CN106087615A - A kind of coke-quenching vehicle track maintenance device - Google Patents

A kind of coke-quenching vehicle track maintenance device Download PDF

Info

Publication number
CN106087615A
CN106087615A CN201610414205.3A CN201610414205A CN106087615A CN 106087615 A CN106087615 A CN 106087615A CN 201610414205 A CN201610414205 A CN 201610414205A CN 106087615 A CN106087615 A CN 106087615A
Authority
CN
China
Prior art keywords
track
coke
support portion
grout blanket
quenching vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610414205.3A
Other languages
Chinese (zh)
Other versions
CN106087615B (en
Inventor
陈松清
佘世云
夏孝轩
苏平
郑庭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maanshan Iron and Steel Co Ltd
Original Assignee
Maanshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maanshan Iron and Steel Co Ltd filed Critical Maanshan Iron and Steel Co Ltd
Priority to CN201610414205.3A priority Critical patent/CN106087615B/en
Publication of CN106087615A publication Critical patent/CN106087615A/en
Application granted granted Critical
Publication of CN106087615B publication Critical patent/CN106087615B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/40Means or arrangements for temporarily supporting laid tracks, or rails or sleepers in the track

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

nullThe present invention provides a kind of coke-quenching vehicle track maintenance device being applied to coke-quenching vehicle track technical field of auxiliary equipment,Mount board face (4) left part of the device body (1) of described coke-quenching vehicle track maintenance device is connected with device left support portion (2),Mount board face (4) right part is connected with device right support portion (3),Distance between described device left support portion (2) and device right support portion (3) is set greater than the structure of track grout blanket (6) width of track (5),The coke-quenching vehicle track maintenance device of the present invention,Simple in construction,During grout blanket is changed and is safeguarded,Can ensure that use normally arranged by track,Guarantee coke car normal transport,Do not interfere with normal transport operation,Effectively solve the grout blanket problem that track cannot use during safeguarding,And during working service device,Grout blanket will not be damaged by track,Effectively guarantee that grout blanket reaches Solidification Quality.

Description

A kind of coke-quenching vehicle track maintenance device
Technical field
The invention belongs to coke-quenching vehicle track technical field of auxiliary equipment, more specifically, relate to a kind of coke-quenching vehicle track Maintenance device.
Background technology
Coke oven coke quenching car track is the supply line that coke is delivered to after coke oven discharges of the coke water quenching tower or coke dry quenching furnace.Quenching side Formula has: water puts out and dry puts out two kinds;Coke dry quenching furnace is in the east side of coke oven coke quenching car track, and water puts out the west side at coke oven coke quenching car track. Coke oven coke quenching car track of the prior art, during life-time service, the grout blanket of sleeper bottom is overweight and squeezed because of stress Pressure causes breakage, and damaged uneven, the phenomenon that is uneven occurs.Owing to rail height injustice causes coke quenching cart in traveling process Middle vibration is big, repeatedly causes regulator cubicle to collapse, the problem such as converter lower margin comes off, electric binding terminal loosens, track fracture;And Coke oven productive prospecting is: uninterruptedly produce, and rhythm of production is fast (every 10 clock one stoves, every stove coke quenching cart moves back and forth 2 times), not quite The longer time may be had to overhaul, and periodic maintenance is the most difficult;The injustice of track has had a strong impact on safety in production, also affects production Operating time.Track repair method of the prior art is: after being taken off by sleeper, then cleaned up sleeper bottom, on pad Certain thickness steel plate, levelling after be in the milk again, then sleeper is returned dress, recovers coke quenching cart and run.Its shortcoming is: grouting material does not reaches Just it is extruded out to rational health preserving so that it is all that has been achieved is spoiled.The lance between production is safeguarded because it cannot solve track foundation Shield.
Summary of the invention
The technical problem to be solved is: not enough for prior art, it is provided that a kind of simple in construction, at grout blanket Change during safeguarding, it can be ensured that use normally arranged by track, it is ensured that coke normal transport, thus solve prior art is in the milk During layer maintenance, track cannot use the coke-quenching vehicle track maintenance device of problem.
Techniques discussed above problem to be solved, the technical scheme that the present invention takes is:
The present invention is a kind of coke-quenching vehicle track maintenance device, and described coke-quenching vehicle track maintenance device includes device body, Device body includes device left support portion, device right support portion, mount board face, and left part, mount board face is with device left support portion even Connecing, right part, mount board face is connected with device right support portion, the distance between device left support portion and device right support portion It is set greater than the structure of the track grout blanket width of track.
It is set to the structure in n font, track between described device left support portion, device right support portion, mount board face Track grout blanket arrange on the ground, the left support portion of device body is disposed against the ground of track grout blanket leftward position Structure on face, device right support portion is disposed against the ground structure of track grout blanket right positions.
Described device body also includes lower connecting portion, and lower connecting portion arranges recessed recess, lower connecting portion left end Being connected with device left support portion, lower connecting portion right-hand member is connected with device right support portion, the device left support portion of device body and dress Putting right support portion against time on the ground, track grout blanket is set to be positioned at the structure of recess lower position.
Described coke-quenching vehicle track maintenance device also includes multiple fixing bolt, arranges and arranges on the ground of track grout blanket With fixing bolt quantity and position connecting hole one to one, each fixing bolt was configured to through leading on device body The structure that mono-connecting hole of Kong Houyu connects.
Arranging a vertically arranged connection pipe fitting in each described connecting hole, each fixing bolt is configured to wear It is connected the structure that pipe fitting connects with one after crossing the through hole on device body.
Described track is configured to the structure that the upper surface in the mount board face with device body is connected.
Described track includes base, track body, fastener, and described base is connected with fastener, and track body sets Being set to the structure that can be placed on base, fastener is configured to the structure being installed in rail bed by track body.
Use technical scheme, can obtain following beneficial effect:
Coke-quenching vehicle track maintenance device of the present invention, when being arranged in ground track grout blanket because being put out for a long time Burnt car apply pressure in orbit and impaired after, need to carry out track grout blanket safeguarding and change, at this moment, by track and sleeper Remove successively, then carry out roller-way grout blanket safeguarding and change, after replacing maintenance completes, owing to grouting material does not solidify, nothing Method support stress, and if be mounted directly the parts such as sleeper and use, it will cause the damage of grout blanket.Assembly of the invention After employing, after carrying out roller-way grout blanket safeguarding replacing, the device body of coke-quenching vehicle track maintenance device is supported on ground On, at this moment, track grout blanket is between device left support portion and device right support portion, then by track installation at device body On, thus may insure that track can normally bear pressure, both guaranteed that coke quenching cart normally worked, maintenance will not be changed again Grout blanket causes damage.And after grout blanket realizes solidification through maintenance after a while, i.e. can pull down coke-quenching vehicle track Maintenance device, again by the parts such as sleeper and track and installation, so that whole track recovers normal condition.Institute of the present invention The coke-quenching vehicle track maintenance device stated, simple in construction, during grout blanket is changed and is safeguarded, it can be ensured that track is normally arranged and made With, it is ensured that coke car normal transport, do not interfere with normal transport operation, effectively solving grout blanket track during safeguarding cannot make Problem, and during working service device, grout blanket will not be damaged by track, effectively guarantees that grout blanket reaches solidification Quality.
Accompanying drawing explanation
Content expressed by accompanying drawing each to this specification and the labelling in figure make brief description below:
Fig. 1 is structural representation during coke-quenching vehicle track maintenance device of the present invention use;
Fig. 2 is the structural representation that coke-quenching vehicle track of the present invention arranges when being arranged on sleeper;
Reference: 1, device body;2, device left support portion;3, device right support portion;4, mount board face;5, track; 6, track grout blanket;7, ground;8, lower connecting portion;9, recess;10, fixing bolt;11, connecting hole;12, pipe fitting is connected;13、 Base;14, track body;15, fastener;16, sleeper.
Detailed description of the invention
Below against accompanying drawing, by the description to embodiment, each structure the most involved to the detailed description of the invention of the present invention Mutual alignment and annexation, the effect of each several part and operation principle etc. between the shape of part, structure, each several part are made further Detailed description:
As shown in Figure 1, the present invention is a kind of coke-quenching vehicle track maintenance device, described coke-quenching vehicle track maintenance device bag Including device body 1, device body 1 includes device left support portion 2, device right support portion 3, mount board face 4, mount board face 4 left end Portion is connected with device left support portion 2, and right part, mount board face 4 is connected with device right support portion 3, described device left support portion 2 With the distance between device right support portion 3 is set greater than the structure of track grout blanket 6 width of track 5.Said structure Arrange, when be arranged in ground track grout blanket because being applied for a long time pressure in orbit by coke quenching cart impaired after, need To carry out track grout blanket safeguarding and change, at this moment, track and sleeper be removed successively, then roller-way grout blanket is safeguarded Change, after replacing maintenance completes, owing to grouting material does not solidify, it is impossible to support stress, and if being mounted directly the portions such as sleeper Part uses, it will cause the damage of grout blanket.After assembly of the invention uses, change carrying out roller-way grout blanket safeguarding After, the device body 1 of coke-quenching vehicle track maintenance device is supported on the ground, at this moment, track grout blanket 6 is positioned at device left support Between portion 2 and device right support portion 3, then by track installation on device body, thus may insure that track can be normal Bear pressure, both guaranteed that coke quenching cart normally works, the grout blanket that maintenance is changed will not be caused damage again.And when grout blanket solidifies After, coke-quenching vehicle track maintenance device can be pulled down, again by the parts such as sleeper and track and installation, so that whole track Recover normal condition.Coke-quenching vehicle track maintenance device of the present invention, simple in construction, low cost, change at grout blanket and safeguard Period, it can be ensured that use normally arranged by track, it is ensured that coke normal transport, do not interfere with normal operation, effectively solve grouting The layer problem that track cannot use during safeguarding, and during working service device, grout blanket will not be damaged by track, Effectively guarantee that grout blanket reaches Solidification Quality.
It is set to the structure in n font, rail between described device left support portion 2, device right support portion 3, mount board face 4 The track grout blanket 6 in road 5 is arranged on ground 7, and the left support portion 2 of device body 1 is disposed against on the left of track grout blanket 6 Structure on the ground 7 of position, device right support portion 3 is disposed against the knot on the ground 7 of track grout blanket 6 right positions Structure.Such structure is arranged, and track grout blanket is arranged on the ground, and when device body uses, device left support portion 2 and device Right support portion 3 bears against in track grout blanket both sides, such structure, can either make mount board face attachment rail, and hold The pressure produced during by coke quenching cart by track, and it can be avoided that the track grout blanket after updating maintenance is produced and damages, really Protect track grout blanket can normal freezing, guarantee that transport is normal, does not interferes with production simultaneously.
Described device body 1 also includes lower connecting portion 8, and lower connecting portion 8 arranges recessed recess 9, lower connecting portion 8 Left end is connected with device left support portion 2, and lower connecting portion 8 right-hand member is connected with device right support portion 3, and a device left side for device body 1 is propped up When support part 2 and device right support portion 3 are resisted against on ground 7, track grout blanket 6 is set to be positioned at the knot of recess 9 lower position Structure.The setting of the lower connecting portion 8 on device body 1, had both played attachment means left support portion 2 and the purpose in device right support portion 3, Strengthen the intensity of whole device body, improve the purpose bearing the power produced in coke quenching cart course of conveying, it is to avoid stress deformation, carry High-quality, in use, the track grout blanket after maintenance can be positioned at the position of the cavity space that recess is formed to device body, Track grout blanket is played a protective role, it is ensured that track grout blanket can normal freezing.
Described coke-quenching vehicle track maintenance device also includes multiple fixing bolt 10, arranges on the ground 7 of track grout blanket 6 Arranging and fixing bolt 10 quantity and connecting hole 11 one to one, position, each fixing bolt 10 is configured to through device The structure being connected with a connecting hole 11 after through hole on body 1.Fixing bolt and the setting of connecting hole, it is ensured that device body with Ground is reliably connected, it is to avoid rock and image transport.
Arranging a vertically arranged connection pipe fitting 12 in each described connecting hole 11, each fixing bolt 10 is set to It is connected the structure that pipe fitting 12 connects with one after can passing the through hole on device body 1.
Described track 5 is configured to the structure that the upper surface in the mount board face 4 with device body 1 is connected.
Described track 5 includes that base 13, track body 14, fastener 15, described base 13 are connected with fastener 15, Track body 14 is configured to the structure being placed on base 13, and fastener 15 is configured to be installed on track body 14 Structure in rail bed 13.Base 13, track body 14, fastener 15 with the use of, track body and dress can be realized Put being reliably connected of body, again can convenient and swift dismounting track body, it is simple to the installation and removal of coke-quenching vehicle track maintenance device, Improve the efficiency of loading and unloading.
Coke-quenching vehicle track maintenance device of the present invention, when being arranged in ground track grout blanket because being put out for a long time Burnt car apply pressure in orbit and impaired after, need to carry out track grout blanket safeguarding and change, at this moment, by track and sleeper Remove successively, then carry out roller-way grout blanket safeguarding and change, after replacing maintenance completes, owing to grouting material does not solidify, nothing Method support stress, and if be mounted directly the parts such as sleeper and use, it will cause the damage of grout blanket.Assembly of the invention After employing, after carrying out roller-way grout blanket safeguarding replacing, the device body of coke-quenching vehicle track maintenance device is supported on ground On, at this moment, track grout blanket is between device left support portion and device right support portion, then by track installation at device body On, thus may insure that track can normally bear pressure, both guaranteed that coke quenching cart normally worked, maintenance will not be changed again Grout blanket causes damage.And after grout blanket realizes solidification through maintenance after a while, i.e. can pull down coke-quenching vehicle track Maintenance device, again by the parts such as sleeper and track and installation, so that whole track recovers normal condition.Institute of the present invention The coke-quenching vehicle track maintenance device stated, simple in construction, during grout blanket is changed and is safeguarded, it can be ensured that track is normally arranged and made With, it is ensured that coke car normal transport, do not interfere with normal transport operation, effectively solving grout blanket track during safeguarding cannot make Problem, and during working service device, grout blanket will not be damaged by track, effectively guarantees that grout blanket reaches solidification Quality.
Above in conjunction with accompanying drawing, the present invention is carried out exemplary description, it is clear that concrete implementation of the present invention is not by above-mentioned The restriction of mode, if the various improvement that the method design that have employed the present invention is carried out with technical scheme, or the most improved by this Design and the technical scheme of invention directly apply to other occasions, the most within the scope of the present invention.

Claims (7)

1. a coke-quenching vehicle track maintenance device, it is characterised in that: described coke-quenching vehicle track maintenance device includes device body (1), device body (1) includes device left support portion (2), device right support portion (3), mount board face (4), and mount board face (4) are left End is connected with device left support portion (2), and mount board face (4) right part is connected with device right support portion (3), and described device is left Distance between supporting part (2) and device right support portion (3) is set greater than track grout blanket (6) width of track (5) Structure.
Coke-quenching vehicle track maintenance device the most according to claim 1, it is characterised in that: described device left support portion (2), Being set to the structure in n font between device right support portion (3), mount board face (4), the track grout blanket (6) of track (5) is arranged On ground (7), the left support portion (2) of device body (1) is disposed against the ground of track grout blanket (6) leftward position (7) structure on, device right support portion (3) is disposed against the knot on the ground (7) of track grout blanket (6) right positions Structure.
Coke-quenching vehicle track maintenance device the most according to claim 2, it is characterised in that: described device body (1) also wraps Include lower connecting portion (8), lower connecting portion (8) arranges recessed recess (9), lower connecting portion (8) left end and device left support portion (2) connecting, lower connecting portion (8) right-hand member is connected with device right support portion (3), the device left support portion (2) of device body (1) and dress Put right support portion (3) be resisted against ground (7) upper time, track grout blanket (6) is set to be positioned at the knot of recess (9) lower position Structure.
Coke-quenching vehicle track maintenance device the most according to claim 2, it is characterised in that: described coke-quenching vehicle track maintenance dress Put and also include multiple fixing bolt (10), arrange the ground (7) of track grout blanket (6) upper arrange with fixing bolt (10) quantity and Position connecting hole one to one (11), each fixing bolt (10) is configured to after the through hole on device body (1) The structure being connected with a connecting hole (11).
Coke-quenching vehicle track maintenance device the most according to claim 4, it is characterised in that: in each described connecting hole (11) Arranging a vertically arranged connection pipe fitting (12), each fixing bolt (10) is configured on device body (1) It is connected the structure that pipe fitting (12) connects with one after through hole.
Coke-quenching vehicle track maintenance device the most according to claim 2, it is characterised in that: described track (5) is arranged to Enough structures being connected with the upper surface in the mount board face (4) of device body (1).
Coke-quenching vehicle track maintenance device the most according to claim 1, it is characterised in that: described track (5) includes base (13), track body (14), fastener (15), described base (13) is connected with fastener (15), track body (14) arrange For can be placed at the structure on base (13), fastener (15) is configured to track body (14) is installed on rail bed (13) structure on.
CN201610414205.3A 2016-06-06 2016-06-06 A kind of coke-quenching vehicle track maintenance device Active CN106087615B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610414205.3A CN106087615B (en) 2016-06-06 2016-06-06 A kind of coke-quenching vehicle track maintenance device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610414205.3A CN106087615B (en) 2016-06-06 2016-06-06 A kind of coke-quenching vehicle track maintenance device

Publications (2)

Publication Number Publication Date
CN106087615A true CN106087615A (en) 2016-11-09
CN106087615B CN106087615B (en) 2018-05-18

Family

ID=57845451

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610414205.3A Active CN106087615B (en) 2016-06-06 2016-06-06 A kind of coke-quenching vehicle track maintenance device

Country Status (1)

Country Link
CN (1) CN106087615B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10021962A1 (en) * 2000-02-10 2001-08-16 Walter Heilit Verkehrswegebau Procedure for positioning of two-block sleepers relative to rail grid support plate has one sleeper block supported relative to rail grid support plate in or near its opposite end regions in longitudinal direction
CN202688805U (en) * 2012-08-08 2013-01-23 北京铁五院工程机械有限公司 Framed bent unit with supporting stud outside template
CN203403330U (en) * 2013-07-25 2014-01-22 马钢(集团)控股有限公司 Composite type track bed
CN204022752U (en) * 2014-07-16 2014-12-17 攀钢集团西昌钢钒有限公司 Coke-quenching vehicle track assembly
CN204875397U (en) * 2015-06-25 2015-12-16 中国中铁航空港建设集团有限公司 Empty structure of railway line long distance reinforcing frame

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10021962A1 (en) * 2000-02-10 2001-08-16 Walter Heilit Verkehrswegebau Procedure for positioning of two-block sleepers relative to rail grid support plate has one sleeper block supported relative to rail grid support plate in or near its opposite end regions in longitudinal direction
CN202688805U (en) * 2012-08-08 2013-01-23 北京铁五院工程机械有限公司 Framed bent unit with supporting stud outside template
CN203403330U (en) * 2013-07-25 2014-01-22 马钢(集团)控股有限公司 Composite type track bed
CN204022752U (en) * 2014-07-16 2014-12-17 攀钢集团西昌钢钒有限公司 Coke-quenching vehicle track assembly
CN204875397U (en) * 2015-06-25 2015-12-16 中国中铁航空港建设集团有限公司 Empty structure of railway line long distance reinforcing frame

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王士杰: "遂渝铁路无砟轨道病害原因分析及治理措施", 《路基工程》 *

Also Published As

Publication number Publication date
CN106087615B (en) 2018-05-18

Similar Documents

Publication Publication Date Title
CN104562863B (en) A kind of dual-purpose railway two-orbit
CN203947375U (en) A kind of shield machine chassis and battery truck composite sleeper
CN104527691A (en) Mounting method and mounting bases for locomotive underframe parts
CN203237796U (en) Rail walking mechanism and material carrying machine
CN106087615A (en) A kind of coke-quenching vehicle track maintenance device
CN203420183U (en) Adjustable railway track coupling structure
CN202830664U (en) Plate-type ballastless track maintenance structure
CN205871788U (en) Condact rail supports base temporarily
CN210965370U (en) Lining plate of ball mill
CN204551143U (en) A kind of dual-purpose railway two-rail
CN105401495A (en) Method for rapidly and directly paving 100 m long rail of ballast track of newly-built railway
CN106120487A (en) Composite cement guidance tape ground roll bracket
CN203922604U (en) Subway lay a railway track gantry crane dismounting and transportation rotary lifter
CN209556232U (en) Blast furnace off-line assembled sliding propulsion balance beam
CN203200620U (en) Adjustable anti-tumbling protective device suitable for mine transporting track
CN207987630U (en) A kind of track bracing means
CN204173708U (en) A kind of towing machine fag end fixed support
CN104863028A (en) Rail fixing device combined with carrier roller
CN206015435U (en) A kind of flat base railway track fixing device
CN204456169U (en) A kind of transformer track settlement formula mounting structure
CN204163217U (en) The syndeton of the heat insulation backplate of converter platform girder steel
CN204690521U (en) Roller for conveying steel rail on sleeper
CN203682345U (en) Movable type quadrilateral articulated chute for particle or bulk stock discharge of sealing-tape machine
CN203344741U (en) Fixing device of transmission shaft bracket of scooptram
CN203542431U (en) Vertically inclined turnover positioning device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 243003 Department of intellectual property right of Hunan West Road No. 8 technology center, Ma'anshan City, Anhui Province

Applicant after: Ma'anshan Iron and Steel Co., Ltd.

Address before: 243003 Hunan Anhui West Road, No. 8 technology center, Intellectual Property Department

Applicant before: Ma'anshan Iron and Steel Co., Ltd.

GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 243003 8 Jiuhua Road, Yushan, Ma'anshan, Anhui

Patentee after: Ma'anshan Iron and Steel Co., Ltd.

Address before: 243003 intellectual property department, technology center, No. 8 Hunan West Road, Yushan, Ma'anshan, Anhui

Patentee before: Ma'anshan Iron and Steel Co., Ltd.

CP02 Change in the address of a patent holder