CN106087928A - A kind of axisymmetric barrel base list lower limb post production platform and construction method thereof - Google Patents

A kind of axisymmetric barrel base list lower limb post production platform and construction method thereof Download PDF

Info

Publication number
CN106087928A
CN106087928A CN201610601042.XA CN201610601042A CN106087928A CN 106087928 A CN106087928 A CN 106087928A CN 201610601042 A CN201610601042 A CN 201610601042A CN 106087928 A CN106087928 A CN 106087928A
Authority
CN
China
Prior art keywords
barrel base
job platform
bucket
platform system
hollow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610601042.XA
Other languages
Chinese (zh)
Inventor
刘金龙
刘洁群
徐满满
宁华晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei University
Hefei College
Original Assignee
Hefei College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei College filed Critical Hefei College
Priority to CN201610601042.XA priority Critical patent/CN106087928A/en
Publication of CN106087928A publication Critical patent/CN106087928A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/027Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto steel structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/22Caisson foundations made by starting from fixed or floating artificial islands by using protective bulkheads
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • E02B2017/0043Placing the offshore structure on a pre-installed foundation structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs
    • E02B2017/006Platforms with supporting legs with lattice style supporting legs
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs
    • E02B2017/0073Details of sea bottom engaging footing
    • E02B2017/0078Suction piles, suction cans
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of axisymmetric barrel base list lower limb post production platform and construction method thereof, including bottom barrel base system and top job platform system;Bottom barrel base system is made up of three identical secondary buckets and a main bucket, is connected by floor between each barrel base;Top job platform system is made up of three horizontal truss, three sub-trusses, gin pole, series strut and top job platform;The guide rod auxiliary that work progress uses upper end to tie control rope makes bottom barrel base system be formed overall with the assembling that is mutually butted of top job platform system.Top of the present invention job platform system is separate with bottom barrel base system, the heavy of bottom barrel base system is passed through operation without impact by top job platform system, state axisymmetricly after overall package, load assignment is uniform, sink top job platform system is installed based on guide rod, speed of application is fast, precision is high, and the recycling of production platform system is easy with recovery operation.

Description

A kind of axisymmetric barrel base list lower limb post production platform and construction method thereof
Technical field:
The present invention relates to the production platform in offshore oil and gas field field, particularly relate to a kind of axisymmetric barrel base list lower limb post and adopt Oil platform and construction method thereof.
Background technology:
Marine marginal field refers to that those reserves are little, outlying district, deep layer and the sea area of harsh environmental conditions, it is exploited All income remains basically stable with the expenditure of exploitation, or income is the fewest.China offshore oil and gas Tanaka has quite a few to belong to limit Oil gas field, the most cost-effective exploitation marginal field is always the problem that Offshore Engineering circle is concerned about.In order to exploit limit Border oil gas field, need to consider that multiple means is to reduce construction investment, to reduce development cost so that it is can obtain certain economic benefit.
It was verified that the simple feature that ocean platform has simple in construction, steel using amount is few, it is possible to greatly reduce offshore oil and gas The development cost in field, is particularly suited for the exploitation of marginal field.Existing multiple simple platform scheme, or platform weight is still Bigger than normal, or manufacture, installation process the most comparatively laborious, and can not reuse or moving process is complicated, recycling Expense too high.
Number of patent application: 201410215018.3 disclose a kind of bucket foundation list lower limb post production platform, and it includes cartridge type Basis, bucket foundation is positioned under mud face, and horizontal truss is positioned at Ni Mianchu and joins end to end triangle horizontal plane, each junction point one End face is respectively welded on bucket foundation, and other end is welded with sub-truss and gin pole;Gin pole is welded on by water On the junction point that plane frame work connects and composes, gin pole bottommost welds with bucket foundation;Two sub-truss one end are divided Not being welded on other two junction point, the other end is all welded on gin pole, and is positioned at water with the pad of gin pole Below plane, more than mud face;Horizontal truss, sub-truss and gin pole form space tetrahedral structure;Boarding platform is positioned at More than the water surface, centrally disposed column top;Job platform is positioned at above boarding platform, the top of centrally disposed column;Position Cat ladder it is additionally provided with between boarding platform and job platform.The defect of this structure is: overall structure is asymmetric, gin pole position The vertical load that the barrel base at the place of putting is subject to is relatively big, and the vertical load that other two barrel bases are subject to is less, in causing The Vertical Settlement that at the stud of centre, barrel base produces is naturally larger than the Vertical Settlement of other two barrel bases, and basis is in peace Easily produce differential settlement during dress and use and make production platform run-off the straight, and then affect the use of production platform; It addition, said two sub-truss and gin pole weld together with barrel base, overall weight is relatively big, to lifting appliance Elevating capacity requires height, is also unfavorable for that engineering terminates the floating of rear production platform, transition and recycling.
Summary of the invention:
In order to make up the deficiency of prior art problem, it is an object of the invention to provide a kind of axisymmetric barrel base list lower limb post and adopt Oil platform and construction method thereof, its simple in construction, easy construction, recycling is convenient, good in economic efficiency, it is adaptable to limit oil gas The exploitation in field, the exploitation for marginal field reduces development cost.
Technical scheme is as follows:
Axisymmetric barrel base list lower limb post production platform, it is characterised in that include bottom barrel base system and top operation Plateform system, described bottom barrel base system includes three place, identical secondary buckets and the master of central authorities thereof in isosceles triangle Bucket, is connected by floor between each barrel base outer wall, and the bucket top of secondary bucket is provided with lower hollow bearing, and the bucket top of main bucket is provided with Bottom solid bearing;
Described top job platform system includes matching with secondary bucket three upper seats, three upper seat central authorities be provided with The gin pole that main bucket matches, three upper seat outer walls connects and has horizontal truss, three upper seat outer walls and central authorities Being provided with the sub-truss being obliquely installed between column outer wall, gin pole upper end is provided with job platform;
Described top job platform system and bottom barrel base system docking are installed fixing, its middle and upper part job platform system Upper seat is set on the barrel base system bottom hollow seats of bottom, and the gin pole of hollow is enclosed within bottom solid bearing On.
Described axisymmetric barrel base list lower limb post production platform, it is characterised in that described main bucket and secondary bucket all fall Putting, main bucket diameter is more than secondary bucket diameter, and main bucket is identical with the height of secondary bucket, welds phase two-by-two by floor between main bucket with secondary bucket Even;Three secondary buckets are formed equilateral triangle after being weldingly connected two-by-two by floor and arrange, main bucket is positioned at the center of equilateral triangle Position.
Described axisymmetric barrel base list lower limb post production platform, it is characterised in that described secondary Tong Tongding center Being provided with lower hollow bearing, lower hollow bearing is the round steel pipe of inner hollow, and lower hollow holder top is provided with bolt hole.
Described axisymmetric barrel base list lower limb post production platform, it is characterised in that described upper seat is hollow Round steel pipe, diameter of bore is more than lower hollow bearing external diameter, and upper seat height is less than lower hollow height of support.
Described axisymmetric barrel base list lower limb post production platform, it is characterised in that described gin pole is hollow Round steel pipe, gin pole is positioned in the central symmetry axis of top job platform system, three horizontal truss, three support purlins Frame forms, with gin pole, the space tetrahedral structure that side is identical.
The construction method of a kind of axisymmetric barrel base list lower limb post production platform, comprises the steps:
1), bottom barrel base system stand on predetermined sea, take three guide rods and be inserted and fixed into bottom barrel base In the lower hollow bearing of system, control rope is tied in guide rod upper end;
2), slowly decline bottom barrel base system in sea water, until contact seabed, open each barrel base suction eye of connection And utilize water pump to take out negative pressure, make bottom barrel base system progressively injection in sea bed, when barrel base whole injection sea bed and Levelness meets when requiring, bottom barrel base system is heavy passes through the end of job;
3), smoothly lift by crane top job platform system and stand on predetermined sea, first control rope and penetrate in upper seat, extremely Three upper seats are respectively fitted on three guide rods, and top job platform system slowly declines along guide rod;Until three Upper seat is the most accurately enclosed within three lower hollow bearings, the sinking end of job in place of top job platform system;
4), top job platform system sink in place after, three guide rods are extracted from lower hollow bearing, send under diver Water, the safety utilizing bolt assembly to pass the bolt hole on lower hollow bearing, i.e. completion system fixes, and whole system has assembled Finish.
The present invention compared with prior art, has the advantage that
1, top of the present invention job platform system is separate with bottom barrel base system, can independently make, be independent of each other;
2, the present invention first completes after bottom barrel base system heavy pass through, then assembles top job platform system, i.e. top operation Bottom barrel base system heavy is passed through operation without impact by plateform system, facilitates the construction of barrel base;
3, state axisymmetricly after overall package of the present invention, load assignment is uniform, and the differential settlement of generation is little, is conducive to recovering the oil The O&M of platform;
4, after bottom of the present invention barrel base system heavy has passed through, sink top job platform system is installed based on guide rod, Speed of application is fast, precision is high, shortens Potential Working Time For Operation At Sea;
5, the present invention is when production platform use terminates to need transition, can lift by crane top job platform system after removal bolt, nut System, then carry out the water filling of bottom barrel base system, floating work, it is seen that top job platform system is to bottom barrel base system The floating operation of system, without impact, facilitates recycling and the recovery operation of production platform system.
Accompanying drawing illustrates:
Fig. 1 is the bottom barrel base system schematic of the present invention.
Fig. 2 is the top job platform structural system schematic diagram of the present invention.
Fig. 3 is the secondary barrel structure schematic diagram of the present invention.
Fig. 4 is the supporting rod part structural representation of the top job platform system of the present invention.
Fig. 5 is that the top job platform system of the present invention assembles schematic diagram with docking of bottom barrel base system.
Fig. 6 is the structural representation of the present invention.
Fig. 7 is that the present invention docks assembling work progress schematic diagram.
Reference:
1, secondary bucket;2, main bucket;3, floor;4, suction eye;5, lower hollow bearing;6, bolt, nut;7, upper seat;8, water Plane frame work;9, sub-truss;10, gin pole;11, job platform;12, bottom solid bearing;13, bolt hole;14, strut; 15, guide rod;16, rope is controlled.
Detailed description of the invention:
See accompanying drawing:
A kind of axisymmetric barrel base list lower limb post production platform, including bottom barrel base system and top job platform system System;Bottom barrel base system, is made up of with a main bucket 2 three identical secondary buckets 1, passes through floor between each barrel base 3 are connected, and the bucket top of secondary bucket 1 is provided with lower hollow bearing 5, and the bucket top of main bucket 2 is provided with bottom solid bearing 12;Top job platform System, is made up of 8, three sub-trusses 9 of three horizontal truss, gin pole 10, series strut 14 and top job platform 11, The head and the tail junction of three horizontal truss 8 is provided with the upper seat 7 of hollow;Propped up by the top of top job platform system hollow Seat 7 is enclosed within bottom barrel base system bottom hollow seats 5, and the gin pole 10 of hollow is enclosed within bottom solid bearing 12, Complete bottom barrel base system and top job platform system docks assembling.
Secondary bucket 1 is identical with the height of main bucket 2, and the diameter of main bucket 2 is more than the diameter of secondary bucket 1.Lead between secondary bucket 1 and main bucket 2 Cross floor 3 to be weldingly connected two-by-two, the end face of floor and the either flush of barrel base;The top of secondary bucket 1 and main bucket 2 is equipped with takes out Water hole 4;The bucket top center position of secondary bucket 1 is provided with lower hollow bearing 5, and lower hollow bearing 5 is the circular steel of inner hollow Pipe;Lower hollow bearing 5, top is provided with bolt hole 13.
Three secondary buckets 1 are formed equilateral triangle after being weldingly connected two-by-two by floor 3 and arrange, main bucket 2 be positioned at this equilateral three The center position of dihedral;The bucket top center position of main bucket 2 is provided with bottom solid bearing 12;Bottom solid bearing 12 and bottom The height of hollow seats 5 is identical, and the diameter of bottom solid bearing 12 is more than the external diameter of lower hollow bearing 5.
The upper seat 7 of top job platform system, for the round steel pipe of inner hollow, the diameter of hollow space is more than the end The external diameter of portion's hollow seats 5;Upper seat 7, its height is less than the height of lower hollow bearing 5;Three horizontal truss 8 head and the tail phases Even constituting equilateral triangle horizontal plane, junction is provided with upper seat 7.
Gin pole 10 is the circular piling bar of inner hollow, and the diameter of hollow space is more than outside bottom solid bearing 12 Footpath;Gin pole 10 is positioned in the central symmetry axis of top job platform system, be used for supporting top job platform 11 and other Auxiliary equipment.Sub-truss 9 one end is welded with gin pole 10, and the other end welds with upper seat 7.
8, three sub-trusses 9 of three horizontal truss form three identical space tetrahedron knots in side with gin pole 10 Structure;In three triangle horizontal planes of horizontal truss 8 and in described space tetrahedral structure, it is welded with a fairly large number of support Bar 14, forms multiple spatial triangle, it is ensured that the structural stability of top job platform system.
Three upper seats 7 of top job platform system, three just installing, being enclosed within bottom barrel base system On lower hollow bearing 5;While three upper seats 7 are enclosed within three lower hollow bearings 5, the gin pole 10 of hollow is also Just install, be enclosed within bottom solid bearing 12;Top job platform system and bottom barrel base system docking, assemble after, Bolt, nut 6 is utilized to fix through the bolt hole 13 i.e. safety of completion system on lower hollow bearing 5;The diameter of bolt is little Aperture in bolt hole 13.
Guide rod 15 is solid circles rod iron, and its diameter is slightly less than the inner hollow diameter of lower hollow bearing 5, guide rod 15 One end fine-meshed, passes through for controlling rope 16 and ties.
Each component of top job platform system and bottom barrel base system is made by steel material, between each component Connection by welding formed;Barrel base list lower limb post production platform, structural system axisymmetricly after overall package.
The construction method of a kind of axisymmetric barrel base list lower limb post production platform, comprises the steps:
1), after top job platform system completes with bottom barrel base system is prefabricated, it is transported to specify behind marine site, smoothly lifts by crane Bottom barrel base system stands on predetermined sea, the inside of lower hollow bearing 5 is inserted in one end of guide rod 15 and uses Industry quick-drying gelatin or other material are slightly fixed, and guide rod 15 ties one end of rope making rope 16 upward;
2), slowly decline bottom barrel base system in sea water, until contact seabed, open each barrel base suction eye of connection Negative pressure taken out by the water pump of 4, make bottom barrel base system progressively injection in sea bed, when barrel base whole injection sea bed and level When spending satisfied requirement, bottom barrel base system is heavy passes through the end of job;
3), smoothly lift by crane top job platform system and stand on predetermined sea, first control rope 16 and penetrate upper seat 7 In, more slowly move top job platform system, make three upper seats 7 be respectively fitted on three guide rods 15;
4), control top job platform system slowly to decline along guide rod 15, until three upper seats 7 are the most accurately enclosed within On three lower hollow bearings 5, the sinking end of job in place of top job platform system;
In the job platform system sinking watching of top, its stationarity should be kept, prevent its inclination, torsion etc. from irregularly trembleing and handle Part guide rod 15 is extracted from lower hollow bearing 5, affects follow-up the most in place.One end of rope making rope 16 can by human hand held or Tying up on ship side, its effect is when guide rod 15 occurs unexpected extracting to fall into marine, can be by 16 guide rods 15 of rope making rope Pull-up, pick up;
5), top job platform system sink in place after, three guide rods 15 are extracted from lower hollow bearing 5.Group's diving The lower water of member, utilizes bolt, nut 6 through the bolt hole 13 on lower hollow bearing 5, i.e. the safety of completion system is fixed, whole System assembles is complete.
Additionally, after the use of carried production platform terminates, its unloading process is as follows: send water under diver, removes, lays down spiral shell Bolt in keyhole 13, nut 6;Steadily lifting, lift-off top job platform system, places on transport ship;Based on each barrel-shaped The suction eye 4 on basis, to barrel base internal water flooding, makes bottom barrel base system gradually extract, departs from sea bed, then lift by crane, Lift-off bottom barrel base system, i.e. completes the dismounting operation of barrel base list lower limb post production platform;
The upper seat 7 of top job platform system, for the round steel pipe of inner hollow, the diameter of hollow space is more than in bottom The external diameter of empty bearing 5, make upper seat 7 dock, entangle the work progress of hollow seats 5 in have certain shift offset, just In installation exercise;
Bolt, nut 6 screw diameter less than the aperture of bolt hole 13, it is simple to diver the most quickly screw rod is inserted spiral shell In keyhole 13 and fix, shorten the underwater performance time;
In production platform running, the lower hollow bearing 5 on secondary bucket 1 may with the bottom solid bearing 12 on secondary bucket 2 By bigger horizontal shear;In order to improve the shear resistance of each bearing, each bearing may pass through barrel base top board and enters bucket Shape basic internal a certain distance, and crisscross ribbed stiffener reinforcing bearing is set inside barrel base;
Waterproof casing on production platform, cable protecting tube etc., the gin pole 10 that can be positioned over hollow is internal, to reduce platform knot Environmental load suffered by structure;Gin pole 10 top in addition to being provided with top job platform 11, also can on-demand arrange boarding platform, The auxiliary equipment such as cat ladder, simple hoist formula loop wheel machine, space frame deck, jury strut;Can arrange on top job platform 11 Relevant oil production equipment;
The present invention install in place after, its space provided should meet the jackup vessel of band cantilever beam and be drilled the requirement of well, bores Well ship pitching pile position and barrel base should have enough safe distances, the soil disturbance that the pitching pile of drill ship and pile pulling operation cause Do not interfere with reliability and the bearing capacity of barrel base.
The present invention is not limited to above-mentioned detailed description of the invention, according to foregoing, according to the ordinary technical knowledge of this area And customary means, without departing under the present invention above-mentioned basic fundamental thought premise, the present invention can also make other various ways Equivalent modifications, replace or change, within all falling within protection scope of the present invention.

Claims (6)

1. an axisymmetric barrel base list lower limb post production platform, it is characterised in that include that bottom barrel base system is with upper Portion's job platform system, described bottom barrel base system includes three place, identical secondary buckets and wherein in isosceles triangle The main bucket of centre, is connected by floor between each barrel base outer wall, and the bucket top of secondary bucket is provided with lower hollow bearing, the bucket of main bucket Top is provided with bottom solid bearing;
Described top job platform system includes matching with secondary bucket three upper seats, three upper seat central authorities be provided with The gin pole that main bucket matches, three upper seat outer walls connects and has horizontal truss, three upper seat outer walls and central authorities Being provided with the sub-truss being obliquely installed between column outer wall, gin pole upper end is provided with job platform;
Described top job platform system and bottom barrel base system docking are installed fixing, its middle and upper part job platform system Upper seat is set on the barrel base system bottom hollow seats of bottom, and the gin pole of hollow is enclosed within bottom solid bearing On.
Axisymmetric barrel base list lower limb post production platform the most according to claim 1, it is characterised in that described main bucket All being inverted with secondary bucket, main bucket diameter is more than secondary bucket diameter, and main bucket is identical with the height of secondary bucket, passes through floor between main bucket and secondary bucket It is weldingly connected two-by-two;Three secondary buckets are formed equilateral triangle after being weldingly connected two-by-two by floor and arrange, main bucket is positioned at equilateral three The center position of dihedral.
Axisymmetric barrel base list lower limb post production platform the most according to claim 1, it is characterised in that described secondary bucket Tong Ding center be provided with lower hollow bearing, lower hollow bearing is the round steel pipe of inner hollow, lower hollow holder top It is provided with bolt hole.
Axisymmetric barrel base list lower limb post production platform the most according to claim 1, it is characterised in that described top is propped up Seat is the round steel pipe of hollow, and diameter of bore is more than lower hollow bearing external diameter, and upper seat height is less than lower hollow bearing Highly.
Axisymmetric barrel base list lower limb post production platform the most according to claim 1, it is characterised in that described central authorities Column is the round steel pipe of hollow, and gin pole is positioned in the central symmetry axis of top job platform system, three horizontal truss, Three sub-trusses form, with gin pole, the space tetrahedral structure that side is identical.
6. the construction method of an axisymmetric barrel base list lower limb post production platform, it is characterised in that comprise the steps:
1), bottom barrel base system stand on predetermined sea, take three guide rods and be inserted and fixed into bottom barrel base In the lower hollow bearing of system, control rope is tied in guide rod upper end;
2), slowly decline bottom barrel base system in sea water, until contact seabed, open each barrel base suction eye of connection And utilize water pump to take out negative pressure, make bottom barrel base system progressively injection in sea bed, when barrel base whole injection sea bed and Levelness meets when requiring, bottom barrel base system is heavy passes through the end of job;
3), smoothly lift by crane top job platform system and stand on predetermined sea, first control rope and penetrate in upper seat, extremely Three upper seats are respectively fitted on three guide rods, and top job platform system slowly declines along guide rod;Until three Upper seat is the most accurately enclosed within three lower hollow bearings, the sinking end of job in place of top job platform system;
4), top job platform system sink in place after, three guide rods are extracted from lower hollow bearing, send under diver Water, the safety utilizing bolt assembly to pass the bolt hole on lower hollow bearing, i.e. completion system fixes, and whole system has assembled Finish.
CN201610601042.XA 2016-07-27 2016-07-27 A kind of axisymmetric barrel base list lower limb post production platform and construction method thereof Pending CN106087928A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610601042.XA CN106087928A (en) 2016-07-27 2016-07-27 A kind of axisymmetric barrel base list lower limb post production platform and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610601042.XA CN106087928A (en) 2016-07-27 2016-07-27 A kind of axisymmetric barrel base list lower limb post production platform and construction method thereof

Publications (1)

Publication Number Publication Date
CN106087928A true CN106087928A (en) 2016-11-09

Family

ID=57449871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610601042.XA Pending CN106087928A (en) 2016-07-27 2016-07-27 A kind of axisymmetric barrel base list lower limb post production platform and construction method thereof

Country Status (1)

Country Link
CN (1) CN106087928A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930313A (en) * 2017-04-19 2017-07-07 合肥学院 A kind of coastal waters wind energy project stake bucket combination foundation and its construction method
CN106930261A (en) * 2017-04-19 2017-07-07 合肥学院 A kind of simple ocean platform in intertidal zone and its construction method
CN106948366A (en) * 2017-04-19 2017-07-14 合肥学院 A kind of barrel base and accessory part and construction method for being easy to control perpendicularity
CN109811767A (en) * 2019-01-29 2019-05-28 广州打捞局 Suction barrel base piling positioning frame
EP3693515A1 (en) 2019-02-11 2020-08-12 Temporary Works Design Engineering B.V. Pile installation template

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2911009Y (en) * 2006-01-23 2007-06-13 中国海洋石油总公司 One-leg three-pile simple platform suitable for developing medium-small oil fields in sea
CN103981867A (en) * 2014-05-26 2014-08-13 天津港航工程有限公司 Piling limiting frame for intertidal zone offshore wind power foundation pile sinking and construction method thereof
CN204461907U (en) * 2015-03-06 2015-07-08 中交第三航务工程勘察设计院有限公司 There is the waters vane shear test platform on tub truss basis
CN205046535U (en) * 2015-07-21 2016-02-24 天津港航工程有限公司 Portable steel platform of marine construction operation
CN205857145U (en) * 2016-07-27 2017-01-04 合肥学院 A kind of axisymmetric barrel base list lower limb post production platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2911009Y (en) * 2006-01-23 2007-06-13 中国海洋石油总公司 One-leg three-pile simple platform suitable for developing medium-small oil fields in sea
CN103981867A (en) * 2014-05-26 2014-08-13 天津港航工程有限公司 Piling limiting frame for intertidal zone offshore wind power foundation pile sinking and construction method thereof
CN204461907U (en) * 2015-03-06 2015-07-08 中交第三航务工程勘察设计院有限公司 There is the waters vane shear test platform on tub truss basis
CN205046535U (en) * 2015-07-21 2016-02-24 天津港航工程有限公司 Portable steel platform of marine construction operation
CN205857145U (en) * 2016-07-27 2017-01-04 合肥学院 A kind of axisymmetric barrel base list lower limb post production platform

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930313A (en) * 2017-04-19 2017-07-07 合肥学院 A kind of coastal waters wind energy project stake bucket combination foundation and its construction method
CN106930261A (en) * 2017-04-19 2017-07-07 合肥学院 A kind of simple ocean platform in intertidal zone and its construction method
CN106948366A (en) * 2017-04-19 2017-07-14 合肥学院 A kind of barrel base and accessory part and construction method for being easy to control perpendicularity
CN106930313B (en) * 2017-04-19 2023-10-13 合肥学院 Offshore wind power engineering pile barrel combined foundation and construction method thereof
CN106948366B (en) * 2017-04-19 2023-10-13 合肥学院 Barrel-shaped foundation and auxiliary assembly convenient for controlling verticality and construction method
CN106930261B (en) * 2017-04-19 2023-10-27 合肥学院 Simple ocean platform in intertidal zone and construction method thereof
CN109811767A (en) * 2019-01-29 2019-05-28 广州打捞局 Suction barrel base piling positioning frame
CN109811767B (en) * 2019-01-29 2024-05-17 广州打捞局 Pile sinking positioning frame for suction bucket foundation
EP3693515A1 (en) 2019-02-11 2020-08-12 Temporary Works Design Engineering B.V. Pile installation template
NL2022553B1 (en) * 2019-02-11 2020-08-19 Temporary Works Design Eng B V Pile installation template

Similar Documents

Publication Publication Date Title
CN106087928A (en) A kind of axisymmetric barrel base list lower limb post production platform and construction method thereof
KR101151091B1 (en) Auxiliary float of floating structure and method for remodeling floating structure
JP2020514181A (en) Floating offshore platform
CN202492848U (en) Invisible attached type low height guide rack
CN102322069B (en) Underwater combination base of open caisson and steel pipe piles and construction method
CN102089493A (en) Offshore unit and method of installing wellhead platform using the offshore unit
CN109312552A (en) The unit and method of the sea bed support of shallow water probing terminal are provided
US2236682A (en) Marine foundation and method of construction
RU2090699C1 (en) Offshore platform and method of its construction
CN101962946A (en) Method for arranging hoisting points and floating-supported conduit frame with skirt pile sleeves
CN101392521A (en) Rock-socketed steel dock structure and construction method thereof
CN207452738U (en) The deep water high-block bridge degree bridge construction naked rock river bed trestle of hard stone
CN205857145U (en) A kind of axisymmetric barrel base list lower limb post production platform
CN202969333U (en) Steel truss rock-socketed wharf structure
CN203866802U (en) Single-foot column oil production platform
CN202170512U (en) Underwater combined base for open caisson and steel pipe piles
CN201990995U (en) Jacket support structure for expanding offshore platform
CN107117269A (en) A kind of new semi-submersible offshore platform and application method suitable for the arctic
US2935854A (en) Offshore drilling platform
CN106703064A (en) Mooring foundation with multiple lines of steel piles and waste tires symmetrically distributed and construction method of mooring foundation
CN110155263B (en) Cylindrical semi-submersible drilling platform
CN104018481A (en) Cylinder-type base single-leg-column oil production platform
CN103953021B (en) Pilot production wellhead platform for Complex Reservoir
CN113914783A (en) Dual-purpose engineering investigation water drilling platform and use method thereof
CN208148982U (en) Amphibious geotechnical engineering investigation platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161109

RJ01 Rejection of invention patent application after publication