CN106087808A - A kind of modular railing and installation method - Google Patents

A kind of modular railing and installation method Download PDF

Info

Publication number
CN106087808A
CN106087808A CN201610697527.3A CN201610697527A CN106087808A CN 106087808 A CN106087808 A CN 106087808A CN 201610697527 A CN201610697527 A CN 201610697527A CN 106087808 A CN106087808 A CN 106087808A
Authority
CN
China
Prior art keywords
steel
frame
chan frame
groove
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610697527.3A
Other languages
Chinese (zh)
Other versions
CN106087808B (en
Inventor
林铮
李胜林
朱彤
胡伟坚
邓继业
邱小维
蔡彭华
谢高让
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Zhengzhong Design Co., Ltd
Original Assignee
SHENZHEN ASIANTIME INTERNATIONAL CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN ASIANTIME INTERNATIONAL CONSTRUCTION Co Ltd filed Critical SHENZHEN ASIANTIME INTERNATIONAL CONSTRUCTION Co Ltd
Priority to CN201610697527.3A priority Critical patent/CN106087808B/en
Publication of CN106087808A publication Critical patent/CN106087808A/en
Priority to PCT/CN2017/079039 priority patent/WO2018032772A1/en
Application granted granted Critical
Publication of CN106087808B publication Critical patent/CN106087808B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F15/00Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
    • E01F15/02Continuous barriers extending along roads or between traffic lanes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/20Posts therefor
    • E04H17/22Anchoring means therefor, e.g. specially-shaped parts entering the ground; Struts or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to building decoration guardrail field, disclose a kind of modular railing and installation method.This modular railing includes the chan frame (1) being connected with ground, be arranged in chan frame toughened rubber-laminated vacuum glass (2) and the stone material (3) with adjacent slot beam-to-column connection two-by-two, described stone material inserts stone material with described chan frame by electric welding metalwork (5) one end, one end welding groove steel frame mode is connected.The invention provides the modular railing that one kind of multiple material adapteds, style are novel, fastening, each part dimension specification, pattern variation is connected between all parts, various occasion can be widely used in, and owing to using many material adapteds to make modular railing more attractive.

Description

A kind of modular railing and installation method
Technical field
The present invention relates to building decoration guardrail field, particularly relate to a kind of modular railing and installation method.
Background technology
Railing, as road, a kind of safety devices of building, is seen everywhere in our life.Conventional railing makes With homogenous material and be fabricated to unit, successively unit is connected composition guardrail, such as wood railing, stone railing.Along with society Can development, some new materials, the modular railing of new technology emerge, such as: glass balustrade, rustless steel railing, peace Loading easily, style shape style is many, and adapts to various occasion.But there is also following shortcoming: material adapted is single;Hurdle Bar is fragile;Railing is connected insecure etc. with ground.
Summary of the invention
In order to overcome above the deficiencies in the prior art, it is an object of the invention to provide one kind of multiple material adapteds, be difficult to The modular railing damaged and the installation method being connected firmly with ground.
The purpose of the present invention realizes by the following technical solutions:
A kind of modular railing, including multiple chan frames, multiple are positioned at chan frame and are connected with chan frame Toughened rubber-laminated vacuum glass and multiple and adjacent slot beam-to-column connection two-by-two stone material;Described stone material and described chan frame are by electricity Weldering metalwork connects, and stone material is inserted in described electric welding metalwork one end, and one end is welded with chan frame.
Preferably, described chan frame include channel-section steel, 2 the side channel steel parts welded with upper channel-section steel two ends respectively and 2 steel plates welded with 2 side channel steel part other ends;Described chan frame is inverted U;The upper channel-section steel of described chan frame is recessed Down, described 2 side channel steel part groove port are relative for notch.
Preferably, described upper channel-section steel both ends open face and upper channel-section steel web surface are 45 degree, described side channel steel part and upper groove The one end open face of steel welding is 45 degree with side channel steel part web surface, and described steel plate has four through holes.
Preferably, it is characterised in that described side channel steel part includes channel-section steel body, the U being welded in channel-section steel body recess Type draw-in groove, the packing material being filled between channel-section steel body recess and U-shaped draw-in groove and be pasted onto the rubber blanket in U-shaped draw-in groove.
Preferably, it is characterised in that it is deep that the two ends that described stone material is connected with chan frame are provided with multiple 50mm symmetrically Grooving.
Preferably, it is characterised in that in described grooving, scribble epoxide resin AB glue.
Preferably, described electric welding metalwork one end is inserted in grooving, and inserts the electric welding metalwork electric welding metal in grooving Part surface scribbles epoxide resin AB glue.
The installation method of a kind of modular railing, said method comprising the steps of:
Measure unwrapping wire by design drawing and code requirement, identify chan frame steel plate position location line and heeling-in Learn location, position, the hole line of crab-bolt;
Examine the location line of mark according to chan frame material object, examine errorless after according to position, described hole location line ground is entered Row punching, then by chemical anchor bolts implant holes, then chemical agent is poured in hole, and adjust the flatness of chemical anchor bolts and hang down Straight degree;
Steel plate through hole on alignment slot steel frame and the chemical anchor bolts on heeling-in ground, place chan frame on ground, and Adjustment tank steel frame perpendicularity and levelness, then tighten the nut on chemical anchor bolts;
The footing steel plate position of chan frame is carried out concrete bed course and waters the end;
In the U-shaped draw-in groove that toughened rubber-laminated vacuum glass is arranged in chan frame;
Stone material grooving and electric welding metalwork are smeared epoxide resin AB glue, stone material grooving is inserted in electric welding metalwork one end In, the other end and chan frame carry out electric welding and fill the space between stone material and chan frame by structure glue again.
Preferably, the footing steel plate position to chan frame carries out also including after concrete bed course waters the end: fall on concrete bed course Expansive concrete in a subtle way, and carry out vibration compacting, described concrete cushion thickness is 5mm.
Preferably, also include after in the described U-shaped draw-in groove that toughened rubber-laminated vacuum glass is arranged in chan frame:
Fill the gap between the U-shaped rustless steel draw-in groove in toughened rubber-laminated vacuum glass and chan frame by structure glue, then use Packing material is by full for space filling between side channel steel groove and U-shaped rustless steel draw-in groove, and is compacted, and finally uses silicone sealant Carry out sealing closing in the space of packing material.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to institute in embodiment The accompanying drawing used is needed to be briefly described, it should be apparent that, the accompanying drawing in describing below is only some enforcements of the present invention Example, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to according to these accompanying drawings Obtain other accompanying drawing.
Fig. 1 is the front view of the modular railing in the embodiment of the present invention;
Fig. 2 is the chan frame front view in the embodiment of the present invention;
Fig. 3 is the chan frame top view in the embodiment of the present invention;
Fig. 4 is the side channel steel part structure chart in the embodiment of the present invention;
Fig. 5 is Figure 1B-B generalized section;
Fig. 6 is Figure 1A-A generalized section;
Fig. 7 is part A enlarged diagram in Fig. 6;
Labelling in accompanying drawing: 1, chan frame;2, toughened rubber-laminated vacuum glass;3, stone material;4, structure glue;5, electric welding metalwork;6、 Chemical anchor bolts;11, upper channel-section steel;12, side channel steel part;13, steel plate;121, channel-section steel body;122, U-shaped rustless steel draw-in groove;123、 Rubber blanket;124, packing material;1211, channel-section steel web;31, stone material grooving;32, epoxide resin AB glue.
Detailed description of the invention
Below, in conjunction with accompanying drawing and detailed description of the invention, the present invention is described further:
As it is shown in figure 1, the modular railing that the embodiment of the present invention provides, including 2 chan frames 1, it is arranged on channel-section steel frame 2 toughened rubber-laminated vacuum glass 2 in frame 1 and the stone material 3 being connected with 2 chan frames 1.Stone material 3 and described 2 chan frames 1 Being connected by 4 rustless steel angle steel lacing films 5, stone material 3, one end and 2 chan frames 1 are inserted in 4 electric welding metalwork 5 one end Electric welding.Certainly, in reality, chan frame, toughened rubber-laminated vacuum glass and stone material quantity and size can design according to demand, The embodiment of the present invention does not limits.
As shown in Figure 2 and Figure 3, chan frame 1 includes 1 upper 11,2 side channel steel part 12 of channel-section steel and 2 steel plates 13. Upper channel-section steel 11 both ends open face is 45 degree, and 2 side channel steel part 12 one end open faces are 45 degree, and 2 steel plates 13 are the most all opened There are 4 through holes.Upper channel-section steel 11 two ends are together with one end of 45 degree is welded respectively with 2 side channel steel part 12 opening surfaces, upper channel-section steel 11 groove port are directed downward, and the groove port direction of 2 side channel steel parts 12 is relative.The other end of 2 side channel steel parts 12 and 2 Steel plate 13 is respectively welded together, and welding position is positioned at steel plate 13 center.Chan frame 1 is by heeling-in chemistry in ground Crab-bolt 6 links together with ground.Certainly, in reality, the shape of chan frame can also develop into other shape accordingly, preferably Ground is inverted U, and the number of openings of steel plate also can be more, such as 6,8 etc., it is therefore preferable to 4, the embodiment of the present invention does not limits Fixed.
As shown in Figure 4, side channel steel part 12 by channel-section steel body 121, U-shaped rustless steel draw-in groove 122, rubber blanket 123 and is filled out Fill material 124 to combine.U-shaped rustless steel draw-in groove 122 groove port is consistent with channel-section steel body 121 groove port direction, and is welded on Channel-section steel body recess endosternum 1211 middle part.U-shaped rustless steel draw-in groove 122 height is less than the height of channel-section steel body 121, U-shaped Rustless steel draw-in groove 122 width is more than toughened rubber-laminated vacuum glass 2 thickness, and U-shaped rustless steel draw-in groove 122 lower bottom part is sealing;Rubber blanket 123 are pasted onto on U-shaped rustless steel draw-in groove 122, and the length of rubber blanket 123 is identical with the height of U-shaped rustless steel draw-in groove 122;Fill Material 124 is positioned in channel-section steel body 121 and U-shaped rustless steel draw-in groove 122 space.Certainly, in reality, the shape of draw-in groove can also evidence This develops into other shape, it is possible to use other material, it is therefore preferable to U-shaped rustless steel, and the embodiment of the present invention does not limits.
As it is shown in figure 5, stone material 3 both sides end face is respectively provided with 2 groovings 31 deep for 50mm, in grooving, all scribble epoxide resin AB Glue 32.Electric welding metalwork 5 surface scribbles one end of epoxide resin AB glue 32 and is placed in grooving 31, and electric welding metal pieces 5 is in three Angle-style is arranged.Certainly, in reality, the shape of grooving, it is also possible to develop into other shape accordingly, the degree of depth of grooving can also be arranged Deeper or the most shallow, it is therefore preferable to rectangle, 50mm, the embodiment of the present invention does not limits.
As shown in Figure 6, Figure 7, toughened rubber-laminated vacuum glass about 2 two ends are placed in 1 two side channel steel part 12 grooves of chan frame In U-shaped rustless steel draw-in groove 122 in, and paste on U-shaped rustless steel draw-in groove 122 that rubber blanket 123 is adjacent to be contacted, and pass through structure glue 4 with U-shaped rustless steel draw-in groove 122) and rubber blanket 123 paste connect.Electric welding metalwork 5 one end is passed through in being arranged on grooving 31 Epoxide resin AB glue 32 is pasted solidification with stone material 3 and is connected, and the other end passes through with the side channel steel part web 1211 in chan frame 1 Electric welding connects.Between stone material 3 and chan frame 1, space arranges structure glue 4 and fills, in certain reality, and the shape of electric welding metalwork Can also develop into other shape accordingly, the material of suspension member can also select other material, it is therefore preferable to rustless steel angle steel, this Bright embodiment does not limits.
The beneficial effects of the present invention is: the embodiment of the present invention use chan frame as pillar, toughened rubber-laminated vacuum glass with And stone material collocation is as guardrail, three kinds of materials belong to firm material, are hardly damaged, and toughened rubber-laminated vacuum glass can print on surface Making various pattern, stone material can use depiction, it would however also be possible to employ various granites, and toughened rubber-laminated vacuum glass and stone material are arranged in pairs or groups Coming, more attractive, toughened rubber-laminated vacuum glass is arranged in chan frame, and stone material is welded on framework by electric welding metal hanger, each It is connected firmly between parts.
The embodiment of the present invention additionally provides the installation method of a kind of modular railing, described method
Comprise the following steps:
Step 101, measure unwrapping wire by design drawing and code requirement, identify chan frame steel plate position location line Line is positioned with the position, hole of heeling-in chemical anchor bolts.
Concrete, measure unwrapping wire by design drawing and code requirement, determine the steel plate position on each chan frame And lead to the hole site on steel plate, the good control line of bullet also identifies heeling-in chemistry at steel plate location line and lead to the hole site on the ground The cross location line of crab-bolt.
Step 102, examine the location line of mark according to chan frame material object, examine errorless after position line according to position, described hole Is punched in ground, then by chemical anchor bolts implant holes, then chemical agent is poured in hole, and adjust the flat of chemical anchor bolts Whole degree and perpendicularity.
Concrete, examine lead to the hole site and the location line above identified on chan frame steel plate position in kind and steel plate Whether coincide, examine errorless after according to mark cross location line is punched in ground, after punching, by clear for dust in hole Reason is clean, then by chemical anchor bolts implant holes, and adjusts flatness and the perpendicularity of chemical anchor bolts, by chemical agent after adjusting Pour in hole, after chemical agent solidifies, chemical anchor bolts are checked whether firm.
Steel plate through hole on step 103, alignment slot steel frame and the chemical anchor bolts on heeling-in ground, place ground by chan frame On face, and adjustment tank steel frame perpendicularity and levelness, then tighten the nut on chemical anchor bolts.
Concrete, in the embodiment of the present invention, confirmation chemical anchor bolts heeling-in consolidates after treating, holds up chan frame by channel-section steel frame Frame is placed on plants on the ground burying chemical anchor bolts, needs be directed at steel plate through hole and chemical anchor bolts and make the chemistry of heeling-in in placement process Crab-bolt completely extends across steel plate through hole, then chan frame is adjusted perpendicularity and levelness, and after adjusting, set top nut is in chemical anchors On bolt, and fastening nut makes together with chan frame is fastenedly connected with ground, to expose nut portion as chemical anchor bolts have, can use hands Grinding machine cuts off and is coated with last layer antirust paint.
Step 104, footing steel plate position to chan frame carry out concrete bed course and water the end.
In this step of the embodiment of the present invention, with water, the steel plate top and bottom flushing of chan frame is cleaned out, then to channel-section steel Framework steel plate position carries out watering end concrete bed course 5mm, it is preferred that can pour C40 microdilatancy concrete into concrete bed course afterwards, and shake Puddling is real, the most firm chan frame and the connection on ground.
In step 105, the U-shaped draw-in groove that toughened rubber-laminated vacuum glass is arranged in chan frame.
Concrete, first the inclination of toughened rubber-laminated vacuum glass one end be inserted in a side channel steel part of chan frame is stainless In the U-shaped draw-in groove of steel, then the other end of toughened rubber-laminated vacuum glass is inserted in another side channel steel part of chan frame stainless In the U-shaped draw-in groove of steel, adjust toughened rubber-laminated vacuum glass, make toughened rubber-laminated vacuum glass be centered in the U-shaped draw-in groove of rustless steel, toughened rubber-laminated vacuum glass Two ends are close to rubber blanket, then use the space between glue rifle draw-in groove U-shaped to rustless steel and toughened rubber-laminated vacuum glass to fill knot Structure glue, after structure glue is fully cured, finally clogs space between side channel steel groove and U-shaped rustless steel draw-in groove with packing material Full, and be compacted, carry out sealing with silicone sealant after compacting and close up;
Step 106, stone material grooving and electric welding metalwork are smeared epoxide resin AB glue, stone is inserted in electric welding metalwork one end In material grooving, the other end and chan frame carry out electric welding and fill the space between stone material and chan frame by structure glue again.
Concrete, in electric welding metalwork end surface and stone material grooving, smear epoxide resin AB glue, then by electric welding metal Part is smeared one end of epoxide resin AB glue and is inserted in stone material grooving, and electric welding metalwork is in positive triangle, until bottom grooving, then Stone material is vertically fixed, adjusts stone material right position and terrain clearance, after adjusting OK, to electric welding metalwork and chan frame Side channel steel part web outside carries out electric welding, is cleared up by welding slag after having welded, and brushing antirust paint, finally uses glue rifle pair Space interstitital texture glue between stone material and chan frame, the width of glue-line keeps consistent.
It should be noted that for aforesaid embodiment of the method, in order to be briefly described, therefore it is all expressed as a series of Combination of actions, but those skilled in the art should know, and the present invention is not limited by described sequence of movement, because depending on According to the present invention, some step can use other orders or carry out simultaneously.
The beneficial effects of the present invention is: the embodiment of the present invention provides the installation method of a kind of modular railing, steel Changing doubling glass to be placed in chan frame, be connected with chan frame by structure glue, stone material is welded on by electric welding metalwork On framework, being connected firmly between all parts, chan frame is by chemical anchor bolts and irrigate the fields concrete bed course and ground stable connection.
It will be apparent to those skilled in the art that can technical scheme as described above and design, make other various Corresponding change and deformation, and all these change and deformation all should belong to the protection domain of the claims in the present invention Within.

Claims (10)

1. a modular railing, it is characterised in that include multiple chan frame, multiple be positioned at chan frame and with channel-section steel frame The toughened rubber-laminated vacuum glass of frame connection and multiple and adjacent slot beam-to-column connection two-by-two stone material;Described stone material and described channel-section steel frame Frame is connected by electric welding metalwork, and stone material is inserted in described electric welding metalwork one end, and one end is welded with chan frame.
A kind of modular railing, it is characterised in that described chan frame includes channel-section steel, difference 2 the side channel steel parts welded with upper channel-section steel two ends and 2 steel plates welded with 2 side channel steel part other ends;Described groove Steel frame is inverted U;Down, described 2 side channel steel part groove port are relative for the upper channel-section steel groove port of described chan frame.
A kind of modular railing, it is characterised in that described upper channel-section steel both ends open face and upper channel-section steel Web surface is 45 degree, and the one end open face that described side channel steel part welds with upper channel-section steel and side channel steel part web surface are 45 degree, Described steel plate has four through holes.
A kind of modular railing, it is characterised in that described side channel steel part include channel-section steel body, The U-shaped draw-in groove being welded in channel-section steel body recess, the packing material being filled between channel-section steel body recess and U-shaped draw-in groove and viscous It is attached to the rubber blanket in U-shaped draw-in groove.
A kind of modular railing, it is characterised in that the two ends that described stone material is connected with chan frame It is provided with the deep grooving of multiple 50mm symmetrically.
A kind of modular railing, it is characterised in that scribble epoxide resin AB glue in described grooving.
A kind of modular railing, it is characterised in that the described electric welding metalwork in insertion grooving End surface scribbles epoxide resin AB glue.
8. the installation method of modular railing described in a claim 1, it is characterised in that said method comprising the steps of:
Measure unwrapping wire by design drawing and code requirement, identify chan frame steel plate position location line and heeling-in chemical anchors Location, position, the hole line of bolt;
Examine the location line of mark according to chan frame material object, examine errorless after carry out ground beating according to location, position, described hole line Hole, then by chemical anchor bolts implant holes, then chemical agent is poured in hole, and adjust the flatness of chemical anchor bolts with vertical Degree;
Steel plate through hole on alignment slot steel frame and the chemical anchor bolts on heeling-in ground, place chan frame on ground, and adjust Chan frame perpendicularity and levelness, then tighten the nut on chemical anchor bolts;
The footing steel plate position of chan frame is carried out concrete bed course and waters the end;
In the U-shaped draw-in groove that toughened rubber-laminated vacuum glass is arranged in chan frame;
Stone material grooving and electric welding metalwork are smeared epoxide resin AB glue, electric welding metalwork one end is inserted in stone material grooving, separately One end and chan frame carry out electric welding and fill the space between stone material and chan frame by structure glue again.
A kind of combination type installation method the most according to claim 8, it is characterised in that the footing steel plate position to chan frame Putting and carry out also including after concrete bed course waters the end: pour microdilatancy concrete on concrete bed course into, and carry out vibration compacting, described concrete bed course is thick Degree is 5mm.
A kind of combination type installation method the most according to claim 8, it is characterised in that described by toughened rubber-laminated vacuum glass peace Also include after in the U-shaped draw-in groove being contained in chan frame:
The gap between the U-shaped rustless steel draw-in groove in toughened rubber-laminated vacuum glass and chan frame is filled, then with filling by structure glue Material is by full for space filling between side channel steel groove and U-shaped rustless steel draw-in groove, and is compacted, finally with silicone sealant to filling out The space filling material carries out sealing closing in.
CN201610697527.3A 2016-08-19 2016-08-19 A kind of modular railing and installation method Active CN106087808B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610697527.3A CN106087808B (en) 2016-08-19 2016-08-19 A kind of modular railing and installation method
PCT/CN2017/079039 WO2018032772A1 (en) 2016-08-19 2017-03-31 Combined handrail and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610697527.3A CN106087808B (en) 2016-08-19 2016-08-19 A kind of modular railing and installation method

Publications (2)

Publication Number Publication Date
CN106087808A true CN106087808A (en) 2016-11-09
CN106087808B CN106087808B (en) 2018-06-08

Family

ID=58070002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610697527.3A Active CN106087808B (en) 2016-08-19 2016-08-19 A kind of modular railing and installation method

Country Status (2)

Country Link
CN (1) CN106087808B (en)
WO (1) WO2018032772A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018032772A1 (en) * 2016-08-19 2018-02-22 深圳市亚泰国际建设股份有限公司 Combined handrail and installation method
CN108677799A (en) * 2018-05-18 2018-10-19 南京天方电子工程有限公司 A kind of installation method of isolated gate
CN108868315A (en) * 2018-07-26 2018-11-23 温州鹿城第三建筑工程有限公司 A kind of building construction protective fence

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2451652Y (en) * 2000-07-26 2001-10-03 吕明良 Imitation white marble railing
US20080271652A1 (en) * 2007-05-04 2008-11-06 Defenshield, Inc. Barrier
CN201924652U (en) * 2011-03-24 2011-08-10 招景棉 Assembly type glass rail
CN202577814U (en) * 2012-05-04 2012-12-05 孙玉良 Novel stainless steel glass railing
CN205907636U (en) * 2016-08-19 2017-01-25 深圳市亚泰国际建设股份有限公司 Combined railing

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2729250B2 (en) * 1994-12-22 1998-03-18 メトロ電気工業株式会社 Luminous curb
DE29721660U1 (en) * 1997-12-09 1998-02-12 Uhl Hermann Fa Construction system
CN203977332U (en) * 2014-07-11 2014-12-03 郑州三迪建筑科技有限公司 The guardrail of a kind of high-speed railway both sides
CN104164848B (en) * 2014-07-23 2016-03-09 华北水利水电大学 Junked tire highway isolation belt device
CN105672172B (en) * 2016-01-06 2017-09-22 潍坊远大金属表面科技有限公司 A kind of construction method of Dacroment steel highway barrier
CN205369158U (en) * 2016-03-04 2016-07-06 沈文权 View flood control dykes and dams
CN106087808B (en) * 2016-08-19 2018-06-08 深圳市亚泰国际建设股份有限公司 A kind of modular railing and installation method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2451652Y (en) * 2000-07-26 2001-10-03 吕明良 Imitation white marble railing
US20080271652A1 (en) * 2007-05-04 2008-11-06 Defenshield, Inc. Barrier
CN201924652U (en) * 2011-03-24 2011-08-10 招景棉 Assembly type glass rail
CN202577814U (en) * 2012-05-04 2012-12-05 孙玉良 Novel stainless steel glass railing
CN205907636U (en) * 2016-08-19 2017-01-25 深圳市亚泰国际建设股份有限公司 Combined railing

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018032772A1 (en) * 2016-08-19 2018-02-22 深圳市亚泰国际建设股份有限公司 Combined handrail and installation method
CN108677799A (en) * 2018-05-18 2018-10-19 南京天方电子工程有限公司 A kind of installation method of isolated gate
CN108868315A (en) * 2018-07-26 2018-11-23 温州鹿城第三建筑工程有限公司 A kind of building construction protective fence

Also Published As

Publication number Publication date
CN106087808B (en) 2018-06-08
WO2018032772A1 (en) 2018-02-22

Similar Documents

Publication Publication Date Title
CN106087808A (en) A kind of modular railing and installation method
CN109853800B (en) Assembled low-energy-consumption curtain wall system and construction method thereof
CN203821847U (en) Sealing element and sealing structure for building template
WO2018208716A1 (en) Articulating composite surface covering mat and method of making
GB2444637A (en) Permanent formwork having with hollow concrete walls, separated and reinforced by steel framework
CN103835303B (en) A kind of cast-type armored concrete shearing resistance method and structure
CN112921821B (en) Capping beam subsection prefabrication and assembly wet joint construction structure and construction method thereof
CN206328941U (en) A kind of concrete hollow block and combinations thereof structure
CN205907636U (en) Combined railing
CN203822048U (en) Composite door frame with auxiliary steel frame
CN206360343U (en) A kind of post-cast strip side mold device for pre-installed and inverted adhered waterproof surface
CN204645661U (en) Adjustable angle steel template
CN212984490U (en) Casting surface separation seam forming frame assembly
CN212896179U (en) Drainage stopping structure for transverse joint between adjacent seepage-proof panels on near-water surface of concrete gravity dam
CN211201146U (en) Aluminum template assembly structure with reserved material conveying holes
CN210396138U (en) Pour and use section bar mounting structure
CN203977282U (en) A kind of quick-replaceable bridge expansion joint installation
CN208266611U (en) A kind of precast concrete pavement of fast spreading
CN205742997U (en) Foursquare arc band groove heavy in section superelevation Fair-Faced Concrete Column template
CN207392470U (en) A kind of improved T plate bottom plate piece construction
CN206859660U (en) A kind of beam column template system of reserved opening
CN220285179U (en) Composite copper tile for special-shaped archaized tower building decoration
CN104929012A (en) Construction method for basalt brick road and tile road of skid pad
CN111411774A (en) Template structure for preventing construction joint dislocation and slurry leakage and construction method
JP2007154555A (en) Water channel cover device for ditch

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Liu Yungui

Inventor after: She Pi

Inventor after: Wang Xiaoying

Inventor after: Li Jierong

Inventor after: Cai Penghua

Inventor after: Mei Lin

Inventor after: Zhu Ning

Inventor after: Yang Yuanying

Inventor after: Nie Hong

Inventor after: Chen Fuyao

Inventor before: Lin Zheng

Inventor before: Li Shenglin

Inventor before: Zhu Tong

Inventor before: Hu Weijian

Inventor before: Deng Jiye

Inventor before: Qiu Xiaowei

Inventor before: Cai Penghua

Inventor before: Xie Gaorang

GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 518000 Guangdong city of Shenzhen province Yitian Futian District District Road and Fuhua Road Interchange, 4B02 4B01 excellence Times Square

Patentee after: Shenzhen Zhengzhong Design Co., Ltd

Address before: 518000 Guangdong city of Shenzhen province Yitian Futian District District Road and Fuhua Road Interchange, 4B02 4B01 excellence Times Square

Patentee before: SHENZHEN ASIANTIME INTERNATIONAL CONSTRUCTION Co.,Ltd.