CN106081862A - A kind of special hanger for concrete tubular pile lifting - Google Patents
A kind of special hanger for concrete tubular pile lifting Download PDFInfo
- Publication number
- CN106081862A CN106081862A CN201610649844.8A CN201610649844A CN106081862A CN 106081862 A CN106081862 A CN 106081862A CN 201610649844 A CN201610649844 A CN 201610649844A CN 106081862 A CN106081862 A CN 106081862A
- Authority
- CN
- China
- Prior art keywords
- hook
- tubular pile
- concrete tubular
- lifting
- pressure hook
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
The invention discloses a kind of special hanger for concrete tubular pile lifting, including pressure hook, hook, described pressure hook one end is provided with pressure hook bare terminal end, the pressure hook other end is provided with lifting hole, pressure hook between pressure hook bare terminal end and lifting hole is provided with stopper slot, and described hook includes montant, cross bar, and montant upper end is connected with the stopper slot of pressure hook by axle, montant lower end is fixing with cross bar one end to be connected, and the cross bar other end is provided with hook bare terminal end;The present invention is simple for the special hanger design of concrete tubular pile lifting, handling ease, and service life is long, and job safety is secure, is particularly well-suited to concrete tubular pile storage, the lifting operation of transport.
Description
Technical field
The invention belongs to suspender field, a kind of special hanger for concrete tubular pile lifting.
Background technology
Conventional concrete pile tube, carrying out storing in a warehouse, during transporting and hoisting, generally uses L-type or c-type metal suspender, mixed
Solidifying soil pile tube carries out storing in a warehouse, transporting and hoisting operation time often occur breaking off relations and fall the security risk of stake, and also can often occur
The extruding of metal suspender causes surface concrete damage, affects the situation of pile tube quality and outward appearance, and this problem never obtains very
Good solution, therefore, in the urgent need to a kind of new special hanger used when concrete tubular pile lifts.
Summary of the invention
It is an object of the invention to provide a kind of overall construction design ingenious, easy to operate, it is ensured that Hoisting Security, and energy
Enough ensure concrete tubular pile outward appearance, the impregnable special hanger of quality in hoisting process.
The technical solution realizing the object of the invention is:
A kind of special hanger for concrete tubular pile lifting, including pressure hook, hook, described pressure hook one end is provided with pressure hook clamping
End, the pressure hook other end is provided with lifting hole, and the pressure hook between pressure hook bare terminal end and lifting hole is provided with stopper slot, described hook
Including montant, cross bar, montant upper end is connected with the stopper slot of pressure hook by axle, and montant lower end is fixing with cross bar one end to be connected, horizontal
The bar other end is provided with hook bare terminal end.
Preferably, described pressure hook bare terminal end 11 and hook bare terminal end 23 are equipped with rubber sleeve.
Preferably, between described montant 21 and cross bar 22, angle is 90 °.
Preferably, described pressure hook bare terminal end 11 length is more than hook bare terminal end 23 length.
The present invention compared with prior art, its remarkable advantage:
(1) present invention is for the special hanger whole technical scheme reasonable in design, ingenious of concrete tubular pile lifting, operation side
Just, work efficiency high, convenient disassembly;
(2) present invention adds rubber sleeve for protecting the concrete inside and outside pile tube for the special hanger of concrete tubular pile lifting
Reduce and lift quality and the impact of outward appearance, simultaneously take account of the wall thickness of pile tube, accordingly increased angle and spacing design,
Reduce the excessive quality impact on concrete tubular pile when lifting operation of hanging clamp clamp force;
(3) present invention for hook and the pressure hook spacing formation of dependence of the special hanger of concrete tubular pile lifting certain close to
The angle of pile tube wall thickness, simultaneously pressure hook bare terminal end slightly longer hook bare terminal end, during clamping, pressure hook is longer than hook part and props up concrete
Outside pile tube, naturally hang because of hook and form bigger angle, only need to touch pressure hook external arc part and lift by crane the most again, operation letter
Single, convenient.
(4) present invention is provided with lifting hole for the special hanger that concrete tubular pile lifts and U-shaped card suspender be can be used directly
Or the connection of other forms, install and on bridge crane, gantry crane or autocrane, easy to use.
(5) present invention is simple for the special hanger design of concrete tubular pile lifting, handling ease, and service life is long, makees
Industry safety is secure, is particularly well-suited to concrete tubular pile storage, the lifting operation of transport.
Below in conjunction with the accompanying drawings the present invention is described in further detail for the special hanger of concrete tubular pile lifting.
Accompanying drawing explanation
Fig. 1 is the special hanger overall structure schematic diagram for concrete tubular pile lifting;
Fig. 2 is the special hanger top view for concrete tubular pile lifting;
Fig. 3 is the special hanger side view for concrete tubular pile lifting;
Fig. 4 is the special hanger lifting pile tube schematic diagram for concrete tubular pile lifting.
Detailed description of the invention
As Figure 1-4:
A kind of special hanger for concrete tubular pile lifting, including pressure hook 1, hook 2, described pressure hook 1 one end is provided with pressure hook folder
Holding end 11, pressure hook 1 other end is provided with lifting hole 12, and the pressure hook 1 between pressure hook bare terminal end 11 and lifting hole 12 is provided with limit
Position groove 13, described hook 2 includes montant 21, cross bar 22, and montant 21 upper end is connected with the stopper slot 13 of pressure hook 1 by axle, montant
21 lower ends are fixing with cross bar 22 one end to be connected, and cross bar 22 other end is provided with hook bare terminal end 23;Stopper slot 13 is provided with spacing
131, for ensureing the restriction of suspender self falling kinetic energy when having lifted so that remove suspender conveniently, safely, the most spacing
131 also ensure that there is certain angle when carrying out suspender lifting concrete tubular pile 3, are unlikely to Slip Hook when lifting;Stopper slot
13 are provided with spacing 131, for ensureing that special hanger is when meeting or be slightly larger than the clamping force that concrete tubular pile 3 lifts by crane
No longer there is extra clamping force, it is to avoid because suspender clamping force crosses macrolesion concrete tubular pile 3;For concrete tubular pile lifting special
With suspender lifting complete concrete tubular pile 3 land time, hook 2 also will hang naturally, returns to the position of spacing 131, it is not necessary to
External force unclamps suspender, simple to operation.
Described pressure hook bare terminal end 11 and hook bare terminal end 23 all overlap rubber sleeve, are used for protecting concrete tubular pile 3 in lifting
During reduce damage.
Between described montant 21 and cross bar 22, angle is 90 °, is used for ensureing that concrete tubular pile 3 is vertically subject to when lifting as far as possible
Power, play stress, lifting active force reasonably act on, it is to avoid crane or other crane gears accept a little unreasonable damage
Crane and the problem of other suspenders.
Described pressure hook bare terminal end 11 length is more than hook bare terminal end 23 length, for the i.e. pressure hook when concrete tubular pile lifts by crane
1 extension is pressed on the outer wall of concrete tubular pile 3 end face, and hook 2 state now is that nature hangs, simultaneously because of spacing 131
Constraint shape at a certain angle, the circular arc afterbody at this moment touching pressure hook 1 i.e. can guarantee that hook 2 gos deep into concrete tubular pile 3 inwall,
Lifting lifting is convenient and simple.
Invention is for the operation principle of the special hanger of concrete tubular pile lifting:
The special hanger being used for concrete tubular pile lifting is connected with suspender belt, chain sling or steel wire rope 4, manually buttresses suspender belt, chain sling
Or steel wire rope 4, move special hanger near concrete tubular pile 3 with suspender belt, chain sling or steel wire rope 4, by pressure hook 1 elongated portion dividing potential drop
Live the outer wall of concrete tubular pile 3 end face, the artificial outside using strength of one's legs to act on pressure hook 1, concrete tubular pile lifting will be used for
In special hanger advances concrete tubular pile 3 end face, in now hook 2 has been enter into concrete tubular pile 3 endoporus, commander's crane gear rises
Hang, notice that sling height is unlikely to unhook for formation clamping force and is advisable, the lifting being now, use above-mentioned identical
Process concrete tubular pile 3 another one end face is lifted by crane, be after completing before the lifting completing concrete tubular pile 3 and pacify
Dress suspender work, now can carry out lifting mobile operation.
After relying on crane gear lifting concrete tubular pile 3 to land, use and manually pull open suspender belt, chain sling or steel wire rope 3 i.e.
Can, it is not necessary to external force unclamps the special hanger for concrete tubular pile lifting.
The most i.e. complete whole actions that concrete tubular pile 3 lifts by crane, stacks.
Claims (4)
1. the special hanger for concrete tubular pile lifting, it is characterised in that: include pressure hook (1), hook (2), described pressure
Hook (1) one end is provided with pressure hook bare terminal end (11), pressure hook (1) other end be provided with lifting hole (12), pressure hook bare terminal end (11) with hang
Pressure hook (1) between dress hole (12) is provided with stopper slot (13), and described hook (2) includes montant (21), cross bar (22), montant
(21) upper end is connected with the stopper slot (13) of pressure hook (1) by axle, and montant (21) lower end is fixing with cross bar (22) one end to be connected, horizontal
Bar (22) other end is provided with hook bare terminal end (23).
A kind of special hanger for concrete tubular pile lifting the most according to claim 1, it is characterised in that: described pressure hook
Bare terminal end (11) and hook bare terminal end (23) are equipped with rubber sleeve.
A kind of special hanger for concrete tubular pile lifting the most according to claim 1, it is characterised in that: described montant
(21) angle is 90 ° and between cross bar (22).
A kind of special hanger for concrete tubular pile lifting the most according to claim 1, it is characterised in that: described pressure hook
Bare terminal end (11) length is more than hook bare terminal end (23) length.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610649844.8A CN106081862A (en) | 2016-08-10 | 2016-08-10 | A kind of special hanger for concrete tubular pile lifting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610649844.8A CN106081862A (en) | 2016-08-10 | 2016-08-10 | A kind of special hanger for concrete tubular pile lifting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106081862A true CN106081862A (en) | 2016-11-09 |
Family
ID=57456402
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610649844.8A Pending CN106081862A (en) | 2016-08-10 | 2016-08-10 | A kind of special hanger for concrete tubular pile lifting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106081862A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112609797A (en) * | 2020-12-16 | 2021-04-06 | 钱晨 | Laying and installing method for municipal sewage treatment water supply and drainage pipeline |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB191008261A (en) * | 1910-04-06 | 1911-01-12 | Alexander George Strathern | Improvements in Lifting Clamps or Dogs. |
US3851358A (en) * | 1973-10-01 | 1974-12-03 | M Janosko | Non-marring horizontal clamp |
CN2716228Y (en) * | 2004-06-25 | 2005-08-10 | 天津市特变电工变压器有限公司 | Coil materials hoisting device |
CN2848798Y (en) * | 2005-04-28 | 2006-12-20 | 攀钢集团钢城企业总公司冷轧协力公司 | Steel roll lifting conveying clamping device |
CN200967705Y (en) * | 2006-10-16 | 2007-10-31 | 天津港第一港埠公司 | Clamp apparatus for handling H-bar |
CN201458522U (en) * | 2009-06-11 | 2010-05-12 | 天津港第一港埠有限公司 | Double-layer special clamping tool for bundling I irons |
CN103508308A (en) * | 2013-10-11 | 2014-01-15 | 无锡市新华起重工具有限公司 | Adjustable steel plate clamp |
CN205892490U (en) * | 2016-08-10 | 2017-01-18 | 连云港艾可新型建材有限公司 | A special lifting device for concrete pipe pile hoist and mount |
-
2016
- 2016-08-10 CN CN201610649844.8A patent/CN106081862A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB191008261A (en) * | 1910-04-06 | 1911-01-12 | Alexander George Strathern | Improvements in Lifting Clamps or Dogs. |
US3851358A (en) * | 1973-10-01 | 1974-12-03 | M Janosko | Non-marring horizontal clamp |
CN2716228Y (en) * | 2004-06-25 | 2005-08-10 | 天津市特变电工变压器有限公司 | Coil materials hoisting device |
CN2848798Y (en) * | 2005-04-28 | 2006-12-20 | 攀钢集团钢城企业总公司冷轧协力公司 | Steel roll lifting conveying clamping device |
CN200967705Y (en) * | 2006-10-16 | 2007-10-31 | 天津港第一港埠公司 | Clamp apparatus for handling H-bar |
CN201458522U (en) * | 2009-06-11 | 2010-05-12 | 天津港第一港埠有限公司 | Double-layer special clamping tool for bundling I irons |
CN103508308A (en) * | 2013-10-11 | 2014-01-15 | 无锡市新华起重工具有限公司 | Adjustable steel plate clamp |
CN205892490U (en) * | 2016-08-10 | 2017-01-18 | 连云港艾可新型建材有限公司 | A special lifting device for concrete pipe pile hoist and mount |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112609797A (en) * | 2020-12-16 | 2021-04-06 | 钱晨 | Laying and installing method for municipal sewage treatment water supply and drainage pipeline |
CN112609797B (en) * | 2020-12-16 | 2022-04-19 | 广东南方建设集团有限公司 | Laying and installing method for municipal sewage treatment water supply and drainage pipeline |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107215765A (en) | Lift shackle | |
CN106081862A (en) | A kind of special hanger for concrete tubular pile lifting | |
CN204752012U (en) | Wall -hanging miniature hoist | |
CN205892490U (en) | A special lifting device for concrete pipe pile hoist and mount | |
CN204022267U (en) | Steel trestle tool special for hoisting | |
CN206599363U (en) | Vertical transferring apparatus | |
CN203699679U (en) | Lifting appliance for lifting wire coil | |
CN202988556U (en) | Special lifting appliance for angle-steel type frame body | |
CN202164037U (en) | Adjustable plate hook | |
CN109132842B (en) | Pipe fitting hoisting structure | |
CN203833484U (en) | Magnetic force internal-expanding type lifting device for steel parts | |
CN210558996U (en) | Assembled building model platform double-limb column lifting appliance | |
CN202465035U (en) | Brick lifting device | |
CN209758819U (en) | Annular horizontal hoisting accessory of iron bucket | |
CN204162284U (en) | A kind of lifting device of rectangular top pipe tube coupling | |
CN208916602U (en) | Cement electric pole boom hoisting | |
CN208948679U (en) | Assembled hanger | |
CN205099195U (en) | Can dismantle stirrup hoist and mount cage | |
CN204643580U (en) | Cement pole lifting chuck device | |
CN204224084U (en) | A kind of three-pawl type I-beam wheel suspender | |
CN210619994U (en) | Hoisting member for hoisting large-capacity box transformer substation | |
CN205397926U (en) | Special hoist of carton factory | |
CN107826961A (en) | Cable steel band roller tool special for hoisting | |
CN216105542U (en) | Hoisting sleeve for long rail of subway | |
CN103420263A (en) | Prefabricated plate hoisting tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161109 |