Invention content
In order to overcome more than the deficiencies in the prior art, the purpose of the present invention is to provide one kind of multiple material adapteds, it is not easy
The modular railing of damage and the installation method being connected firmly with ground.
The purpose of the present invention is realized using following technical scheme:
A kind of modular railing including multiple chan frames, multiple is connect in the chan frame and with chan frame
Toughened rubber-laminated vacuum glass and multiple stone materials with adjacent slot beam-to-column connection two-by-two;The stone material passes through electricity with the chan frame
Metalwork connection is welded, stone material is inserted into described electric welding metalwork one end, and one end is welded with chan frame.
Preferably, the chan frame include upper channel steel, respectively with upper channel steel both ends welding 2 side channel steel parts and
With 2 steel plates of 2 side channel steel part other end welding;The chan frame is in inverted U;The upper channel steel of the chan frame is recessed
Downward, 2 side channels steel part groove port is opposite for notch.
Preferably, the upper channel steel both ends open face and upper channel steel web surface are in 45 degree, the side channel steel part and upper slot
One end open face and the side channel steel part web surface of steel welding in 45 degree, the steel plate open there are four through-hole.
Preferably, which is characterized in that the side channel steel part includes channel steel ontology, the U being welded in channel steel body recess
Type card slot, the packing material being filled between channel steel body recess and U-shaped card slot and the rubber pad being pasted onto in U-shaped card slot.
Preferably, which is characterized in that the both ends that the stone material is connect with chan frame are symmetrically equipped with multiple 50mm depths
Grooving.
Preferably, which is characterized in that epoxy resin AB glue is coated in the grooving.
Preferably, described electric welding metalwork one end is inserted into grooving, and the electric welding metalwork electric welding metal being inserted into grooving
Part surface is coated with epoxy resin AB glue.
A kind of installation method of modular railing, the described method comprises the following steps:
Unwrapping wire is measured by design drawing and code requirement, identifies chan frame steel plate position position line and heeling-in
Learn the hole position position line of anchor bolt;
According to chan frame material object verify mark position line, verify it is errorless after according to the hole position position line to ground into
Row punching, then by chemical anchor bolts implant holes, then pour into chemical agent in hole, and adjust the flatness of chemical anchor bolts and hang down
Straight degree;
The steel plate through-hole on chan frame and the chemical anchor bolts on heeling-in ground are directed at, chan frame is placed on ground, and
Chan frame verticality and levelness are adjusted, then tightens the nut on chemical anchor bolts;
Concrete bed course is carried out to the footing steel plate position of chan frame and pours bottom;
Toughened rubber-laminated vacuum glass is mounted in the U-shaped card slot in chan frame;
Epoxy resin AB glue is smeared to stone material grooving and electric welding metalwork, stone material grooving is inserted into electric welding metalwork one end
Interior, the other end and chan frame carry out electric welding again with the gap between structure glue filling stone material and chan frame.
Preferably, the footing steel plate position of chan frame is carried out to further include after concrete bed course pours bottom:It is fallen on concrete bed course
Expansive concrete in a subtle way, and vibration compacting is carried out, the concrete cushion thickness is 5mm.
Preferably, it is further included later in the U-shaped card slot that toughened rubber-laminated vacuum glass is mounted in chan frame:
The gap between the U-shaped stainless steel card slot in toughened rubber-laminated vacuum glass and chan frame, Ran Houyong are filled with structure glue
Packing material clogs in gap between side channel steel groove and U-shaped stainless steel card slot completely, and is compacted, and finally uses silicone sealant
Closing in is sealed to the gap of packing material.
Description of the drawings
It in order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to institute in embodiment
Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the present invention
Example, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these attached drawings
Obtain other attached drawings.
Fig. 1 is the front view of the modular railing in the embodiment of the present invention;
Fig. 2 is the chan frame front view in the embodiment of the present invention;
Fig. 3 is the chan frame vertical view in the embodiment of the present invention;
Fig. 4 is the side channel steel part structure chart in the embodiment of the present invention;
Fig. 5 is Figure 1B-B diagrammatic cross-sections;
Fig. 6 is Figure 1A-A diagrammatic cross-sections;
Fig. 7 is part A enlarged diagram in Fig. 6;
It is marked in attached drawing:1st, chan frame;2nd, toughened rubber-laminated vacuum glass;3rd, stone material;4th, structure glue;5th, it is welded metalwork;6、
Chemical anchor bolts;11st, upper channel steel;12nd, side channel steel part;13rd, steel plate;121st, channel steel ontology;122nd, U-shaped stainless steel card slot;123、
Rubber pad;124th, packing material;1211st, channel steel web;31st, stone material grooving;32nd, epoxy resin AB glue.
Specific embodiment
In the following, with reference to attached drawing and specific embodiment, the present invention is described further:
As shown in Figure 1, modular railing provided in an embodiment of the present invention, including 2 chan frames 1, mounted on channel steel frame
2 toughened rubber-laminated vacuum glass 2 in frame 1 and the stone material 3 being connect with 2 chan frames 1.Stone material 3 and 2 chan frames 1
It is connected by 4 stainless steel angle steel lacing films 5, stone material 3, one end and 2 chan frames 1 are inserted into 45 one end of electric welding metalwork
Electric welding.Certainly in practice, chan frame, toughened rubber-laminated vacuum glass and stone material quantity and size can design according to demand,
The embodiment of the present invention does not limit.
As shown in Figure 2 and Figure 3, chan frame 1 includes 1 upper 11,2 side channel steel part 12 of channel steel and 2 steel plates 13.
Upper 11 both ends open face of channel steel is in 45 degree, and 2 12 one end open faces of side channel steel part are in 45 degree, are all opened respectively on 2 steel plates 13
There are 4 through-holes.Upper 11 both ends of channel steel are welded together respectively with 2 opening faces of side channel steel parts 12 in 45 degree one end, upper channel steel
11 groove ports are directed downward, and the groove port direction of 2 side channel steel parts 12 is opposite.The other end of 2 side channel steel parts 12 and 2
Steel plate 13 is respectively welded together, and welding position is located at 13 center of steel plate.Chemistry of the chan frame 1 by heeling-in in ground
Anchor bolt 6 links together with ground.Certainly in practice, the shape of chan frame can also evolve into other shape accordingly, preferably
Ground is inverted U, and the number of openings of steel plate also can be more, such as 6,8 etc., it is therefore preferable to which 4, the embodiment of the present invention does not limit
It is fixed.
As shown in figure 4, side channel steel part 12 is by channel steel ontology 121, U-shaped stainless steel card slot 122, rubber pad 123 and fills out
Material 124 is filled to be composed.U-shaped 122 groove port of stainless steel card slot is consistent with 121 groove port direction of channel steel ontology, and is welded on
1211 intermediate position of channel steel body recess endosternum.U-shaped 122 height of stainless steel card slot is less than the height of channel steel ontology 121, U-shaped
122 width of stainless steel card slot is more than 2 thickness of toughened rubber-laminated vacuum glass, and U-shaped 122 lower bottom part of stainless steel card slot is sealing;Rubber pad
123 are pasted onto on U-shaped stainless steel card slot 122, and the length of rubber pad 123 is identical with the height of U-shaped stainless steel card slot 122;Filling
Material 124 is located in channel steel ontology 121 and U-shaped 122 gap of stainless steel card slot.Certainly in practice, the shape of card slot can also evidence
This evolves into other shape, can also use other material, it is therefore preferable to which U-shaped stainless steel, the embodiment of the present invention do not limit.
As shown in figure 5,3 both sides of the face of stone material are respectively provided with the grooving 31 of 2 50mm depths, epoxide resin AB is coated in grooving
Glue 32.One end that 5 surface of electric welding metalwork is coated with epoxy resin AB glue 32 is placed in grooving 31, and electric welding metalwork part 5 is in three
Angle-style is set.Certainly in practice, the shape of grooving can also evolve into other shape accordingly, and the depth of grooving can also be set
It is deeper or slightly shallow, it is therefore preferable to which that rectangle, 50mm, the embodiment of the present invention do not limit.
As shown in Figure 6, Figure 7,2 left and right ends of toughened rubber-laminated vacuum glass are placed in 1 two 12 grooves of side channel steel part of chan frame
In U-shaped stainless steel card slot 122 in, closely contacted, and pass through structure glue with pasting rubber pad 123 on U-shaped stainless steel card slot 122
4 with U-shaped stainless steel card slot 122) and rubber pad 123 stickup connect.5 one end of electric welding metalwork, which is arranged in grooving 31, to be passed through
Epoxy resin AB glue 32 pastes curing connection with stone material 3, and the other end passes through with the side channel steel part web 1211 in chan frame 1
Electric welding connection.Gap setting structure glue 4 is filled between stone material 3 and chan frame 1, certainly in practice, is welded the shape of metalwork
Other shape can also be evolved into accordingly, and the material of pendant can also select other material, it is therefore preferable to stainless steel angle steel, this hair
Bright embodiment does not limit.
The beneficial effects of the present invention are:The embodiment of the present invention using chan frame as pillar, toughened rubber-laminated vacuum glass with
And stone material collocation, as guardrail, three kinds of materials belong to firm material, are hardly damaged, and toughened rubber-laminated vacuum glass can print on surface
Various patterns are made, depiction may be used in stone material, can also use various granites, and toughened rubber-laminated vacuum glass is arranged in pairs or groups with stone material
Come, more attractive, toughened rubber-laminated vacuum glass is mounted in chan frame, and stone material is welded on by being welded metal hanger on frame, each
It is connected firmly between component.
The embodiment of the present invention additionally provides a kind of installation method of modular railing, the method
Include the following steps:
Step 101 measures unwrapping wire by design drawing and code requirement, identifies chan frame steel plate position position line
With the hole position position line of heeling-in chemical anchor bolts.
Specifically, measuring unwrapping wire by design drawing and code requirement, the steel plate position on each chan frame is determined
And lead to the hole site on steel plate, the good control line of bullet simultaneously identify heeling-in chemistry at steel plate position line and lead to the hole site on the ground
The cross position line of anchor bolt.
Step 102, the position line that mark is verified according to chan frame material object, according to hole position position line after verification is errorless
Ground is punched, then by chemical anchor bolts implant holes, is then poured into chemical agent in hole, and adjusts the flat of chemical anchor bolts
Whole degree and verticality.
Specifically, verify the position line that lead to the hole site is identified with front on the steel plate position and steel plate of chan frame material object
Whether it coincide, ground is punched according to the cross position line of mark after verification is errorless, it is after punching, dust in hole is clear
Reason is clean, then by chemical anchor bolts implant holes, and adjusts the flatness and verticality of chemical anchor bolts, by chemical agent after adjusting
It pours into hole, after chemical agent curing, chemical anchor bolts check whether firm.
Step 103, the steel plate through-hole on alignment chan frame and the chemical anchor bolts on heeling-in ground, place ground by chan frame
On face, and chan frame verticality and levelness are adjusted, then tighten the nut on chemical anchor bolts.
Specifically, in the embodiment of the present invention, after confirming that chemical anchor bolts heeling-in is consolidated and treated, chan frame is holded up by channel steel frame
Frame, which is placed on, plants on the ground for burying chemical anchor bolts, needs alignment steel plate through-hole with chemical anchor bolts in placement process and makes the chemistry of heeling-in
Anchor bolt completely extends across steel plate through-hole, then adjusts verticality and levelness to chan frame, and after adjusting, set top nut is in chemical anchors
On bolt, and tightening nut makes chan frame be fastenedly connected together with ground, and if chemical anchor bolts have exposing nut portion, hand can be used
Grinding machine cuts off and applies last layer antirust paint.
Step 104 pours bottom to the footing steel plate position progress concrete bed course of chan frame.
In the step of the embodiment of the present invention, the steel plate top and bottom of chan frame are rinsed with water and are cleaned out, then to channel steel
Frame steel plate position carries out pouring bottom concrete bed course 5mm, it is preferred that can pour into C40 microdilatancy concretes to concrete bed course later, and shake
Puddling is real, further consolidates the connection on chan frame and ground.
Toughened rubber-laminated vacuum glass is mounted in the U-shaped card slot in chan frame by step 105.
Specifically, first the inclination of toughened rubber-laminated vacuum glass one end is inserted into stainless in a side channel steel part of chan frame
In steel U-shaped card slot, then the other end of toughened rubber-laminated vacuum glass is inserted into stainless in another side channel steel part of chan frame
In steel U-shaped card slot, toughened rubber-laminated vacuum glass is adjusted, toughened rubber-laminated vacuum glass is made to be centered in stainless steel U-shaped card slot, toughened rubber-laminated vacuum glass
Both ends are close to rubber pad, then fill knot using gap of the glue rifle between stainless steel U-shaped card slot and toughened rubber-laminated vacuum glass
Structure glue after structure glue is fully cured, is finally clogged gap between side channel steel groove and U-shaped stainless steel card slot with packing material
It is full, and be compacted, after compacting closing in is sealed with silicone sealant;
Step 106 smears epoxy resin AB glue to stone material grooving and electric welding metalwork, and electric welding metalwork one end is inserted into stone
In material grooving, the other end and chan frame carry out electric welding again with the gap between structure glue filling stone material and chan frame.
Specifically, smearing epoxy resin AB glue in electric welding metalwork end surface and stone material grooving, then metal will be welded
Part smear epoxy resin AB glue one end be inserted into stone material grooving in, electric welding metalwork in fall positive triangle, until grooving bottom, then
Stone material is fixed vertically, adjusts stone material right position and terrain clearance, after adjusting OK, to electric welding metalwork and chan frame
Side channel steel part web outside carries out electric welding, clears up welding slag after having welded, and brushing antirust paint, finally using glue rifle pair
Gap interstitital texture glue between stone material and chan frame, the width of glue-line are consistent.
It should be noted that for aforementioned embodiment of the method, in order to be briefly described, therefore it is all expressed as a series of
Combination of actions, but those skilled in the art should know, the present invention is not limited by described sequence of movement, because according to
According to the present invention, certain steps may be used other sequences or be carried out at the same time.
The beneficial effects of the present invention are:A kind of installation method of modular railing, steel are provided in the embodiment of the present invention
Change doubling glass to be placed in chan frame, be connect by structure glue with chan frame, stone material is welded on by being welded metalwork
It on frame, is connected firmly between all parts, chan frame passes through chemical anchor bolts and irrigate the fields concrete bed course and ground stable connection.
It will be apparent to those skilled in the art that technical solution that can be as described above and design, make other various
Corresponding change and deformation, and all these changes and deformation should all belong to the protection domain of the claims in the present invention
Within.