CN106080675B - A kind of urban railway transit train automatic monitored control system - Google Patents

A kind of urban railway transit train automatic monitored control system Download PDF

Info

Publication number
CN106080675B
CN106080675B CN201610556280.3A CN201610556280A CN106080675B CN 106080675 B CN106080675 B CN 106080675B CN 201610556280 A CN201610556280 A CN 201610556280A CN 106080675 B CN106080675 B CN 106080675B
Authority
CN
China
Prior art keywords
dispatcher workstation
station
dispatcher
confirmation
operation requests
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610556280.3A
Other languages
Chinese (zh)
Other versions
CN106080675A (en
Inventor
孙永生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhonghe Technology Co Ltd
Original Assignee
Zhejiang Zhonghe Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhonghe Technology Co Ltd filed Critical Zhejiang Zhonghe Technology Co Ltd
Priority to CN201610556280.3A priority Critical patent/CN106080675B/en
Publication of CN106080675A publication Critical patent/CN106080675A/en
Application granted granted Critical
Publication of CN106080675B publication Critical patent/CN106080675B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation
    • B61L2027/204Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation using Communication-based Train Control [CBTC]

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention discloses a kind of urban railway transit train automatic monitored control system,Including by selected the first dispatcher workstation for being used for issuing operation requests of operator,The second dispatcher workstation and station/communication server as secondary-confirmation terminal,First dispatcher workstation sends operation requests to the second dispatcher workstation and station/communication server simultaneously,Operation requests are sent to CBI/ZC and send the CBI/ZC confirmation requests fed back to the first dispatcher workstation and the second dispatcher workstation by the station/communication server,Second dispatcher workstation is provided with machine and confirms module and manual confirmation module,Second dispatcher workstation is after machine confirms that module and manual confirmation module confirm to confirmation request,Through station/communication server operation acknowledgement instruction is sent to CBI/ZC.The present invention uses combined fault safe practice, and the operation requests and operation acknowledgement of safety operation realize that reliability is higher, avoids causing failure by completely self-contained two passages.

Description

A kind of urban railway transit train automatic monitored control system
Technical field
The present invention relates to track traffic automatic control technology, more particularly to urban railway transit train automatic monitored control system and Method.
Background technology
The safety operation request of existing ATS systems and confirm instruction by same passage to interlock system, automatic protection system System issues, and easily causes the various faults such as common cause fault, Single Point of Faliure.
The content of the invention
The technical problems to be solved by the invention are just to provide a kind of urban railway transit train automatic monitored control system, reliably Property it is high, avoid causing failure.
In order to solve the above technical problems, the present invention adopts the following technical scheme that:A kind of urban railway transit train is supervised automatically Control system, including be used for issuing the first dispatcher workstation of operation requests, as secondary-confirmation terminal by operator is selected Second dispatcher workstation and station/communication server, first dispatcher workstation work to the second dispatcher simultaneously Stand and station/communication server sends operation requests, operation requests are sent to CBI/ZC and incited somebody to action by the station/communication server The confirmation request of CBI/ZC feedbacks is sent to the first dispatcher workstation and the second dispatcher workstation, the second scheduling employee Make station and be provided with machine to confirm module and manual confirmation module, second dispatcher workstation machine confirm module and it is artificial really After recognizing module to confirmation request confirmation, operation acknowledgement instruction is sent to CBI/ZC through station/communication server.
Preferably, whether first dispatcher workstation is overtime to the time for receiving confirmation request to sending operation requests Judged and send result to the second dispatcher workstation, second dispatcher workstation is to receiving operation requests to receipts To time of confirmation request, whether time-out is judged.
Preferably, second dispatcher workstation, which is provided with, sends out the first dispatcher workstation and the second dispatcher workstation The pop-up whether overtime result is confirmed that goes out confirms module, two not after the ejection of time-out information ejection acknowledgement window, by grasping As member reaffirm whether time-out, and under not timeout case, confirm to send operation acknowledgement instruction.
Preferably, the CBI/ZC is to from operation requests are received, to the time for receiving operation acknowledgement, whether time-out is sentenced It is disconnected, and decide whether to perform final operation.
Preferably, the instruction of the operation requests, confirmation request and operation acknowledgement needs to generate 32 CRC in transmitting procedure Check code, and be packaged in efficient message body.
Preferably, the station/communication server is divided into communication interface server A and position on operation requests passage In the communication interface server B on operation acknowledgement passage.
Preferably, operating result is transmitted to by the station/communication server after CBI/ZC operating result is received One dispatcher workstation.
The technical solution adopted by the present invention, using combined fault-safe practice, the operation requests of safety operation and operation are true Recognize and realized by completely self-contained two passages, and increase prevents timeout mechanism, therefore reliability is higher, avoids causing event Barrier.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and detailed description:
Fig. 1 is binary channels secondary-confirmation schematic diagram;
Fig. 2 is anti-timeout mechanism schematic diagram.
Embodiment
As shown in figure 1, a kind of urban railway transit train based on independent binary channels secondary-confirmation mode monitors and is automatically System, including be used for issuing the first dispatcher workstation of operation requests, second as secondary-confirmation terminal by operator is selected Dispatcher workstation and station/communication server, first dispatcher workstation simultaneously to the second dispatcher workstation and Station/the communication server sends operation requests, and operation requests are sent to CBI/ZC and by CBI/ by the station/communication server The confirmation request of ZC feedbacks is sent to the first dispatcher workstation and the second dispatcher workstation, second dispatcher workstation Confirm module and manual confirmation module provided with machine, second dispatcher workstation confirms module and manual confirmation mould in machine After block confirms to confirmation request, operation acknowledgement instruction is sent to CBI/ZC through station/communication server.
The technical solution adopted by the present invention, using combined fault-safe practice, the operation requests of safety operation and operation are true Recognize and realized by completely self-contained two passages.
Issue first and the secondary-confirmation of safety operation are supported to use two-machine operation mode.Two operating personnel must be each From work station on confirm the display of operation requests and operation acknowledgement respectively, and confirm the display of security command operating result.With Specified in the work station of secondary-confirmation by the operator for issuing operation requests.
User initiates the first dispatcher workstation of security function request, and confirms the second dispatcher work of security function To stand, be two different work stations, two chassis stations/communication server is respectively used to transmit operation requests and operation acknowledgement order, Ensure request and confirm it is two independent physical channels.
ATS work stations provide two kinds of different display sides to the secondary-confirmation and returning result of safety-related command operation Formula.Only allow an operator to carry out security related operations to same target in the same time, it is right to this to refuse other operators The operation requests of elephant.
In addition, adding anti-timeout mechanism, user's secondary-confirmation should have time restriction, if not confirmed within the time limit Operation, ATS automatically exits from safety operation process, and reminds user.As shown in Fig. 2 work station, which is responsible for protection, sends operation requests It is specific as follows to the time-out for receiving the confirmation request period:
First dispatcher workstation sends operation requests to server and the second dispatcher workstation simultaneously, and starts to count When, the second dispatcher workstation starts timing when receiving operation requests.Confirmation request will issue simultaneously the first dispatcher workstation, Second dispatcher workstation, the first dispatcher workstation and the second dispatcher workstation are all compared to time-out, the first scheduling Work station will whether overtime result issues the second dispatcher workstation to member, people's dispatcher workstation according to two not time-out informations Acknowledgement window is ejected, now whether overtime artificial (operator) must reaffirm.
CBI, ZC must decide whether to from operation requests are received, to the time for receiving confirmation request, whether time-out judges Perform final operation.
The instruction of the operation requests, confirmation request and operation acknowledgement needs to generate 32 CRC check codes in transmitting procedure, And be packaged in efficient message body, it is specially:
Increase sequence number, processing field in application layer messages, increase sequence-number field in host-host protocol, prevent repeatedly, Delete, be out of order;
By message feedback, ATS compares whether confirmation request is consistent with operation requests information, and CBI/ZC compares operation requests It is whether consistent with operation acknowledgement, and sequence number in application message and host-host protocol prevents message from inserting;
Application layer critical data is verified using CRC32, and security protocol prevents message mistake using encryption technology;
Prevent message from pretending by the encryption of message feedback, and security protocol.
For the more preferable explanation present invention, concrete principle is described as follows:
When operator selects a work station to issue operation requests, the terminal of secondary-confirmation need to be specified, is selected in the present invention Fixed first dispatcher workstation issues operation requests, the second dispatcher workstation as secondary-confirmation terminal, while the work station Operation object on interface should be marked with different states, and be prompted in a text form.
Before instruction is sent, 32 CRC check codes are generated to corresponding information position, and be packaged in efficient message body.Behaviour Make request and issue station/communication server and selected operation acknowledgement work station simultaneously.Operation requests work station sends operation please Start timing when asking instruction, operation acknowledgement work station starts timing when receiving operation requests information.
Station/communication server is operation requests passage or operation acknowledgement passage according to configuration differentiation.Instruction reaches behaviour After making station/communication server of request channel, terminal, the place of station/communication server record operation requests and operation acknowledgement The information such as reason number, message body is then subjected to security protocol encapsulation, and is sent to CBI/ZC.
When station/communication server of operation acknowledgement passage receives CBI/ZC confirmation request, station/communication server enters Row security protocol is unpacked, and further according to the operation acknowledgement terminal recorded in message, message is sent to set operation acknowledgement terminal.
Operation acknowledgement terminal is unpacked and CRC check, judges whether confirmation request is identical with operation requests and whether surpasses When, operation requests terminal will whether overtime result issues operation acknowledgement terminal, and what the latter judged according to itself having not timed out and grasping Information ejection secondary-confirmation window is had not timed out as what requesting terminal was sent, user carries out operation acknowledgement.
Operation acknowledgement terminal will generate 32 CRC check codes to confirmation, and be packaged in efficient message body, issue behaviour Make station/communication server of confirmation passage.
After instruction reaches station/communication server of operation acknowledgement passage, security protocol encapsulation is carried out, and be sent to CBI/ ZC。
When the operating result for receiving CBI/ZC, operating result is transmitted to operation terminal by station/communication server.

Claims (4)

  1. A kind of 1. urban railway transit train automatic monitored control system, it is characterised in that:Including being used for issuing behaviour by operator is selected Make the first dispatcher workstation, the second dispatcher workstation as secondary-confirmation terminal and the station/communication service asked Device, first dispatcher workstation send operation requests, institute to the second dispatcher workstation and station/communication server simultaneously Station/communication server is stated to send operation requests to CBI/ZC and send the CBI/ZC confirmation requests fed back to the first scheduling Member's work station and the second dispatcher workstation, second dispatcher workstation are provided with machine and confirm module and manual confirmation mould Block, second dispatcher workstation after machine confirms that module and manual confirmation module confirm to confirmation request, through station/ The communication server sends operation acknowledgement instruction to CBI/ZC, and first dispatcher workstation is true to receiving to sending operation requests Whether time-out was judged and sent result to the second dispatcher workstation the time for recognizing request, the second dispatcher work Standing, to the time for receiving confirmation request, whether time-out judges to receiving operation requests, and second dispatcher workstation is provided with The pop-up whether overtime result is confirmed sent to the first dispatcher workstation and the second dispatcher workstation confirms module, Two not after the ejection of time-out information ejection acknowledgement window, by operator reaffirm whether time-out, and under not timeout case, really Recognize and send operation acknowledgement instruction;Station/the communication server is divided into the communication interface server A on operation requests passage With the communication interface server B on operation acknowledgement passage.
  2. A kind of 2. urban railway transit train automatic monitored control system according to claim 1, it is characterised in that:The CBI/ ZC decides whether to perform final behaviour to from operation requests are received, to the time for receiving operation acknowledgement, whether time-out judges Make.
  3. A kind of 3. urban railway transit train automatic monitored control system according to claims 1 or 2, it is characterised in that:Institute State the instruction of operation requests, confirmation request and operation acknowledgement needs to generate 32 CRC check codes in transmitting procedure, and has been packaged in Imitate in message body.
  4. A kind of 4. urban railway transit train automatic monitored control system according to claim 3, it is characterised in that:The car Stand/operating result is transmitted to the first dispatcher workstation by the communication server after CBI/ZC operating result is received.
CN201610556280.3A 2016-07-12 2016-07-12 A kind of urban railway transit train automatic monitored control system Active CN106080675B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610556280.3A CN106080675B (en) 2016-07-12 2016-07-12 A kind of urban railway transit train automatic monitored control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610556280.3A CN106080675B (en) 2016-07-12 2016-07-12 A kind of urban railway transit train automatic monitored control system

Publications (2)

Publication Number Publication Date
CN106080675A CN106080675A (en) 2016-11-09
CN106080675B true CN106080675B (en) 2017-12-22

Family

ID=57220158

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610556280.3A Active CN106080675B (en) 2016-07-12 2016-07-12 A kind of urban railway transit train automatic monitored control system

Country Status (1)

Country Link
CN (1) CN106080675B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107054414B (en) * 2017-04-18 2023-04-07 卡斯柯信号有限公司 Remote restart control method and device for urban rail transit signal equipment
CN108189863B (en) * 2017-12-22 2020-08-07 合肥工大高科信息科技股份有限公司 Safety command control method for automatic train monitoring system
CN110032841A (en) * 2019-02-28 2019-07-19 郑州轨道交通信息技术研究院 A kind of method for security protection of operational order
CN110838910B (en) * 2019-10-16 2022-04-05 郑州地铁集团有限公司 Subway comprehensive monitoring system based on SM3 and SM4 communication encryption
CN114516355B (en) * 2022-02-23 2024-03-12 浙江众合科技股份有限公司 Intelligent management and control system based on whole railway station

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101659271A (en) * 2009-09-01 2010-03-03 卡斯柯信号有限公司 Method for connecting station ATS with interlocking subsystem
CN101795454A (en) * 2010-02-10 2010-08-04 熊文俊 Method and system of double identity authentication based on mobile communication independent channel
CN102407867A (en) * 2011-08-09 2012-04-11 河南辉煌科技股份有限公司 Urban rail transit signal maintenance supporting system
CN102941866A (en) * 2012-10-22 2013-02-27 上海富欣智能交通控制有限公司 Automatic train supervisor (ATS) system and method
CN105128895A (en) * 2015-07-13 2015-12-09 北京和利时系统工程有限公司 Computer interlock method and system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101553643B1 (en) * 2014-11-05 2015-09-16 한국철도기술연구원 Ats apparatus, system and method for preventing human error

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101659271A (en) * 2009-09-01 2010-03-03 卡斯柯信号有限公司 Method for connecting station ATS with interlocking subsystem
CN101795454A (en) * 2010-02-10 2010-08-04 熊文俊 Method and system of double identity authentication based on mobile communication independent channel
CN102407867A (en) * 2011-08-09 2012-04-11 河南辉煌科技股份有限公司 Urban rail transit signal maintenance supporting system
CN102941866A (en) * 2012-10-22 2013-02-27 上海富欣智能交通控制有限公司 Automatic train supervisor (ATS) system and method
CN105128895A (en) * 2015-07-13 2015-12-09 北京和利时系统工程有限公司 Computer interlock method and system

Also Published As

Publication number Publication date
CN106080675A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN106080675B (en) A kind of urban railway transit train automatic monitored control system
CN102320316B (en) CTCS-3-level train control center system
CN107244338B (en) CTCS-1 grades of region column control data center apparatus
CN103825905B (en) A kind of multi-medium data exchange method and device
CN105531747A (en) Vehicle messaging
CN103707845B (en) The control method that long-range march limits
CN106448777B (en) A kind of transfer station for npp safety level I&C system
RU2577936C1 (en) Integrated device for safe data exchange and control of locomotive and stationary safety devices on railway transport
CN102427604A (en) Method and device for confirming delivery of MTC (Machine Type Communication) Device trigger message
CN107215360A (en) Heavy haul railway temporary speed-limiting method and temporary speed limitation server based on movable block
CN102632908A (en) Track circuit reader
CN112590880B (en) ATS control right switching method
EP2548330A1 (en) Method of conducting safety-critical communications
CN103744401A (en) Method and system of data communication of wireless reconnection of locomotive
CN101877873A (en) Method and device for authorizing communication right in digital trunked communication system
CN105163330A (en) Information monitoring method, equipment and information monitoring system
CN108600235B (en) Interface device and method for data exchange
CN113225179A (en) Encryption method for train controller
CN102951190A (en) Method and system for safety control on dispatching commands
RU2683704C1 (en) Important information safe exchange device by the communication channel by the railway transport locomotive and stationary safety devices
CN110789577B (en) Train positioning method and device
US10778799B2 (en) Apparatus, system and method for MTC
CN113824539A (en) Data transmission method and device for interlock monitoring machine and MSS system
Guo et al. Protecting train Balise telegram data integrity
CN112141174A (en) ZC simulation system and method in VOBC test environment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant