CN106082316A - Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement - Google Patents

Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement Download PDF

Info

Publication number
CN106082316A
CN106082316A CN201610694306.0A CN201610694306A CN106082316A CN 106082316 A CN106082316 A CN 106082316A CN 201610694306 A CN201610694306 A CN 201610694306A CN 106082316 A CN106082316 A CN 106082316A
Authority
CN
China
Prior art keywords
corti
feed
boiling chloridizing
chloridizing furnace
spiral organ
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610694306.0A
Other languages
Chinese (zh)
Inventor
赵泽权
李保金
李朝伟
龙翔
冯炜光
潘德刚
杨正蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Metallurgy Xin Litai Industry Co Ltd
Original Assignee
Yunnan Metallurgy Xin Litai Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Metallurgy Xin Litai Industry Co Ltd filed Critical Yunnan Metallurgy Xin Litai Industry Co Ltd
Priority to CN201610694306.0A priority Critical patent/CN106082316A/en
Publication of CN106082316A publication Critical patent/CN106082316A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C01INORGANIC CHEMISTRY
    • C01GCOMPOUNDS CONTAINING METALS NOT COVERED BY SUBCLASSES C01D OR C01F
    • C01G23/00Compounds of titanium
    • C01G23/02Halides of titanium
    • C01G23/022Titanium tetrachloride
    • CCHEMISTRY; METALLURGY
    • C01INORGANIC CHEMISTRY
    • C01GCOMPOUNDS CONTAINING METALS NOT COVERED BY SUBCLASSES C01D OR C01F
    • C01G23/00Compounds of titanium
    • C01G23/04Oxides; Hydroxides
    • C01G23/047Titanium dioxide
    • C01G23/07Producing by vapour phase processes, e.g. halide oxidation

Landscapes

  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Inorganic Chemistry (AREA)
  • Inorganic Compounds Of Heavy Metals (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The invention discloses a kind of Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement, including: three feed bins;Three weighing apparatus, three weighing apparatus are connected by feed pipeline and three feed bin one_to_one corresponding respectively;Three screen clothes, in each screen cloth is located at the feed pipeline of correspondence and between weighing apparatus and feed bin, feed pipeline is provided with neighbouring screen cloth and gathering hole to be opened/closed;Carrier, the outlet of carrier connects with boiling chloridizing furnace;Batch mixing spiral organ of Corti, batch mixing spiral organ of Corti is located between weighing apparatus and the import of carrier.Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement feeding amount according to embodiments of the present invention is compared with accurate and the more uniform property of batch mixing, feeding is smooth and easy and continues, ensure that the stable and continuous of feed arrangement is run, improve product quality, improve boiling chloridizing furnace fluidized state, material through filtering mixes evenly in batch mixing spiral organ of Corti simultaneously, it is to avoid enters the material in boiling chloridizing furnace and layering occurs.

Description

Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement
Technical field
The present invention relates to Titanium Dioxide Produced by Chloride Procedure production technical field, more particularly, to a kind of Titanium Dioxide Produced by Chloride Procedure boiling Chlorination furnace feed arrangement.
Background technology
In upper deslagging fluidizing chlorination titanium white production, raw material is mainly high titanium slag, rutile and petroleum coke, at boiling chlorine It is under fluidized state in changing stove and reacts with chlorine.Fluidized bed furnace fluidized state in correlation technique is poor, and material is at fluidized bed furnace Layering the most easily occur, product quality is poor, and often occurs when production operation returning gas problem, and safety is relatively low.
Summary of the invention
The application is to make following facts and the discovery of problem and understanding based on inventor:
Producing, transporting and during conveying etc., raw material high titanium slag, rutile and petroleum coke are inevitably being infiltrated Iron filings and oarse-grained impurity.In reaction unit fill process, can often there is stuck conveyor screw in these impurity, blocking The problems such as charging line, these problems will cause feed arrangement poor continuity, cause discontinuity to feed.The most not only can cause boiling Rise chlorination furnace fluidized state poor, too increase the miscellaneous content entering reaction unit, reduce the matter of intermediate products and final products Amount.
Meanwhile, need in process of production to feed to boiling chloridizing furnace continuously, but it is difficult to ensure that three during charging Plant raw material mix homogeneously, so will cause the material entering in boiling chloridizing furnace that layering occurs, and react bad, reduce further Intermediate products and the quality of final products
It addition, reacting gas and reacted gas are mainly high temperature, poisonous corrosive gas in chlorination furnace, common Feeding manner and device do not ensure that furnace gas does not returns in raw material feed bin or feed system, thus cause producing Operation occurs often return gas.
In view of this, it is contemplated that one of technical problem solved the most to a certain extent in correlation technique.To this end, The present invention proposes a kind of Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement, and described Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feeds Device feeding is smooth and easy and continues, and feeding amount is more accurate, it is possible to reduce miscellaneous content and the layering of material entering boiling chloridizing furnace.
Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement according to embodiments of the present invention, including: three feed bins;Three titles Treasure, described three weighing apparatus are connected with described three feed bin one_to_one corresponding by feed pipeline respectively;Three screen clothes, Mei Gesuo Stating in screen cloth is located at the described feed pipeline of correspondence and between described weighing apparatus and described feed bin, described feed pipeline is provided with Neighbouring described screen cloth and gathering hole to be opened/closed;Carrier, the outlet of described carrier connects with the reaction chamber of boiling chloridizing furnace; Batch mixing spiral organ of Corti, described batch mixing spiral organ of Corti is located between the import of described weighing apparatus and described carrier.
Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement feeding amount according to embodiments of the present invention relatively accurately and batch mixing relatively Uniformity, feeding is smooth and easy and continues, it is ensured that the stable and continuous of feed arrangement is run, and improves boiling chloridizing furnace fluidized state, Reduce the miscellaneous content entering reaction unit, improve the quality of intermediate products and final products;Meanwhile, through the material filtered Batch mixing spiral organ of Corti mix evenly, it is to avoid entering the material in boiling chloridizing furnace and layering occur, reaction effect is good.
It addition, Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement according to the above embodiment of the present invention can also have as Lower additional technical characteristic:
According to some embodiments of the present invention, Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement also includes: tramp iron separator, institute State tramp iron separator to be located between each described feed bin and the described batch mixing spiral organ of Corti of correspondence.
According to some embodiments of the present invention, described tramp iron separator is located between described weighing apparatus and described batch mixing spiral organ of Corti.
According to some embodiments of the present invention, described carrier is connected with described boiling chloridizing furnace by feed lines, institute State feed lines and at least include tilting upward relative to vertical direction the inclination pipeline section of extension.
According to some embodiments of the present invention, described feed lines includes that two horizontal pipeline sections, described inclination pipeline section are located at Between two described horizontal pipeline sections.
According to some embodiments of the present invention, described feed lines is provided with the control valve controlling its break-make.
According to some embodiments of the present invention, described carrier includes that two be arranged in parallel, each described carrier divide Feed lines that Tong Guo be not corresponding is connected with described boiling chloridizing furnace.
According to some embodiments of the present invention, described batch mixing spiral organ of Corti is three grades of spiral organ of Corti, the of described three grades of spiral organ of Corti One-level spiral organ of Corti, second level spiral organ of Corti and third level spiral organ of Corti are vertically distributed.
According to some embodiments of the present invention, described first order spiral organ of Corti includes two, one of them described first order spiral shell Spigot is connected with feed bin described in two of which, first order spiral organ of Corti described in other in which and feed bin phase described in other in which Even.
The additional aspect of the present invention and advantage will part be given in the following description, and part will become from the following description Obtain substantially, or recognized by the practice of the present invention.
Accompanying drawing explanation
Fig. 1 is the structural representation of Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement according to embodiments of the present invention;
Fig. 2 is the part-structure signal of Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement according to embodiments of the present invention Figure;
Fig. 3 is the knot at the feed lines of Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement according to embodiments of the present invention Structure schematic diagram.
Reference:
Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement 100;Boiling chloridizing furnace 200;
Feed bin 10;Weighing apparatus 20;Screen cloth 30;Carrier 40;
Batch mixing spiral organ of Corti 50;First order spiral organ of Corti 51;Second level spiral organ of Corti 52;Third level spiral organ of Corti 53;
Tramp iron separator 60;Feed lines 70;Horizontal pipeline section 71;Tilt pipeline section 72;
Control valve 81;Switch valve 82;Blending bunker 90.
Detailed description of the invention
Embodiments of the invention are described below in detail, and the example of described embodiment is shown in the drawings.Below with reference to The embodiment that accompanying drawing describes is exemplary, it is intended to is used for explaining the present invention, and is not considered as limiting the invention, ability Above-described embodiment can be changed, revises, replace and modification by the those of ordinary skill in territory within the scope of the invention.
Describe Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement according to embodiments of the present invention below in conjunction with the accompanying drawings in detail 100。
Referring to figs. 1 through shown in Fig. 3, Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement 100 according to embodiments of the present invention Three feed bins, 20, three screen clothes 30 of 10, three weighing apparatus, carrier 40 and batch mixing spiral organ of Corti 50 can be included.Three feed bins 10 points Can not hold high titanium slag, rutile and petroleum coke.
Specifically, feed bin 10, screen cloth 30, weighing apparatus 20, batch mixing spiral organ of Corti 50 and carrier 40 set gradually.Weigh for three Device 20 can be connected by feed pipeline and three feed bin 10 one_to_one corresponding respectively.It is to say, three weighing apparatus 20 and three material Storehouse 10 one_to_one corresponding, each weighing apparatus 20 is connected with corresponding feed bin 10 by feed pipeline.The most defeated for convenience of material Sending, as it is shown in figure 1, each weighing apparatus 20 can be arranged on the lower section of the feed bin 10 of correspondence, feed pipeline can be arranged by general vertical. Three screen clothes 30 and three weighing apparatus 20 one_to_one corresponding, each screen cloth 30 is respectively provided in the feed pipeline of correspondence, and is positioned at Between corresponding weighing apparatus 20 and feed bin 10.
Thus, when material flows out from feed bin 10 and flows to weighing apparatus 20, can be through screen cloth 30, screen cloth 30 can be by material In large granular impurity filter down, prevent large granular impurity from entering weighing apparatus 20 and be positioned at the parts after weighing apparatus 20, shadow Ring weigh effect and stuck batch mixing spiral organ of Corti 50 and carrier 40 etc., make feeding to continue, steadily and swimmingly carry out. Further, more accurate through the material metage filtered, improve the accuracy of charging.
The mesh size of screen cloth 30 can be arranged the most flexibly, when short grained contaminant filter is fallen by needs Time, it is more relatively small that the mesh size of screen cloth 30 can be arranged;When oarse-grained contaminant filter is fallen by needs, screen cloth 30 It is more relatively large that mesh size then can be arranged.It addition, for improving charging system dispensing more accurately, more uniformly mix, Weighing apparatus 20 can use Weightlessness balance, to join in batch mixing spiral organ of Corti 50 according to corresponding doses.
Can be provided with the gathering hole of neighbouring corresponding screen cloth 30 on each feed pipeline, gathering hole can open and close.When Gathering hole, when conveying, can be closed by material, prevents material from flowing out from gathering hole;When Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace enters When material device 100 does not carry out the conveying of material, gathering hole can be opened, so that the granule foreign being trapped on screen cloth 30 is gone Remove, prevent granule foreign to be deposited on screen cloth 30, affect the conveying effect of material.
As in figure 2 it is shown, switch valve 82 can be arranged between feed bin 10 and screen cloth 30, when switch valve 82 is opened, feed bin 10 In material can flow to screen cloth 30, when switch valve 82 cuts out, the material in feed bin 10 can not flow to screen cloth 30.When opening When gathering hole carries out the cleaning of screen cloth 30, switch valve 82 can cut out, easy to operate.Alternatively, switch valve 82 can be hands Dynamic valve, to facilitate operator to stop the feed of feed bin 10 the most at any time.
Batch mixing spiral organ of Corti 50 may be provided between the import of weighing apparatus 20 and carrier 40, and the outlet of carrier 40 can be with boiling Chlorination furnace 200 is connected.Material after correct amount can realize mixing in batch mixing spiral organ of Corti 50, then by conveying Device 40 is delivered in boiling chloridizing furnace 200.Wherein, the mixing uniformity of batch mixing spiral organ of Corti 50 is good, it is ensured that material is entering boiling Rise before in chlorination furnace 200 and can be uniformly mixed, be beneficial to the reaction in boiling chloridizing furnace 200.
Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement 100 according to embodiments of the present invention, by feed bin 10 and title Screen cloth 30 is set between treasure 20, makes the material flowed out from feed bin 10 can flow to weighing apparatus 20 after the filtration of screen cloth 30 again With batch mixing spiral organ of Corti 50 etc., it is ensured that the accuracy weighed and the uniformity of batch mixing, feeding is smooth and easy and continues, it is ensured that charging The stable and continuous of device 100 is run, and improves boiling chloridizing furnace 200 fluidized state, and reduces the miscellaneous of entrance reaction unit Content, reduces the quality of intermediate products and final products.Meanwhile, the material through filtering mixes more in batch mixing spiral organ of Corti 50 Uniformly, it is to avoid entering the material in boiling chloridizing furnace 200 and layering occur, reaction effect is good.
Preferably, according to some embodiments of the present invention, Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement 100 also may be used Including tramp iron separator 60, tramp iron separator 60 may be provided between each feed bin 10 and the batch mixing spiral organ of Corti 50 of correspondence.Tramp iron separator 60 can make The irony impurity entering this region is held removing, is possible not only to realize the recovery to irony impurity, and achieves material Further filtration, the impurity in material is less, is more beneficial for reaction.
After Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement 100 works a period of time, tramp iron separator 60 can gather relatively Many iron tramps, at this point it is possible to the hand hole opened on tramp iron separator 60, remove the iron tramp of absorption, and this clear operation can be Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement 100 is carried out when not feeding, to ensure safety and the elimination effect of operation.
As in figure 2 it is shown, tramp iron separator 60 may be provided between weighing apparatus 20 and batch mixing spiral organ of Corti 50.Now, tramp iron separator 60 is permissible After being positioned at screen cloth 30, screen cloth 30 can be as main filter element, and tramp iron separator 60 can use as secondary filter members, Can improve the de-ferrous effect of tramp iron separator 60, it is to avoid the impact on tramp iron separator 60 of other impurity, meanwhile, tramp iron separator 60 is not susceptible to Damage.
As shown in figures 1 and 3, according to some embodiments of the present invention, carrier 40 can be by feed lines 70 and boiling Chlorination furnace 200 is connected, and feed lines 70 at least includes the inclination pipeline section 72 tilting upward extension relative to vertical direction.Namely Say, when material moves in feed lines 70, there is the motion of one section of extension that is inclined upwardly relative to vertical direction to I haven't seen you for ages, In feeding process, material can fill up this inclination pipeline section 72, and now material can play certain sealing function, i.e. at feed pipe Road 70 can be formed material seal structure, prevent the material in boiling chloridizing furnace 200 from returning carrier 40 and preventing feeding process In there is returning gas, safety improves.
As it is shown on figure 3, feed lines 70 can include two horizontal pipeline sections 71, tilt pipeline section 72 and may be provided in two horizontal pipeline sections Between 71.Thus, it is possible to ensure that the material seal structure formed during stationarity and the feeding of feeding is more stable, it is ensured that seal effect Really.
Further, feed lines 70 can be provided with the control valve 81 of its break-make of control.It is to say, on feed lines 70 Can arrange control valve 81, control valve 81 can control conducting and the disconnection of feed lines 70, when control valve 81 is opened, and conveying Device 40 and boiling chloridizing furnace 200 are in connected state, and when control valve 81 is closed, carrier 40 disconnects with boiling chloridizing furnace 200. Thus, it is possible to control the carrier 40 feeding to boiling chloridizing furnace 200 easily by control valve 81.Alternatively, control valve 81 Can be electrically-controlled valve, it is also possible to for hand-operated valve.As it is shown on figure 3, control valve 81 can be positioned adjacent to the one of boiling chloridizing furnace 200 On individual horizontal pipeline section 71, with operation and the better tightness of being more convenient for.
As it is shown in figure 1, carrier 40 can include two be arranged in parallel, specifically, two carriers 40 are arranged in parallel Between batch mixing spiral organ of Corti 50 and boiling chloridizing furnace 200.Each carrier 40 is respectively by corresponding feed lines 70 and boiling Chlorination furnace 200 is connected.Thus, it is possible not only to improve feeding ability, and two carriers 40 can realize complementation, it is to avoid one When being damaged, whole device all can not feeding, material conveying effective, stationarity and reliability are higher.
According to some embodiments of the present invention, batch mixing spiral organ of Corti 50 is three grades of spiral organ of Corti.Three grades of spiral organ of Corti include the first order Spiral organ of Corti 51, second level spiral organ of Corti 52 and third level spiral organ of Corti 53, first order spiral organ of Corti 51, second level spiral organ of Corti 52 and the third level Spiral organ of Corti 53 is vertically distributed.It is to say, batch mixing spiral organ of Corti 50 is formed as vertically disposed three grades of spiral organ of Corti, thus, Three grades of batch mixings, batch mixing and feeding performance can be realized good, preferably guarantee that dispensing is accurately and mixing uniform, it is achieved material exists The purpose of mix homogeneously is admirably achieved before entering carrier 40.
As it is shown in figure 1, according to some embodiments of the present invention, first order spiral organ of Corti 51 can include two, one of them is years old One-level spiral organ of Corti 51 is connected with two of which feed bin 10, other in which first order spiral organ of Corti 51 and other in which feed bin 10 phase Even.It is to say, when carrying out first order batch mixing, two of which material first mixes, wherein another material individually enters Row auger, two kinds of materials of mix homogeneously mix with another material when second level batch mixing again, it is achieved three kinds The mixing of material, finally when third level batch mixing, three kinds of materials mix again.Thus, it is possible to raising by a relatively large margin mixes Close effect, make the mixing uniformity of material significantly improve.
In a specific embodiment of the present invention, in one-level batch mixing, rutile and petroleum coke first mix homogeneously, Then mix with high titanium slag again in two grades of batch mixings, finally mix in three grades of batch mixings, good mixing effect the most simultaneously.
As it is shown in figure 1, also can be provided with blending bunker 90 between carrier 40 and batch mixing spiral organ of Corti 50, blending bunker 90 is located at Between batch mixing spiral organ of Corti 50 and carrier 40, blending bunker 90 can store through the mixed material of batch mixing spiral organ of Corti 50, and Material is delivered to further carrier 40, is delivered in boiling chloridizing furnace by 40 materials of carrier.
Blending bunker 90 can play and temporarily stores material and balance batch mixing speed and the carrier of batch mixing spiral organ of Corti 50 The effect of the transfer rate of 40, prevents when the material flowed out in batch mixing spiral organ of Corti 50 enters directly in carrier 40, because of one Secondary feeding too much causes carrier 40 stuck or a feeding is very few and the situation of zero load occurs, and feed arrangement 100 is permissible The speed kept in balance carries material in boiling chloridizing furnace, and feeding is evenly and plant running is more steadily reliable.
As it is shown in figure 1, when carrier 40 is two, blending bunker 90 can be two, and with two carriers 40 1 One is corresponding connected.Thus, the material flowed out from batch mixing spiral organ of Corti 50 can enter in different blending bunker 90, and can smoothly Subsequent delivery is realized in entering into the carrier 40 of correspondence.It is understood that the carrier 40 shown in Fig. 1 and blending bunker 90 are two is only used as example and is described, and in the present invention, the quantity of carrier 40 and blending bunker 90 is not limited to two, also Can be one or more than two etc., specifically can be configured as required.
In sum, Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace 200 feed arrangement 100 according to embodiments of the present invention has even Continuous charging, material mix homogeneously, remove impurity removing continuously, prevent the features such as returning charge.
Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace 200 feed arrangement 100 according to embodiments of the present invention other constitute and Operation is knowable for the person of ordinary skill of the art, is not described in detail at this.
In describing the invention, it is to be understood that term " " center ", " on ", D score, "front", "rear", " vertically ", The orientation of the instruction such as " level ", " top ", " end ", " interior ", " outward " or position relationship are to close based on orientation shown in the drawings or position System, is for only for ease of the description present invention and simplifies description rather than instruction or imply that the device of indication or element must have Specific orientation, with specific azimuth configuration and operation, be therefore not considered as limiting the invention.
In the present invention, unless otherwise clearly defined and limited, term " install ", " being connected ", " connection ", " fixing " etc. Term should be interpreted broadly, and connects for example, it may be fixing, it is also possible to be to removably connect, or integral;Can be that machinery connects Connect, it is also possible to be electrical connection or each other can communication;Can be to be joined directly together, it is also possible to be indirectly connected to by intermediary, permissible It is connection or the interaction relationship of two elements of two element internals, unless otherwise clear and definite restriction.For this area For those of ordinary skill, above-mentioned term concrete meaning in the present invention can be understood as the case may be.
In the description of this specification, reference term " embodiment ", " specific embodiment ", " example " or " concrete example " etc. Description means to combine this embodiment or example describes specific features, structure, material or feature be contained in the present invention extremely In a few embodiment or example.In this manual, the schematic representation of above-mentioned term is necessarily directed to identical Embodiment or example.And, the specific features of description, structure, material or feature can with one or more embodiments in office or Example combines in an appropriate manner.Additionally, in the case of the most conflicting, those skilled in the art can be by this explanation Different embodiments or the feature of example and different embodiment or example described in book are combined and combine.

Claims (9)

1. a Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement, it is characterised in that including:
Three feed bins;
Three weighing apparatus, described three weighing apparatus are connected with described three feed bin one_to_one corresponding by feed pipeline respectively;
Three screen clothes, in each described screen cloth is located at the described feed pipeline of correspondence and be positioned at described weighing apparatus and described feed bin it Between, described feed pipeline is provided with neighbouring described screen cloth and gathering hole to be opened/closed;
Carrier, the outlet of described carrier connects with the reaction chamber of boiling chloridizing furnace;
Batch mixing spiral organ of Corti, described batch mixing spiral organ of Corti is located between the import of described weighing apparatus and described carrier.
Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement the most according to claim 1, it is characterised in that also include: remove Ironware, described tramp iron separator is located between described feed bin and the described batch mixing spiral organ of Corti of correspondence.
Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement the most according to claim 2, it is characterised in that described tramp iron separator It is located between described weighing apparatus and described batch mixing spiral organ of Corti.
Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement the most according to claim 1, it is characterised in that described carrier Being connected with described boiling chloridizing furnace by feed lines, described feed lines at least includes tilting upward relative to vertical direction prolonging The inclination pipeline section stretched.
Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement the most according to claim 4, it is characterised in that described feed pipe Road also includes that two horizontal pipeline sections, described inclination pipeline section are located between two described horizontal pipeline sections.
Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement the most according to claim 4, it is characterised in that described feed pipe Road is provided with the control valve controlling its break-make.
Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement the most according to claim 1, it is characterised in that described carrier Including two be arranged in parallel, each described carrier is connected with described boiling chloridizing furnace by corresponding feed lines respectively.
Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement the most according to claim 1, it is characterised in that described batch mixing spiral shell Spigot is three grades of spiral organ of Corti, and the first order spiral organ of Corti of described three grades of spiral organ of Corti, second level spiral organ of Corti and third level spiral organ of Corti are along perpendicular Straight directional spreding.
Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement the most according to claim 8, it is characterised in that the described first order Spiral organ of Corti includes two, and one of them described first order spiral organ of Corti is connected with feed bin described in two of which, described in other in which First order spiral organ of Corti is connected with feed bin described in other in which.
CN201610694306.0A 2016-08-19 2016-08-19 Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement Pending CN106082316A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610694306.0A CN106082316A (en) 2016-08-19 2016-08-19 Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610694306.0A CN106082316A (en) 2016-08-19 2016-08-19 Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement

Publications (1)

Publication Number Publication Date
CN106082316A true CN106082316A (en) 2016-11-09

Family

ID=58071093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610694306.0A Pending CN106082316A (en) 2016-08-19 2016-08-19 Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement

Country Status (1)

Country Link
CN (1) CN106082316A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108675342A (en) * 2018-06-19 2018-10-19 河南佰利联新材料有限公司 A kind of device and method improving titanium white chloride production efficiency
CN111908501A (en) * 2020-08-25 2020-11-10 攀钢集团攀枝花钢铁研究院有限公司 Chlorination furnace for fine-fraction titanium-rich material and fluidized bed chlorination process thereof
CN113108609A (en) * 2021-04-26 2021-07-13 南京艾尔康威物料输送系统有限公司 Automatic charging system of chlorination furnace and control method thereof
CN113351121A (en) * 2021-06-30 2021-09-07 蚌埠中瓷纳米科技有限公司 System and method for continuously conveying solid mixed material into chlorination furnace
CN115465887A (en) * 2022-09-14 2022-12-13 攀钢集团攀枝花钢铁研究院有限公司 Charging system for chlorination furnace

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3169351B2 (en) * 1994-09-21 2001-05-21 石原産業株式会社 Flake-like titanium dioxide powder and method for producing the same
CN202704600U (en) * 2012-08-13 2013-01-30 攀钢集团攀枝花钢铁研究院有限公司 Powder feeding system and feeding system of chlorination furnace
CN203294323U (en) * 2013-05-20 2013-11-20 华微科技(苏州)有限公司 Automatic powder charging device
CN203419758U (en) * 2013-08-30 2014-02-05 漯河兴茂钛业股份有限公司 Mixture feeding device of boiling chlorination furnace
CN103785328A (en) * 2013-12-09 2014-05-14 云南新立有色金属有限公司 Continuous feeding system
CN203668018U (en) * 2013-12-09 2014-06-25 云南新立有色金属有限公司 Chlorination furnace feeding equipment
CN103962057A (en) * 2014-05-23 2014-08-06 攀钢集团攀枝花钢铁研究院有限公司 Pressure response system and constant feeding device and feeding method thereof
CN203790908U (en) * 2014-01-23 2014-08-27 天紫工程管理(天津)有限公司 Blending device specially used for preparing fertilizer
CN203976420U (en) * 2014-06-11 2014-12-03 遵宝钛业有限公司 A kind of boiling chloridizing furnace automatic feeding device
CN204872974U (en) * 2015-07-27 2015-12-16 江西三石有色金属有限公司 Automatic feed device that sieves
CN105833788A (en) * 2016-05-25 2016-08-10 苏州铭冠软件科技有限公司 Industrial automatic proportioning system
CN205973837U (en) * 2016-08-19 2017-02-22 云南冶金新立钛业有限公司 Chloridized titanium white chlorinator feed arrangement that boils

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3169351B2 (en) * 1994-09-21 2001-05-21 石原産業株式会社 Flake-like titanium dioxide powder and method for producing the same
CN202704600U (en) * 2012-08-13 2013-01-30 攀钢集团攀枝花钢铁研究院有限公司 Powder feeding system and feeding system of chlorination furnace
CN203294323U (en) * 2013-05-20 2013-11-20 华微科技(苏州)有限公司 Automatic powder charging device
CN203419758U (en) * 2013-08-30 2014-02-05 漯河兴茂钛业股份有限公司 Mixture feeding device of boiling chlorination furnace
CN103785328A (en) * 2013-12-09 2014-05-14 云南新立有色金属有限公司 Continuous feeding system
CN203668018U (en) * 2013-12-09 2014-06-25 云南新立有色金属有限公司 Chlorination furnace feeding equipment
CN203790908U (en) * 2014-01-23 2014-08-27 天紫工程管理(天津)有限公司 Blending device specially used for preparing fertilizer
CN103962057A (en) * 2014-05-23 2014-08-06 攀钢集团攀枝花钢铁研究院有限公司 Pressure response system and constant feeding device and feeding method thereof
CN203976420U (en) * 2014-06-11 2014-12-03 遵宝钛业有限公司 A kind of boiling chloridizing furnace automatic feeding device
CN204872974U (en) * 2015-07-27 2015-12-16 江西三石有色金属有限公司 Automatic feed device that sieves
CN105833788A (en) * 2016-05-25 2016-08-10 苏州铭冠软件科技有限公司 Industrial automatic proportioning system
CN205973837U (en) * 2016-08-19 2017-02-22 云南冶金新立钛业有限公司 Chloridized titanium white chlorinator feed arrangement that boils

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
"《机械创新与设计》" *
李建文: "《饲料加工技术》", 31 March 2011 *
毛广卿等: "《粮食输送机械与应用》", 31 August 2003 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108675342A (en) * 2018-06-19 2018-10-19 河南佰利联新材料有限公司 A kind of device and method improving titanium white chloride production efficiency
CN111908501A (en) * 2020-08-25 2020-11-10 攀钢集团攀枝花钢铁研究院有限公司 Chlorination furnace for fine-fraction titanium-rich material and fluidized bed chlorination process thereof
CN111908501B (en) * 2020-08-25 2022-07-19 攀钢集团攀枝花钢铁研究院有限公司 Chlorination furnace for fine-fraction titanium-rich material and fluidized bed chlorination process thereof
CN113108609A (en) * 2021-04-26 2021-07-13 南京艾尔康威物料输送系统有限公司 Automatic charging system of chlorination furnace and control method thereof
CN113351121A (en) * 2021-06-30 2021-09-07 蚌埠中瓷纳米科技有限公司 System and method for continuously conveying solid mixed material into chlorination furnace
CN115465887A (en) * 2022-09-14 2022-12-13 攀钢集团攀枝花钢铁研究院有限公司 Charging system for chlorination furnace
CN115465887B (en) * 2022-09-14 2023-10-13 攀钢集团攀枝花钢铁研究院有限公司 Charging system for chlorination furnace

Similar Documents

Publication Publication Date Title
CN106082316A (en) Titanium Dioxide Produced by Chloride Procedure boiling chloridizing furnace feed arrangement
US3106385A (en) Method and apparatus for solids blending
US20080000327A1 (en) Method and apparatus for charging hot direct reduced iron from hot transport vessels into a melter or finisher
CN108906309A (en) Dense-medium shallow-tank separation system
US5018869A (en) Method and apparatus using feed conveying fluid for blending the feed and/or separating debris from the feed
CN205973837U (en) Chloridized titanium white chlorinator feed arrangement that boils
CN108219813A (en) Mesophase pitch and its continuous producing method and system
CN208653207U (en) A kind of vacuum melting furnace
US3317191A (en) Method and apparatus for solids blending
CN105236477A (en) Continuous slag discharge device for low-temperature boiling chlorination furnace
EP0139167B1 (en) Method and apparatus for blending solids or the like
CN111470323A (en) Carbon black conveying equipment and method
CN208727733U (en) Dense-medium shallow-tank separation system
RU2593808C2 (en) Method and device for loading carbon containing material and iron-containing material
CN216880329U (en) Medicine fertilizer granule vibration screening plant
US1151332A (en) Mixing apparatus.
EP0089612A2 (en) Apparatus for blending solids
CN1067109C (en) Process and device for coating fusion gasifier with gasifying means and spongy iron
CN208553865U (en) A kind of industrial chemicals is pre-mixed device
CN102417943A (en) Bellless feeding device
CN207434625U (en) A kind of Iron Ore Powder dosing feeding device of no dust leakage
CN110527539A (en) Coal-based needle coke pretreatment unit and process
JPH01500359A (en) Blast furnace charging equipment
CN204602024U (en) A kind of storage bin mixing device
KR100628691B1 (en) Powder sintered ore charging apparatus and the method by using division rate occurrence quantity automatic control

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161109