging pipeline dredging system Download PDF

Info

Publication number
CN106088311B
CN106088311B CN201610618419.2A CN201610618419A CN106088311B CN 106088311 B CN106088311 B CN 106088311B CN 201610618419 A CN201610618419 A CN 201610618419A CN 106088311 B CN106088311 B CN 106088311B
Authority
CN
China
Prior art keywords
dredging
drill bit
sleeve
ring
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610618419.2A
Other languages
Chinese (zh)
Other versions
CN106088311A (en
Inventor
陈永方
陈帮军
李会琴
刘超
张宏
张霄亮
张磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huanghe Science and Technology College
Original Assignee
Huanghe Science and Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huanghe Science and Technology College filed Critical Huanghe Science and Technology College
Priority to CN201610618419.2A priority Critical patent/CN106088311B/en
Publication of CN106088311A publication Critical patent/CN106088311A/en
Application granted granted Critical
Publication of CN106088311B publication Critical patent/CN106088311B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F9/00Arrangements or fixed installations methods or devices for cleaning or clearing sewer pipes, e.g. by flushing
    • E03F9/002Cleaning sewer pipes by mechanical means
    • E03F9/005Apparatus for simultaneously pushing and rotating a cleaning device carried by the leading end of a cable or an assembly of rods
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F9/00Arrangements or fixed installations methods or devices for cleaning or clearing sewer pipes, e.g. by flushing
    • E03F9/007Devices providing a flushing surge

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Earth Drilling (AREA)

Abstract

城市排水管道疏通系统,包括疏通钻头;疏通钻头后端同轴向连接有主连接管,主连接管后端通过旋转密封器连接有主进水管,主连接管和主进水管内设有高压软管,高压软管前端伸入到疏通钻头内,高压软管上套设有挡圈,挡圈的外圈沿圆周方向开设有圆环形的安装槽,安装槽内安装有压力轴承,压力轴承的外圈与疏通钻头内壁接触;疏通钻头后部沿圆周方向均匀开设有至少三个前进喷水孔,疏通钻头前部沿圆周方向均匀开设有至少三个后退喷水孔。本发明设计新颖、结构简单且紧凑,易于操作,充分降低操作人员劳动强度,自动化程度高,可自动前进和后退,并可多次重复使用,疏通效果好,专门适用于市政管道的疏通作业。

The urban drainage pipeline dredging system includes a dredging drill bit; the rear end of the dredging drill bit is connected with the main connecting pipe in the same direction, and the rear end of the main connecting pipe is connected with the main water inlet pipe through a rotary sealer. The front end of the high-pressure hose extends into the dredging drill bit. The high-pressure hose is covered with a retaining ring. The outer ring of the retaining ring is provided with a circular installation groove along the circumferential direction. A pressure bearing is installed in the installation groove. The pressure bearing The outer ring of the dredging bit is in contact with the inner wall of the dredging bit; the rear part of the dredging bit is evenly provided with at least three forward water spray holes along the circumferential direction, and the front part of the dredge bit is evenly provided with at least three retreating water spray holes along the circumferential direction. The invention is novel in design, simple and compact in structure, easy to operate, fully reduces the labor intensity of operators, has a high degree of automation, can automatically advance and retreat, and can be used repeatedly, with good dredging effect, and is specially suitable for dredging of municipal pipelines.

Description

城市排水管道疏通系统Urban drainage pipe dredging system

技术领域technical field

本发明属于市政工程管理养护技术领域,尤其涉及一种城市排水管道疏通系统。The invention belongs to the technical field of municipal engineering management and maintenance, and in particular relates to a system for dredging urban drainage pipes.

背景技术Background technique

每年的夏季,国内很多地方都出现强降雨天气,城市内涝问题层出不穷,直接危害到城市的安全运行及人民的生命安全,同时也造成了巨大的经济损失。而造成城市内涝的原因有很多,如雨量过大、排水系统不完善、排水管道破损等。再加之城市建设的力度越来越大,工程所需的沙土在运输中极易掉落堆积在道路上,并随路面冲洗流入污水、雨水排水系统,造成管道内的淤泥量增加引起管道阻塞,同时也会导致雨天排水不畅,进一步加剧城市内涝,影响交通通畅,甚至导致交通瘫痪。如何切实提高城市排水管道的排水效率,减少管道淤积或堵塞, 确保管道畅通,保障汛期安全,是解决城市内涝的最有效途径。Every summer, heavy rainfall occurs in many places in China, and urban waterlogging problems emerge one after another, directly endangering the safe operation of the city and people's lives, and also causing huge economic losses. There are many reasons for urban waterlogging, such as excessive rainfall, imperfect drainage systems, and damaged drainage pipes. Coupled with the increasing intensity of urban construction, the sand and soil required for the project are easily dropped and accumulated on the road during transportation, and flow into the sewage and rainwater drainage system with the road surface washing, resulting in an increase in the amount of silt in the pipeline and causing pipeline blockage. At the same time, it will also lead to poor drainage in rainy days, further aggravating urban waterlogging, affecting smooth traffic, and even causing traffic paralysis. How to effectively improve the drainage efficiency of urban drainage pipes, reduce pipe siltation or blockage, ensure smooth flow of pipes, and ensure safety during flood seasons are the most effective ways to solve urban waterlogging.

目前,对城市雨水、污水排水管道的疏通一般使用市政工程的疏通车,但现场大部分作业还是需要人工操作,这不仅工作环境恶劣、劳动强度大,工作效率低,而且耗费大量的水资源,疏通效果也不好。At present, the dredging vehicles of municipal engineering are generally used to dredge urban rainwater and sewage drainage pipes, but most of the operations on site still require manual operation, which not only has harsh working environment, high labor intensity, low work efficiency, but also consumes a lot of water resources. Dredge effect is not good.

发明内容Contents of the invention

本发明为了解决现有技术中的不足之处,提供一种自动化程度高、疏通效率高、疏通效果好、节约用水的城市排水管道疏通系统。In order to solve the deficiencies in the prior art, the present invention provides an urban drainage pipe dredging system with high degree of automation, high dredging efficiency, good dredging effect and water saving.

为解决上述技术问题,本发明采用如下技术方案:城市排水管道疏通系统,包括疏通钻头,疏通钻头的前部外型为圆锥形结构,疏通钻头的后部外型为圆柱形结构,疏通钻头后部的圆柱形结构外圆周表面设有螺旋状的凸棱条,疏通钻头为中空结构且后端敞口;In order to solve the above-mentioned technical problems, the present invention adopts the following technical solutions: the urban drainage pipe dredging system includes a dredging drill bit, the front part of the dredging drill bit has a conical structure, and the rear part of the dredging drill bit has a cylindrical structure. The outer peripheral surface of the cylindrical structure of the head is provided with spiral convex ribs, and the dredging drill bit is a hollow structure with an open rear end;

疏通钻头后端同轴向连接有主连接管,主连接管后端通过旋转密封器连接有主进水管,主进水管的进水口设有主连接法兰,主进水管上设有主控制阀,主连接管和主进水管内设有高压软管,高压软管前端伸入到疏通钻头内,高压软管上套设有挡圈,高压软管上设有位于挡圈前后两侧的前限位环和后限位环,前限位环固定设在高压软管前端,挡圈的外圈沿圆周方向开设有圆环形的安装槽,安装槽内安装有压力轴承,压力轴承的外圈与疏通钻头内壁接触;高压软管后端连接有辅助供水管,辅助供水管垂直于高压软管,辅助供水管穿过主进水管并与主进水管之间设有辅助进水密封圈,辅助供水管上设有辅助控制阀,辅助供水管的进水口设有辅助连接法兰;The rear end of the dredging drill bit is connected with the main connecting pipe in the same axial direction, and the rear end of the main connecting pipe is connected with the main water inlet pipe through the rotary sealer. The water inlet of the main water inlet pipe is provided with a main connecting flange, and the main water inlet pipe is provided with a main control valve. , the main connecting pipe and the main water inlet pipe are provided with a high-pressure hose, the front end of the high-pressure hose extends into the dredging drill bit, the high-pressure hose is covered with a retaining ring, and the high-pressure hose is provided with front valves located on the front and rear sides of the retaining ring. The limit ring and the rear limit ring, the front limit ring is fixed on the front end of the high-pressure hose, the outer ring of the retaining ring is provided with a circular installation groove along the circumferential direction, and a pressure bearing is installed in the installation groove, and the outer surface of the pressure bearing The ring is in contact with the inner wall of the dredging drill bit; the rear end of the high-pressure hose is connected with an auxiliary water supply pipe, the auxiliary water supply pipe is perpendicular to the high-pressure hose, the auxiliary water supply pipe passes through the main water inlet pipe and is provided with an auxiliary water inlet sealing ring between the main water inlet pipe, The auxiliary water supply pipe is provided with an auxiliary control valve, and the water inlet of the auxiliary water supply pipe is provided with an auxiliary connecting flange;

疏通钻头后部沿圆周方向均匀开设有至少三个前进喷水孔,疏通钻头前部沿圆周方向均匀开设有至少三个后退喷水孔,前进喷水孔和后退喷水孔的孔径均小于压力轴承外圈的宽度,前进喷水孔的内端口位于前进喷水孔的外端口的前侧,前进喷水孔的中心线偏离疏通钻头的中心线;后退喷水孔的内端口位于后退喷水孔的外端口的后侧,后退喷水孔的中心线偏离疏通钻头的中心线,前进喷水孔的中心线和后退喷水孔的中心线均与疏通钻头的中心线呈40-50°的夹角;The rear part of the dredging drill bit is evenly provided with at least three forward water spray holes along the circumferential direction, and the front part of the dredge drill bit is evenly provided with at least three retreat water spray holes along the circumferential direction. The width of the outer ring of the bearing, the inner port of the forward water spray hole is located on the front side of the outer port of the forward water spray hole, the center line of the forward water spray hole deviates from the center line of the dredging drill bit; the inner port of the backward water spray hole is located On the rear side of the outer port of the hole, the center line of the retreating water spray hole deviates from the center line of the dredging drill bit, and the center line of the forward water spray hole and the center line of the retreating water spray hole are 40-50° from the center line of the dredging drill bit. Angle;

旋转密封器包括同轴向设置的前套筒和后套筒,前套筒套设在主连接管外,前套筒后部与后套筒前部螺纹连接,前套筒前端设有前环形挡板,前套筒内壁的中部设有中环形挡板,后套筒内壁的前端部设有后环形挡板,后环形挡板的内壁后端部设有压紧环;The rotary seal includes a front sleeve and a rear sleeve coaxially arranged, the front sleeve is set outside the main connecting pipe, the rear part of the front sleeve is threaded with the front part of the rear sleeve, and the front end of the front sleeve is provided with a front ring Baffle, the middle part of the inner wall of the front sleeve is provided with a middle annular baffle, the front end of the inner wall of the rear sleeve is provided with a rear annular baffle, and the rear end of the inner wall of the rear annular baffle is provided with a compression ring;

主连接管外壁后端部设有环形凹台阶,主连接管外壁后部设有与中环形挡板前部相对应的定位环板,前环形挡板后侧面、中环形挡板前侧面、定位环板前侧面和主连接管外壁之间合围成轴承室,轴承室内安装有深沟球轴承,深沟球轴承的内圈与主连接管外壁过盈配合,深沟球轴承的外圈与前套筒内壁过盈配合,前环形挡板上设有与轴承室连通的注油孔,The rear end of the outer wall of the main connecting pipe is provided with an annular concave step, and the rear part of the outer wall of the main connecting pipe is provided with a positioning ring plate corresponding to the front part of the middle annular baffle. The front side of the ring plate and the outer wall of the main connecting pipe are enclosed to form a bearing chamber. Deep groove ball bearings are installed in the bearing chamber. The inner ring of the deep groove ball bearing is in interference fit with the outer wall of the main connecting pipe. The inner wall of the barrel is interference fit, and the front annular baffle is provided with an oil injection hole communicating with the bearing chamber.

中环形挡板后部内壁、定位环板后侧面、后环形挡板前侧面和主连接管外壁之间设有前密封圈,环形凹台阶处设有位于压紧环前侧面和后环形挡板内壁之间的后密封圈,主进水管前端伸入到后套筒内并与后套筒螺纹连接,主进水管外壁与后套筒后部内壁之间设有主进水密封圈。There is a front seal ring between the inner wall of the rear part of the middle annular baffle, the rear side of the positioning ring plate, the front side of the rear annular baffle and the outer wall of the main connecting pipe. The rear sealing ring between the inner walls, the front end of the main water inlet pipe extends into the rear sleeve and is threadedly connected with the rear sleeve, and the main water inlet sealing ring is arranged between the outer wall of the main water inlet pipe and the rear inner wall of the rear sleeve.

疏通钻头包括钻头本体和连接套,连接套前端插设在钻头本体后部并通过前螺钉固定连接;连接套前部的内径与钻头本体后部的内径相等,连接套后部的内径小于连接套前部的内径;主连接管前部插设在连接套后部并通过后螺钉固定连接;The dredging drill bit includes a drill body and a connecting sleeve. The front end of the connecting sleeve is inserted into the rear of the drill body and fixedly connected by the front screw; the inner diameter of the front part of the connecting sleeve is equal to the inner diameter of the rear part of the drill body, and the inner diameter of the rear part of the connecting sleeve is smaller than that of the connecting sleeve. The inner diameter of the front part; the front part of the main connecting pipe is inserted in the rear part of the connecting sleeve and fixedly connected by the rear screw;

前进喷水孔和螺旋状的凸棱条均设在钻头本体上,后退喷水孔设在连接套的前部。The forward water spray hole and the spiral rib are all arranged on the drill bit body, and the retreat water spray hole is arranged on the front part of the connecting sleeve.

挡圈上设有前后通透的水压平衡孔。The retaining ring is provided with front and rear transparent water pressure balance holes.

采用上述技术方案,主进水管上的主连接法兰和辅助供水管上的辅助连接法兰,均连接高压水源(高压水源可采用市政工程所常用的疏通车),将本发明放置到排水管道的堵塞处,打开主控制阀,高压水由主进水管进入到主连接管和疏通钻头内,高压水驱动挡圈、压力轴承和高压软管向前移动,疏通钻头前部的圆锥形结构限定压力轴承向前移动的位置,此时压力轴承的外圈把后退喷水孔封堵,同时,高压水从前进喷水孔内向后喷出,由于前进喷水孔的中心线偏离疏通钻头的中心线,即由于前进喷水孔偏心布置,在高压水的喷射作用下,喷射产生的冲量使疏通钻头旋转,轴向产生向前的作用力,由于疏通钻头上设有螺旋状的凸棱条,凸棱条也随着疏通钻头旋转对疏通钻头产生螺旋推力,在螺旋推力和水流共同作用,推动疏通钻头旋转的同时也向前运动,从而对排水管道内堵塞物进行疏通,高压水也对堵塞物起到良好的疏通作用。With the above technical scheme, the main connecting flange on the main water inlet pipe and the auxiliary connecting flange on the auxiliary water supply pipe are both connected to a high-pressure water source (the high-pressure water source can be a dredging vehicle commonly used in municipal engineering), and the present invention is placed in the drainage pipe Open the main control valve, the high-pressure water enters the main connecting pipe and the dredging bit from the main water inlet pipe, and the high-pressure water drives the retaining ring, pressure bearing and high-pressure hose to move forward, and the conical structure at the front of the dredging bit is limited The position where the pressure bearing moves forward. At this time, the outer ring of the pressure bearing blocks the retreat water spray hole. At the same time, high-pressure water is sprayed backward from the forward water spray hole. Since the center line of the forward water spray hole deviates from the center of the dredging drill bit Line, that is, due to the eccentric arrangement of the forward spray holes, under the action of high-pressure water injection, the impulse generated by the injection makes the dredging drill bit rotate, and the axial direction produces a forward force. The convex ribs also rotate with the dredging bit to generate a helical thrust to the dredging bit. When the helical thrust and the water flow act together, the dredging bit is driven to rotate and move forward at the same time, thereby dredging the blockage in the drainage pipe, and the high-pressure water also clears the blockage. Things play a good role in dredging.

由于排水管道比较长,疏通钻头旋进以后很难直接退出,这时关闭主控制阀,打开辅助控制阀,高压水由辅助供水管进入到高压软管,最后进入到疏通钻头内,高压水驱动挡圈和压力轴承向后移动,使高压软管弯曲,连接套后部对压力轴承限定向后移动的位置,此时压力轴承的外圈把前进喷水孔封堵,同时,高压水从后退喷水孔内向后喷出,由于后退喷水孔的中心线偏离疏通钻头的中心线,即由于后退喷水孔偏心布置,在高压水的喷射作用下,喷射产生的冲量使疏通钻头旋转,轴向产生向后的作用力,由于疏通钻头上设有螺旋状的凸棱条,凸棱条也随着疏通钻头旋转对疏通钻头产生螺旋推力,在螺旋推力和水流共同作用,推动疏通钻头旋转的同时也向后运动,这样就使疏通钻头退出排水管道。Because the drainage pipe is relatively long, it is difficult to exit directly after the dredging drill bit is screwed in. At this time, close the main control valve and open the auxiliary control valve. The high-pressure water enters the high-pressure hose from the auxiliary water supply pipe, and finally enters the dredging bit. The retaining ring and the pressure bearing move backward to make the high-pressure hose bend, and the rear part of the connecting sleeve limits the position of the pressure bearing to move backward. At this time, the outer ring of the pressure bearing blocks the forward water spray hole, and at the same time, the high-pressure water moves backward The water spray hole is sprayed backwards. Since the center line of the retreat water spray hole deviates from the center line of the dredging drill bit, that is, due to the eccentric arrangement of the retreat water spray hole, under the action of high-pressure water spray, the impulse generated by the spray makes the dredge drill bit rotate, and the shaft Since the dredging bit is provided with a spiral convex rib, the convex rib also produces a spiral thrust to the dredging bit as the dredging bit rotates, and the screw thrust and the water flow work together to push the dredging bit to rotate. Simultaneously, it also moves backwards, so that the dredge bit is withdrawn from the drain pipe.

由于旋转密封器的设置,疏通钻头在转动时带动主连接管转动,主进水管、前套筒和后套筒均固定不动,随着疏通钻头前进或后退,旋转密封器中的深沟球轴承起到主连接管良好旋转的作用,前密封圈、后密封圈和主进水密封圈起到避免漏水的作用。高压软管上设置的前限位环和后限位环,可将挡圈固定设在高压软管上,避免挡圈和压力轴承在高压水的作用下脱离高压软管,高压软管随着挡圈和压力轴承的前后移动可以伸展或弯曲。Due to the setting of the rotary sealer, the dredging bit drives the main connecting pipe to rotate when it rotates, and the main water inlet pipe, front sleeve and rear sleeve are all fixed. As the dredging bit advances or retreats, the deep groove ball in the rotary sealer The bearing plays the role of good rotation of the main connecting pipe, and the front sealing ring, the rear sealing ring and the main water inlet sealing ring play the role of preventing water leakage. The front limit ring and the rear limit ring set on the high-pressure hose can fix the retaining ring on the high-pressure hose to prevent the retaining ring and pressure bearing from detaching from the high-pressure hose under the action of high-pressure water. The back and forth movement of the retaining ring and pressure bearing can stretch or bend.

挡圈上设置的水压平衡孔,高压水可通过水压平衡孔使挡圈和压力轴承前后两侧的压力保持平衡,避免水压过大对挡圈和压力轴承产生巨大的轴向力而使压力轴承脱离挡圈或者使压力轴承的外圈与内圈脱离。The water pressure balance hole is set on the retaining ring, and the high-pressure water can pass through the water pressure balancing hole to keep the pressure on the front and rear sides of the retaining ring and the pressure bearing in balance, so as to avoid excessive water pressure from causing huge axial force on the retaining ring and the pressure bearing. Disengage the pressure bearing from the retaining ring or disengage the outer ring of the pressure bearing from the inner ring.

疏通钻头由钻头本体和连接套组成,这样不仅便于生产制造,而且便于安装,易于连接套与主连接管之间的装配连接。The dredging drill bit is composed of a drill body and a connecting sleeve, which is not only convenient for manufacturing, but also convenient for installation, and is easy to assemble and connect between the connecting sleeve and the main connecting pipe.

前进喷水孔和后退喷水孔的设置结构(中心线偏心设置、前进喷水孔的内端口位于前进喷水孔的外端口的前侧,、后退喷水孔的内端口位于后退喷水孔的外端口的后侧,前进喷水孔的中心线和后退喷水孔的中心线均与疏通钻头的中心线呈40-50°的夹角),这样可使高压水驱动疏通钻头旋转同时充分降低阻力。The setting structure of the forward water spray hole and the backward water spray hole (the center line is set eccentrically, the inner port of the forward water spray hole is located on the front side of the outer port of the forward water spray hole, and the inner port of the backward water spray hole is located The rear side of the outer port, the center line of the forward water spray hole and the center line of the retreat water spray hole are at an angle of 40-50° with the center line of the dredging drill bit), so that the high pressure water can drive the dredging bit to rotate fully at the same time Reduce drag.

综上所述,本发明设计新颖、结构简单且紧凑,易于操作,充分降低操作人员劳动强度,自动化程度高,可自动前进和后退,并可多次重复使用,疏通效果好,专门适用于市政管道的疏通作业。In summary, the present invention is novel in design, simple and compact in structure, easy to operate, fully reduces the labor intensity of operators, has a high degree of automation, can automatically advance and retreat, and can be used repeatedly, and has a good dredging effect. It is specially suitable for municipal Pipeline dredging work.

附图说明Description of drawings

图1是本发明的结构示意图;Fig. 1 is a structural representation of the present invention;

图2是图1中A-A剖视图;Fig. 2 is A-A sectional view among Fig. 1;

图3是图1中旋转密封器的结构示意图。Fig. 3 is a schematic structural view of the rotary sealer in Fig. 1 .

具体实施方式Detailed ways

如图1、图2和图3所示,本发明的城市排水管道疏通系统,包括疏通钻头,疏通钻头的前部外型为圆锥形结构,疏通钻头的后部外型为圆柱形结构,疏通钻头后部的圆柱形结构外圆周表面设有螺旋状的凸棱条1,疏通钻头为中空结构且后端敞口。As shown in Fig. 1, Fig. 2 and Fig. 3, the urban drainage pipe dredging system of the present invention comprises a dredging drill bit. The outer peripheral surface of the cylindrical structure at the rear of the drill bit is provided with a helical convex rib 1, and the dredging drill bit is a hollow structure with an open rear end.

疏通钻头后端同轴向连接有主连接管2,主连接管2后端通过旋转密封器3连接有主进水管4,主进水管4的进水口设有主连接法兰5,主进水管4上设有主控制阀6,主连接管2和主进水管4内设有高压软管7,高压软管7前端伸入到疏通钻头内,高压软管7上套设有挡圈10,高压软管7上设有位于挡圈10前后两侧的前限位环9和后限位环8,前限位环9固定设在高压软管7前端,挡圈10的外圈沿圆周方向开设有圆环形的安装槽,安装槽内安装有压力轴承11,压力轴承11的外圈与疏通钻头内壁接触;高压软管7后端连接有辅助供水管12,辅助供水管12垂直于高压软管7,辅助供水管12穿过主进水管4并与主进水管4之间设有辅助进水密封圈13,辅助供水管12上设有辅助控制阀14,辅助供水管12的进水口设有辅助连接法兰15。The rear end of the dredging drill bit is connected with the main connecting pipe 2 coaxially, the rear end of the main connecting pipe 2 is connected with the main water inlet pipe 4 through the rotary sealer 3, the water inlet of the main water inlet pipe 4 is provided with a main connecting flange 5, and the main water inlet pipe 4 is provided with a main control valve 6, and the main connecting pipe 2 and the main water inlet pipe 4 are provided with a high-pressure hose 7. The high-pressure hose 7 is provided with a front limit ring 9 and a rear limit ring 8 on the front and rear sides of the retaining ring 10. The front limit ring 9 is fixed on the front end of the high-pressure hose 7, and the outer ring of the retaining ring 10 is along the circumferential direction. An annular installation groove is provided, and a pressure bearing 11 is installed in the installation groove. The outer ring of the pressure bearing 11 is in contact with the inner wall of the dredging drill bit; the rear end of the high-pressure hose 7 is connected with an auxiliary water supply pipe 12, and the auxiliary water supply pipe 12 is perpendicular to the high pressure The hose 7 and the auxiliary water supply pipe 12 pass through the main water inlet pipe 4 and are provided with an auxiliary water inlet sealing ring 13 between the main water inlet pipe 4, and the auxiliary water supply pipe 12 is provided with an auxiliary control valve 14, and the water inlet of the auxiliary water supply pipe 12 An auxiliary connecting flange 15 is provided.

疏通钻头后部沿圆周方向均匀开设有至少三个前进喷水孔16,疏通钻头前部沿圆周方向均匀开设有至少三个后退喷水孔17,前进喷水孔16和后退喷水孔17的孔径均小于压力轴承11外圈的宽度,前进喷水孔16的内端口位于前进喷水孔16的外端口的前侧,前进喷水孔16的中心线偏离疏通钻头的中心线;后退喷水孔17的内端口位于后退喷水孔17的外端口的后侧,后退喷水孔17的中心线偏离疏通钻头的中心线,前进喷水孔16的中心线和后退喷水孔17的中心线均与疏通钻头的中心线呈40-50°的夹角。The rear part of the dredging drill bit is evenly provided with at least three forward water spray holes 16 along the circumferential direction, and the front part of the dredge drill bit is evenly provided with at least three retreating water spray holes 17 along the circumferential direction. Aperture is all less than the width of pressure bearing 11 outer rings, and the inner port of advancing water spray hole 16 is positioned at the front side of the outer port of advancing water spray hole 16, and the center line of advancing water spray hole 16 deviates from the center line of dredging drill bit; The inner port of hole 17 is positioned at the rear side of the outer port of retreat water spray hole 17, and the center line of retreat water spray hole 17 deviates from the center line of dredging drill bit, the center line of advance water spray hole 16 and the center line of retreat water spray hole 17 They all form an included angle of 40-50° with the center line of the dredging drill bit.

旋转密封器3包括同轴向设置的前套筒18和后套筒19,前套筒18套设在主连接管2外,前套筒18后部与后套筒19前部螺纹连接,前套筒18前端设有前环形挡板20,前套筒18内壁的中部设有中环形挡板21,后套筒19内壁的前端部设有后环形挡板22,后环形挡板22的内壁后端部设有压紧环23。The rotary sealer 3 includes a front sleeve 18 and a rear sleeve 19 arranged coaxially, the front sleeve 18 is sleeved outside the main connecting pipe 2, the rear part of the front sleeve 18 is threadedly connected with the front part of the rear sleeve 19, and the front The front end of the sleeve 18 is provided with a front annular baffle 20, the middle part of the inner wall of the front sleeve 18 is provided with a middle annular baffle 21, the front end of the rear sleeve 19 inner wall is provided with a rear annular baffle 22, and the inner wall of the rear annular baffle 22 A compression ring 23 is provided at the rear end.

主连接管2外壁后端部设有环形凹台阶,主连接管2外壁后部设有与中环形挡板21前部相对应的定位环板24,前环形挡板20后侧面、中环形挡板21前侧面、定位环板24前侧面和主连接管2外壁之间合围成轴承室,轴承室内安装有深沟球轴承25,深沟球轴承25的内圈与主连接管2外壁过盈配合,深沟球轴承25的外圈与前套筒18内壁过盈配合,前环形挡板20上设有与轴承室连通的注油孔26。The rear end of the outer wall of the main connecting pipe 2 is provided with an annular concave step. The front side of the plate 21, the front side of the positioning ring plate 24 and the outer wall of the main connecting pipe 2 are enclosed to form a bearing room. The deep groove ball bearing 25 is installed in the bearing room, and the inner ring of the deep groove ball bearing 25 interferes with the outer wall of the main connecting pipe 2. Cooperate, the outer ring of the deep groove ball bearing 25 is in interference fit with the inner wall of the front sleeve 18, and the front annular baffle 20 is provided with an oil injection hole 26 communicating with the bearing chamber.

中环形挡板21后部内壁、定位环板24后侧面、后环形挡板22前侧面和主连接管2外壁之间设有前密封圈27,环形凹台阶处设有位于压紧环23前侧面和后环形挡板22内壁之间的后密封圈28,主进水管4前端伸入到后套筒19内并与后套筒19螺纹连接,主进水管4外壁与后套筒19后部内壁之间设有主进水密封圈29。A front sealing ring 27 is provided between the inner wall of the rear part of the middle annular baffle 21, the rear side of the positioning ring plate 24, the front side of the rear annular baffle 22, and the outer wall of the main connecting pipe 2, and a front sealing ring 27 is provided at the annular concave step at the front of the compression ring 23. The rear sealing ring 28 between the side and the inner wall of the rear annular baffle plate 22, the front end of the main water inlet pipe 4 extends into the rear sleeve 19 and is threaded with the rear sleeve 19, the outer wall of the main water inlet pipe 4 is connected to the rear sleeve 19 rear portion A main water inlet sealing ring 29 is arranged between the inner walls.

疏通钻头包括钻头本体30和连接套31,连接套31前端插设在钻头本体30后部并通过前螺钉32固定连接;连接套31前部的内径与钻头本体30后部的内径相等,连接套31后部的内径小于连接套31前部的内径;主连接管2前部插设在连接套31后部并通过后螺钉33固定连接;前进喷水孔16和螺旋状的凸棱条1均设在钻头本体30上,后退喷水孔17设在连接套31的前部。The dredging drill bit includes a drill body 30 and a connecting sleeve 31. The front end of the connecting sleeve 31 is inserted in the rear portion of the drill body 30 and is fixedly connected by the front screw 32; The inner diameter of the 31 rear part is smaller than the inner diameter of the connecting sleeve 31 front; the main connecting pipe 2 front is inserted in the connecting sleeve 31 rear and fixedly connected by the rear screw 33; the forward water spray hole 16 and the spiral rib 1 are all It is arranged on the drill body 30 , and the retreat water spray hole 17 is arranged on the front part of the connection sleeve 31 .

挡圈10上设有前后通透的水压平衡孔34。The retaining ring 10 is provided with a water pressure balance hole 34 which is transparent from front to back.

本发明的工作过程如下:主进水管4上的主连接法兰5和辅助供水管12上的辅助连接法兰15,均连接高压水源(高压水源可采用市政工程所常用的疏通车),将本发明放置到排水管道的堵塞处,打开主控制阀6,高压水由主进水管4进入到主连接管2和疏通钻头内,高压水驱动挡圈10、压力轴承11和高压软管7向前移动,疏通钻头前部的圆锥形结构限定压力轴承11向前移动的位置,此时压力轴承11的外圈把后退喷水孔17封堵,同时,高压水从前进喷水孔16内向后喷出,由于前进喷水孔16的中心线偏离疏通钻头的中心线,即由于前进喷水孔16偏心布置,在高压水的喷射作用下,喷射产生的冲量使疏通钻头旋转,轴向产生向前的作用力,由于疏通钻头上设有螺旋状的凸棱条1,凸棱条1也随着疏通钻头旋转对疏通钻头产生螺旋推力,在螺旋推力和水流共同作用,推动疏通钻头旋转的同时也向前运动,从而对排水管道内堵塞物进行疏通,高压水也对堵塞物起到良好的疏通作用。The working process of the present invention is as follows: the main connecting flange 5 on the main water inlet pipe 4 and the auxiliary connecting flange 15 on the auxiliary water supply pipe 12 are all connected to a high-pressure water source (the high-pressure water source can adopt a dredging vehicle commonly used in municipal engineering), and the The present invention is placed in the blockage of the drainage pipe, the main control valve 6 is opened, the high-pressure water enters the main connecting pipe 2 and the dredging drill bit from the main water inlet pipe 4, and the high-pressure water drives the retaining ring 10, the pressure bearing 11 and the high-pressure hose 7 directions Moving forward, the conical structure at the front of the dredge drill bit limits the position where the pressure bearing 11 moves forward. At this time, the outer ring of the pressure bearing 11 blocks the retreat water spray hole 17. At the same time, the high-pressure water flows backward from the forward water spray hole 16. Ejection, because the center line of the advancing water spray hole 16 deviates from the center line of the dredging drill bit, that is, due to the eccentric arrangement of the advancing water spray hole 16, under the injection effect of high-pressure water, the impulse generated by the injection makes the dredging drill bit rotate, and the axial direction is generated. The previous force, because the dredging bit is provided with a spiral convex rib 1, the convex rib 1 also produces a helical thrust to the dredging bit as the dredging bit rotates, and the helical thrust and the water flow work together to push the dredging bit to rotate It also moves forward to clear the blockage in the drainage pipe, and the high-pressure water also plays a good role in clearing the blockage.

由于排水管道比较长,疏通钻头旋进以后很难直接退出,这时关闭主控制阀6,打开辅助控制阀14,高压水由辅助供水管12进入到高压软管7,最后进入到疏通钻头内,高压水驱动挡圈10和压力轴承11向后移动,使高压软管7弯曲,连接套31后部对压力轴承11限定向后移动的位置,此时压力轴承11的外圈把前进喷水孔16封堵,同时,高压水从后退喷水孔17内向后喷出,由于后退喷水孔17的中心线偏离疏通钻头的中心线,即由于后退喷水孔17偏心布置,在高压水的喷射作用下,喷射产生的冲量使疏通钻头旋转,轴向产生向后的作用力,由于疏通钻头上设有螺旋状的凸棱条1,凸棱条1也随着疏通钻头旋转对疏通钻头产生螺旋推力,在螺旋推力和水流共同作用,推动疏通钻头旋转的同时也向后运动,这样就使疏通钻头退出排水管道。Due to the relatively long drainage pipe, it is difficult to exit directly after the dredging drill bit is screwed in. At this time, the main control valve 6 is closed and the auxiliary control valve 14 is opened. The high-pressure water enters the high-pressure hose 7 from the auxiliary water supply pipe 12, and finally enters the dredging drill bit. , the high-pressure water drives the retaining ring 10 and the pressure bearing 11 to move backward, so that the high-pressure hose 7 is bent, and the rear part of the connecting sleeve 31 limits the backward movement position of the pressure bearing 11. At this time, the outer ring of the pressure bearing 11 sprays water forward. Hole 16 is blocked, and simultaneously, high-pressure water sprays backward in the water spray hole 17 from retreating, because the center line of retreating water spray hole 17 deviates from the center line of dredging drill bit, namely because retreating water spray hole 17 eccentric arrangements, in the high pressure water Under the action of the jet, the impulse generated by the jet makes the dredging bit rotate, and the axial force produces a backward force. Since the dredging bit is provided with a helical rib 1, the rib 1 also produces a force on the dredging bit as the dredging bit rotates. The helical thrust, when the helical thrust and the water flow act together, promotes the dredging drill bit to rotate and also moves backward, so that the dredging drill bit is withdrawn from the drainage pipe.

由于旋转密封器3的设置,疏通钻头在转动时带动主连接管2转动,主进水管4、前套筒18和后套筒19均固定不动,随着疏通钻头前进或后退,旋转密封器3中的深沟球轴承25起到主连接管2良好旋转的作用,前密封圈27、后密封圈28和主进水密封圈29起到避免漏水的作用。高压软管7上设置的前限位环9和后限位环8,可将挡圈10固定设在高压软管7上,避免挡圈10和压力轴承11在高压水的作用下脱离高压软管7,高压软管7随着挡圈10和压力轴承11的前后移动可以伸展或弯曲。Due to the setting of the rotary sealer 3, the dredging drill bit drives the main connecting pipe 2 to rotate when it rotates, and the main water inlet pipe 4, the front sleeve 18 and the rear sleeve 19 are all fixed, and as the dredging drill bit advances or retreats, the rotary sealer The deep groove ball bearing 25 in 3 plays the effect of good rotation of the main connecting pipe 2, and the front sealing ring 27, the rear sealing ring 28 and the main water inlet sealing ring 29 play the effect of avoiding water leakage. The front limit ring 9 and the rear limit ring 8 provided on the high-pressure hose 7 can fix the retaining ring 10 on the high-pressure hose 7, so as to prevent the retaining ring 10 and the pressure bearing 11 from breaking away from the high-pressure hose under the action of high-pressure water. The pipe 7 and the high-pressure hose 7 can be stretched or bent as the retaining ring 10 and the pressure bearing 11 move back and forth.

挡圈10上设置的水压平衡孔34,高压水可通过水压平衡孔34使挡圈10和压力轴承11前后两侧的压力保持平衡,避免水压过大对挡圈10和压力轴承11产生巨大的轴向力而使压力轴承11脱离挡圈10或者使压力轴承11的外圈与内圈脱离。The water pressure balance hole 34 provided on the retaining ring 10, high-pressure water can pass through the hydraulic pressure balancing hole 34 to keep the pressure on both sides of the retaining ring 10 and the pressure bearing 11 in balance, so as to avoid excessive water pressure on the retaining ring 10 and the pressure bearing 11 Huge axial force is generated to disengage the pressure bearing 11 from the retaining ring 10 or to disengage the outer ring and the inner ring of the pressure bearing 11 .

疏通钻头由钻头本体30和连接套31组成,这样不仅便于生产制造,而且便于安装,易于连接套31与主连接管2之间的装配连接。The dredging drill bit is made up of a drill body 30 and a connecting sleeve 31, which is not only convenient for manufacturing, but also convenient for installation, and is easy to assemble and connect between the connecting sleeve 31 and the main connecting pipe 2.

前进喷水孔16和后退喷水孔17的设置结构(中心线偏心设置,如图2中的偏离距离X,前进喷水孔16的内端口位于前进喷水孔16的外端口的前侧,、后退喷水孔17的内端口位于后退喷水孔17的外端口的后侧,前进喷水孔16的中心线和后退喷水孔17的中心线均与疏通钻头的中心线呈40-50°的夹角,优选44°),这样可使高压水驱动疏通钻头旋转同时充分降低阻力。The setting structure of the forward water spray hole 16 and the retreat water spray hole 17 (the center line is eccentrically arranged, as shown in Fig. 1. The inner port of the retreat water spray hole 17 is positioned at the rear side of the outer port of the retreat water spray hole 17, and the center line of the forward water spray hole 16 and the center line of the retreat water spray hole 17 are 40-50° with the center line of the dredging drill bit. °, preferably 44°), so that the high-pressure water can drive the dredging drill bit to rotate while fully reducing the resistance.

本实施例并非对本发明的形状、材料、结构等作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均属于本发明技术方案的保护范围。This embodiment does not impose any formal restrictions on the shape, material, structure, etc. of the present invention. All simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention belong to the protection of the technical solution of the present invention. scope.

Claims (3)

1.城市排水管道疏通系统,其特征在于:包括疏通钻头,疏通钻头的前部外型为圆锥形结构,疏通钻头的后部外型为圆柱形结构,疏通钻头后部的圆柱形结构外圆周表面设有螺旋状的凸棱条,疏通钻头为中空结构且后端敞口;1. The dredging system of urban drainage pipes is characterized in that: it includes a dredging drill bit, the front part of the dredging drill bit is a conical structure, the rear part of the dredging drill bit is a cylindrical structure, and the outer circumference of the cylindrical structure of the dredging drill bit is The surface is provided with spiral convex ribs, and the dredging drill bit is hollow and the rear end is open; 疏通钻头后端同轴向连接有主连接管,主连接管后端通过旋转密封器连接有主进水管,主进水管的进水口设有主连接法兰,主进水管上设有主控制阀,主连接管和主进水管内设有高压软管,高压软管前端伸入到疏通钻头内,高压软管上套设有挡圈,高压软管上设有位于挡圈前后两侧的前限位环和后限位环,前限位环固定设在高压软管前端,挡圈的外圈沿圆周方向开设有圆环形的安装槽,安装槽内安装有压力轴承,压力轴承的外圈与疏通钻头内壁接触;高压软管后端连接有辅助供水管,辅助供水管垂直于高压软管,辅助供水管穿过主进水管并与主进水管之间设有辅助进水密封圈,辅助供水管上设有辅助控制阀,辅助供水管的进水口设有辅助连接法兰;The rear end of the dredging drill bit is connected with the main connecting pipe in the same axial direction, and the rear end of the main connecting pipe is connected with the main water inlet pipe through the rotary sealer. The water inlet of the main water inlet pipe is provided with a main connecting flange, and the main water inlet pipe is provided with a main control valve. , the main connecting pipe and the main water inlet pipe are provided with a high-pressure hose, the front end of the high-pressure hose extends into the dredging drill bit, the high-pressure hose is covered with a retaining ring, and the high-pressure hose is provided with front valves located on the front and rear sides of the retaining ring. The limit ring and the rear limit ring, the front limit ring is fixed on the front end of the high-pressure hose, the outer ring of the retaining ring is provided with a circular installation groove along the circumferential direction, and a pressure bearing is installed in the installation groove, and the outer surface of the pressure bearing The ring is in contact with the inner wall of the dredging drill bit; the rear end of the high-pressure hose is connected with an auxiliary water supply pipe, the auxiliary water supply pipe is perpendicular to the high-pressure hose, the auxiliary water supply pipe passes through the main water inlet pipe and is provided with an auxiliary water inlet sealing ring between the main water inlet pipe, The auxiliary water supply pipe is provided with an auxiliary control valve, and the water inlet of the auxiliary water supply pipe is provided with an auxiliary connecting flange; 疏通钻头后部沿圆周方向均匀开设有至少三个前进喷水孔,疏通钻头前部沿圆周方向均匀开设有至少三个后退喷水孔,前进喷水孔和后退喷水孔的孔径均小于压力轴承外圈的宽度,前进喷水孔的内端口位于前进喷水孔的外端口的前侧,前进喷水孔的中心线偏离疏通钻头的中心线;后退喷水孔的内端口位于后退喷水孔的外端口的后侧,后退喷水孔的中心线偏离疏通钻头的中心线,前进喷水孔的中心线和后退喷水孔的中心线均与疏通钻头的中心线呈44°的夹角;The rear part of the dredging drill bit is evenly provided with at least three forward water spray holes along the circumferential direction, and the front part of the dredge drill bit is evenly provided with at least three retreat water spray holes along the circumferential direction. The width of the outer ring of the bearing, the inner port of the forward water spray hole is located on the front side of the outer port of the forward water spray hole, the center line of the forward water spray hole deviates from the center line of the dredging drill bit; the inner port of the backward water spray hole is located On the rear side of the outer port of the hole, the center line of the retreating water spray hole deviates from the center line of the dredging drill bit, and the center line of the forward water spray hole and the center line of the retreating water spray hole are at an angle of 44° to the center line of the dredging drill bit ; 旋转密封器包括同轴向设置的前套筒和后套筒,前套筒套设在主连接管外,前套筒后部与后套筒前部螺纹连接,前套筒前端设有前环形挡板,前套筒内壁的中部设有中环形挡板,后套筒内壁的前端部设有后环形挡板,后环形挡板的内壁后端部设有压紧环;The rotary seal includes a front sleeve and a rear sleeve coaxially arranged, the front sleeve is set outside the main connecting pipe, the rear part of the front sleeve is threaded with the front part of the rear sleeve, and the front end of the front sleeve is provided with a front ring Baffle, the middle part of the inner wall of the front sleeve is provided with a middle annular baffle, the front end of the inner wall of the rear sleeve is provided with a rear annular baffle, and the rear end of the inner wall of the rear annular baffle is provided with a compression ring; 主连接管外壁后端部设有环形凹台阶,主连接管外壁后部设有与中环形挡板前部相对应的定位环板,前环形挡板后侧面、中环形挡板前侧面、定位环板前侧面和主连接管外壁之间合围成轴承室,轴承室内安装有深沟球轴承,深沟球轴承的内圈与主连接管外壁过盈配合,深沟球轴承的外圈与前套筒内壁过盈配合,前环形挡板上设有与轴承室连通的注油孔,The rear end of the outer wall of the main connecting pipe is provided with an annular concave step, and the rear part of the outer wall of the main connecting pipe is provided with a positioning ring plate corresponding to the front part of the middle annular baffle. The front side of the ring plate and the outer wall of the main connecting pipe are enclosed to form a bearing chamber. Deep groove ball bearings are installed in the bearing chamber. The inner ring of the deep groove ball bearing is in interference fit with the outer wall of the main connecting pipe. The inner wall of the barrel is interference fit, and the front annular baffle is provided with an oil injection hole communicating with the bearing chamber. 中环形挡板后部内壁、定位环板后侧面、后环形挡板前侧面和主连接管外壁之间设有前密封圈,环形凹台阶处设有位于压紧环前侧面和后环形挡板内壁之间的后密封圈,主进水管前端伸入到后套筒内并与后套筒螺纹连接,主进水管外壁与后套筒后部内壁之间设有主进水密封圈。There is a front seal ring between the inner wall of the rear part of the middle annular baffle, the rear side of the positioning ring plate, the front side of the rear annular baffle and the outer wall of the main connecting pipe. The rear sealing ring between the inner walls, the front end of the main water inlet pipe extends into the rear sleeve and is threadedly connected with the rear sleeve, and the main water inlet sealing ring is arranged between the outer wall of the main water inlet pipe and the rear inner wall of the rear sleeve. 2.根据权利要求1所述的城市排水管道疏通系统,其特征在于:疏通钻头包括钻头本体和连接套,连接套前端插设在钻头本体后部并通过前螺钉固定连接;连接套前部的内径与钻头本体后部的内径相等,连接套后部的内径小于连接套前部的内径;主连接管前部插设在连接套后部并通过后螺钉固定连接;2. The urban drainage pipe dredging system according to claim 1, characterized in that: the dredging drill bit comprises a drill body and a connecting sleeve, the front end of the connecting sleeve is inserted in the rear part of the drill body and is fixedly connected by a front screw; The inner diameter is equal to the inner diameter of the rear part of the drill body, and the inner diameter of the rear part of the connecting sleeve is smaller than the inner diameter of the front part of the connecting sleeve; the front part of the main connecting pipe is inserted in the rear part of the connecting sleeve and fixedly connected by the rear screw; 前进喷水孔和螺旋状的凸棱条均设在钻头本体上,后退喷水孔设在连接套的前部。The forward water spray hole and the spiral rib are all arranged on the drill bit body, and the retreat water spray hole is arranged on the front part of the connecting sleeve. 3.根据权利要求1或2所述的城市排水管道疏通系统,其特征在于:挡圈上设有前后通透的水压平衡孔。3. The urban drainage pipe dredging system according to claim 1 or 2, characterized in that: the retaining ring is provided with water pressure balance holes that are transparent from front to back.
CN201610618419.2A 2016-08-01 2016-08-01 Urban discharging pipeline dredging system Expired - Fee Related CN106088311B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610618419.2A CN106088311B (en) 2016-08-01 2016-08-01 Urban discharging pipeline dredging system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610618419.2A CN106088311B (en) 2016-08-01 2016-08-01 Urban discharging pipeline dredging system

Publications (2)

Publication Number Publication Date
CN106088311A CN106088311A (en) 2016-11-09
CN106088311B true CN106088311B (en) 2018-07-06

Family

ID=57478822

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610618419.2A Expired - Fee Related CN106088311B (en) 2016-08-01 2016-08-01 Urban discharging pipeline dredging system

Country Status (1)

Country Link
CN (1) CN106088311B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109127596B (en) * 2018-10-23 2024-02-06 中国铁道科学研究院集团有限公司铁道建筑研究所 Dredging system and method for tunnel drainage pipes
CN110552420B (en) * 2019-09-19 2020-09-25 国网上海市电力公司 Quick pull throughs of pipe connection
CN114164923A (en) * 2021-12-28 2022-03-11 南方电网调峰调频发电有限公司鲁布革水力发电厂 Pipeline dredging device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2183831Y (en) * 1994-02-03 1994-11-30 黄友华 Jet rotary pushing pipe cleaner
JPH11114513A (en) * 1997-10-13 1999-04-27 Kantool:Kk High pressure jet cleaning equipment with camera for piping
JP2003184151A (en) * 2001-12-20 2003-07-03 Kyowa:Kk Nozzle device for washing inside of pipe
CN201040872Y (en) * 2007-05-08 2008-03-26 舒泰 Hydraulic dredging equipment
CN201056744Y (en) * 2007-06-27 2008-05-07 舒泰 Hydraulic pressure type dredge
CN102619277A (en) * 2012-04-11 2012-08-01 上海京瓷电子有限公司 Cleaning device of silt-blocked pipeline
CN204899777U (en) * 2015-05-22 2015-12-23 杰瑞能源服务有限公司 Efflux well drilling shower nozzle
CN205875379U (en) * 2016-08-01 2017-01-11 黄河科技学院 Urban drainage pipeline dredges system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8667987B2 (en) * 2011-02-14 2014-03-11 Stoneage, Inc. Flow controlled switching valve

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2183831Y (en) * 1994-02-03 1994-11-30 黄友华 Jet rotary pushing pipe cleaner
JPH11114513A (en) * 1997-10-13 1999-04-27 Kantool:Kk High pressure jet cleaning equipment with camera for piping
JP2003184151A (en) * 2001-12-20 2003-07-03 Kyowa:Kk Nozzle device for washing inside of pipe
CN201040872Y (en) * 2007-05-08 2008-03-26 舒泰 Hydraulic dredging equipment
CN201056744Y (en) * 2007-06-27 2008-05-07 舒泰 Hydraulic pressure type dredge
CN102619277A (en) * 2012-04-11 2012-08-01 上海京瓷电子有限公司 Cleaning device of silt-blocked pipeline
CN204899777U (en) * 2015-05-22 2015-12-23 杰瑞能源服务有限公司 Efflux well drilling shower nozzle
CN205875379U (en) * 2016-08-01 2017-01-11 黄河科技学院 Urban drainage pipeline dredges system

Also Published As

Publication number Publication date
CN106088311A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN106193270B (en) Urban discharging pipeline blocking Dredge drill bit
CN106049659B (en) High-pressure water jet spiral advance and retreat formula pipe dredging device
CN109811877B (en) Water conservancy construction pipeline mediation guiding device
CN113153156B (en) Hydraulic combined mechanical hole repairing device and method
CN106088311B (en) Urban discharging pipeline dredging system
WO2022142558A1 (en) Municipal drainage and blow-off pipeline
CN210730436U (en) Municipal administration water supply and drainage pipeline exempts from to excavate inner wall belt cleaning device
CN206396878U (en) Urban discharging pipeline blocking Dredge drill bit
CN104481580A (en) Method and device for repairing downhole coal-bed gas extraction drilled hole
CN105696598A (en) Device suitable for elevation-angle grouting of sleeve valve pipe and using method thereof
CN105696699B (en) Urban sewage pipeline blockage-clearing device and Method of blockage removal
CN205894263U (en) Municipal administration pipe blockage mediation system
CN214697699U (en) A hydraulic combined mechanical hole repairing device
CN205875379U (en) Urban drainage pipeline dredges system
CN106193271B (en) High-pressure water jet spiral advance and retreat formula pipe-dredging drill bit
CN206396879U (en) High-pressure water jet spiral advance and retreat formula pipe-dredging drill bit
CN102635363B (en) Shield machine, and additive injection port and additive injection device for shield machine
CN206015860U (en) Spiral drilling for pipe dredging device exits swivel head
CN205875380U (en) High -pressure water jet spiral advance and retreat formula pipeline dredging device
CN205875358U (en) Reciprocal drive arrangement of water under high pressure of urban drainage pipeline mediation system
CN202627165U (en) Device for repairing completely collapsed and large-deformation pipes without excavating whole pipes
CN204402406U (en) A kind of down-hole coal bed mash gas pumping drilling prosthetic device
CN205875378U (en) Spiral advance and retreat formula pipeline dredging device's water under high pressure drive arrangement
CN205875381U (en) A rotating sealer for spiral advance and retreat formula pipeline dredging device
CN105275032B (en) Hydraulic type cable tunnel cleaning plant

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180706

Termination date: 20200801