CN106058930A - Automatic detecting system and automatic detecting method for capacitance of photovoltaic grid-connected inverter bus capacitor - Google Patents
Automatic detecting system and automatic detecting method for capacitance of photovoltaic grid-connected inverter bus capacitor Download PDFInfo
- Publication number
- CN106058930A CN106058930A CN201610528533.6A CN201610528533A CN106058930A CN 106058930 A CN106058930 A CN 106058930A CN 201610528533 A CN201610528533 A CN 201610528533A CN 106058930 A CN106058930 A CN 106058930A
- Authority
- CN
- China
- Prior art keywords
- bus
- bus capacitor
- capacitance
- voltage
- subtest
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000003990 capacitor Substances 0.000 title claims abstract description 57
- 238000000034 method Methods 0.000 title claims abstract description 11
- 230000010354 integration Effects 0.000 claims abstract description 10
- 238000001514 detection method Methods 0.000 claims description 22
- 230000005611 electricity Effects 0.000 claims description 10
- 238000012360 testing method Methods 0.000 abstract description 9
- 238000007599 discharging Methods 0.000 abstract 2
- 239000003054 catalyst Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000003203 everyday effect Effects 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- 241000127225 Enceliopsis nudicaulis Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000003749 cleanliness Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000014509 gene expression Effects 0.000 description 1
- 230000001172 regenerating effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 230000001052 transient effect Effects 0.000 description 1
Classifications
-
- H02J3/383—
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R27/00—Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
- G01R27/02—Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
- G01R27/26—Measuring inductance or capacitance; Measuring quality factor, e.g. by using the resonance method; Measuring loss factor; Measuring dielectric constants ; Measuring impedance or related variables
- G01R27/2605—Measuring capacitance
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02M—APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
- H02M7/00—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output
- H02M7/42—Conversion of dc power input into ac power output without possibility of reversal
- H02M7/44—Conversion of dc power input into ac power output without possibility of reversal by static converters
- H02M7/48—Conversion of dc power input into ac power output without possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
- H02M7/53—Conversion of dc power input into ac power output without possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal
- H02M7/537—Conversion of dc power input into ac power output without possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only, e.g. single switched pulse inverters
- H02M7/5387—Conversion of dc power input into ac power output without possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only, e.g. single switched pulse inverters in a bridge configuration
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Photovoltaic Devices (AREA)
- Measurement Of Resistance Or Impedance (AREA)
Abstract
The invention relates to an automatic detecting system and an automatic detecting method for capacitance of a photovoltaic grid-connected inverter bus capacitor. At night, an inverter is in a standby state; voltage of a DC bus reduces; a soft starting loop of the inverter is started for charging a bus capacitor, so that the voltage of the bus capacitor of the inverter is equal with the DC voltage. After charging is finished, soft starting is stopped. Hereon, an auxiliary resistance testing loop is started. The bus capacitor performs discharging through an auxiliary testing resistor, and the bus capacitor is in zero-state response. The capacitance of the capacitor can be obtained through bus voltage integration in a discharging time period and dividing the integrated result by the bus voltage drop and the auxiliary testing resistance. Furthermore the calculated capacitance is compared with a preset capacitance lower limit, thereby determining whether the capacitance of the capacitor is qualified. If the capacitance is unqualified, fault alarm is performed for reminding change of the bus capacitor, thereby preventing further damage caused by performance reduction or failure of the bus capacitor.
Description
Technical field
The present invention relates to parallel network power generation field, particularly photovoltaic combining inverter bus capacitor capacitance and automatically detect system
System and method.
Background technology
Solar energy as one of regenerative resource, has rich reserves, widely distributed, cleanliness without any pollution, environmental protection
Advantage, the alternative energy source being well recognized as.The unidirectional current that solar panel sends through inverter be converted into line voltage constant amplitude, with
Frequently, the alternating current of homophase, be transported to electrical network.
Photovoltaic combining inverter is made up of key components such as switching device unit, dc-link capacitance unit, and direct current is female
Line capacitance is the vital unit of photovoltaic combining inverter, its act as photovoltaic combining inverter DC side with exchange
During top-cross is changed, absorb and the most required transient current is provided, safeguarding the voltage stabilization of dc bus, it is also possible to absorb IGBT
Turn off peak voltage etc..Photovoltaic combining inverter requires the service life possessing 25 years, but due to many reasons, dc bus electricity
The performance held will reduce, and mainly shows as capacitor's capacity and reduces, thus cause DC bus-bar voltage ripple to increase, exports electric current
THD increases, and when DC bus-bar voltage ripple exceedes photovoltaic combining inverter tolerance value, IGBT also will be caused to demolish, and accident expands
Greatly, a lot of situations, are all other component wear such as IGBT, are just the discovery that the reason that dc-link capacitance capacitance reduces, the most directly
Automatically the detection of stream bus capacitor capacitance is the most particularly significant.
The detection method of photovoltaic combining inverter dc-link capacitance capacitance at present, necessarily affects system when implementing normal
Run.Prior art does not the most affect the simple and effective detection method that system is run, for this situation, set forth herein
A kind of photovoltaic combining inverter bus capacitor capacitance automatic testing method, the method is simple, effective, stable, reliable.
Summary of the invention
It is an object of the invention to provide a kind of photovoltaic combining inverter bus capacitor capacitance automatic checkout system, and utilize
The detection method of this system, affects, in order to solve prior art detection, the problem that system is properly functioning.
For achieving the above object, the solution of the present invention includes:
Photovoltaic combining inverter bus capacitor capacitance automatic checkout system, including for connecting photovoltaic apparatus (such as photovoltaic panel
Deng) DC terminal, DC terminal connect dc bus, dc bus by current transformer, soft starting circuit connect ac terminal,
Ac terminal is used for connecting AC network;Connect on dc bus and have bus capacitor and voltage sensor;On described dc bus
Connect and have subtest loop, subtest loop include the subtest resistance of series connection and control switch.
Present invention also offers a kind of photovoltaic combining inverter bus capacitor capacitance automatic testing method, step is as follows:
When the evening draws on, DC bus-bar voltage is less than setting value in detection, disconnect the connection of photovoltaic apparatus and dc bus,
Connect AC network, bus capacitor is charged;
After charging, disconnecting AC network, put into subtest loop, is discharged in subtest loop by bus capacitor;
At least the start-stop voltage in detection discharge process and discharge time, the difference according to electricity is equal with electric parameters integration
Relation, calculates bus capacitor capacitance.
Further, the difference of described electricity is the product of voltage difference and bus capacitor, and electricity difference is equal with electric parameters integration
Relation beThe computing formula of bus capacitor capacitance:
Wherein, Uc(t1)、Uc(t2) being respectively start-stop voltage, t1, t2 are start/stop time,
R41For subtest resistance, C is bus capacitor.
Further, when the bus capacitor capacitance calculated is compared with the bus capacitor capacitance of setting, and gap exceedes limit value
Shi Ze alerts, and bus capacitor is changed in prompting.
The invention has the beneficial effects as follows, this capacitance determining method can detect automatically at night every day, it is possible in time
The performance indications grasping bus capacitor, and the normal power generation not affecting daytime is grid-connected, and therefore the method does not affect system and runs,
And it is high to detect frequency, simple, effectively, it is simple to realize in Practical Project and promote.
Voltage Hall additionally by inverter self i.e. can detect that accurate bus voltage value, it is not necessary to increases extra
Detection device, calculate through voltage integrating meter the most again and i.e. can get the capacitance of electric capacity.Relative to utilizing based on current integration carries out
Calculate, not only reduce detection variable, and can avoid owing to electric current is less, detect the inaccurate detection error brought thus drop
Low calculating error.
Accompanying drawing explanation
Fig. 1 is a kind of photovoltaic combining inverter bus capacitor capacitance automatic checkout system of the embodiment of the present invention;
Fig. 2 is a kind of photovoltaic combining inverter bus capacitor capacitance automatic testing method of the embodiment of the present invention.
Detailed description of the invention
The present invention will be further described in detail below in conjunction with the accompanying drawings.
As it is shown in figure 1, photovoltaic combining inverter bus capacitor capacitance automatic checkout system, including for connecting photovoltaic apparatus
The DC terminal of (such as photovoltaic panel etc.), DC terminal connects dc bus, and dc bus is connected by current transformer, soft starting circuit
Ac terminal.Ac terminal is used for connecting AC network;Connect on dc bus and have bus capacitor.Use it is additionally provided with on dc bus
Voltage sensor in detection busbar voltage.
Soft starting circuit includes main contactor and soft opens catalyst, soft opens resistance, for grid-connected and reduce startup
The impact of electric current.Current transformer uses power bridge in bridge-type current transformer, i.e. figure.
Foregoing circuit part belongs to the grid-connected part of prior art.The present invention being improved by structure division,
Being also associated with subtest loop on dc bus, subtest loop includes the subtest resistance of series connection and corresponding control
System switch.In the present embodiment, voltage sensor is Hall voltage sensor.As other embodiments, it would however also be possible to employ other
The voltage sensor of type.
The present invention carries out the principle of bus capacitor capacitance test:
The every night of gradually dying down along with sunray, cell panel port voltage is gradually lowered, and inverter stops
Work, after treating that DC voltage is reduced to 0V, inverter startup exchange is soft, and to open loop (soft open catalyst and soft open resistance) right
Dc-link capacitance is charged, and complete stopping to be charged is soft opens loop, then starts subtest loop and discharges, utilizes
The capacity of bus capacitor is detected by direct-current discharge process.Capacitance detecting mainly utilize AC network therein, soft open loop,
Power bridge, subtest loop, bus capacitor and Hall voltage sensor, wherein AC network provide power supply, soft open loop and
Power bridge constitutes commutating circuit, is charged to bus capacitor, and subtest loop is bus capacitor electric discharge, voltage hall sensing
Device carries out busbar voltage detection.Then inverter utilizes own controller to carry out capacitance calculation.
According to the character of electric capacity, there is an expressions below:
R41For subtest resistance.
(1) formula both sides integration can be obtained:
I.e.Thus can get the computing formula of capacitor's capacity, i.e. capacity:
Can be seen that it is known that the change in voltage △ U at t1~t2 moment bus capacitor C two ends and bus capacitor two from formula (3)
The voltage u of endcT () can calculate capacitance value according to formula (3).
Specifically test process is as shown in Figure 2:
After detecting that inverter at night is shut down, (i.e. some is close to the setting value of 0V, originally less than 20V for DC voltage
Skilled person can select according to practical situation) time, start soft loop of opening and electric capacity is charged.
(it is charged to set a magnitude of voltage can stop) after to be charged to stop soft opening loop, starts auxiliary simultaneously and survey
Examination resistance (starts subtest loop by the control switch of Guan Bi with subtest resistant series), in busbar voltage from Uc
(t1) is to Uc(t2) during, DC bus-bar voltage is integrated, when detecting that busbar voltage is less than Uc(t3) will auxiliary time
Test loop excision (controls switch realization excision by disconnecting), wherein Uc(t3)<Uc(t2)<Uc(t1), formula is then utilized
(3) bus capacitor capacitance is calculated, the capacitor's capacity of the result of calculating with setting is compared, when the bus electricity calculated
Hold capacitance compared with the capacitor's capacity of setting (by being divided by or subtracting each other), suggest that bus capacitor problem tight when gap is excessive
Weight, needs the information being replaced.
In above-described embodiment, carrying out period of bus capacitor detection is after the evening draws on, does not thus interfere with photovoltaic
Normal work.It is therefore desirable to judge that the evening draws on;The judgement to night can be realized by the way of timing, such as control
Device self-clocking chip or by master control system activity clocking information;Accurately judge that the evening draws on it can be avoided that black clouds on daytime blocks
Shutdown situation is caused to be also carried out bus capacitor detection.As other embodiments, it is also possible to combine judgement with the information shut down
The evening draws on.
Frequency as required, can select detect night every day, or detection in some days is once.
In above-described embodiment, use detection busbar voltage, utilize electricity poor (i.e. voltage difference is with electric capacity long-pending) to amass with voltage
The relation detection capacitance of split-phase etc..As other embodiments, it is also possible to by sealing in current sense in subtest loop
Device (such as current transformer) detects discharge current, detects appearance by the poor equal relation of the integration of discharge current and electricity
Value, the concrete formula calculated will change current integration (resistance removing on denominator) into by voltage integrating meter in formula (3), therefore no longer
Repeat.But owing to Hall voltage sensor belongs to the equipment inherently having on dc bus, therefore, use voltage integrating meter to enter
Row calculates and need not introduce extra equipment, and relative to the scheme of current integration, cost is lower.
Above-described embodiment, in Fig. 1, DC terminal is the outfan of photovoltaic apparatus, therefore puts into the charging of subtest loop
During with electric discharge, need to disconnect photovoltaic apparatus and the connection of DC terminal in Fig. 1, it is to avoid photovoltaic apparatus participates in filling bus capacitor
Electricity and the electric discharge to subtest resistance.
It is presented above the detailed description of the invention that the present invention relates to, but the present invention is not limited to described embodiment.
Under the thinking that the present invention provides, use the mode being readily apparent that to those skilled in the art to the skill in above-described embodiment
Art means carry out converting, replace, revise, and the effect played is essentially identical with the relevant art means in the present invention, realize
Goal of the invention the most essentially identical, so formed technical scheme above-described embodiment is finely adjusted formation, this technology
Scheme still falls within protection scope of the present invention.
Claims (4)
1. photovoltaic combining inverter bus capacitor capacitance automatic checkout system, including the DC terminal for connecting photovoltaic apparatus,
DC terminal connects dc bus, and dc bus connects ac terminal by current transformer, soft starting circuit, and ac terminal is for even
Connect AC network;Connect on dc bus and have bus capacitor and voltage sensor;It is characterized in that, described dc bus connects
Subtest loop, subtest loop is had to include the subtest resistance of series connection and control switch.
2. the detection method of detecting system as claimed in claim 1, it is characterised in that step is as follows:
When the evening draws on, DC bus-bar voltage is less than setting value in detection, disconnect the connection of photovoltaic apparatus and dc bus, connect
AC network, charges to bus capacitor;
After charging, disconnecting AC network, put into subtest loop, is discharged in subtest loop by bus capacitor;
At least start-stop voltage in detection discharge process and discharge time, according to the pass that the difference of electricity is equal with electric parameters integration
System, calculates bus capacitor capacitance.
Detection method the most according to claim 2, it is characterised in that the relation that the difference of electricity is equal with electric parameters integration isThe computing formula of bus capacitor capacitance:
Wherein, Uc(t1)、Uc(t2) being respectively start-stop voltage, t1, t2 are start/stop time, R41For
Subtest resistance, C is bus capacitor.
Detection method the most according to claim 2, it is characterised in that as the mother of the bus capacitor capacitance calculated Yu setting
Line capacitance capacitance is compared, and gap then alerts when exceeding limit value, and bus capacitor is changed in prompting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610528533.6A CN106058930A (en) | 2016-07-06 | 2016-07-06 | Automatic detecting system and automatic detecting method for capacitance of photovoltaic grid-connected inverter bus capacitor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610528533.6A CN106058930A (en) | 2016-07-06 | 2016-07-06 | Automatic detecting system and automatic detecting method for capacitance of photovoltaic grid-connected inverter bus capacitor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106058930A true CN106058930A (en) | 2016-10-26 |
Family
ID=57202170
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610528533.6A Pending CN106058930A (en) | 2016-07-06 | 2016-07-06 | Automatic detecting system and automatic detecting method for capacitance of photovoltaic grid-connected inverter bus capacitor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106058930A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106526334A (en) * | 2016-11-25 | 2017-03-22 | 北京科诺伟业光电科技有限公司 | Capacity detection circuit for DC bus capacitor of photovoltaic inverter |
CN108469218A (en) * | 2018-05-09 | 2018-08-31 | 广东工业大学 | A kind of capacity based distance measuring method, system, device and readable storage medium storing program for executing |
CN109004853A (en) * | 2018-07-27 | 2018-12-14 | 国网江苏省电力有限公司苏州供电分公司 | The submodule state monitoring method and device of modularization multi-level converter |
CN109596923A (en) * | 2018-12-24 | 2019-04-09 | 日立电梯(中国)有限公司 | Frequency converter bus capacitor on-line measuring device, method and frequency converter |
CN109633283A (en) * | 2019-01-31 | 2019-04-16 | 厦门科华恒盛股份有限公司 | Bus capacitor capacitance monitoring method, device and terminal device |
CN110471004A (en) * | 2019-08-05 | 2019-11-19 | 深圳市禾望电气股份有限公司 | Current transformer and its operation and monitoring method |
CN112710901A (en) * | 2020-12-25 | 2021-04-27 | 深圳市禾望科技有限公司 | Direct current bus capacitance detection circuit and method |
CN112737014A (en) * | 2020-12-20 | 2021-04-30 | 郑州精铖能源技术有限公司 | Micro energy storage mobile power supply with super-strong load function |
CN112798869A (en) * | 2019-11-13 | 2021-05-14 | 南京国电南自新能源科技有限公司 | Capacitance detection method and system for unit series type converter |
CN117452078A (en) * | 2023-12-26 | 2024-01-26 | 锦浪科技股份有限公司 | Capacitance attenuation prediction method of busbar electrolytic capacitor and photovoltaic system |
CN117811092A (en) * | 2024-02-29 | 2024-04-02 | 锦浪科技股份有限公司 | Starting method of photovoltaic optimizer system based on wireless communication |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202886481U (en) * | 2012-10-12 | 2013-04-17 | 无锡上能新能源有限公司 | Capacitor capacity detection circuit of solar energy inverter |
CN104345217A (en) * | 2013-08-02 | 2015-02-11 | 艾默生网络能源有限公司 | Detection method and device for capacitance value |
CN105044470A (en) * | 2015-06-30 | 2015-11-11 | 同济大学 | Method for detecting DC capacity of current transformer based on resonance principles |
CN105699786A (en) * | 2016-01-28 | 2016-06-22 | 重庆大学 | A direct current bus capacitor monitoring method and system based on a variable discharge network |
-
2016
- 2016-07-06 CN CN201610528533.6A patent/CN106058930A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202886481U (en) * | 2012-10-12 | 2013-04-17 | 无锡上能新能源有限公司 | Capacitor capacity detection circuit of solar energy inverter |
CN104345217A (en) * | 2013-08-02 | 2015-02-11 | 艾默生网络能源有限公司 | Detection method and device for capacitance value |
CN105044470A (en) * | 2015-06-30 | 2015-11-11 | 同济大学 | Method for detecting DC capacity of current transformer based on resonance principles |
CN105699786A (en) * | 2016-01-28 | 2016-06-22 | 重庆大学 | A direct current bus capacitor monitoring method and system based on a variable discharge network |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106526334A (en) * | 2016-11-25 | 2017-03-22 | 北京科诺伟业光电科技有限公司 | Capacity detection circuit for DC bus capacitor of photovoltaic inverter |
CN108469218A (en) * | 2018-05-09 | 2018-08-31 | 广东工业大学 | A kind of capacity based distance measuring method, system, device and readable storage medium storing program for executing |
CN109004853A (en) * | 2018-07-27 | 2018-12-14 | 国网江苏省电力有限公司苏州供电分公司 | The submodule state monitoring method and device of modularization multi-level converter |
CN109596923B (en) * | 2018-12-24 | 2021-07-16 | 日立电梯(中国)有限公司 | Online detection device and method for bus capacitor of frequency converter and frequency converter |
CN109596923A (en) * | 2018-12-24 | 2019-04-09 | 日立电梯(中国)有限公司 | Frequency converter bus capacitor on-line measuring device, method and frequency converter |
CN109633283A (en) * | 2019-01-31 | 2019-04-16 | 厦门科华恒盛股份有限公司 | Bus capacitor capacitance monitoring method, device and terminal device |
CN110471004A (en) * | 2019-08-05 | 2019-11-19 | 深圳市禾望电气股份有限公司 | Current transformer and its operation and monitoring method |
CN112798869A (en) * | 2019-11-13 | 2021-05-14 | 南京国电南自新能源科技有限公司 | Capacitance detection method and system for unit series type converter |
CN112737014A (en) * | 2020-12-20 | 2021-04-30 | 郑州精铖能源技术有限公司 | Micro energy storage mobile power supply with super-strong load function |
CN112710901A (en) * | 2020-12-25 | 2021-04-27 | 深圳市禾望科技有限公司 | Direct current bus capacitance detection circuit and method |
CN117452078A (en) * | 2023-12-26 | 2024-01-26 | 锦浪科技股份有限公司 | Capacitance attenuation prediction method of busbar electrolytic capacitor and photovoltaic system |
CN117452078B (en) * | 2023-12-26 | 2024-04-05 | 锦浪科技股份有限公司 | Capacitance attenuation prediction method of busbar electrolytic capacitor and photovoltaic system |
CN117811092A (en) * | 2024-02-29 | 2024-04-02 | 锦浪科技股份有限公司 | Starting method of photovoltaic optimizer system based on wireless communication |
CN117811092B (en) * | 2024-02-29 | 2024-05-14 | 锦浪科技股份有限公司 | Starting method of photovoltaic optimizer system based on wireless communication |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106058930A (en) | Automatic detecting system and automatic detecting method for capacitance of photovoltaic grid-connected inverter bus capacitor | |
CN104065157B (en) | Uninterruptible power supply with improved power supply reliability | |
EP2887080B1 (en) | Power supply apparatus | |
EP3633841B1 (en) | Power conversion device | |
CN101931238A (en) | Master-slave strategy-based microgrid system coordination control method | |
KR20150071681A (en) | Method and apparatus for ground fault detection | |
US20220326294A1 (en) | Photovoltaic energy system and method for detecting ground insulation impedance | |
JP2017099252A (en) | Cascade multilevel converter self test system and self test method therefor | |
CN103412207A (en) | Photovoltaic grid connected inverter island detection method based on negative sequence current injection | |
CN102721915B (en) | Method for UPS power circuit fault detection | |
CN103887834A (en) | Storage battery set flexible equalization charging and discharging management rectification module, device and system | |
CN105164545A (en) | Electricity storage device abnormality detection circuit, and electricity storage device provided with same | |
CN115276549B (en) | PID effect suppression system | |
CN104569716A (en) | Method for diagnosing open-circuit fault of bridge arm IGBT of energy storage converter from outside | |
WO2022166931A1 (en) | Power optimizer having short circuit protection, and photovoltaic power generation system | |
CN104333107B (en) | Direct-current screen power source device utilizing hybrid power sources | |
CN202886481U (en) | Capacitor capacity detection circuit of solar energy inverter | |
CN103560541A (en) | Fault ride-through control device and method for alternating/direct current mixed microgrid | |
CN115085367A (en) | Island detection method and device | |
CN116577590B (en) | Inverter self-checking method | |
CN113489046A (en) | Photovoltaic system, direct current combiner box and wiring error detection method | |
CN104037778B (en) | A kind of chain type SVG device with fault autoboot function | |
CN102998529A (en) | Insulation resistance testing method | |
CN110138196A (en) | A kind of multiple branch circuit energy accumulation current converter direct current soft start control method and system | |
CN103683188A (en) | Safety detection apparatus of solar energy inverter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161026 |